[Piuparts-devel] rescheduling broken (Re: [Piuparts-reports] Cron <piupartsm at piatti> /org/piuparts.debian.org/share/piuparts/master/reschedule_oldest_logs

Holger Levsen holger at layer-acht.org
Tue Mar 26 07:56:39 UTC 2013


Hi,

rescheduling doesnt work as it should, or maybe, it doesnt work as I want it:

On Montag, 25. März 2013, Cron Daemon wrote:
> sid: 119/31/0

what does that mean exactly? 113 passed rescheduled and 31 failed? 

I can only see passed logs being rescheduled (and those shouldnt be 
rescheduled atm. piatti.d.o needs to catch up on squeeze and lenny2squeeze 
tests and rescheduling sid logs doesnt help at all.

For example, libghc-maths-dev and x86info were both rescheduled, despite no 
newer version exists.

> sid2experimental: 0/2/0
> -rw-r--r-- 3 piupartsm piuparts 115106 Mar  9 13:16
> fail/libc-dev-bin_2.17-0experimental2.log -rw-r--r-- 3 piupartsm piuparts
> 116085 Mar  9 13:16 fail/locales_2.17-0experimental2.log removed
> `fail/libc-dev-bin_2.17-0experimental2.log'
> removed `fail/locales_2.17-0experimental2.log'

same here, why were those two rescheduled? IMO rescheduling should not happen 
at all, if there are packages still to be tested.

> Rescheduled 336 logs.
> Deleted 167 expired logs.
> Cancelled 47 outdated rescheduling requests.

I hope this is a configuration problem and not one of the code.


cheers,
	Holger



More information about the Piuparts-devel mailing list