[Nut-upsuser] Cyber Power System CP1500 AVR UPS: changing battery.charge.low value [ups.delay.start sidebar]
chribonn at duck.com
chribonn at duck.com
Sun Mar 10 07:05:19 GMT 2024
Very good point. I hope to write a beginners guide -- more like adopting
my notes --on NUT.
I could summarise your point that technically one should only override
settings that NUT can act upon (like those settings that control Low
Battery or, as stated in the documentation if the reported value is known
to be incorrect. Overriding a variable that is out of scope for NUT (as
with upd.delay.start) only leads to false depictions of facts; the reading
would not match what will actually happen.
On Sun, 10 Mar 2024 at 00:21, Charles Lepple <
clepple_at_gmail.com_chribonn at duck.com> wrote:
> On Mar 9, 2024, at 6:14 PM, Charles Lepple <clepple at gmail.com> wrote:
> >
> > On Mar 9, 2024, at 5:16 PM, chribonn at duck.com wrote:
> >> I used the override.ups.delay.start = -1 in nut.conf and this is now
> being reported.
>
> The ups.conf man page describes the direction that the data flows with
> override.*:
>
> > Use with caution! This will only change the appearance of the variable
> to the outside world [read: clients connected to upsd], internally in the
> UPS the original value is used.
>
> https://networkupstools.org/docs/man/ups.conf.html#_ups_fields
>
> --
> Charles Lepple
> clepple at gmail
>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://alioth-lists.debian.net/pipermail/nut-upsuser/attachments/20240310/307eeaf7/attachment.htm>
More information about the Nut-upsuser
mailing list