[Nut-upsdev] [HCL] CyberPower OR700 supported by usbhid-ups

McCann, Brian bmccann at andmore.com
Mon Mar 5 16:03:12 UTC 2012


Sorry about the delay.

upsrw:

[battery.charge.low]
Remaining battery level when UPS switches to LB (percent)
Type: STRING
Value: 10

[battery.runtime.low]
Remaining battery runtime when UPS switches to LB (seconds)
Type: STRING
Value: 300

[input.transfer.high]
High voltage transfer point (V)
Type: STRING
Value: 140

[input.transfer.low]
Low voltage transfer point (V)
Type: STRING
Value: 90

[ups.delay.shutdown]
Interval to wait after shutdown with delay command (seconds)
Type: STRING
Value: 20

[ups.delay.start]
Interval to wait before (re)starting the load (seconds)
Type: STRING
Value: 30

---------------

upscmd:
Instant commands supported on UPS [ssups]:

beeper.disable - Disable the UPS beeper
beeper.enable - Enable the UPS beeper
beeper.mute - Temporarily mute the UPS beeper
beeper.off - Obsolete (use beeper.disable or beeper.mute)
beeper.on - Obsolete (use beeper.enable)
load.off - Turn off the load immediately
load.off.delay - Turn off the load with a delay (seconds)
load.on - Turn on the load immediately
load.on.delay - Turn on the load with a delay (seconds)
shutdown.return - Turn off the load and return when power is back
shutdown.stayoff - Turn off the load and remain off
shutdown.stop - Stop a shutdown in progress
test.battery.start.deep - Start a deep battery test
test.battery.start.quick - Start a quick battery test
test.battery.stop - Stop the battery test

--Brian

> -----Original Message-----
> From: Arnaud Quette [mailto:aquette.dev at gmail.com]
> Sent: Monday, February 27, 2012 6:48 AM
> To: McCann, Brian
> Cc: nut-upsdev at lists.alioth.debian.org
> Subject: Re: [Nut-upsdev] [HCL] CyberPower OR700 supported by usbhid-ups
> 
> Hi Brian,
> 
> 2012/2/22 McCann, Brian <bmccann at andmore.com>:
> > CyberPower OR700LCDRM1U
> (http://www.cyberpowersystems.com/products/ups-systems/smart-app-
> ups/rackmount-lcd/OR700LCDRM1U.html)
> > upsc output:
> >
> > battery.charge: 100
> > battery.charge.low: 10
> > battery.charge.warning: 20
> > battery.mfr.date: CPS
> > battery.runtime: 6000
> > battery.runtime.low: 300
> > battery.type: PbAcid
> > battery.voltage: 14.5
> > battery.voltage.nominal: 12
> > device.mfr: CPS
> > device.model: UPS OR700
> > device.type: ups
> > driver.name: usbhid-ups
> > driver.parameter.pollfreq: 30
> > driver.parameter.pollinterval: 2
> > driver.parameter.port: auto
> > driver.version: 2.6.1
> > driver.version.data: CyberPower HID 0.3
> > driver.version.internal: 0.35
> > input.transfer.high: 140
> > input.transfer.low: 90
> > input.voltage: 119.0
> > input.voltage.nominal: 120
> > output.voltage: 119.0
> > ups.beeper.status: enabled
> > ups.delay.shutdown: 20
> > ups.delay.start: 30
> > ups.load: 0
> > ups.mfr: CPS
> > ups.model: UPS OR700
> > ups.productid: 0601
> > ups.realpower.nominal: 400
> > ups.status: OL
> > ups.test.result: Done and passed
> > ups.timer.shutdown: -60
> > ups.timer.start: -60
> > ups.vendorid: 0764
> >
> > System shutdown cleanly.  Was tested on FreeBSD 8.1
> 
> thanks for your report.
> I've just committed (r3468) an entry in the HCL.
> 
> for the sake of completion, could you also send us upsrw and upscmd
> outputs?
> 
> cheers,
> Arnaud
> --
> Linux / Unix Expert R&D - Eaton - http://powerquality.eaton.com
> Network UPS Tools (NUT) Project Leader - http://www.networkupstools.org/
> Debian Developer - http://www.debian.org
> Free Software Developer - http://arnaud.quette.free.fr/


More information about the Nut-upsdev mailing list