[Pkg-kde-extras] Bug#661368: k3b: fatal IO error when 99% of data written onto BD-R
sergey
sergey.ifeo at gmail.com
Sun Feb 26 14:06:21 UTC 2012
Package: k3b
Version: 2.0.1-2
Severity: normal
(Excuse me for my poor English please)
First, I tried to write my files onto blank BD-RE. Process froze at preparing
stage. It is just note and not subject of bug report.
Then I tried to format other BD-RE and to write data on it. k3b done this fine.
Then I tried to write my data onto BD-R. Process did not halt on preparing stage
and I was happy. But k3b gave me an error when 99% of data was written.
This is the subject of this bug report.
After this error, the disk was not bad. All files was written.
I checked md5sums, all sums are OK.
Then I tried to write other BD-R. The result was same:
k3b gave error message after 99%. Resulting disk is not bad:
all files are in place and all control sums is OK.
* Burning device is Optiarc BD-5300S.
* BD-R is Philips BR2I4B25F/97 (labeled also "White Inkjet printable BD-R recordable",
"Blu-ray disk version 1.2", "25 GB", "1-4x speed")
* Kernel is 2.6.38-bpo.2-686-bigmem.
I will attach the screenshot with k3b's log, debugging output and
terminal output.
Regards, Sergey.
-- Package-specific info:
Device was not specified. Trying to find an appropriate drive...
Detected CD-R drive: /dev/cdrw
Using /dev/cdrom of unknown capabilities
Device type : Removable CD-ROM
Version : 5
Response Format: 2
Capabilities :
Vendor_info : 'Optiarc '
Identification : 'BD RW BD-5300S '
Revision : '2.00'
Device seems to be: Generic mmc2 DVD-R/DVD-RW.
Using generic SCSI-3/mmc CD-R/CD-RW driver (mmc_cdr).
Driver flags : MMC-3 SWABAUDIO BURNFREE FORCESPEED
Supported modes: TAO PACKET SAO SAO/R96P SAO/R96R RAW/R16 RAW/R96P RAW/R96R
-- System Information:
Debian Release: 6.0.4
APT prefers stable-updates
APT policy: (500, 'stable-updates'), (500, 'stable')
Architecture: i386 (i686)
Kernel: Linux 2.6.38-bpo.2-686-bigmem (SMP w/4 CPU cores)
Locale: LANG=ru_RU.UTF-8, LC_CTYPE=ru_RU.UTF-8 (charmap=UTF-8)
Shell: /bin/sh linked to /bin/dash
Versions of packages k3b depends on:
ii cdparanoia 3.10.2+debian-9 audio extraction tool for sampling
ii cdrdao 1:1.2.3-0.1 records CDs in Disk-At-Once (DAO)
ii genisoimage 9:1.1.11-1 Creates ISO-9660 CD-ROM filesystem
ii hal 0.5.14-3 Hardware Abstraction Layer
ii k3b-data 2.0.1-2 A sophisticated CD/DVD burning app
ii kdebase-runtime 4:4.4.5-1 runtime components from the offici
ii libc6 2.11.3-3 Embedded GNU C Library: Shared lib
ii libgcc1 1:4.4.5-8 GCC support library
ii libk3b6 2.0.1-2 The KDE CD/DVD burning application
ii libkcddb4 4:4.4.5-1 CDDB library for KDE Platform (run
ii libkde3support4 4:4.4.5-2+squeeze3 the KDE 3 Support Library for the
ii libkdecore5 4:4.4.5-2+squeeze3 the KDE Platform Core Library
ii libkdeui5 4:4.4.5-2+squeeze3 the KDE Platform User Interface Li
ii libkfile4 4:4.4.5-2+squeeze3 the File Selection Dialog Library
ii libkio5 4:4.4.5-2+squeeze3 the Network-enabled File Managemen
ii libknotifyconfig4 4:4.4.5-2+squeeze3 library for configuring KDE Notifi
ii libkparts4 4:4.4.5-2+squeeze3 the Framework for the KDE Platform
ii libkutils4 4:4.4.5-2+squeeze3 various utility classes for the KD
ii libmusicbrainz4c2a 2.1.5-4 Second generation incarnation of t
ii libqt4-dbus 4:4.6.3-4+squeeze1 Qt 4 D-Bus module
ii libqt4-network 4:4.6.3-4+squeeze1 Qt 4 network module
ii libqt4-qt3support 4:4.6.3-4+squeeze1 Qt 3 compatibility library for Qt
ii libqt4-svg 4:4.6.3-4+squeeze1 Qt 4 SVG module
ii libqt4-webkit 4:4.6.3-4+squeeze1 Qt 4 WebKit module
ii libqt4-xml 4:4.6.3-4+squeeze1 Qt 4 XML module
ii libqtcore4 4:4.6.3-4+squeeze1 Qt 4 core module
ii libqtgui4 4:4.6.3-4+squeeze1 Qt 4 GUI module
ii libsolid4 4:4.4.5-2+squeeze3 Solid Library for KDE Platform
ii libstdc++6 4.4.5-8 The GNU Standard C++ Library v3
ii wodim 9:1.1.11-1 command line CD/DVD writing tool
Versions of packages k3b recommends:
ii dvd+rw-tools 7.1-6 DVD+-RW/R tools
ii libk3b6-extracodecs 2.0.1-2 The KDE CD/DVD burning application
ii vcdimager 0.7.23-4+b2 A VideoCD (VCD) image mastering an
Versions of packages k3b suggests:
pn k3b-extrathemes <none> (no description available)
pn k3b-i18n <none> (no description available)
pn movixmaker-2 <none> (no description available)
pn normalize-audio <none> (no description available)
ii sox 14.3.1-1 Swiss army knife of sound processi
-- no debconf information
-------------- next part --------------
A non-text attachment was scrubbed...
Name: bug.png
Type: image/png
Size: 264486 bytes
Desc: not available
URL: <http://lists.alioth.debian.org/pipermail/pkg-kde-extras/attachments/20120226/a4a4c736/attachment-0001.png>
-------------- next part --------------
Burned media
-----------------------
BD-R Sequential (SRM)
Devices
-----------------------
Optiarc BD RW BD-5300S 2.00 (/dev/sr0, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, BD-ROM, BD-R, BD-RE, DVD+R, DVD+RW, DVD+R DL) [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW, BD-ROM, BD-R Sequential (SRM), BD-R Random (RRM), BD-RE] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Restricted Overwrite, Layer Jump, Random Recording, Sequential Recording, Sequential Recording + POW] [%7]
K3b::IsoImager
-----------------------
mkisofs print size result: 10618620 (21746933760 bytes)
System
-----------------------
K3b Version: 2.0.1
KDE Version: 4.4.5 (KDE 4.4.5)
QT Version: 4.6.3
Kernel: 2.6.38-bpo.2-686-bigmem
Used versions
-----------------------
mkisofs: 1.1.11
growisofs: 7.1
growisofs
-----------------------
Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=0'
/dev/sr0: pre-formatting blank BD-R for 24.8GB...
/dev/sr0: "Current Write Speed" is 4.1x4390KBps.
42205184/21746933760 ( 0.2%) @2.0x, remaining 42:51 RBU 100.0% UBU 5.9%
71761920/21746933760 ( 0.3%) @2.0x, remaining 45:18 RBU 100.0% UBU 40.3%
96468992/21746933760 ( 0.4%) @1.6x, remaining 44:53 RBU 100.0% UBU 48.9%
126615552/21746933760 ( 0.6%) @2.0x, remaining 42:41 RBU 100.0% UBU 41.4%
156368896/21746933760 ( 0.7%) @2.0x, remaining 43:43 RBU 100.0% UBU 51.1%
181993472/21746933760 ( 0.8%) @1.7x, remaining 43:26 RBU 100.0% UBU 39.2%
211025920/21746933760 ( 1.0%) @1.9x, remaining 42:31 RBU 100.0% UBU 43.5%
241172480/21746933760 ( 1.1%) @2.0x, remaining 43:05 RBU 100.0% UBU 55.4%
266108928/21746933760 ( 1.2%) @1.7x, remaining 43:03 RBU 100.0% UBU 40.3%
295436288/21746933760 ( 1.4%) @2.0x, remaining 42:21 RBU 100.0% UBU 40.3%
325582848/21746933760 ( 1.5%) @2.0x, remaining 42:45 RBU 100.0% UBU 41.4%
351240192/21746933760 ( 1.6%) @1.7x, remaining 42:38 RBU 97.7% UBU 41.4%
380370944/21746933760 ( 1.7%) @1.9x, remaining 42:07 RBU 100.0% UBU 43.5%
409993216/21746933760 ( 1.9%) @2.0x, remaining 42:30 RBU 100.0% UBU 41.4%
436731904/21746933760 ( 2.0%) @1.8x, remaining 42:17 RBU 100.0% UBU 42.5%
465240064/21746933760 ( 2.1%) @1.9x, remaining 41:55 RBU 100.0% UBU 42.5%
494403584/21746933760 ( 2.3%) @1.9x, remaining 42:16 RBU 100.0% UBU 41.4%
524550144/21746933760 ( 2.4%) @2.0x, remaining 41:48 RBU 100.0% UBU 44.6%
548667392/21746933760 ( 2.5%) @1.6x, remaining 41:51 RBU 100.0% UBU 40.3%
578813952/21746933760 ( 2.7%) @2.0x, remaining 42:03 RBU 100.0% UBU 46.8%
608960512/21746933760 ( 2.8%) @2.0x, remaining 41:39 RBU 100.0% UBU 40.3%
634486784/21746933760 ( 2.9%) @1.7x, remaining 41:35 RBU 99.6% UBU 40.3%
663224320/21746933760 ( 3.0%) @1.9x, remaining 41:51 RBU 100.0% UBU 43.5%
693370880/21746933760 ( 3.2%) @2.0x, remaining 41:29 RBU 100.0% UBU 39.2%
719880192/21746933760 ( 3.3%) @1.8x, remaining 41:22 RBU 100.0% UBU 41.4%
747634688/21746933760 ( 3.4%) @1.9x, remaining 41:39 RBU 100.0% UBU 40.3%
777781248/21746933760 ( 3.6%) @2.0x, remaining 41:20 RBU 100.0% UBU 53.2%
807927808/21746933760 ( 3.7%) @2.0x, remaining 41:02 RBU 100.0% UBU 43.5%
833290240/21746933760 ( 3.8%) @1.7x, remaining 41:24 RBU 100.0% UBU 42.5%
862191616/21746933760 ( 4.0%) @1.9x, remaining 41:10 RBU 100.0% UBU 39.2%
892338176/21746933760 ( 4.1%) @2.0x, remaining 40:53 RBU 100.0% UBU 41.4%
916619264/21746933760 ( 4.2%) @1.6x, remaining 41:17 RBU 100.0% UBU 50.0%
946601984/21746933760 ( 4.4%) @2.0x, remaining 41:01 RBU 100.0% UBU 41.4%
976748544/21746933760 ( 4.5%) @2.0x, remaining 40:45 RBU 100.0% UBU 39.2%
1003749376/21746933760 ( 4.6%) @1.8x, remaining 40:59 RBU 100.0% UBU 44.6%
1031602176/21746933760 ( 4.7%) @1.9x, remaining 40:49 RBU 100.0% UBU 39.2%
1061158912/21746933760 ( 4.9%) @2.0x, remaining 40:36 RBU 100.0% UBU 40.3%
1090158592/21746933760 ( 5.0%) @1.9x, remaining 40:44 RBU 100.0% UBU 40.3%
1117061120/21746933760 ( 5.1%) @1.8x, remaining 40:37 RBU 100.0% UBU 43.5%
1145569280/21746933760 ( 5.3%) @1.9x, remaining 40:27 RBU 100.0% UBU 45.7%
1175715840/21746933760 ( 5.4%) @2.0x, remaining 40:32 RBU 100.0% UBU 39.2%
1200095232/21746933760 ( 5.5%) @1.6x, remaining 40:31 RBU 100.0% UBU 45.7%
1229979648/21746933760 ( 5.7%) @2.0x, remaining 40:18 RBU 100.0% UBU 43.5%
1260126208/21746933760 ( 5.8%) @2.0x, remaining 40:22 RBU 100.0% UBU 39.2%
1287618560/21746933760 ( 5.9%) @1.8x, remaining 40:15 RBU 100.0% UBU 47.8%
1314717696/21746933760 ( 6.0%) @1.8x, remaining 40:08 RBU 100.0% UBU 43.5%
1344536576/21746933760 ( 6.2%) @2.0x, remaining 40:12 RBU 100.0% UBU 56.5%
1374683136/21746933760 ( 6.3%) @2.0x, remaining 40:00 RBU 100.0% UBU 40.3%
1398800384/21746933760 ( 6.4%) @1.6x, remaining 40:00 RBU 100.0% UBU 48.9%
1428946944/21746933760 ( 6.6%) @2.0x, remaining 40:02 RBU 100.0% UBU 39.2%
1459093504/21746933760 ( 6.7%) @2.0x, remaining 39:51 RBU 100.0% UBU 42.5%
1483735040/21746933760 ( 6.8%) @1.6x, remaining 39:49 RBU 100.0% UBU 44.6%
1513357312/21746933760 ( 7.0%) @2.0x, remaining 39:53 RBU 100.0% UBU 39.2%
1543503872/21746933760 ( 7.1%) @2.0x, remaining 39:42 RBU 100.0% UBU 46.8%
1569161216/21746933760 ( 7.2%) @1.7x, remaining 39:38 RBU 99.6% UBU 39.2%
1598423040/21746933760 ( 7.4%) @2.0x, remaining 39:42 RBU 100.0% UBU 50.0%
1627914240/21746933760 ( 7.5%) @2.0x, remaining 39:32 RBU 100.0% UBU 43.5%
1656422400/21746933760 ( 7.6%) @1.9x, remaining 39:25 RBU 100.0% UBU 46.8%
1682178048/21746933760 ( 7.7%) @1.7x, remaining 39:33 RBU 100.0% UBU 48.9%
1712324608/21746933760 ( 7.9%) @2.0x, remaining 39:23 RBU 100.0% UBU 39.2%
1742471168/21746933760 ( 8.0%) @2.0x, remaining 39:13 RBU 100.0% UBU 40.3%
1767374848/21746933760 ( 8.1%) @1.7x, remaining 39:22 RBU 100.0% UBU 41.4%
1796734976/21746933760 ( 8.3%) @2.0x, remaining 39:13 RBU 100.0% UBU 39.2%
1826881536/21746933760 ( 8.4%) @2.0x, remaining 39:04 RBU 100.0% UBU 44.6%
1852997632/21746933760 ( 8.5%) @1.7x, remaining 39:11 RBU 97.9% UBU 39.2%
1881145344/21746933760 ( 8.7%) @1.9x, remaining 39:04 RBU 100.0% UBU 47.8%
1911291904/21746933760 ( 8.8%) @2.0x, remaining 38:55 RBU 100.0% UBU 40.3%
1938784256/21746933760 ( 8.9%) @1.8x, remaining 38:59 RBU 100.0% UBU 42.5%
1966342144/21746933760 ( 9.0%) @1.8x, remaining 38:53 RBU 100.0% UBU 41.4%
1995702272/21746933760 ( 9.2%) @2.0x, remaining 38:45 RBU 100.0% UBU 43.5%
2025848832/21746933760 ( 9.3%) @2.0x, remaining 38:46 RBU 100.0% UBU 47.8%
2053111808/21746933760 ( 9.4%) @1.8x, remaining 38:41 RBU 100.0% UBU 48.9%
2080112640/21746933760 ( 9.6%) @1.8x, remaining 38:36 RBU 100.0% UBU 41.4%
2110259200/21746933760 ( 9.7%) @2.0x, remaining 38:37 RBU 100.0% UBU 41.4%
2137030656/21746933760 ( 9.8%) @1.8x, remaining 38:32 RBU 100.0% UBU 40.3%
2164523008/21746933760 (10.0%) @1.8x, remaining 38:26 RBU 100.0% UBU 45.7%
2194669568/21746933760 (10.1%) @2.0x, remaining 38:27 RBU 100.0% UBU 39.2%
2222456832/21746933760 (10.2%) @1.9x, remaining 38:21 RBU 100.0% UBU 39.2%
2249195520/21746933760 (10.3%) @1.8x, remaining 38:17 RBU 100.0% UBU 41.4%
2279079936/21746933760 (10.5%) @2.0x, remaining 38:17 RBU 100.0% UBU 40.3%
2307260416/21746933760 (10.6%) @1.9x, remaining 38:11 RBU 100.0% UBU 44.6%
2333736960/21746933760 (10.7%) @1.8x, remaining 38:07 RBU 100.0% UBU 39.2%
2363490304/21746933760 (10.9%) @2.0x, remaining 38:08 RBU 100.0% UBU 40.3%
2393636864/21746933760 (11.0%) @2.0x, remaining 38:00 RBU 100.0% UBU 43.5%
2419195904/21746933760 (11.1%) @1.7x, remaining 37:56 RBU 100.0% UBU 47.8%
2447900672/21746933760 (11.3%) @1.9x, remaining 37:58 RBU 100.0% UBU 46.8%
2478047232/21746933760 (11.4%) @2.0x, remaining 37:50 RBU 100.0% UBU 40.3%
2506817536/21746933760 (11.5%) @1.9x, remaining 37:44 RBU 100.0% UBU 46.8%
2532311040/21746933760 (11.6%) @1.7x, remaining 37:48 RBU 100.0% UBU 39.2%
2562457600/21746933760 (11.8%) @2.0x, remaining 37:40 RBU 100.0% UBU 39.2%
2592407552/21746933760 (11.9%) @2.0x, remaining 37:33 RBU 100.0% UBU 42.5%
2616721408/21746933760 (12.0%) @1.6x, remaining 37:39 RBU 100.0% UBU 39.2%
2646867968/21746933760 (12.2%) @2.0x, remaining 37:31 RBU 100.0% UBU 43.5%
2677014528/21746933760 (12.3%) @2.0x, remaining 37:23 RBU 100.0% UBU 40.3%
2701131776/21746933760 (12.4%) @1.6x, remaining 37:29 RBU 100.0% UBU 48.9%
2731278336/21746933760 (12.6%) @2.0x, remaining 37:21 RBU 100.0% UBU 39.2%
2761424896/21746933760 (12.7%) @2.0x, remaining 37:14 RBU 100.0% UBU 46.8%
2788818944/21746933760 (12.8%) @1.8x, remaining 37:16 RBU 100.0% UBU 48.9%
2815688704/21746933760 (12.9%) @1.8x, remaining 37:12 RBU 100.0% UBU 55.4%
2845835264/21746933760 (13.1%) @2.0x, remaining 37:04 RBU 100.0% UBU 44.6%
2874474496/21746933760 (13.2%) @1.9x, remaining 37:05 RBU 100.0% UBU 48.9%
2900230144/21746933760 (13.3%) @1.7x, remaining 37:02 RBU 100.0% UBU 39.2%
2930245632/21746933760 (13.5%) @2.0x, remaining 36:55 RBU 100.0% UBU 40.3%
2959376384/21746933760 (13.6%) @1.9x, remaining 36:55 RBU 100.0% UBU 50.0%
2984837120/21746933760 (13.7%) @1.7x, remaining 36:52 RBU 100.0% UBU 51.1%
3014656000/21746933760 (13.9%) @2.0x, remaining 36:45 RBU 100.0% UBU 40.3%
3044802560/21746933760 (14.0%) @2.0x, remaining 36:45 RBU 100.0% UBU 39.2%
3069706240/21746933760 (14.1%) @1.7x, remaining 36:42 RBU 100.0% UBU 41.4%
3099066368/21746933760 (14.3%) @2.0x, remaining 36:36 RBU 100.0% UBU 39.2%
3129212928/21746933760 (14.4%) @2.0x, remaining 36:35 RBU 100.0% UBU 43.5%
3154051072/21746933760 (14.5%) @1.7x, remaining 36:32 RBU 100.0% UBU 39.2%
3183476736/21746933760 (14.6%) @2.0x, remaining 36:26 RBU 100.0% UBU 40.3%
3213623296/21746933760 (14.8%) @2.0x, remaining 36:25 RBU 100.0% UBU 42.5%
3241672704/21746933760 (14.9%) @1.9x, remaining 36:20 RBU 100.0% UBU 66.1%
3267887104/21746933760 (15.0%) @1.7x, remaining 36:17 RBU 100.0% UBU 58.6%
3298033664/21746933760 (15.2%) @2.0x, remaining 36:16 RBU 100.0% UBU 42.5%
3326640128/21746933760 (15.3%) @1.9x, remaining 36:10 RBU 100.0% UBU 45.7%
3353870336/21746933760 (15.4%) @1.8x, remaining 36:06 RBU 100.0% UBU 53.2%
3382444032/21746933760 (15.6%) @1.9x, remaining 36:06 RBU 100.0% UBU 39.2%
3412590592/21746933760 (15.7%) @2.0x, remaining 35:59 RBU 100.0% UBU 41.4%
3438116864/21746933760 (15.8%) @1.7x, remaining 36:02 RBU 100.0% UBU 39.2%
3466854400/21746933760 (15.9%) @1.9x, remaining 35:56 RBU 100.0% UBU 45.7%
3497000960/21746933760 (16.1%) @2.0x, remaining 35:50 RBU 100.0% UBU 40.3%
3523215360/21746933760 (16.2%) @1.7x, remaining 35:51 RBU 98.7% UBU 39.2%
3551264768/21746933760 (16.3%) @1.9x, remaining 35:46 RBU 100.0% UBU 41.4%
3581411328/21746933760 (16.5%) @2.0x, remaining 35:40 RBU 100.0% UBU 40.3%
3606872064/21746933760 (16.6%) @1.7x, remaining 35:42 RBU 99.8% UBU 43.5%
3635675136/21746933760 (16.7%) @1.9x, remaining 35:37 RBU 100.0% UBU 40.3%
3665821696/21746933760 (16.9%) @2.0x, remaining 35:30 RBU 100.0% UBU 46.8%
3691479040/21746933760 (17.0%) @1.7x, remaining 35:32 RBU 100.0% UBU 41.4%
3720085504/21746933760 (17.1%) @1.9x, remaining 35:27 RBU 100.0% UBU 40.3%
3750232064/21746933760 (17.2%) @2.0x, remaining 35:21 RBU 100.0% UBU 41.4%
3779788800/21746933760 (17.4%) @2.0x, remaining 35:20 RBU 100.0% UBU 45.7%
3806330880/21746933760 (17.5%) @1.8x, remaining 35:16 RBU 99.5% UBU 53.2%
3834642432/21746933760 (17.6%) @1.9x, remaining 35:11 RBU 100.0% UBU 53.2%
3864788992/21746933760 (17.8%) @2.0x, remaining 35:09 RBU 100.0% UBU 39.2%
3890741248/21746933760 (17.9%) @1.7x, remaining 35:06 RBU 100.0% UBU 39.2%
3919052800/21746933760 (18.0%) @1.9x, remaining 35:01 RBU 100.0% UBU 45.7%
3949199360/21746933760 (18.2%) @2.0x, remaining 35:00 RBU 100.0% UBU 44.6%
3976888320/21746933760 (18.3%) @1.8x, remaining 34:55 RBU 100.0% UBU 43.5%
4003463168/21746933760 (18.4%) @1.8x, remaining 34:51 RBU 100.0% UBU 45.7%
4033609728/21746933760 (18.5%) @2.0x, remaining 34:50 RBU 100.0% UBU 44.6%
4061036544/21746933760 (18.7%) @1.8x, remaining 34:46 RBU 100.0% UBU 39.2%
4087873536/21746933760 (18.8%) @1.8x, remaining 34:42 RBU 100.0% UBU 43.5%
4118020096/21746933760 (18.9%) @2.0x, remaining 34:40 RBU 100.0% UBU 40.3%
4144594944/21746933760 (19.1%) @1.8x, remaining 34:36 RBU 99.6% UBU 46.8%
4172283904/21746933760 (19.2%) @1.8x, remaining 34:32 RBU 100.0% UBU 42.5%
4202430464/21746933760 (19.3%) @2.0x, remaining 34:30 RBU 100.0% UBU 47.8%
4228513792/21746933760 (19.4%) @1.7x, remaining 34:27 RBU 100.0% UBU 41.4%
4257546240/21746933760 (19.6%) @1.9x, remaining 34:22 RBU 100.0% UBU 53.2%
4286840832/21746933760 (19.7%) @2.0x, remaining 34:20 RBU 100.0% UBU 39.2%
4316495872/21746933760 (19.8%) @2.0x, remaining 34:15 RBU 100.0% UBU 43.5%
4341891072/21746933760 (20.0%) @1.7x, remaining 34:12 RBU 100.0% UBU 43.5%
4371251200/21746933760 (20.1%) @2.0x, remaining 34:11 RBU 100.0% UBU 44.6%
4401397760/21746933760 (20.2%) @2.0x, remaining 34:05 RBU 100.0% UBU 42.5%
4428169216/21746933760 (20.4%) @1.8x, remaining 34:01 RBU 100.0% UBU 42.5%
4455661568/21746933760 (20.5%) @1.8x, remaining 34:01 RBU 100.0% UBU 40.3%
4485808128/21746933760 (20.6%) @2.0x, remaining 33:55 RBU 100.0% UBU 46.8%
4514119680/21746933760 (20.8%) @1.9x, remaining 33:50 RBU 99.9% UBU 39.2%
4540071936/21746933760 (20.9%) @1.7x, remaining 33:51 RBU 100.0% UBU 51.1%
4570218496/21746933760 (21.0%) @2.0x, remaining 33:45 RBU 100.0% UBU 41.4%
4599087104/21746933760 (21.1%) @1.9x, remaining 33:40 RBU 100.0% UBU 40.3%
4624482304/21746933760 (21.3%) @1.7x, remaining 33:41 RBU 100.0% UBU 45.7%
4654628864/21746933760 (21.4%) @2.0x, remaining 33:35 RBU 100.0% UBU 40.3%
4682153984/21746933760 (21.5%) @1.8x, remaining 33:31 RBU 100.0% UBU 40.3%
4708892672/21746933760 (21.7%) @1.8x, remaining 33:31 RBU 100.0% UBU 41.4%
4739039232/21746933760 (21.8%) @2.0x, remaining 33:26 RBU 100.0% UBU 39.2%
4766171136/21746933760 (21.9%) @1.8x, remaining 33:22 RBU 100.0% UBU 44.6%
4793303040/21746933760 (22.0%) @1.8x, remaining 33:21 RBU 100.0% UBU 41.4%
4823449600/21746933760 (22.2%) @2.0x, remaining 33:16 RBU 100.0% UBU 57.5%
4851892224/21746933760 (22.3%) @1.9x, remaining 33:11 RBU 100.0% UBU 43.5%
4878106624/21746933760 (22.4%) @1.7x, remaining 33:11 RBU 100.0% UBU 48.9%
4907859968/21746933760 (22.6%) @2.0x, remaining 33:06 RBU 100.0% UBU 44.6%
4938006528/21746933760 (22.7%) @2.0x, remaining 33:01 RBU 100.0% UBU 45.7%
4962582528/21746933760 (22.8%) @1.6x, remaining 33:01 RBU 100.0% UBU 48.9%
4992270336/21746933760 (23.0%) @2.0x, remaining 32:56 RBU 100.0% UBU 41.4%
5022416896/21746933760 (23.1%) @2.0x, remaining 32:51 RBU 100.0% UBU 40.3%
5047484416/21746933760 (23.2%) @1.7x, remaining 32:51 RBU 100.0% UBU 39.2%
5076680704/21746933760 (23.3%) @1.9x, remaining 32:46 RBU 100.0% UBU 43.5%
5106827264/21746933760 (23.5%) @2.0x, remaining 32:41 RBU 100.0% UBU 46.8%
5135106048/21746933760 (23.6%) @1.9x, remaining 32:40 RBU 100.0% UBU 42.5%
5161091072/21746933760 (23.7%) @1.7x, remaining 32:37 RBU 100.0% UBU 48.9%
5191237632/21746933760 (23.9%) @2.0x, remaining 32:31 RBU 100.0% UBU 39.2%
5219385344/21746933760 (24.0%) @1.9x, remaining 32:30 RBU 100.0% UBU 40.3%
5245501440/21746933760 (24.1%) @1.7x, remaining 32:27 RBU 100.0% UBU 44.6%
5275648000/21746933760 (24.3%) @2.0x, remaining 32:21 RBU 100.0% UBU 41.4%
5303271424/21746933760 (24.4%) @1.8x, remaining 32:21 RBU 99.2% UBU 43.5%
5329911808/21746933760 (24.5%) @1.8x, remaining 32:17 RBU 100.0% UBU 42.5%
5360058368/21746933760 (24.6%) @2.0x, remaining 32:12 RBU 100.0% UBU 47.8%
5385781248/21746933760 (24.8%) @1.7x, remaining 32:12 RBU 100.0% UBU 45.7%
5414322176/21746933760 (24.9%) @1.9x, remaining 32:07 RBU 100.0% UBU 41.4%
5444468736/21746933760 (25.0%) @2.0x, remaining 32:02 RBU 100.0% UBU 44.6%
5471404032/21746933760 (25.2%) @1.8x, remaining 32:01 RBU 100.0% UBU 39.2%
5498732544/21746933760 (25.3%) @1.8x, remaining 31:57 RBU 100.0% UBU 44.6%
5528879104/21746933760 (25.4%) @2.0x, remaining 31:52 RBU 100.0% UBU 44.6%
5559025664/21746933760 (25.6%) @2.0x, remaining 31:50 RBU 100.0% UBU 42.5%
5583208448/21746933760 (25.7%) @1.6x, remaining 31:47 RBU 100.0% UBU 46.8%
5613289472/21746933760 (25.8%) @2.0x, remaining 31:42 RBU 100.0% UBU 53.2%
5643436032/21746933760 (26.0%) @2.0x, remaining 31:40 RBU 100.0% UBU 52.2%
5671124992/21746933760 (26.1%) @1.8x, remaining 31:36 RBU 100.0% UBU 38.2%
5697896448/21746933760 (26.2%) @1.8x, remaining 31:32 RBU 100.0% UBU 39.2%
5727846400/21746933760 (26.3%) @2.0x, remaining 31:30 RBU 100.0% UBU 39.2%
5757992960/21746933760 (26.5%) @2.0x, remaining 31:25 RBU 100.0% UBU 41.4%
5783158784/21746933760 (26.6%) @1.7x, remaining 31:22 RBU 97.9% UBU 45.7%
5812256768/21746933760 (26.7%) @1.9x, remaining 31:20 RBU 100.0% UBU 42.5%
5842403328/21746933760 (26.9%) @2.0x, remaining 31:15 RBU 100.0% UBU 41.4%
5866979328/21746933760 (27.0%) @1.6x, remaining 31:13 RBU 99.7% UBU 42.5%
5896667136/21746933760 (27.1%) @2.0x, remaining 31:10 RBU 100.0% UBU 39.2%
5926813696/21746933760 (27.3%) @2.0x, remaining 31:05 RBU 100.0% UBU 43.5%
5950930944/21746933760 (27.4%) @1.6x, remaining 31:03 RBU 100.0% UBU 40.3%
5981077504/21746933760 (27.5%) @2.0x, remaining 31:00 RBU 100.0% UBU 47.8%
6011224064/21746933760 (27.6%) @2.0x, remaining 30:55 RBU 100.0% UBU 39.2%
6035341312/21746933760 (27.8%) @1.6x, remaining 30:53 RBU 100.0% UBU 39.2%
6061162496/21746933760 (27.9%) @1.7x, remaining 30:52 RBU 100.0% UBU 42.5%
6089605120/21746933760 (28.0%) @1.9x, remaining 30:48 RBU 100.0% UBU 40.3%
6119751680/21746933760 (28.1%) @2.0x, remaining 30:43 RBU 100.0% UBU 43.5%
6147440640/21746933760 (28.3%) @1.8x, remaining 30:42 RBU 100.0% UBU 40.3%
6175916032/21746933760 (28.4%) @1.9x, remaining 30:37 RBU 100.0% UBU 43.5%
6204162048/21746933760 (28.5%) @1.9x, remaining 30:33 RBU 100.0% UBU 41.4%
6233423872/21746933760 (28.7%) @2.0x, remaining 30:31 RBU 100.0% UBU 41.4%
6258425856/21746933760 (28.8%) @1.7x, remaining 30:28 RBU 100.0% UBU 44.6%
6288572416/21746933760 (28.9%) @2.0x, remaining 30:23 RBU 100.0% UBU 41.4%
6318718976/21746933760 (29.1%) @2.0x, remaining 30:21 RBU 100.0% UBU 42.5%
6344933376/21746933760 (29.2%) @1.7x, remaining 30:18 RBU 100.0% UBU 43.5%
6373376000/21746933760 (29.3%) @1.9x, remaining 30:13 RBU 100.0% UBU 51.1%
6403129344/21746933760 (29.4%) @2.0x, remaining 30:11 RBU 100.0% UBU 48.9%
6431768576/21746933760 (29.6%) @1.9x, remaining 30:07 RBU 100.0% UBU 40.3%
6457982976/21746933760 (29.7%) @1.7x, remaining 30:03 RBU 100.0% UBU 43.5%
6486425600/21746933760 (29.8%) @1.9x, remaining 30:02 RBU 100.0% UBU 45.7%
6516572160/21746933760 (30.0%) @2.0x, remaining 29:57 RBU 100.0% UBU 40.3%
6545047552/21746933760 (30.1%) @1.9x, remaining 29:53 RBU 100.0% UBU 40.3%
6571098112/21746933760 (30.2%) @1.7x, remaining 29:52 RBU 100.0% UBU 44.6%
6600982528/21746933760 (30.4%) @2.0x, remaining 29:47 RBU 100.0% UBU 42.5%
6631129088/21746933760 (30.5%) @2.0x, remaining 29:42 RBU 100.0% UBU 46.8%
6655246336/21746933760 (30.6%) @1.6x, remaining 29:42 RBU 100.0% UBU 40.3%
6685392896/21746933760 (30.7%) @2.0x, remaining 29:37 RBU 100.0% UBU 44.6%
6715539456/21746933760 (30.9%) @2.0x, remaining 29:32 RBU 100.0% UBU 47.8%
6739656704/21746933760 (31.0%) @1.6x, remaining 29:32 RBU 100.0% UBU 42.5%
6769803264/21746933760 (31.1%) @2.0x, remaining 29:27 RBU 100.0% UBU 47.8%
6799163392/21746933760 (31.3%) @2.0x, remaining 29:23 RBU 100.0% UBU 46.8%
6824067072/21746933760 (31.4%) @1.7x, remaining 29:22 RBU 100.0% UBU 53.2%
6854213632/21746933760 (31.5%) @2.0x, remaining 29:17 RBU 100.0% UBU 41.4%
6883147776/21746933760 (31.7%) @1.9x, remaining 29:13 RBU 99.8% UBU 45.7%
6908477440/21746933760 (31.8%) @1.7x, remaining 29:12 RBU 100.0% UBU 52.2%
6938624000/21746933760 (31.9%) @2.0x, remaining 29:07 RBU 100.0% UBU 47.8%
6964641792/21746933760 (32.0%) @1.7x, remaining 29:04 RBU 99.9% UBU 46.8%
6992887808/21746933760 (32.2%) @1.9x, remaining 29:02 RBU 100.0% UBU 39.2%
7023034368/21746933760 (32.3%) @2.0x, remaining 28:58 RBU 100.0% UBU 48.9%
7051411456/21746933760 (32.4%) @1.9x, remaining 28:53 RBU 100.0% UBU 41.4%
7077691392/21746933760 (32.5%) @1.8x, remaining 28:52 RBU 100.0% UBU 42.5%
7107444736/21746933760 (32.7%) @2.0x, remaining 28:48 RBU 100.0% UBU 40.3%
7135363072/21746933760 (32.8%) @1.9x, remaining 28:44 RBU 100.0% UBU 46.8%
7161708544/21746933760 (32.9%) @1.8x, remaining 28:42 RBU 100.0% UBU 58.6%
7191855104/21746933760 (33.1%) @2.0x, remaining 28:38 RBU 100.0% UBU 42.5%
7222001664/21746933760 (33.2%) @2.0x, remaining 28:33 RBU 100.0% UBU 47.8%
7251886080/21746933760 (33.3%) @2.0x, remaining 28:30 RBU 100.0% UBU 51.1%
7276658688/21746933760 (33.5%) @1.7x, remaining 28:28 RBU 100.0% UBU 41.4%
7306412032/21746933760 (33.6%) @2.0x, remaining 28:23 RBU 100.0% UBU 43.5%
7336558592/21746933760 (33.7%) @2.0x, remaining 28:20 RBU 100.0% UBU 47.8%
7363461120/21746933760 (33.9%) @1.8x, remaining 28:17 RBU 100.0% UBU 41.4%
7390822400/21746933760 (34.0%) @1.8x, remaining 28:13 RBU 100.0% UBU 44.6%
7420968960/21746933760 (34.1%) @2.0x, remaining 28:11 RBU 100.0% UBU 46.8%
7447478272/21746933760 (34.2%) @1.8x, remaining 28:07 RBU 100.0% UBU 54.3%
7475232768/21746933760 (34.4%) @1.9x, remaining 28:03 RBU 100.0% UBU 42.5%
7505379328/21746933760 (34.5%) @2.0x, remaining 28:01 RBU 100.0% UBU 45.7%
7529496576/21746933760 (34.6%) @1.6x, remaining 27:58 RBU 100.0% UBU 47.8%
7559643136/21746933760 (34.8%) @2.0x, remaining 27:54 RBU 100.0% UBU 40.3%
7589363712/21746933760 (34.9%) @2.0x, remaining 27:51 RBU 100.0% UBU 46.8%
7613906944/21746933760 (35.0%) @1.6x, remaining 27:48 RBU 100.0% UBU 43.5%
7644053504/21746933760 (35.2%) @2.0x, remaining 27:44 RBU 100.0% UBU 54.3%
7671611392/21746933760 (35.3%) @1.8x, remaining 27:42 RBU 100.0% UBU 40.3%
7698317312/21746933760 (35.4%) @1.8x, remaining 27:38 RBU 100.0% UBU 44.6%
7728463872/21746933760 (35.5%) @2.0x, remaining 27:34 RBU 100.0% UBU 42.5%
7755333632/21746933760 (35.7%) @1.8x, remaining 27:32 RBU 100.0% UBU 43.5%
7782727680/21746933760 (35.8%) @1.8x, remaining 27:28 RBU 100.0% UBU 74.7%
7812874240/21746933760 (35.9%) @2.0x, remaining 27:24 RBU 100.0% UBU 44.6%
7839842304/21746933760 (36.1%) @1.8x, remaining 27:22 RBU 100.0% UBU 41.4%
7867400192/21746933760 (36.2%) @1.8x, remaining 27:18 RBU 100.0% UBU 42.5%
7897284608/21746933760 (36.3%) @2.0x, remaining 27:14 RBU 100.0% UBU 39.2%
7925989376/21746933760 (36.4%) @1.9x, remaining 27:12 RBU 100.0% UBU 40.3%
7952334848/21746933760 (36.6%) @1.8x, remaining 27:08 RBU 100.0% UBU 39.2%
7981694976/21746933760 (36.7%) @2.0x, remaining 27:06 RBU 100.0% UBU 40.3%
8011841536/21746933760 (36.8%) @2.0x, remaining 27:01 RBU 100.0% UBU 44.6%
8040316928/21746933760 (37.0%) @1.9x, remaining 26:57 RBU 100.0% UBU 48.9%
8066105344/21746933760 (37.1%) @1.7x, remaining 26:56 RBU 100.0% UBU 52.2%
8096251904/21746933760 (37.2%) @2.0x, remaining 26:51 RBU 100.0% UBU 39.2%
8126398464/21746933760 (37.4%) @2.0x, remaining 26:47 RBU 100.0% UBU 40.3%
8151433216/21746933760 (37.5%) @1.7x, remaining 26:46 RBU 100.0% UBU 40.3%
8180989952/21746933760 (37.6%) @2.0x, remaining 26:41 RBU 100.1% UBU 40.3%
8210808832/21746933760 (37.8%) @2.0x, remaining 26:37 RBU 100.0% UBU 45.7%
8238596096/21746933760 (37.9%) @1.9x, remaining 26:35 RBU 100.0% UBU 46.8%
8265072640/21746933760 (38.0%) @1.8x, remaining 26:32 RBU 100.0% UBU 47.8%
8295219200/21746933760 (38.1%) @2.0x, remaining 26:27 RBU 100.0% UBU 40.3%
8323203072/21746933760 (38.3%) @1.9x, remaining 26:25 RBU 100.0% UBU 50.0%
8349483008/21746933760 (38.4%) @1.8x, remaining 26:22 RBU 100.0% UBU 42.5%
8379629568/21746933760 (38.5%) @2.0x, remaining 26:17 RBU 100.0% UBU 41.4%
8407351296/21746933760 (38.7%) @1.8x, remaining 26:15 RBU 100.0% UBU 46.8%
8433893376/21746933760 (38.8%) @1.8x, remaining 26:12 RBU 100.0% UBU 46.8%
8464039936/21746933760 (38.9%) @2.0x, remaining 26:07 RBU 100.0% UBU 50.0%
8489205760/21746933760 (39.0%) @1.7x, remaining 26:06 RBU 100.0% UBU 48.9%
8518303744/21746933760 (39.2%) @1.9x, remaining 26:02 RBU 100.0% UBU 45.7%
8548450304/21746933760 (39.3%) @2.0x, remaining 25:57 RBU 100.0% UBU 48.9%
8572567552/21746933760 (39.4%) @1.6x, remaining 25:56 RBU 100.0% UBU 41.4%
8602714112/21746933760 (39.6%) @2.0x, remaining 25:52 RBU 100.0% UBU 45.7%
8629551104/21746933760 (39.7%) @1.8x, remaining 25:48 RBU 100.0% UBU 47.8%
8656977920/21746933760 (39.8%) @1.8x, remaining 25:46 RBU 100.0% UBU 52.2%
8687124480/21746933760 (39.9%) @2.0x, remaining 25:42 RBU 100.0% UBU 43.5%
8713732096/21746933760 (40.1%) @1.8x, remaining 25:39 RBU 99.3% UBU 42.5%
8742240256/21746933760 (40.2%) @1.9x, remaining 25:36 RBU 100.0% UBU 45.7%
8771534848/21746933760 (40.3%) @2.0x, remaining 25:32 RBU 100.0% UBU 45.7%
8801615872/21746933760 (40.5%) @2.0x, remaining 25:28 RBU 99.9% UBU 54.3%
8827699200/21746933760 (40.6%) @1.7x, remaining 25:26 RBU 100.0% UBU 53.2%
8855945216/21746933760 (40.7%) @1.9x, remaining 25:22 RBU 100.0% UBU 51.1%
8886091776/21746933760 (40.9%) @2.0x, remaining 25:18 RBU 100.0% UBU 42.5%
8912109568/21746933760 (41.0%) @1.7x, remaining 25:16 RBU 100.0% UBU 53.2%
8940355584/21746933760 (41.1%) @1.9x, remaining 25:12 RBU 100.0% UBU 53.2%
8970502144/21746933760 (41.2%) @2.0x, remaining 25:08 RBU 100.0% UBU 40.3%
9000648704/21746933760 (41.4%) @2.0x, remaining 25:05 RBU 100.0% UBU 46.8%
9026142208/21746933760 (41.5%) @1.7x, remaining 25:02 RBU 99.5% UBU 45.7%
9055502336/21746933760 (41.6%) @2.0x, remaining 24:58 RBU 100.0% UBU 51.1%
9085059072/21746933760 (41.8%) @2.0x, remaining 24:55 RBU 100.0% UBU 39.2%
9115205632/21746933760 (41.9%) @2.0x, remaining 24:51 RBU 100.0% UBU 41.4%
9139585024/21746933760 (42.0%) @1.6x, remaining 24:48 RBU 100.0% UBU 46.8%
9169469440/21746933760 (42.2%) @2.0x, remaining 24:45 RBU 100.0% UBU 39.2%
9199616000/21746933760 (42.3%) @2.0x, remaining 24:41 RBU 100.0% UBU 40.3%
9225011200/21746933760 (42.4%) @1.7x, remaining 24:38 RBU 99.8% UBU 43.5%
9254076416/21746933760 (42.6%) @1.9x, remaining 24:35 RBU 100.0% UBU 41.4%
9284026368/21746933760 (42.7%) @2.0x, remaining 24:31 RBU 100.0% UBU 45.7%
9311191040/21746933760 (42.8%) @1.8x, remaining 24:27 RBU 100.0% UBU 40.3%
9338290176/21746933760 (42.9%) @1.8x, remaining 24:25 RBU 100.0% UBU 40.3%
9368436736/21746933760 (43.1%) @2.0x, remaining 24:21 RBU 100.0% UBU 42.5%
9397534720/21746933760 (43.2%) @1.9x, remaining 24:17 RBU 100.0% UBU 40.3%
9422700544/21746933760 (43.3%) @1.7x, remaining 24:15 RBU 100.0% UBU 47.8%
9452847104/21746933760 (43.5%) @2.0x, remaining 24:11 RBU 100.0% UBU 43.5%
9479323648/21746933760 (43.6%) @1.8x, remaining 24:08 RBU 99.3% UBU 40.3%
9507110912/21746933760 (43.7%) @1.9x, remaining 24:05 RBU 100.0% UBU 42.5%
9537257472/21746933760 (43.9%) @2.0x, remaining 24:01 RBU 100.0% UBU 41.4%
9561374720/21746933760 (44.0%) @1.6x, remaining 23:58 RBU 100.0% UBU 50.0%
9591521280/21746933760 (44.1%) @2.0x, remaining 23:55 RBU 100.0% UBU 41.4%
9621209088/21746933760 (44.2%) @2.0x, remaining 23:51 RBU 100.0% UBU 53.2%
9645785088/21746933760 (44.4%) @1.6x, remaining 23:48 RBU 100.0% UBU 42.5%
9675669504/21746933760 (44.5%) @2.0x, remaining 23:45 RBU 100.0% UBU 52.2%
9702539264/21746933760 (44.6%) @1.8x, remaining 23:42 RBU 100.0% UBU 42.5%
9730195456/21746933760 (44.7%) @1.8x, remaining 23:39 RBU 100.0% UBU 40.3%
9760342016/21746933760 (44.9%) @2.0x, remaining 23:35 RBU 100.0% UBU 47.8%
9786064896/21746933760 (45.0%) @1.7x, remaining 23:32 RBU 99.2% UBU 42.5%
9814605824/21746933760 (45.1%) @1.9x, remaining 23:29 RBU 100.0% UBU 40.3%
9844752384/21746933760 (45.3%) @2.0x, remaining 23:26 RBU 100.0% UBU 40.3%
9869656064/21746933760 (45.4%) @1.7x, remaining 23:23 RBU 98.5% UBU 45.7%
9899343872/21746933760 (45.5%) @2.0x, remaining 23:19 RBU 100.0% UBU 45.7%
9929162752/21746933760 (45.7%) @2.0x, remaining 23:16 RBU 100.0% UBU 45.7%
9957212160/21746933760 (45.8%) @1.9x, remaining 23:12 RBU 100.0% UBU 64.0%
9983819776/21746933760 (45.9%) @1.8x, remaining 23:09 RBU 100.0% UBU 42.5%
10013573120/21746933760 (46.0%) @2.0x, remaining 23:06 RBU 100.0% UBU 45.7%
10043129856/21746933760 (46.2%) @2.0x, remaining 23:02 RBU 100.0% UBU 45.7%
10069671936/21746933760 (46.3%) @1.8x, remaining 22:58 RBU 100.0% UBU 46.8%
10097983488/21746933760 (46.4%) @1.9x, remaining 22:56 RBU 100.0% UBU 45.7%
10128130048/21746933760 (46.6%) @2.0x, remaining 22:52 RBU 100.0% UBU 40.3%
10154901504/21746933760 (46.7%) @1.8x, remaining 22:48 RBU 99.6% UBU 42.5%
10182590464/21746933760 (46.8%) @1.8x, remaining 22:46 RBU 100.0% UBU 45.7%
10212540416/21746933760 (47.0%) @2.0x, remaining 22:42 RBU 100.0% UBU 50.0%
10241048576/21746933760 (47.1%) @1.9x, remaining 22:38 RBU 100.0% UBU 53.2%
10268246016/21746933760 (47.2%) @1.8x, remaining 22:35 RBU 99.3% UBU 39.2%
10297769984/21746933760 (47.4%) @2.0x, remaining 22:31 RBU 100.0% UBU 44.6%
10327097344/21746933760 (47.5%) @2.0x, remaining 22:27 RBU 100.0% UBU 48.9%
10356916224/21746933760 (47.6%) @2.0x, remaining 22:24 RBU 100.0% UBU 40.3%
10381950976/21746933760 (47.7%) @1.7x, remaining 22:22 RBU 100.0% UBU 42.5%
10411507712/21746933760 (47.9%) @2.0x, remaining 22:18 RBU 100.0% UBU 46.8%
10441654272/21746933760 (48.0%) @2.0x, remaining 22:14 RBU 100.0% UBU 40.3%
10469376000/21746933760 (48.1%) @1.8x, remaining 22:11 RBU 100.0% UBU 43.5%
10495918080/21746933760 (48.3%) @1.8x, remaining 22:08 RBU 100.0% UBU 44.6%
10525802496/21746933760 (48.4%) @2.0x, remaining 22:05 RBU 100.0% UBU 48.9%
10550181888/21746933760 (48.5%) @1.6x, remaining 22:02 RBU 100.0% UBU 40.3%
10580328448/21746933760 (48.7%) @2.0x, remaining 21:58 RBU 100.0% UBU 44.6%
10610475008/21746933760 (48.8%) @2.0x, remaining 21:55 RBU 100.0% UBU 47.8%
10634592256/21746933760 (48.9%) @1.6x, remaining 21:52 RBU 100.0% UBU 55.4%
10664738816/21746933760 (49.0%) @2.0x, remaining 21:48 RBU 100.0% UBU 45.7%
10690658304/21746933760 (49.2%) @1.7x, remaining 21:46 RBU 100.0% UBU 41.4%
10719002624/21746933760 (49.3%) @1.9x, remaining 21:42 RBU 100.0% UBU 48.9%
10748887040/21746933760 (49.4%) @2.0x, remaining 21:38 RBU 100.0% UBU 45.7%
10773266432/21746933760 (49.5%) @1.6x, remaining 21:36 RBU 100.0% UBU 51.1%
10803412992/21746933760 (49.7%) @2.0x, remaining 21:32 RBU 100.0% UBU 46.8%
10831167488/21746933760 (49.8%) @1.9x, remaining 21:28 RBU 100.0% UBU 50.0%
10857676800/21746933760 (49.9%) @1.8x, remaining 21:26 RBU 100.0% UBU 48.9%
10887823360/21746933760 (50.1%) @2.0x, remaining 21:22 RBU 100.0% UBU 45.7%
10912202752/21746933760 (50.2%) @1.6x, remaining 21:19 RBU 100.0% UBU 53.2%
10942087168/21746933760 (50.3%) @2.0x, remaining 21:16 RBU 100.0% UBU 40.3%
10972233728/21746933760 (50.5%) @2.0x, remaining 21:12 RBU 100.0% UBU 42.5%
10998120448/21746933760 (50.6%) @1.7x, remaining 21:09 RBU 100.0% UBU 52.2%
11026956288/21746933760 (50.7%) @1.9x, remaining 21:06 RBU 100.0% UBU 54.3%
11056644096/21746933760 (50.8%) @2.0x, remaining 21:02 RBU 100.0% UBU 44.6%
11085086720/21746933760 (51.0%) @1.9x, remaining 20:59 RBU 100.0% UBU 46.8%
11110907904/21746933760 (51.1%) @1.7x, remaining 20:56 RBU 100.0% UBU 54.3%
11141054464/21746933760 (51.2%) @2.0x, remaining 20:52 RBU 100.0% UBU 40.3%
11171201024/21746933760 (51.4%) @2.0x, remaining 20:48 RBU 100.0% UBU 47.8%
11199709184/21746933760 (51.5%) @1.9x, remaining 20:45 RBU 100.0% UBU 47.8%
11225464832/21746933760 (51.6%) @1.7x, remaining 20:42 RBU 100.0% UBU 41.4%
11255611392/21746933760 (51.8%) @2.0x, remaining 20:38 RBU 100.0% UBU 46.8%
11285692416/21746933760 (51.9%) @2.0x, remaining 20:35 RBU 100.0% UBU 51.1%
11309875200/21746933760 (52.0%) @1.6x, remaining 20:32 RBU 100.0% UBU 54.3%
11340021760/21746933760 (52.1%) @2.0x, remaining 20:28 RBU 100.0% UBU 40.3%
11370168320/21746933760 (52.3%) @2.0x, remaining 20:25 RBU 100.0% UBU 40.3%
11396775936/21746933760 (52.4%) @1.8x, remaining 20:22 RBU 100.0% UBU 43.5%
11424432128/21746933760 (52.5%) @1.8x, remaining 20:18 RBU 100.0% UBU 44.6%
11454578688/21746933760 (52.7%) @2.0x, remaining 20:15 RBU 100.0% UBU 45.7%
11484463104/21746933760 (52.8%) @2.0x, remaining 20:11 RBU 100.0% UBU 50.0%
11509235712/21746933760 (52.9%) @1.7x, remaining 20:08 RBU 100.0% UBU 40.3%
11539054592/21746933760 (53.1%) @2.0x, remaining 20:05 RBU 100.0% UBU 42.5%
11569135616/21746933760 (53.2%) @2.0x, remaining 20:01 RBU 100.0% UBU 44.6%
11594956800/21746933760 (53.3%) @1.7x, remaining 19:58 RBU 100.0% UBU 43.5%
11623399424/21746933760 (53.4%) @1.9x, remaining 19:55 RBU 100.0% UBU 42.5%
11653545984/21746933760 (53.6%) @2.0x, remaining 19:51 RBU 100.0% UBU 40.3%
11679793152/21746933760 (53.7%) @1.8x, remaining 19:48 RBU 100.0% UBU 41.4%
11707809792/21746933760 (53.8%) @1.9x, remaining 19:45 RBU 100.0% UBU 38.2%
11737956352/21746933760 (54.0%) @2.0x, remaining 19:41 RBU 100.0% UBU 41.4%
11764531200/21746933760 (54.1%) @1.8x, remaining 19:38 RBU 100.0% UBU 42.5%
11792220160/21746933760 (54.2%) @1.8x, remaining 19:35 RBU 100.0% UBU 48.9%
11822366720/21746933760 (54.4%) @2.0x, remaining 19:31 RBU 100.0% UBU 42.5%
11848351744/21746933760 (54.5%) @1.7x, remaining 19:28 RBU 100.0% UBU 47.8%
11876630528/21746933760 (54.6%) @1.9x, remaining 19:25 RBU 100.0% UBU 51.1%
11906580480/21746933760 (54.8%) @2.0x, remaining 19:22 RBU 100.0% UBU 45.7%
11930894336/21746933760 (54.9%) @1.6x, remaining 19:19 RBU 100.0% UBU 50.0%
11961040896/21746933760 (55.0%) @2.0x, remaining 19:16 RBU 100.0% UBU 41.4%
11987714048/21746933760 (55.1%) @1.8x, remaining 19:12 RBU 100.0% UBU 40.3%
12015304704/21746933760 (55.3%) @1.8x, remaining 19:09 RBU 100.0% UBU 44.6%
12045451264/21746933760 (55.4%) @2.0x, remaining 19:06 RBU 100.0% UBU 43.5%
12069568512/21746933760 (55.5%) @1.6x, remaining 19:03 RBU 100.0% UBU 52.2%
12099715072/21746933760 (55.6%) @2.0x, remaining 18:59 RBU 100.0% UBU 44.6%
12127928320/21746933760 (55.8%) @1.9x, remaining 18:56 RBU 100.0% UBU 48.9%
12154765312/21746933760 (55.9%) @1.8x, remaining 18:53 RBU 100.0% UBU 39.2%
12184125440/21746933760 (56.0%) @2.0x, remaining 18:49 RBU 100.0% UBU 39.2%
12212699136/21746933760 (56.2%) @1.9x, remaining 18:46 RBU 100.0% UBU 42.5%
12238651392/21746933760 (56.3%) @1.7x, remaining 18:43 RBU 100.0% UBU 41.4%
12268535808/21746933760 (56.4%) @2.0x, remaining 18:40 RBU 100.0% UBU 41.4%
12298420224/21746933760 (56.6%) @2.0x, remaining 18:36 RBU 100.0% UBU 39.2%
12324241408/21746933760 (56.7%) @1.7x, remaining 18:33 RBU 99.7% UBU 54.3%
12352946176/21746933760 (56.8%) @1.9x, remaining 18:30 RBU 100.0% UBU 44.6%
12383092736/21746933760 (56.9%) @2.0x, remaining 18:26 RBU 100.0% UBU 43.5%
12409569280/21746933760 (57.1%) @1.8x, remaining 18:23 RBU 100.0% UBU 50.0%
12437749760/21746933760 (57.2%) @1.9x, remaining 18:20 RBU 100.0% UBU 41.4%
12467503104/21746933760 (57.3%) @2.0x, remaining 18:16 RBU 100.0% UBU 43.5%
12497649664/21746933760 (57.5%) @2.0x, remaining 18:12 RBU 100.0% UBU 44.6%
12521766912/21746933760 (57.6%) @1.6x, remaining 18:10 RBU 100.0% UBU 51.1%
12551913472/21746933760 (57.7%) @2.0x, remaining 18:06 RBU 100.0% UBU 44.6%
12582060032/21746933760 (57.9%) @2.0x, remaining 18:02 RBU 100.0% UBU 50.0%
12608700416/21746933760 (58.0%) @1.8x, remaining 17:59 RBU 100.0% UBU 50.0%
12636848128/21746933760 (58.1%) @1.9x, remaining 17:56 RBU 100.0% UBU 40.3%
12666470400/21746933760 (58.2%) @2.0x, remaining 17:52 RBU 100.0% UBU 43.5%
12696616960/21746933760 (58.4%) @2.0x, remaining 17:49 RBU 100.0% UBU 45.7%
12721651712/21746933760 (58.5%) @1.7x, remaining 17:46 RBU 100.0% UBU 51.1%
12750880768/21746933760 (58.6%) @1.9x, remaining 17:42 RBU 100.0% UBU 39.2%
12781027328/21746933760 (58.8%) @2.0x, remaining 17:39 RBU 100.0% UBU 41.4%
12809306112/21746933760 (58.9%) @1.9x, remaining 17:35 RBU 100.0% UBU 45.7%
12836864000/21746933760 (59.0%) @1.8x, remaining 17:32 RBU 100.0% UBU 54.3%
12865437696/21746933760 (59.2%) @1.9x, remaining 17:29 RBU 100.0% UBU 39.2%
12895584256/21746933760 (59.3%) @2.0x, remaining 17:25 RBU 100.0% UBU 42.5%
12920487936/21746933760 (59.4%) @1.7x, remaining 17:22 RBU 100.0% UBU 51.1%
12950011904/21746933760 (59.5%) @2.0x, remaining 17:19 RBU 100.0% UBU 40.3%
12979994624/21746933760 (59.7%) @2.0x, remaining 17:15 RBU 100.0% UBU 46.8%
13008011264/21746933760 (59.8%) @1.9x, remaining 17:11 RBU 100.0% UBU 41.4%
13034258432/21746933760 (59.9%) @1.8x, remaining 17:09 RBU 100.0% UBU 44.6%
13064404992/21746933760 (60.1%) @2.0x, remaining 17:05 RBU 100.0% UBU 41.4%
13092519936/21746933760 (60.2%) @1.9x, remaining 17:01 RBU 100.0% UBU 47.8%
13118799872/21746933760 (60.3%) @1.8x, remaining 16:59 RBU 100.0% UBU 42.5%
13148815360/21746933760 (60.5%) @2.0x, remaining 16:55 RBU 100.0% UBU 44.6%
13174571008/21746933760 (60.6%) @1.7x, remaining 16:52 RBU 100.0% UBU 48.9%
13203079168/21746933760 (60.7%) @1.9x, remaining 16:49 RBU 100.0% UBU 39.2%
13233225728/21746933760 (60.9%) @2.0x, remaining 16:45 RBU 100.0% UBU 45.7%
13258031104/21746933760 (61.0%) @1.7x, remaining 16:42 RBU 98.8% UBU 47.8%
13287489536/21746933760 (61.1%) @2.0x, remaining 16:39 RBU 100.0% UBU 53.2%
13317636096/21746933760 (61.2%) @2.0x, remaining 16:35 RBU 100.0% UBU 47.8%
13341753344/21746933760 (61.4%) @1.6x, remaining 16:32 RBU 100.0% UBU 46.8%
13371899904/21746933760 (61.5%) @2.0x, remaining 16:29 RBU 100.0% UBU 48.9%
13397491712/21746933760 (61.6%) @1.7x, remaining 16:26 RBU 100.0% UBU 47.8%
13426163712/21746933760 (61.7%) @1.9x, remaining 16:22 RBU 100.0% UBU 54.3%
13456179200/21746933760 (61.9%) @2.0x, remaining 16:19 RBU 94.2% UBU 42.5%
13480427520/21746933760 (62.0%) @1.6x, remaining 16:16 RBU 100.0% UBU 52.2%
13510574080/21746933760 (62.1%) @2.0x, remaining 16:12 RBU 100.0% UBU 42.5%
13536296960/21746933760 (62.2%) @1.7x, remaining 16:10 RBU 99.6% UBU 43.5%
13564837888/21746933760 (62.4%) @1.9x, remaining 16:06 RBU 100.0% UBU 48.9%
13594984448/21746933760 (62.5%) @2.0x, remaining 16:03 RBU 100.0% UBU 42.5%
13619101696/21746933760 (62.6%) @1.6x, remaining 16:00 RBU 100.0% UBU 50.0%
13649149952/21746933760 (62.8%) @2.0x, remaining 15:56 RBU 100.0% UBU 41.4%
13677133824/21746933760 (62.9%) @1.9x, remaining 15:53 RBU 100.0% UBU 40.3%
13703512064/21746933760 (63.0%) @1.8x, remaining 15:50 RBU 100.0% UBU 40.3%
13733658624/21746933760 (63.2%) @2.0x, remaining 15:46 RBU 100.0% UBU 39.2%
13760888832/21746933760 (63.3%) @1.8x, remaining 15:43 RBU 99.8% UBU 45.7%
13787922432/21746933760 (63.4%) @1.8x, remaining 15:40 RBU 100.0% UBU 44.6%
13818068992/21746933760 (63.5%) @2.0x, remaining 15:37 RBU 100.0% UBU 58.6%
13846118400/21746933760 (63.7%) @1.9x, remaining 15:33 RBU 100.0% UBU 40.3%
13872332800/21746933760 (63.8%) @1.7x, remaining 15:30 RBU 100.0% UBU 39.2%
13902479360/21746933760 (63.9%) @2.0x, remaining 15:27 RBU 100.0% UBU 43.5%
13932625920/21746933760 (64.1%) @2.0x, remaining 15:23 RBU 100.0% UBU 39.2%
13957267456/21746933760 (64.2%) @1.6x, remaining 15:20 RBU 100.0% UBU 46.8%
13986889728/21746933760 (64.3%) @2.0x, remaining 15:17 RBU 100.0% UBU 51.1%
14016577536/21746933760 (64.5%) @2.0x, remaining 15:13 RBU 100.0% UBU 54.3%
14044102656/21746933760 (64.6%) @1.8x, remaining 15:10 RBU 100.0% UBU 42.5%
14071496704/21746933760 (64.7%) @1.8x, remaining 15:07 RBU 100.0% UBU 41.4%
14101446656/21746933760 (64.8%) @2.0x, remaining 15:03 RBU 100.0% UBU 43.5%
14131593216/21746933760 (65.0%) @2.0x, remaining 14:59 RBU 100.0% UBU 39.2%
14157086720/21746933760 (65.1%) @1.7x, remaining 14:56 RBU 100.0% UBU 43.5%
14185857024/21746933760 (65.2%) @1.9x, remaining 14:53 RBU 100.0% UBU 46.8%
14216003584/21746933760 (65.4%) @2.0x, remaining 14:49 RBU 100.0% UBU 41.4%
14242611200/21746933760 (65.5%) @1.8x, remaining 14:46 RBU 98.9% UBU 47.8%
14270595072/21746933760 (65.6%) @1.9x, remaining 14:43 RBU 100.0% UBU 40.3%
14300413952/21746933760 (65.8%) @2.0x, remaining 14:40 RBU 100.0% UBU 44.6%
14328922112/21746933760 (65.9%) @1.9x, remaining 14:36 RBU 100.0% UBU 47.8%
14355202048/21746933760 (66.0%) @1.8x, remaining 14:33 RBU 100.0% UBU 51.1%
14384824320/21746933760 (66.1%) @2.0x, remaining 14:30 RBU 100.0% UBU 40.3%
14414970880/21746933760 (66.3%) @2.0x, remaining 14:26 RBU 100.0% UBU 43.5%
14442332160/21746933760 (66.4%) @1.8x, remaining 14:22 RBU 100.0% UBU 48.9%
14469496832/21746933760 (66.5%) @1.8x, remaining 14:20 RBU 100.0% UBU 39.2%
14499381248/21746933760 (66.7%) @2.0x, remaining 14:16 RBU 100.0% UBU 46.8%
14529527808/21746933760 (66.8%) @2.0x, remaining 14:12 RBU 100.0% UBU 41.4%
14553841664/21746933760 (66.9%) @1.6x, remaining 14:10 RBU 100.0% UBU 39.2%
14583791616/21746933760 (67.1%) @2.0x, remaining 14:06 RBU 100.0% UBU 43.5%
14613938176/21746933760 (67.2%) @2.0x, remaining 14:02 RBU 100.0% UBU 39.2%
14638972928/21746933760 (67.3%) @1.7x, remaining 14:00 RBU 100.0% UBU 43.5%
14668595200/21746933760 (67.5%) @2.0x, remaining 13:56 RBU 100.0% UBU 40.3%
14698348544/21746933760 (67.6%) @2.0x, remaining 13:52 RBU 100.0% UBU 39.2%
14726594560/21746933760 (67.7%) @1.9x, remaining 13:49 RBU 99.9% UBU 42.5%
14752612352/21746933760 (67.8%) @1.7x, remaining 13:46 RBU 100.0% UBU 40.3%
14782758912/21746933760 (68.0%) @2.0x, remaining 13:42 RBU 100.0% UBU 52.2%
14807990272/21746933760 (68.1%) @1.7x, remaining 13:40 RBU 100.1% UBU 48.9%
14837022720/21746933760 (68.2%) @1.9x, remaining 13:36 RBU 100.0% UBU 48.9%
14866907136/21746933760 (68.4%) @2.0x, remaining 13:32 RBU 100.0% UBU 50.0%
14891286528/21746933760 (68.5%) @1.6x, remaining 13:30 RBU 100.0% UBU 47.8%
14921433088/21746933760 (68.6%) @2.0x, remaining 13:26 RBU 100.0% UBU 48.9%
14945550336/21746933760 (68.7%) @1.6x, remaining 13:23 RBU 100.0% UBU 48.9%
14975696896/21746933760 (68.9%) @2.0x, remaining 13:20 RBU 100.0% UBU 55.4%
15004860416/21746933760 (69.0%) @1.9x, remaining 13:16 RBU 100.0% UBU 41.4%
15029960704/21746933760 (69.1%) @1.7x, remaining 13:13 RBU 100.0% UBU 52.2%
15060107264/21746933760 (69.3%) @2.0x, remaining 13:10 RBU 100.0% UBU 43.5%
15084224512/21746933760 (69.4%) @1.6x, remaining 13:07 RBU 100.0% UBU 44.6%
15114371072/21746933760 (69.5%) @2.0x, remaining 13:03 RBU 100.0% UBU 52.2%
15142551552/21746933760 (69.6%) @1.9x, remaining 13:00 RBU 100.0% UBU 42.5%
15168634880/21746933760 (69.8%) @1.7x, remaining 12:57 RBU 100.0% UBU 51.1%
15198781440/21746933760 (69.9%) @2.0x, remaining 12:53 RBU 100.0% UBU 43.5%
15224406016/21746933760 (70.0%) @1.7x, remaining 12:51 RBU 99.5% UBU 40.3%
15253045248/21746933760 (70.1%) @1.9x, remaining 12:47 RBU 100.0% UBU 40.3%
15283191808/21746933760 (70.3%) @2.0x, remaining 12:43 RBU 100.0% UBU 41.4%
15310651392/21746933760 (70.4%) @1.8x, remaining 12:40 RBU 100.0% UBU 40.3%
15337455616/21746933760 (70.5%) @1.8x, remaining 12:37 RBU 100.0% UBU 47.8%
15367602176/21746933760 (70.7%) @2.0x, remaining 12:33 RBU 100.0% UBU 41.4%
15397748736/21746933760 (70.8%) @2.0x, remaining 12:30 RBU 100.0% UBU 40.3%
15422914560/21746933760 (70.9%) @1.7x, remaining 12:27 RBU 100.0% UBU 44.6%
15452012544/21746933760 (71.1%) @1.9x, remaining 12:23 RBU 100.0% UBU 43.5%
15481372672/21746933760 (71.2%) @2.0x, remaining 12:20 RBU 100.0% UBU 40.3%
15508340736/21746933760 (71.3%) @1.8x, remaining 12:17 RBU 96.7% UBU 40.3%
15537537024/21746933760 (71.4%) @1.9x, remaining 12:13 RBU 100.0% UBU 41.4%
15566569472/21746933760 (71.6%) @1.9x, remaining 12:10 RBU 100.0% UBU 41.4%
15595601920/21746933760 (71.7%) @1.9x, remaining 12:06 RBU 100.0% UBU 48.9%
15621423104/21746933760 (71.8%) @1.7x, remaining 12:03 RBU 100.0% UBU 40.3%
15650979840/21746933760 (72.0%) @2.0x, remaining 12:00 RBU 100.0% UBU 41.4%
15681126400/21746933760 (72.1%) @2.0x, remaining 11:56 RBU 100.0% UBU 39.2%
15705374720/21746933760 (72.2%) @1.6x, remaining 11:53 RBU 100.0% UBU 40.3%
15735390208/21746933760 (72.4%) @2.0x, remaining 11:50 RBU 100.0% UBU 41.4%
15765536768/21746933760 (72.5%) @2.0x, remaining 11:46 RBU 100.0% UBU 40.3%
15790833664/21746933760 (72.6%) @1.7x, remaining 11:43 RBU 97.4% UBU 43.5%
15820423168/21746933760 (72.7%) @2.0x, remaining 11:40 RBU 100.0% UBU 39.2%
15849947136/21746933760 (72.9%) @2.0x, remaining 11:36 RBU 100.0% UBU 41.4%
15879569408/21746933760 (73.0%) @2.0x, remaining 11:33 RBU 100.0% UBU 50.0%
15904735232/21746933760 (73.1%) @1.7x, remaining 11:30 RBU 100.0% UBU 52.2%
15934357504/21746933760 (73.3%) @2.0x, remaining 11:26 RBU 100.0% UBU 39.2%
15964504064/21746933760 (73.4%) @2.0x, remaining 11:23 RBU 100.0% UBU 46.8%
15990194176/21746933760 (73.5%) @1.7x, remaining 11:20 RBU 99.7% UBU 41.4%
16018898944/21746933760 (73.7%) @1.9x, remaining 11:16 RBU 100.0% UBU 42.5%
16048914432/21746933760 (73.8%) @2.0x, remaining 11:13 RBU 100.0% UBU 41.4%
16078110720/21746933760 (73.9%) @1.9x, remaining 11:09 RBU 100.0% UBU 42.5%
16103964672/21746933760 (74.1%) @1.7x, remaining 11:06 RBU 100.0% UBU 39.2%
16133324800/21746933760 (74.2%) @2.0x, remaining 11:03 RBU 100.0% UBU 40.3%
16162029568/21746933760 (74.3%) @1.9x, remaining 11:00 RBU 99.9% UBU 46.8%
16189259776/21746933760 (74.4%) @1.8x, remaining 10:56 RBU 99.0% UBU 41.4%
16218062848/21746933760 (74.6%) @1.9x, remaining 10:53 RBU 100.0% UBU 43.5%
16247881728/21746933760 (74.7%) @2.0x, remaining 10:49 RBU 100.0% UBU 40.3%
16276520960/21746933760 (74.8%) @1.9x, remaining 10:46 RBU 100.0% UBU 46.8%
16302145536/21746933760 (75.0%) @1.7x, remaining 10:43 RBU 100.0% UBU 45.7%
16332292096/21746933760 (75.1%) @2.0x, remaining 10:39 RBU 100.0% UBU 40.3%
16361127936/21746933760 (75.2%) @1.9x, remaining 10:36 RBU 100.0% UBU 45.7%
16386555904/21746933760 (75.4%) @1.7x, remaining 10:33 RBU 100.0% UBU 40.3%
16416702464/21746933760 (75.5%) @2.0x, remaining 10:29 RBU 100.0% UBU 44.6%
16445800448/21746933760 (75.6%) @1.9x, remaining 10:26 RBU 100.0% UBU 43.5%
16470966272/21746933760 (75.7%) @1.7x, remaining 10:23 RBU 100.0% UBU 51.1%
16501112832/21746933760 (75.9%) @2.0x, remaining 10:19 RBU 100.0% UBU 40.3%
16530210816/21746933760 (76.0%) @1.9x, remaining 10:16 RBU 100.0% UBU 42.5%
16555376640/21746933760 (76.1%) @1.7x, remaining 10:13 RBU 100.0% UBU 42.5%
16585523200/21746933760 (76.3%) @2.0x, remaining 10:09 RBU 100.0% UBU 44.6%
16612524032/21746933760 (76.4%) @1.8x, remaining 10:06 RBU 100.0% UBU 48.9%
16639787008/21746933760 (76.5%) @1.8x, remaining 10:03 RBU 100.0% UBU 46.8%
16669933568/21746933760 (76.7%) @2.0x, remaining 9:59 RBU 100.0% UBU 50.0%
16694050816/21746933760 (76.8%) @1.6x, remaining 9:57 RBU 100.0% UBU 50.0%
16724197376/21746933760 (76.9%) @2.0x, remaining 9:53 RBU 100.0% UBU 45.7%
16749690880/21746933760 (77.0%) @1.7x, remaining 9:50 RBU 100.0% UBU 50.0%
16778461184/21746933760 (77.2%) @1.9x, remaining 9:47 RBU 100.0% UBU 46.8%
16808280064/21746933760 (77.3%) @2.0x, remaining 9:43 RBU 100.0% UBU 55.4%
16832724992/21746933760 (77.4%) @1.6x, remaining 9:40 RBU 100.0% UBU 47.8%
16862347264/21746933760 (77.5%) @2.0x, remaining 9:37 RBU 100.0% UBU 53.2%
16886988800/21746933760 (77.7%) @1.6x, remaining 9:34 RBU 100.0% UBU 50.0%
16917135360/21746933760 (77.8%) @2.0x, remaining 9:30 RBU 100.0% UBU 43.5%
16942923776/21746933760 (77.9%) @1.7x, remaining 9:27 RBU 100.0% UBU 53.2%
16971399168/21746933760 (78.0%) @1.9x, remaining 9:24 RBU 100.0% UBU 47.8%
17000464384/21746933760 (78.2%) @1.9x, remaining 9:21 RBU 100.0% UBU 54.3%
17025662976/21746933760 (78.3%) @1.7x, remaining 9:18 RBU 100.0% UBU 46.8%
17055809536/21746933760 (78.4%) @2.0x, remaining 9:14 RBU 100.0% UBU 40.3%
17079926784/21746933760 (78.5%) @1.6x, remaining 9:11 RBU 100.0% UBU 43.5%
17110073344/21746933760 (78.7%) @2.0x, remaining 9:08 RBU 100.0% UBU 39.2%
17139793920/21746933760 (78.8%) @2.0x, remaining 9:04 RBU 100.0% UBU 45.7%
17164337152/21746933760 (78.9%) @1.6x, remaining 9:01 RBU 100.0% UBU 41.4%
17194483712/21746933760 (79.1%) @2.0x, remaining 8:58 RBU 100.0% UBU 46.8%
17224630272/21746933760 (79.2%) @2.0x, remaining 8:54 RBU 100.0% UBU 42.5%
17248747520/21746933760 (79.3%) @1.6x, remaining 8:51 RBU 100.0% UBU 51.1%
17278894080/21746933760 (79.5%) @2.0x, remaining 8:48 RBU 100.0% UBU 41.4%
17309040640/21746933760 (79.6%) @2.0x, remaining 8:44 RBU 100.0% UBU 40.3%
17334272000/21746933760 (79.7%) @1.7x, remaining 8:41 RBU 100.0% UBU 45.7%
17363304448/21746933760 (79.8%) @1.9x, remaining 8:38 RBU 100.0% UBU 42.5%
17393451008/21746933760 (80.0%) @2.0x, remaining 8:34 RBU 100.0% UBU 53.2%
17420615680/21746933760 (80.1%) @1.8x, remaining 8:31 RBU 100.0% UBU 44.6%
17447714816/21746933760 (80.2%) @1.8x, remaining 8:28 RBU 100.0% UBU 44.6%
17477861376/21746933760 (80.4%) @2.0x, remaining 8:24 RBU 100.0% UBU 51.1%
17508007936/21746933760 (80.5%) @2.0x, remaining 8:21 RBU 100.0% UBU 52.2%
17532715008/21746933760 (80.6%) @1.6x, remaining 8:18 RBU 100.0% UBU 54.3%
17562271744/21746933760 (80.8%) @2.0x, remaining 8:14 RBU 100.0% UBU 53.2%
17592418304/21746933760 (80.9%) @2.0x, remaining 8:11 RBU 100.0% UBU 43.5%
17620762624/21746933760 (81.0%) @1.9x, remaining 8:07 RBU 100.0% UBU 42.5%
17646714880/21746933760 (81.1%) @1.7x, remaining 8:04 RBU 100.0% UBU 44.6%
17676828672/21746933760 (81.3%) @2.0x, remaining 8:01 RBU 100.0% UBU 56.5%
17706123264/21746933760 (81.4%) @2.0x, remaining 7:57 RBU 100.0% UBU 42.5%
17732468736/21746933760 (81.5%) @1.8x, remaining 7:54 RBU 100.0% UBU 45.7%
17761239040/21746933760 (81.7%) @1.9x, remaining 7:51 RBU 100.0% UBU 48.9%
17790992384/21746933760 (81.8%) @2.0x, remaining 7:47 RBU 100.0% UBU 47.8%
17816158208/21746933760 (81.9%) @1.7x, remaining 7:44 RBU 100.0% UBU 46.8%
17845649408/21746933760 (82.1%) @2.0x, remaining 7:41 RBU 100.0% UBU 50.0%
17875795968/21746933760 (82.2%) @2.0x, remaining 7:37 RBU 100.0% UBU 39.2%
17903648768/21746933760 (82.3%) @1.9x, remaining 7:34 RBU 100.0% UBU 45.7%
17930518528/21746933760 (82.5%) @1.8x, remaining 7:31 RBU 100.0% UBU 51.1%
17960206336/21746933760 (82.6%) @2.0x, remaining 7:27 RBU 100.0% UBU 40.3%
17990221824/21746933760 (82.7%) @2.0x, remaining 7:24 RBU 100.0% UBU 50.0%
18015158272/21746933760 (82.8%) @1.7x, remaining 7:21 RBU 100.0% UBU 42.5%
18044780544/21746933760 (83.0%) @2.0x, remaining 7:17 RBU 100.0% UBU 42.5%
18074763264/21746933760 (83.1%) @2.0x, remaining 7:14 RBU 100.0% UBU 39.2%
18102353920/21746933760 (83.2%) @1.8x, remaining 7:10 RBU 100.0% UBU 41.4%
18130141184/21746933760 (83.4%) @1.9x, remaining 7:07 RBU 100.0% UBU 48.9%
18159173632/21746933760 (83.5%) @1.9x, remaining 7:04 RBU 100.0% UBU 40.3%
18189320192/21746933760 (83.6%) @2.0x, remaining 7:00 RBU 100.0% UBU 44.6%
18213502976/21746933760 (83.8%) @1.6x, remaining 6:57 RBU 100.0% UBU 40.3%
18243584000/21746933760 (83.9%) @2.0x, remaining 6:54 RBU 100.0% UBU 41.4%
18273730560/21746933760 (84.0%) @2.0x, remaining 6:50 RBU 100.0% UBU 40.3%
18300370944/21746933760 (84.2%) @1.8x, remaining 6:47 RBU 100.0% UBU 46.8%
18328190976/21746933760 (84.3%) @1.9x, remaining 6:44 RBU 100.0% UBU 40.3%
18358140928/21746933760 (84.4%) @2.0x, remaining 6:40 RBU 100.0% UBU 40.3%
18386976768/21746933760 (84.5%) @1.9x, remaining 6:37 RBU 100.0% UBU 41.4%
18412404736/21746933760 (84.7%) @1.7x, remaining 6:34 RBU 100.0% UBU 39.2%
18442551296/21746933760 (84.8%) @2.0x, remaining 6:30 RBU 100.0% UBU 44.6%
18472697856/21746933760 (84.9%) @2.0x, remaining 6:26 RBU 100.0% UBU 40.3%
18496815104/21746933760 (85.1%) @1.6x, remaining 6:24 RBU 100.0% UBU 48.9%
18526961664/21746933760 (85.2%) @2.0x, remaining 6:20 RBU 100.0% UBU 40.3%
18557108224/21746933760 (85.3%) @2.0x, remaining 6:16 RBU 100.0% UBU 42.5%
18581225472/21746933760 (85.4%) @1.6x, remaining 6:14 RBU 100.0% UBU 46.8%
18611372032/21746933760 (85.6%) @2.0x, remaining 6:10 RBU 100.0% UBU 45.7%
18638143488/21746933760 (85.7%) @1.8x, remaining 6:07 RBU 100.0% UBU 52.2%
18665635840/21746933760 (85.8%) @1.8x, remaining 6:04 RBU 100.0% UBU 48.9%
18695782400/21746933760 (86.0%) @2.0x, remaining 6:00 RBU 100.0% UBU 42.5%
18719899648/21746933760 (86.1%) @1.6x, remaining 5:57 RBU 100.0% UBU 47.8%
18750046208/21746933760 (86.2%) @2.0x, remaining 5:54 RBU 100.0% UBU 46.8%
18774884352/21746933760 (86.3%) @1.7x, remaining 5:51 RBU 99.9% UBU 53.2%
18804310016/21746933760 (86.5%) @2.0x, remaining 5:47 RBU 100.0% UBU 43.5%
18833997824/21746933760 (86.6%) @2.0x, remaining 5:44 RBU 100.0% UBU 51.1%
18858573824/21746933760 (86.7%) @1.6x, remaining 5:41 RBU 100.0% UBU 47.8%
18888720384/21746933760 (86.9%) @2.0x, remaining 5:37 RBU 100.0% UBU 48.9%
18912837632/21746933760 (87.0%) @1.6x, remaining 5:35 RBU 100.0% UBU 48.9%
18942984192/21746933760 (87.1%) @2.0x, remaining 5:31 RBU 100.0% UBU 47.8%
18968379392/21746933760 (87.2%) @1.7x, remaining 5:28 RBU 99.0% UBU 53.2%
18997248000/21746933760 (87.4%) @1.9x, remaining 5:25 RBU 100.0% UBU 46.8%
19026051072/21746933760 (87.5%) @1.9x, remaining 5:21 RBU 100.0% UBU 56.5%
19051511808/21746933760 (87.6%) @1.7x, remaining 5:18 RBU 100.0% UBU 50.0%
19081396224/21746933760 (87.7%) @2.0x, remaining 5:15 RBU 100.0% UBU 53.2%
19105775616/21746933760 (87.9%) @1.6x, remaining 5:12 RBU 100.0% UBU 48.9%
19135922176/21746933760 (88.0%) @2.0x, remaining 5:08 RBU 100.0% UBU 42.5%
19162071040/21746933760 (88.1%) @1.7x, remaining 5:05 RBU 99.8% UBU 46.8%
19190185984/21746933760 (88.2%) @1.9x, remaining 5:02 RBU 100.0% UBU 51.1%
19220332544/21746933760 (88.4%) @2.0x, remaining 4:58 RBU 100.0% UBU 45.7%
19244449792/21746933760 (88.5%) @1.6x, remaining 4:56 RBU 100.0% UBU 45.7%
19274596352/21746933760 (88.6%) @2.0x, remaining 4:52 RBU 100.0% UBU 40.3%
19304742912/21746933760 (88.8%) @2.0x, remaining 4:48 RBU 100.0% UBU 44.6%
19329056768/21746933760 (88.9%) @1.6x, remaining 4:46 RBU 100.0% UBU 41.4%
19359006720/21746933760 (89.0%) @2.0x, remaining 4:42 RBU 100.0% UBU 42.5%
19388694528/21746933760 (89.2%) @2.0x, remaining 4:38 RBU 100.0% UBU 40.3%
19414188032/21746933760 (89.3%) @1.7x, remaining 4:36 RBU 100.0% UBU 50.0%
19443417088/21746933760 (89.4%) @1.9x, remaining 4:32 RBU 100.0% UBU 41.4%
19472318464/21746933760 (89.5%) @1.9x, remaining 4:29 RBU 100.0% UBU 41.4%
19497680896/21746933760 (89.7%) @1.7x, remaining 4:26 RBU 100.0% UBU 47.8%
19527827456/21746933760 (89.8%) @2.0x, remaining 4:22 RBU 100.0% UBU 39.2%
19557220352/21746933760 (89.9%) @2.0x, remaining 4:18 RBU 100.0% UBU 55.4%
19585007616/21746933760 (90.1%) @1.9x, remaining 4:15 RBU 100.0% UBU 41.4%
19612237824/21746933760 (90.2%) @1.8x, remaining 4:12 RBU 100.0% UBU 48.9%
19641729024/21746933760 (90.3%) @2.0x, remaining 4:08 RBU 100.0% UBU 45.7%
19667484672/21746933760 (90.4%) @1.7x, remaining 4:06 RBU 100.0% UBU 53.2%
19696648192/21746933760 (90.6%) @1.9x, remaining 4:02 RBU 100.0% UBU 53.2%
19726794752/21746933760 (90.7%) @2.0x, remaining 3:58 RBU 100.0% UBU 39.2%
19755859968/21746933760 (90.8%) @1.9x, remaining 3:55 RBU 100.0% UBU 50.0%
19781386240/21746933760 (91.0%) @1.7x, remaining 3:52 RBU 100.0% UBU 40.3%
19811205120/21746933760 (91.1%) @2.0x, remaining 3:48 RBU 100.0% UBU 47.8%
19841351680/21746933760 (91.2%) @2.0x, remaining 3:45 RBU 100.0% UBU 52.2%
19866976256/21746933760 (91.4%) @1.7x, remaining 3:42 RBU 99.1% UBU 40.3%
19896532992/21746933760 (91.5%) @2.0x, remaining 3:38 RBU 100.0% UBU 42.5%
19925762048/21746933760 (91.6%) @2.0x, remaining 3:35 RBU 100.0% UBU 44.6%
19955286016/21746933760 (91.8%) @2.0x, remaining 3:31 RBU 100.0% UBU 39.2%
19981402112/21746933760 (91.9%) @1.7x, remaining 3:28 RBU 100.0% UBU 39.2%
20010172416/21746933760 (92.0%) @1.9x, remaining 3:25 RBU 100.0% UBU 42.5%
20040318976/21746933760 (92.2%) @2.0x, remaining 3:21 RBU 100.0% UBU 53.2%
20065288192/21746933760 (92.3%) @1.7x, remaining 3:18 RBU 100.0% UBU 40.3%
20095139840/21746933760 (92.4%) @2.0x, remaining 3:15 RBU 100.0% UBU 43.5%
20124729344/21746933760 (92.5%) @2.0x, remaining 3:11 RBU 100.0% UBU 51.1%
20154351616/21746933760 (92.7%) @2.0x, remaining 3:08 RBU 100.0% UBU 41.4%
20178993152/21746933760 (92.8%) @1.6x, remaining 3:05 RBU 100.0% UBU 46.8%
20209139712/21746933760 (92.9%) @2.0x, remaining 3:01 RBU 100.0% UBU 39.2%
20239286272/21746933760 (93.1%) @2.0x, remaining 2:58 RBU 100.0% UBU 47.8%
20264976384/21746933760 (93.2%) @1.7x, remaining 2:55 RBU 100.0% UBU 51.1%
20293550080/21746933760 (93.3%) @1.9x, remaining 2:51 RBU 100.0% UBU 39.2%
20323696640/21746933760 (93.5%) @2.0x, remaining 2:48 RBU 100.0% UBU 43.5%
20352204800/21746933760 (93.6%) @1.9x, remaining 2:44 RBU 100.0% UBU 39.2%
20378943488/21746933760 (93.7%) @1.8x, remaining 2:41 RBU 100.0% UBU 42.5%
20408107008/21746933760 (93.8%) @1.9x, remaining 2:38 RBU 100.0% UBU 40.3%
20438253568/21746933760 (94.0%) @2.0x, remaining 2:34 RBU 100.0% UBU 45.7%
20463550464/21746933760 (94.1%) @1.7x, remaining 2:31 RBU 100.0% UBU 41.4%
20492517376/21746933760 (94.2%) @1.9x, remaining 2:28 RBU 100.0% UBU 43.5%
20522663936/21746933760 (94.4%) @2.0x, remaining 2:24 RBU 100.0% UBU 48.9%
20549992448/21746933760 (94.5%) @1.8x, remaining 2:21 RBU 100.0% UBU 40.3%
20576927744/21746933760 (94.6%) @1.8x, remaining 2:18 RBU 100.0% UBU 40.3%
20607074304/21746933760 (94.8%) @2.0x, remaining 2:14 RBU 100.0% UBU 42.5%
20636598272/21746933760 (94.9%) @2.0x, remaining 2:11 RBU 100.0% UBU 40.3%
20661338112/21746933760 (95.0%) @1.6x, remaining 2:08 RBU 100.0% UBU 46.8%
20691484672/21746933760 (95.1%) @2.0x, remaining 2:04 RBU 100.0% UBU 40.3%
20721631232/21746933760 (95.3%) @2.0x, remaining 2:01 RBU 100.0% UBU 40.3%
20745748480/21746933760 (95.4%) @1.6x, remaining 1:58 RBU 100.0% UBU 42.5%
20775895040/21746933760 (95.5%) @2.0x, remaining 1:54 RBU 100.0% UBU 39.2%
20806041600/21746933760 (95.7%) @2.0x, remaining 1:51 RBU 100.0% UBU 44.6%
20831043584/21746933760 (95.8%) @1.7x, remaining 1:48 RBU 100.0% UBU 39.2%
20860305408/21746933760 (95.9%) @2.0x, remaining 1:44 RBU 100.0% UBU 48.9%
20890451968/21746933760 (96.1%) @2.0x, remaining 1:41 RBU 100.0% UBU 40.3%
20916731904/21746933760 (96.2%) @1.8x, remaining 1:38 RBU 100.0% UBU 40.3%
20944715776/21746933760 (96.3%) @1.9x, remaining 1:34 RBU 100.0% UBU 41.4%
20974862336/21746933760 (96.4%) @2.0x, remaining 1:31 RBU 100.0% UBU 45.7%
20998979584/21746933760 (96.6%) @1.6x, remaining 1:28 RBU 100.0% UBU 54.3%
21028732928/21746933760 (96.7%) @2.0x, remaining 1:24 RBU 100.0% UBU 46.8%
21054554112/21746933760 (96.8%) @1.7x, remaining 1:21 RBU 100.0% UBU 47.8%
21083389952/21746933760 (96.9%) @1.9x, remaining 1:18 RBU 100.0% UBU 47.8%
21113208832/21746933760 (97.1%) @2.0x, remaining 1:14 RBU 100.0% UBU 46.8%
21137653760/21746933760 (97.2%) @1.6x, remaining 1:12 RBU 100.0% UBU 51.1%
21167210496/21746933760 (97.3%) @2.0x, remaining 1:08 RBU 100.0% UBU 50.0%
21191917568/21746933760 (97.4%) @1.6x, remaining 1:05 RBU 100.0% UBU 55.4%
21222064128/21746933760 (97.6%) @2.0x, remaining 1:02 RBU 100.0% UBU 47.8%
21248966656/21746933760 (97.7%) @1.8x, remaining 0:58 RBU 99.6% UBU 47.8%
21276327936/21746933760 (97.8%) @1.8x, remaining 0:55 RBU 100.0% UBU 52.2%
21305982976/21746933760 (98.0%) @2.0x, remaining 0:52 RBU 100.0% UBU 48.9%
21330591744/21746933760 (98.1%) @1.6x, remaining 0:49 RBU 100.0% UBU 53.2%
21360738304/21746933760 (98.2%) @2.0x, remaining 0:45 RBU 100.0% UBU 47.8%
21384855552/21746933760 (98.3%) @1.6x, remaining 0:42 RBU 100.0% UBU 53.2%
21415002112/21746933760 (98.5%) @2.0x, remaining 0:39 RBU 100.0% UBU 47.8%
21440036864/21746933760 (98.6%) @1.7x, remaining 0:36 RBU 98.1% UBU 47.8%
21469265920/21746933760 (98.7%) @1.9x, remaining 0:32 RBU 100.0% UBU 52.2%
21496692736/21746933760 (98.8%) @1.8x, remaining 0:29 RBU 100.0% UBU 50.0%
21523529728/21746933760 (99.0%) @1.8x, remaining 0:26 RBU 100.0% UBU 52.2%
21553152000/21746933760 (99.1%) @2.0x, remaining 0:22 RBU 100.0% UBU 52.2%
21577793536/21746933760 (99.2%) @1.6x, remaining 0:20 RBU 100.0% UBU 56.5%
21607743488/21746933760 (99.4%) @2.0x, remaining 0:16 RBU 100.0% UBU 42.5%
21632057344/21746933760 (99.5%) @1.6x, remaining 0:13 RBU 100.0% UBU 51.1%
21662203904/21746933760 (99.6%) @2.0x, remaining 0:10 RBU 100.0% UBU 51.1%
21686321152/21746933760 (99.7%) @1.6x, remaining 0:07 RBU 100.0% UBU 50.0%
growisofs command:
-----------------------
/usr/bin/growisofs -Z /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=4gms -use-the-force-luke=tracksize:10618620 -speed=2 -use-the-force-luke=bufsize:32m
mkisofs
-----------------------
10618620
I: -input-charset not specified, using utf-8 (detected in locale settings)
This size can only be represented in the UDF filesystem.
Make sure that your clients support and use it.
ISO9660, Joliet, RockRidge, HFS will display incorrect size.
Using 2012_01_03_FJ_SAVE_FOR_YEA000.P;1 for /2012_01_03_fj_save_for_year_2011.7z.016.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.015.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA001.P;1 for /2012_01_03_fj_save_for_year_2011.7z.015.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.014.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA002.P;1 for /2012_01_03_fj_save_for_year_2011.7z.014.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.013.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA003.P;1 for /2012_01_03_fj_save_for_year_2011.7z.013.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.012.vol001+002.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA004.P;1 for /2012_01_03_fj_save_for_year_2011.7z.012.vol001+002.par2 (2012_01_03_fj_save_for_year_2011.7z.011.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA005.P;1 for /2012_01_03_fj_save_for_year_2011.7z.011.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.010.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA006.P;1 for /2012_01_03_fj_save_for_year_2011.7z.010.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.009.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA007.P;1 for /2012_01_03_fj_save_for_year_2011.7z.009.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.008.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA008.P;1 for /2012_01_03_fj_save_for_year_2011.7z.008.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.007.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA009.P;1 for /2012_01_03_fj_save_for_year_2011.7z.007.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.006.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA00A.P;1 for /2012_01_03_fj_save_for_year_2011.7z.006.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.005.vol003+004.par2)
Using 2012_01_03_FJ_SAVE_FOR_YE000.00;1 for /2012_01_03_fj_save_for_year_2011.7z.004 (2012_01_03_fj_save_for_year_2011.7z.003)
Using 2012_01_03_FJ_SAVE_FOR_YEA00B.P;1 for /2012_01_03_fj_save_for_year_2011.7z.005.vol003+004.par2 (2012_01_03_fj_save_for_year_2011.7z.002.vol001+002.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA00C.P;1 for /2012_01_03_fj_save_for_year_2011.7z.002.vol001+002.par2 (2012_01_03_fj_save_for_year_2011.7z.002.vol000+001.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA00D.P;1 for /2012_01_03_fj_save_for_year_2011.7z.002.vol000+001.par2 (2012_01_03_fj_save_for_year_2011.7z.001.vol001+002.par2)
Using 2012_01_03_FJ_SAVE_FOR_YEA00E.P;1 for /2012_01_03_fj_save_for_year_2011.7z.001.vol001+002.par2 (2012_01_03_fj_save_for_year_2011.7z.001.vol000+001.par2)
Using 2012_01_03_FJ_SAVE_FOR_YE000.PA;1 for /2012_01_03_fj_save_for_year_2011.7z.002.par2 (2012_01_03_fj_save_for_year_2011.7z.001.par2)
0.00% done, estimate finish Sun Feb 26 13:53:47 2012
0.01% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.02% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.03% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.04% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.05% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.06% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.07% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.08% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 3 times. ===
0.09% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.10% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.11% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.12% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.13% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.14% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.15% done, estimate finish Sun Feb 26 13:53:47 2012
=== last message repeated 2 times. ===
0.16% done, estimate finish Sun Feb 26 19:26:13 2012
0.16% done, estimate finish Sun Feb 26 19:16:13 2012
0.16% done, estimate finish Sun Feb 26 19:07:05 2012
0.17% done, estimate finish Sun Feb 26 18:58:27 2012
0.17% done, estimate finish Sun Feb 26 18:50:17 2012
0.18% done, estimate finish Sun Feb 26 18:42:18 2012
0.18% done, estimate finish Sun Feb 26 18:44:02 2012
0.19% done, estimate finish Sun Feb 26 18:36:50 2012
0.19% done, estimate finish Sun Feb 26 18:29:59 2012
0.20% done, estimate finish Sun Feb 26 18:23:16 2012
0.20% done, estimate finish Sun Feb 26 18:17:03 2012
0.21% done, estimate finish Sun Feb 26 18:11:07 2012
0.21% done, estimate finish Sun Feb 26 18:13:18 2012
0.22% done, estimate finish Sun Feb 26 18:07:32 2012
0.22% done, estimate finish Sun Feb 26 18:02:11 2012
0.23% done, estimate finish Sun Feb 26 17:57:03 2012
0.23% done, estimate finish Sun Feb 26 17:52:07 2012
0.24% done, estimate finish Sun Feb 26 17:47:15 2012
0.24% done, estimate finish Sun Feb 26 17:49:39 2012
0.24% done, estimate finish Sun Feb 26 17:45:09 2012
0.25% done, estimate finish Sun Feb 26 17:40:49 2012
0.25% done, estimate finish Sun Feb 26 17:36:31 2012
0.26% done, estimate finish Sun Feb 26 17:32:30 2012
0.26% done, estimate finish Sun Feb 26 17:28:37 2012
0.27% done, estimate finish Sun Feb 26 17:24:53 2012
0.27% done, estimate finish Sun Feb 26 17:27:15 2012
0.28% done, estimate finish Sun Feb 26 17:23:40 2012
0.28% done, estimate finish Sun Feb 26 17:20:12 2012
0.29% done, estimate finish Sun Feb 26 17:16:51 2012
0.29% done, estimate finish Sun Feb 26 17:13:29 2012
0.30% done, estimate finish Sun Feb 26 17:10:21 2012
0.30% done, estimate finish Sun Feb 26 17:07:18 2012
0.31% done, estimate finish Sun Feb 26 17:04:21 2012
0.31% done, estimate finish Sun Feb 26 17:01:24 2012
0.32% done, estimate finish Sun Feb 26 16:58:37 2012
0.32% done, estimate finish Sun Feb 26 16:55:55 2012
0.32% done, estimate finish Sun Feb 26 16:58:26 2012
0.33% done, estimate finish Sun Feb 26 16:55:44 2012
0.33% done, estimate finish Sun Feb 26 16:53:11 2012
0.34% done, estimate finish Sun Feb 26 16:50:43 2012
0.34% done, estimate finish Sun Feb 26 16:48:19 2012
0.35% done, estimate finish Sun Feb 26 16:45:54 2012
0.35% done, estimate finish Sun Feb 26 16:48:20 2012
0.36% done, estimate finish Sun Feb 26 16:46:04 2012
0.36% done, estimate finish Sun Feb 26 16:43:51 2012
0.37% done, estimate finish Sun Feb 26 16:41:37 2012
0.37% done, estimate finish Sun Feb 26 16:39:30 2012
0.38% done, estimate finish Sun Feb 26 16:37:27 2012
0.38% done, estimate finish Sun Feb 26 16:35:27 2012
0.39% done, estimate finish Sun Feb 26 16:33:26 2012
0.39% done, estimate finish Sun Feb 26 16:31:31 2012
0.40% done, estimate finish Sun Feb 26 16:29:39 2012
0.40% done, estimate finish Sun Feb 26 16:27:50 2012
0.41% done, estimate finish Sun Feb 26 16:30:07 2012
0.41% done, estimate finish Sun Feb 26 16:28:20 2012
0.41% done, estimate finish Sun Feb 26 16:26:36 2012
0.42% done, estimate finish Sun Feb 26 16:24:53 2012
0.42% done, estimate finish Sun Feb 26 16:23:10 2012
0.43% done, estimate finish Sun Feb 26 16:21:33 2012
0.43% done, estimate finish Sun Feb 26 16:23:48 2012
0.44% done, estimate finish Sun Feb 26 16:22:12 2012
0.44% done, estimate finish Sun Feb 26 16:20:35 2012
0.45% done, estimate finish Sun Feb 26 16:19:03 2012
0.45% done, estimate finish Sun Feb 26 16:17:33 2012
0.46% done, estimate finish Sun Feb 26 16:16:05 2012
0.46% done, estimate finish Sun Feb 26 16:14:35 2012
0.47% done, estimate finish Sun Feb 26 16:13:11 2012
0.47% done, estimate finish Sun Feb 26 16:11:48 2012
0.48% done, estimate finish Sun Feb 26 16:13:57 2012
0.48% done, estimate finish Sun Feb 26 16:12:32 2012
0.49% done, estimate finish Sun Feb 26 16:11:12 2012
0.49% done, estimate finish Sun Feb 26 16:09:54 2012
0.49% done, estimate finish Sun Feb 26 16:08:36 2012
0.50% done, estimate finish Sun Feb 26 16:07:18 2012
0.50% done, estimate finish Sun Feb 26 16:06:04 2012
0.51% done, estimate finish Sun Feb 26 16:04:51 2012
0.51% done, estimate finish Sun Feb 26 16:03:40 2012
0.52% done, estimate finish Sun Feb 26 16:05:40 2012
0.52% done, estimate finish Sun Feb 26 16:04:29 2012
0.53% done, estimate finish Sun Feb 26 16:03:20 2012
0.53% done, estimate finish Sun Feb 26 16:02:12 2012
0.54% done, estimate finish Sun Feb 26 16:01:02 2012
0.54% done, estimate finish Sun Feb 26 15:59:57 2012
0.55% done, estimate finish Sun Feb 26 16:01:55 2012
0.55% done, estimate finish Sun Feb 26 16:00:50 2012
0.56% done, estimate finish Sun Feb 26 15:59:44 2012
0.56% done, estimate finish Sun Feb 26 15:58:41 2012
0.57% done, estimate finish Sun Feb 26 15:57:39 2012
0.57% done, estimate finish Sun Feb 26 15:56:38 2012
0.57% done, estimate finish Sun Feb 26 15:55:36 2012
0.58% done, estimate finish Sun Feb 26 15:54:37 2012
0.58% done, estimate finish Sun Feb 26 15:53:39 2012
0.59% done, estimate finish Sun Feb 26 15:52:42 2012
0.59% done, estimate finish Sun Feb 26 15:51:44 2012
0.60% done, estimate finish Sun Feb 26 15:50:49 2012
0.60% done, estimate finish Sun Feb 26 15:52:40 2012
0.61% done, estimate finish Sun Feb 26 15:51:45 2012
0.61% done, estimate finish Sun Feb 26 15:50:50 2012
0.62% done, estimate finish Sun Feb 26 15:49:56 2012
0.62% done, estimate finish Sun Feb 26 15:49:04 2012
0.63% done, estimate finish Sun Feb 26 15:48:12 2012
0.63% done, estimate finish Sun Feb 26 15:49:58 2012
0.64% done, estimate finish Sun Feb 26 15:49:07 2012
0.64% done, estimate finish Sun Feb 26 15:48:17 2012
0.65% done, estimate finish Sun Feb 26 15:47:27 2012
0.65% done, estimate finish Sun Feb 26 15:46:36 2012
0.65% done, estimate finish Sun Feb 26 15:45:48 2012
0.66% done, estimate finish Sun Feb 26 15:45:00 2012
0.66% done, estimate finish Sun Feb 26 15:44:13 2012
0.67% done, estimate finish Sun Feb 26 15:45:55 2012
0.67% done, estimate finish Sun Feb 26 15:45:09 2012
0.68% done, estimate finish Sun Feb 26 15:44:22 2012
0.68% done, estimate finish Sun Feb 26 15:43:37 2012
0.69% done, estimate finish Sun Feb 26 15:42:51 2012
0.69% done, estimate finish Sun Feb 26 15:42:07 2012
0.70% done, estimate finish Sun Feb 26 15:41:23 2012
0.70% done, estimate finish Sun Feb 26 15:40:40 2012
0.71% done, estimate finish Sun Feb 26 15:39:56 2012
0.71% done, estimate finish Sun Feb 26 15:41:35 2012
0.72% done, estimate finish Sun Feb 26 15:40:53 2012
0.72% done, estimate finish Sun Feb 26 15:40:11 2012
0.73% done, estimate finish Sun Feb 26 15:39:29 2012
0.73% done, estimate finish Sun Feb 26 15:38:48 2012
0.73% done, estimate finish Sun Feb 26 15:38:08 2012
0.74% done, estimate finish Sun Feb 26 15:39:44 2012
0.74% done, estimate finish Sun Feb 26 15:39:03 2012
0.75% done, estimate finish Sun Feb 26 15:38:23 2012
0.75% done, estimate finish Sun Feb 26 15:37:44 2012
0.76% done, estimate finish Sun Feb 26 15:37:06 2012
0.76% done, estimate finish Sun Feb 26 15:36:27 2012
0.77% done, estimate finish Sun Feb 26 15:35:49 2012
0.77% done, estimate finish Sun Feb 26 15:35:12 2012
0.78% done, estimate finish Sun Feb 26 15:34:36 2012
0.78% done, estimate finish Sun Feb 26 15:33:58 2012
0.79% done, estimate finish Sun Feb 26 15:33:23 2012
0.79% done, estimate finish Sun Feb 26 15:32:47 2012
0.80% done, estimate finish Sun Feb 26 15:34:18 2012
0.80% done, estimate finish Sun Feb 26 15:33:42 2012
0.81% done, estimate finish Sun Feb 26 15:33:07 2012
0.81% done, estimate finish Sun Feb 26 15:32:33 2012
0.81% done, estimate finish Sun Feb 26 15:31:59 2012
0.82% done, estimate finish Sun Feb 26 15:31:24 2012
0.82% done, estimate finish Sun Feb 26 15:32:52 2012
0.83% done, estimate finish Sun Feb 26 15:32:19 2012
0.83% done, estimate finish Sun Feb 26 15:31:46 2012
0.84% done, estimate finish Sun Feb 26 15:31:12 2012
0.84% done, estimate finish Sun Feb 26 15:30:39 2012
0.85% done, estimate finish Sun Feb 26 15:30:07 2012
0.85% done, estimate finish Sun Feb 26 15:29:36 2012
0.86% done, estimate finish Sun Feb 26 15:29:03 2012
0.86% done, estimate finish Sun Feb 26 15:30:28 2012
0.87% done, estimate finish Sun Feb 26 15:29:57 2012
0.87% done, estimate finish Sun Feb 26 15:29:26 2012
0.88% done, estimate finish Sun Feb 26 15:28:55 2012
0.88% done, estimate finish Sun Feb 26 15:28:24 2012
0.89% done, estimate finish Sun Feb 26 15:27:54 2012
0.89% done, estimate finish Sun Feb 26 15:27:25 2012
0.89% done, estimate finish Sun Feb 26 15:26:54 2012
0.90% done, estimate finish Sun Feb 26 15:26:25 2012
0.90% done, estimate finish Sun Feb 26 15:27:47 2012
0.91% done, estimate finish Sun Feb 26 15:27:18 2012
0.91% done, estimate finish Sun Feb 26 15:26:49 2012
0.92% done, estimate finish Sun Feb 26 15:26:20 2012
0.92% done, estimate finish Sun Feb 26 15:25:52 2012
0.93% done, estimate finish Sun Feb 26 15:25:24 2012
0.93% done, estimate finish Sun Feb 26 15:24:56 2012
0.94% done, estimate finish Sun Feb 26 15:26:15 2012
0.94% done, estimate finish Sun Feb 26 15:25:48 2012
0.95% done, estimate finish Sun Feb 26 15:25:21 2012
0.95% done, estimate finish Sun Feb 26 15:24:53 2012
0.96% done, estimate finish Sun Feb 26 15:24:26 2012
0.96% done, estimate finish Sun Feb 26 15:24:00 2012
0.97% done, estimate finish Sun Feb 26 15:23:33 2012
0.97% done, estimate finish Sun Feb 26 15:23:07 2012
0.97% done, estimate finish Sun Feb 26 15:22:41 2012
0.98% done, estimate finish Sun Feb 26 15:22:15 2012
0.98% done, estimate finish Sun Feb 26 15:21:50 2012
0.99% done, estimate finish Sun Feb 26 15:23:06 2012
0.99% done, estimate finish Sun Feb 26 15:22:40 2012
1.00% done, estimate finish Sun Feb 26 15:22:15 2012
1.00% done, estimate finish Sun Feb 26 15:21:51 2012
1.01% done, estimate finish Sun Feb 26 15:21:25 2012
1.01% done, estimate finish Sun Feb 26 15:21:01 2012
1.02% done, estimate finish Sun Feb 26 15:20:37 2012
1.02% done, estimate finish Sun Feb 26 15:21:51 2012
1.03% done, estimate finish Sun Feb 26 15:21:26 2012
1.03% done, estimate finish Sun Feb 26 15:21:03 2012
1.04% done, estimate finish Sun Feb 26 15:20:39 2012
1.04% done, estimate finish Sun Feb 26 15:20:16 2012
1.05% done, estimate finish Sun Feb 26 15:19:52 2012
1.05% done, estimate finish Sun Feb 26 15:19:29 2012
1.05% done, estimate finish Sun Feb 26 15:19:06 2012
1.06% done, estimate finish Sun Feb 26 15:18:43 2012
1.06% done, estimate finish Sun Feb 26 15:19:54 2012
1.07% done, estimate finish Sun Feb 26 15:19:32 2012
1.07% done, estimate finish Sun Feb 26 15:19:09 2012
1.08% done, estimate finish Sun Feb 26 15:18:47 2012
1.08% done, estimate finish Sun Feb 26 15:18:24 2012
1.09% done, estimate finish Sun Feb 26 15:18:03 2012
1.09% done, estimate finish Sun Feb 26 15:17:41 2012
1.10% done, estimate finish Sun Feb 26 15:17:19 2012
1.10% done, estimate finish Sun Feb 26 15:18:28 2012
1.11% done, estimate finish Sun Feb 26 15:18:07 2012
1.11% done, estimate finish Sun Feb 26 15:17:46 2012
1.12% done, estimate finish Sun Feb 26 15:17:24 2012
1.12% done, estimate finish Sun Feb 26 15:17:03 2012
1.13% done, estimate finish Sun Feb 26 15:16:42 2012
1.13% done, estimate finish Sun Feb 26 15:16:22 2012
1.13% done, estimate finish Sun Feb 26 15:16:01 2012
1.14% done, estimate finish Sun Feb 26 15:15:40 2012
1.14% done, estimate finish Sun Feb 26 15:16:48 2012
1.15% done, estimate finish Sun Feb 26 15:16:27 2012
1.15% done, estimate finish Sun Feb 26 15:16:07 2012
1.16% done, estimate finish Sun Feb 26 15:15:47 2012
1.16% done, estimate finish Sun Feb 26 15:15:27 2012
1.17% done, estimate finish Sun Feb 26 15:15:07 2012
1.17% done, estimate finish Sun Feb 26 15:14:48 2012
1.18% done, estimate finish Sun Feb 26 15:14:28 2012
1.18% done, estimate finish Sun Feb 26 15:15:33 2012
1.19% done, estimate finish Sun Feb 26 15:15:14 2012
1.19% done, estimate finish Sun Feb 26 15:14:55 2012
1.20% done, estimate finish Sun Feb 26 15:14:35 2012
1.20% done, estimate finish Sun Feb 26 15:14:17 2012
1.21% done, estimate finish Sun Feb 26 15:13:58 2012
1.21% done, estimate finish Sun Feb 26 15:15:02 2012
1.21% done, estimate finish Sun Feb 26 15:14:43 2012
1.22% done, estimate finish Sun Feb 26 15:14:24 2012
1.22% done, estimate finish Sun Feb 26 15:14:05 2012
1.23% done, estimate finish Sun Feb 26 15:13:47 2012
1.23% done, estimate finish Sun Feb 26 15:13:28 2012
1.24% done, estimate finish Sun Feb 26 15:13:10 2012
1.24% done, estimate finish Sun Feb 26 15:12:52 2012
1.25% done, estimate finish Sun Feb 26 15:12:35 2012
1.25% done, estimate finish Sun Feb 26 15:12:16 2012
1.26% done, estimate finish Sun Feb 26 15:11:59 2012
1.26% done, estimate finish Sun Feb 26 15:13:01 2012
1.27% done, estimate finish Sun Feb 26 15:12:43 2012
1.27% done, estimate finish Sun Feb 26 15:12:25 2012
1.28% done, estimate finish Sun Feb 26 15:12:08 2012
1.28% done, estimate finish Sun Feb 26 15:11:51 2012
1.29% done, estimate finish Sun Feb 26 15:11:34 2012
1.29% done, estimate finish Sun Feb 26 15:11:16 2012
1.29% done, estimate finish Sun Feb 26 15:12:17 2012
1.30% done, estimate finish Sun Feb 26 15:12:00 2012
1.30% done, estimate finish Sun Feb 26 15:11:43 2012
1.31% done, estimate finish Sun Feb 26 15:11:26 2012
1.31% done, estimate finish Sun Feb 26 15:11:09 2012
1.32% done, estimate finish Sun Feb 26 15:10:53 2012
1.32% done, estimate finish Sun Feb 26 15:11:52 2012
1.33% done, estimate finish Sun Feb 26 15:11:35 2012
1.33% done, estimate finish Sun Feb 26 15:11:19 2012
1.34% done, estimate finish Sun Feb 26 15:11:03 2012
1.34% done, estimate finish Sun Feb 26 15:10:46 2012
1.35% done, estimate finish Sun Feb 26 15:10:30 2012
1.35% done, estimate finish Sun Feb 26 15:10:14 2012
1.36% done, estimate finish Sun Feb 26 15:09:58 2012
1.36% done, estimate finish Sun Feb 26 15:09:42 2012
1.37% done, estimate finish Sun Feb 26 15:09:26 2012
1.37% done, estimate finish Sun Feb 26 15:09:11 2012
1.38% done, estimate finish Sun Feb 26 15:10:08 2012
1.38% done, estimate finish Sun Feb 26 15:09:53 2012
1.38% done, estimate finish Sun Feb 26 15:09:37 2012
1.39% done, estimate finish Sun Feb 26 15:09:22 2012
1.39% done, estimate finish Sun Feb 26 15:09:06 2012
1.40% done, estimate finish Sun Feb 26 15:08:51 2012
1.40% done, estimate finish Sun Feb 26 15:08:36 2012
1.41% done, estimate finish Sun Feb 26 15:09:32 2012
1.41% done, estimate finish Sun Feb 26 15:09:17 2012
1.42% done, estimate finish Sun Feb 26 15:09:02 2012
1.42% done, estimate finish Sun Feb 26 15:08:47 2012
1.43% done, estimate finish Sun Feb 26 15:08:32 2012
1.43% done, estimate finish Sun Feb 26 15:08:17 2012
1.44% done, estimate finish Sun Feb 26 15:08:03 2012
1.44% done, estimate finish Sun Feb 26 15:07:48 2012
1.45% done, estimate finish Sun Feb 26 15:07:33 2012
1.45% done, estimate finish Sun Feb 26 15:07:19 2012
1.46% done, estimate finish Sun Feb 26 15:07:05 2012
1.46% done, estimate finish Sun Feb 26 15:07:59 2012
1.46% done, estimate finish Sun Feb 26 15:07:45 2012
1.47% done, estimate finish Sun Feb 26 15:07:31 2012
1.47% done, estimate finish Sun Feb 26 15:07:17 2012
1.48% done, estimate finish Sun Feb 26 15:07:02 2012
1.48% done, estimate finish Sun Feb 26 15:06:48 2012
1.49% done, estimate finish Sun Feb 26 15:07:42 2012
1.49% done, estimate finish Sun Feb 26 15:07:28 2012
1.50% done, estimate finish Sun Feb 26 15:07:14 2012
1.50% done, estimate finish Sun Feb 26 15:07:00 2012
1.51% done, estimate finish Sun Feb 26 15:06:46 2012
1.51% done, estimate finish Sun Feb 26 15:06:33 2012
1.52% done, estimate finish Sun Feb 26 15:06:19 2012
1.52% done, estimate finish Sun Feb 26 15:06:06 2012
1.53% done, estimate finish Sun Feb 26 15:06:58 2012
1.53% done, estimate finish Sun Feb 26 15:06:45 2012
1.54% done, estimate finish Sun Feb 26 15:06:31 2012
1.54% done, estimate finish Sun Feb 26 15:06:18 2012
1.54% done, estimate finish Sun Feb 26 15:06:04 2012
1.55% done, estimate finish Sun Feb 26 15:05:51 2012
1.55% done, estimate finish Sun Feb 26 15:05:38 2012
1.56% done, estimate finish Sun Feb 26 15:05:25 2012
1.56% done, estimate finish Sun Feb 26 15:05:12 2012
1.57% done, estimate finish Sun Feb 26 15:04:59 2012
1.57% done, estimate finish Sun Feb 26 15:05:50 2012
1.58% done, estimate finish Sun Feb 26 15:05:37 2012
1.58% done, estimate finish Sun Feb 26 15:05:24 2012
1.59% done, estimate finish Sun Feb 26 15:05:12 2012
1.59% done, estimate finish Sun Feb 26 15:04:59 2012
1.60% done, estimate finish Sun Feb 26 15:04:46 2012
1.60% done, estimate finish Sun Feb 26 15:05:36 2012
1.61% done, estimate finish Sun Feb 26 15:05:24 2012
1.61% done, estimate finish Sun Feb 26 15:05:11 2012
1.62% done, estimate finish Sun Feb 26 15:04:58 2012
1.62% done, estimate finish Sun Feb 26 15:04:46 2012
1.62% done, estimate finish Sun Feb 26 15:04:34 2012
1.63% done, estimate finish Sun Feb 26 15:04:21 2012
1.63% done, estimate finish Sun Feb 26 15:04:09 2012
1.64% done, estimate finish Sun Feb 26 15:03:57 2012
1.64% done, estimate finish Sun Feb 26 15:03:45 2012
1.65% done, estimate finish Sun Feb 26 15:03:33 2012
1.65% done, estimate finish Sun Feb 26 15:04:22 2012
1.66% done, estimate finish Sun Feb 26 15:04:10 2012
1.66% done, estimate finish Sun Feb 26 15:03:58 2012
1.67% done, estimate finish Sun Feb 26 15:03:46 2012
1.67% done, estimate finish Sun Feb 26 15:03:34 2012
1.68% done, estimate finish Sun Feb 26 15:03:22 2012
1.68% done, estimate finish Sun Feb 26 15:04:10 2012
1.69% done, estimate finish Sun Feb 26 15:03:58 2012
1.69% done, estimate finish Sun Feb 26 15:03:46 2012
1.70% done, estimate finish Sun Feb 26 15:03:35 2012
1.70% done, estimate finish Sun Feb 26 15:03:23 2012
1.70% done, estimate finish Sun Feb 26 15:03:11 2012
1.71% done, estimate finish Sun Feb 26 15:03:00 2012
1.71% done, estimate finish Sun Feb 26 15:02:49 2012
1.72% done, estimate finish Sun Feb 26 15:03:36 2012
1.72% done, estimate finish Sun Feb 26 15:03:24 2012
1.73% done, estimate finish Sun Feb 26 15:03:13 2012
1.73% done, estimate finish Sun Feb 26 15:03:01 2012
1.74% done, estimate finish Sun Feb 26 15:02:50 2012
1.74% done, estimate finish Sun Feb 26 15:02:39 2012
1.75% done, estimate finish Sun Feb 26 15:02:28 2012
1.75% done, estimate finish Sun Feb 26 15:02:17 2012
1.76% done, estimate finish Sun Feb 26 15:02:06 2012
1.76% done, estimate finish Sun Feb 26 15:01:55 2012
1.77% done, estimate finish Sun Feb 26 15:02:40 2012
1.77% done, estimate finish Sun Feb 26 15:02:30 2012
1.78% done, estimate finish Sun Feb 26 15:02:19 2012
1.78% done, estimate finish Sun Feb 26 15:02:08 2012
1.78% done, estimate finish Sun Feb 26 15:01:57 2012
1.79% done, estimate finish Sun Feb 26 15:01:46 2012
1.79% done, estimate finish Sun Feb 26 15:02:31 2012
1.80% done, estimate finish Sun Feb 26 15:02:20 2012
1.80% done, estimate finish Sun Feb 26 15:02:10 2012
1.81% done, estimate finish Sun Feb 26 15:01:59 2012
1.81% done, estimate finish Sun Feb 26 15:01:48 2012
1.82% done, estimate finish Sun Feb 26 15:01:38 2012
1.82% done, estimate finish Sun Feb 26 15:01:27 2012
1.83% done, estimate finish Sun Feb 26 15:01:17 2012
1.83% done, estimate finish Sun Feb 26 15:01:06 2012
1.84% done, estimate finish Sun Feb 26 15:00:56 2012
1.84% done, estimate finish Sun Feb 26 15:00:46 2012
1.85% done, estimate finish Sun Feb 26 15:00:35 2012
1.85% done, estimate finish Sun Feb 26 15:01:19 2012
1.86% done, estimate finish Sun Feb 26 15:01:09 2012
1.86% done, estimate finish Sun Feb 26 15:00:59 2012
1.86% done, estimate finish Sun Feb 26 15:00:49 2012
1.87% done, estimate finish Sun Feb 26 15:00:39 2012
1.87% done, estimate finish Sun Feb 26 15:01:22 2012
1.88% done, estimate finish Sun Feb 26 15:01:11 2012
1.88% done, estimate finish Sun Feb 26 15:01:01 2012
1.89% done, estimate finish Sun Feb 26 15:00:51 2012
1.89% done, estimate finish Sun Feb 26 15:00:41 2012
1.90% done, estimate finish Sun Feb 26 15:00:31 2012
1.90% done, estimate finish Sun Feb 26 15:00:21 2012
1.91% done, estimate finish Sun Feb 26 15:00:12 2012
1.91% done, estimate finish Sun Feb 26 15:00:54 2012
1.92% done, estimate finish Sun Feb 26 15:00:44 2012
1.92% done, estimate finish Sun Feb 26 15:00:34 2012
1.93% done, estimate finish Sun Feb 26 15:00:25 2012
1.93% done, estimate finish Sun Feb 26 15:00:15 2012
1.94% done, estimate finish Sun Feb 26 15:00:05 2012
1.94% done, estimate finish Sun Feb 26 14:59:55 2012
1.94% done, estimate finish Sun Feb 26 14:59:46 2012
1.95% done, estimate finish Sun Feb 26 14:59:36 2012
1.95% done, estimate finish Sun Feb 26 14:59:27 2012
1.96% done, estimate finish Sun Feb 26 15:00:08 2012
1.96% done, estimate finish Sun Feb 26 14:59:59 2012
1.97% done, estimate finish Sun Feb 26 14:59:49 2012
1.97% done, estimate finish Sun Feb 26 14:59:40 2012
1.98% done, estimate finish Sun Feb 26 14:59:30 2012
1.98% done, estimate finish Sun Feb 26 14:59:21 2012
1.99% done, estimate finish Sun Feb 26 15:00:02 2012
1.99% done, estimate finish Sun Feb 26 14:59:53 2012
2.00% done, estimate finish Sun Feb 26 14:59:43 2012
2.00% done, estimate finish Sun Feb 26 14:59:34 2012
2.01% done, estimate finish Sun Feb 26 14:59:25 2012
2.01% done, estimate finish Sun Feb 26 14:59:15 2012
2.02% done, estimate finish Sun Feb 26 14:59:06 2012
2.02% done, estimate finish Sun Feb 26 14:58:57 2012
2.02% done, estimate finish Sun Feb 26 14:58:48 2012
2.03% done, estimate finish Sun Feb 26 14:58:39 2012
2.03% done, estimate finish Sun Feb 26 14:58:30 2012
2.04% done, estimate finish Sun Feb 26 14:58:21 2012
2.04% done, estimate finish Sun Feb 26 14:59:01 2012
2.05% done, estimate finish Sun Feb 26 14:58:52 2012
2.05% done, estimate finish Sun Feb 26 14:58:43 2012
2.06% done, estimate finish Sun Feb 26 14:58:34 2012
2.06% done, estimate finish Sun Feb 26 14:58:25 2012
2.07% done, estimate finish Sun Feb 26 14:58:16 2012
2.07% done, estimate finish Sun Feb 26 14:58:56 2012
2.08% done, estimate finish Sun Feb 26 14:58:47 2012
2.08% done, estimate finish Sun Feb 26 14:58:38 2012
2.09% done, estimate finish Sun Feb 26 14:58:29 2012
2.09% done, estimate finish Sun Feb 26 14:58:21 2012
2.10% done, estimate finish Sun Feb 26 14:58:12 2012
2.10% done, estimate finish Sun Feb 26 14:58:03 2012
2.10% done, estimate finish Sun Feb 26 14:57:55 2012
2.11% done, estimate finish Sun Feb 26 14:58:34 2012
2.11% done, estimate finish Sun Feb 26 14:58:25 2012
2.12% done, estimate finish Sun Feb 26 14:58:16 2012
2.12% done, estimate finish Sun Feb 26 14:58:08 2012
2.13% done, estimate finish Sun Feb 26 14:57:59 2012
2.13% done, estimate finish Sun Feb 26 14:57:51 2012
2.14% done, estimate finish Sun Feb 26 14:57:42 2012
2.14% done, estimate finish Sun Feb 26 14:57:34 2012
2.15% done, estimate finish Sun Feb 26 14:57:25 2012
2.15% done, estimate finish Sun Feb 26 14:58:04 2012
2.16% done, estimate finish Sun Feb 26 14:57:55 2012
2.16% done, estimate finish Sun Feb 26 14:57:47 2012
2.17% done, estimate finish Sun Feb 26 14:57:38 2012
2.17% done, estimate finish Sun Feb 26 14:57:30 2012
2.18% done, estimate finish Sun Feb 26 14:57:22 2012
2.18% done, estimate finish Sun Feb 26 14:57:59 2012
2.18% done, estimate finish Sun Feb 26 14:57:51 2012
2.19% done, estimate finish Sun Feb 26 14:57:43 2012
2.19% done, estimate finish Sun Feb 26 14:57:34 2012
2.20% done, estimate finish Sun Feb 26 14:57:26 2012
2.20% done, estimate finish Sun Feb 26 14:57:18 2012
2.21% done, estimate finish Sun Feb 26 14:57:10 2012
2.21% done, estimate finish Sun Feb 26 14:57:02 2012
2.22% done, estimate finish Sun Feb 26 14:56:54 2012
2.22% done, estimate finish Sun Feb 26 14:56:46 2012
2.23% done, estimate finish Sun Feb 26 14:56:38 2012
2.23% done, estimate finish Sun Feb 26 14:56:30 2012
2.24% done, estimate finish Sun Feb 26 14:57:07 2012
2.24% done, estimate finish Sun Feb 26 14:56:59 2012
2.25% done, estimate finish Sun Feb 26 14:56:51 2012
2.25% done, estimate finish Sun Feb 26 14:56:43 2012
2.26% done, estimate finish Sun Feb 26 14:56:35 2012
2.26% done, estimate finish Sun Feb 26 14:56:27 2012
2.26% done, estimate finish Sun Feb 26 14:57:04 2012
2.27% done, estimate finish Sun Feb 26 14:56:55 2012
2.27% done, estimate finish Sun Feb 26 14:56:48 2012
2.28% done, estimate finish Sun Feb 26 14:56:40 2012
2.28% done, estimate finish Sun Feb 26 14:56:32 2012
2.29% done, estimate finish Sun Feb 26 14:56:24 2012
2.29% done, estimate finish Sun Feb 26 14:56:17 2012
2.30% done, estimate finish Sun Feb 26 14:56:09 2012
2.30% done, estimate finish Sun Feb 26 14:56:01 2012
2.31% done, estimate finish Sun Feb 26 14:56:37 2012
2.31% done, estimate finish Sun Feb 26 14:56:29 2012
2.32% done, estimate finish Sun Feb 26 14:56:22 2012
2.32% done, estimate finish Sun Feb 26 14:56:14 2012
2.33% done, estimate finish Sun Feb 26 14:56:06 2012
2.33% done, estimate finish Sun Feb 26 14:55:59 2012
2.34% done, estimate finish Sun Feb 26 14:55:51 2012
2.34% done, estimate finish Sun Feb 26 14:55:44 2012
2.35% done, estimate finish Sun Feb 26 14:55:36 2012
2.35% done, estimate finish Sun Feb 26 14:56:12 2012
2.35% done, estimate finish Sun Feb 26 14:56:04 2012
2.36% done, estimate finish Sun Feb 26 14:55:57 2012
2.36% done, estimate finish Sun Feb 26 14:55:49 2012
2.37% done, estimate finish Sun Feb 26 14:55:42 2012
2.37% done, estimate finish Sun Feb 26 14:55:34 2012
2.38% done, estimate finish Sun Feb 26 14:55:27 2012
2.38% done, estimate finish Sun Feb 26 14:56:02 2012
2.39% done, estimate finish Sun Feb 26 14:55:54 2012
2.39% done, estimate finish Sun Feb 26 14:55:47 2012
2.40% done, estimate finish Sun Feb 26 14:55:40 2012
2.40% done, estimate finish Sun Feb 26 14:55:32 2012
2.41% done, estimate finish Sun Feb 26 14:55:25 2012
2.41% done, estimate finish Sun Feb 26 14:55:18 2012
2.42% done, estimate finish Sun Feb 26 14:55:11 2012
2.42% done, estimate finish Sun Feb 26 14:55:04 2012
2.43% done, estimate finish Sun Feb 26 14:54:56 2012
2.43% done, estimate finish Sun Feb 26 14:55:31 2012
2.43% done, estimate finish Sun Feb 26 14:55:23 2012
2.44% done, estimate finish Sun Feb 26 14:55:16 2012
2.44% done, estimate finish Sun Feb 26 14:55:09 2012
2.45% done, estimate finish Sun Feb 26 14:55:02 2012
2.45% done, estimate finish Sun Feb 26 14:54:55 2012
2.46% done, estimate finish Sun Feb 26 14:55:29 2012
2.46% done, estimate finish Sun Feb 26 14:55:22 2012
2.47% done, estimate finish Sun Feb 26 14:55:15 2012
2.47% done, estimate finish Sun Feb 26 14:55:08 2012
2.48% done, estimate finish Sun Feb 26 14:55:00 2012
2.48% done, estimate finish Sun Feb 26 14:54:53 2012
2.49% done, estimate finish Sun Feb 26 14:54:47 2012
2.49% done, estimate finish Sun Feb 26 14:54:40 2012
2.50% done, estimate finish Sun Feb 26 14:54:33 2012
2.50% done, estimate finish Sun Feb 26 14:54:26 2012
2.51% done, estimate finish Sun Feb 26 14:54:19 2012
2.51% done, estimate finish Sun Feb 26 14:54:12 2012
2.51% done, estimate finish Sun Feb 26 14:54:45 2012
2.52% done, estimate finish Sun Feb 26 14:54:38 2012
2.52% done, estimate finish Sun Feb 26 14:54:32 2012
2.53% done, estimate finish Sun Feb 26 14:54:25 2012
2.53% done, estimate finish Sun Feb 26 14:54:18 2012
2.54% done, estimate finish Sun Feb 26 14:54:11 2012
2.54% done, estimate finish Sun Feb 26 14:54:44 2012
2.55% done, estimate finish Sun Feb 26 14:54:37 2012
2.55% done, estimate finish Sun Feb 26 14:54:30 2012
2.56% done, estimate finish Sun Feb 26 14:54:24 2012
2.56% done, estimate finish Sun Feb 26 14:54:17 2012
2.57% done, estimate finish Sun Feb 26 14:54:10 2012
2.57% done, estimate finish Sun Feb 26 14:54:04 2012
2.58% done, estimate finish Sun Feb 26 14:54:36 2012
2.58% done, estimate finish Sun Feb 26 14:54:29 2012
2.59% done, estimate finish Sun Feb 26 14:54:23 2012
2.59% done, estimate finish Sun Feb 26 14:54:16 2012
2.59% done, estimate finish Sun Feb 26 14:54:09 2012
2.60% done, estimate finish Sun Feb 26 14:54:03 2012
2.60% done, estimate finish Sun Feb 26 14:53:56 2012
2.61% done, estimate finish Sun Feb 26 14:53:50 2012
2.61% done, estimate finish Sun Feb 26 14:53:43 2012
2.62% done, estimate finish Sun Feb 26 14:53:37 2012
2.62% done, estimate finish Sun Feb 26 14:54:09 2012
2.63% done, estimate finish Sun Feb 26 14:54:02 2012
2.63% done, estimate finish Sun Feb 26 14:53:56 2012
2.64% done, estimate finish Sun Feb 26 14:53:49 2012
2.64% done, estimate finish Sun Feb 26 14:53:43 2012
2.65% done, estimate finish Sun Feb 26 14:53:36 2012
2.65% done, estimate finish Sun Feb 26 14:54:08 2012
2.66% done, estimate finish Sun Feb 26 14:54:01 2012
2.66% done, estimate finish Sun Feb 26 14:53:55 2012
2.67% done, estimate finish Sun Feb 26 14:53:48 2012
2.67% done, estimate finish Sun Feb 26 14:53:42 2012
2.67% done, estimate finish Sun Feb 26 14:53:36 2012
2.68% done, estimate finish Sun Feb 26 14:53:30 2012
2.68% done, estimate finish Sun Feb 26 14:53:23 2012
2.69% done, estimate finish Sun Feb 26 14:53:17 2012
2.69% done, estimate finish Sun Feb 26 14:53:11 2012
2.70% done, estimate finish Sun Feb 26 14:53:05 2012
2.70% done, estimate finish Sun Feb 26 14:52:58 2012
2.71% done, estimate finish Sun Feb 26 14:53:29 2012
2.71% done, estimate finish Sun Feb 26 14:53:23 2012
2.72% done, estimate finish Sun Feb 26 14:53:17 2012
2.72% done, estimate finish Sun Feb 26 14:53:10 2012
2.73% done, estimate finish Sun Feb 26 14:53:04 2012
2.73% done, estimate finish Sun Feb 26 14:52:58 2012
2.74% done, estimate finish Sun Feb 26 14:53:29 2012
2.74% done, estimate finish Sun Feb 26 14:53:22 2012
2.75% done, estimate finish Sun Feb 26 14:53:16 2012
2.75% done, estimate finish Sun Feb 26 14:53:10 2012
2.75% done, estimate finish Sun Feb 26 14:53:04 2012
2.76% done, estimate finish Sun Feb 26 14:52:58 2012
2.76% done, estimate finish Sun Feb 26 14:52:52 2012
2.77% done, estimate finish Sun Feb 26 14:52:46 2012
2.77% done, estimate finish Sun Feb 26 14:53:16 2012
2.78% done, estimate finish Sun Feb 26 14:53:10 2012
2.78% done, estimate finish Sun Feb 26 14:53:04 2012
2.79% done, estimate finish Sun Feb 26 14:52:58 2012
2.79% done, estimate finish Sun Feb 26 14:52:52 2012
2.80% done, estimate finish Sun Feb 26 14:52:46 2012
2.80% done, estimate finish Sun Feb 26 14:52:40 2012
2.81% done, estimate finish Sun Feb 26 14:52:34 2012
2.81% done, estimate finish Sun Feb 26 14:52:28 2012
2.82% done, estimate finish Sun Feb 26 14:52:22 2012
2.82% done, estimate finish Sun Feb 26 14:52:52 2012
2.83% done, estimate finish Sun Feb 26 14:52:46 2012
2.83% done, estimate finish Sun Feb 26 14:52:40 2012
2.83% done, estimate finish Sun Feb 26 14:52:34 2012
2.84% done, estimate finish Sun Feb 26 14:52:28 2012
2.84% done, estimate finish Sun Feb 26 14:52:23 2012
2.85% done, estimate finish Sun Feb 26 14:52:52 2012
2.85% done, estimate finish Sun Feb 26 14:52:46 2012
2.86% done, estimate finish Sun Feb 26 14:52:40 2012
2.86% done, estimate finish Sun Feb 26 14:52:34 2012
2.87% done, estimate finish Sun Feb 26 14:52:29 2012
2.87% done, estimate finish Sun Feb 26 14:52:23 2012
2.88% done, estimate finish Sun Feb 26 14:52:17 2012
2.88% done, estimate finish Sun Feb 26 14:52:11 2012
2.89% done, estimate finish Sun Feb 26 14:52:06 2012
2.89% done, estimate finish Sun Feb 26 14:52:00 2012
2.90% done, estimate finish Sun Feb 26 14:51:54 2012
2.90% done, estimate finish Sun Feb 26 14:52:23 2012
2.91% done, estimate finish Sun Feb 26 14:52:17 2012
2.91% done, estimate finish Sun Feb 26 14:52:12 2012
2.91% done, estimate finish Sun Feb 26 14:52:06 2012
2.92% done, estimate finish Sun Feb 26 14:52:00 2012
2.92% done, estimate finish Sun Feb 26 14:51:55 2012
2.93% done, estimate finish Sun Feb 26 14:52:23 2012
2.93% done, estimate finish Sun Feb 26 14:52:18 2012
2.94% done, estimate finish Sun Feb 26 14:52:12 2012
2.94% done, estimate finish Sun Feb 26 14:52:06 2012
2.95% done, estimate finish Sun Feb 26 14:52:01 2012
2.95% done, estimate finish Sun Feb 26 14:51:55 2012
2.96% done, estimate finish Sun Feb 26 14:51:50 2012
2.96% done, estimate finish Sun Feb 26 14:51:44 2012
2.97% done, estimate finish Sun Feb 26 14:51:38 2012
2.97% done, estimate finish Sun Feb 26 14:51:33 2012
2.98% done, estimate finish Sun Feb 26 14:52:01 2012
2.98% done, estimate finish Sun Feb 26 14:51:56 2012
2.99% done, estimate finish Sun Feb 26 14:51:50 2012
2.99% done, estimate finish Sun Feb 26 14:51:45 2012
2.99% done, estimate finish Sun Feb 26 14:51:39 2012
3.00% done, estimate finish Sun Feb 26 14:51:34 2012
3.00% done, estimate finish Sun Feb 26 14:51:28 2012
3.01% done, estimate finish Sun Feb 26 14:51:23 2012
3.01% done, estimate finish Sun Feb 26 14:51:51 2012
3.02% done, estimate finish Sun Feb 26 14:51:45 2012
3.02% done, estimate finish Sun Feb 26 14:51:40 2012
3.03% done, estimate finish Sun Feb 26 14:51:34 2012
3.03% done, estimate finish Sun Feb 26 14:51:29 2012
3.04% done, estimate finish Sun Feb 26 14:51:24 2012
3.04% done, estimate finish Sun Feb 26 14:51:51 2012
3.05% done, estimate finish Sun Feb 26 14:51:46 2012
3.05% done, estimate finish Sun Feb 26 14:51:40 2012
3.06% done, estimate finish Sun Feb 26 14:51:35 2012
3.06% done, estimate finish Sun Feb 26 14:51:30 2012
3.07% done, estimate finish Sun Feb 26 14:51:24 2012
3.07% done, estimate finish Sun Feb 26 14:51:19 2012
3.07% done, estimate finish Sun Feb 26 14:51:14 2012
3.08% done, estimate finish Sun Feb 26 14:51:08 2012
3.08% done, estimate finish Sun Feb 26 14:51:03 2012
3.09% done, estimate finish Sun Feb 26 14:50:58 2012
3.09% done, estimate finish Sun Feb 26 14:50:53 2012
3.10% done, estimate finish Sun Feb 26 14:51:20 2012
3.10% done, estimate finish Sun Feb 26 14:51:15 2012
3.11% done, estimate finish Sun Feb 26 14:51:09 2012
3.11% done, estimate finish Sun Feb 26 14:51:04 2012
3.12% done, estimate finish Sun Feb 26 14:50:59 2012
3.12% done, estimate finish Sun Feb 26 14:51:26 2012
3.13% done, estimate finish Sun Feb 26 14:51:21 2012
3.13% done, estimate finish Sun Feb 26 14:51:16 2012
3.14% done, estimate finish Sun Feb 26 14:51:10 2012
3.14% done, estimate finish Sun Feb 26 14:51:05 2012
3.15% done, estimate finish Sun Feb 26 14:51:00 2012
3.15% done, estimate finish Sun Feb 26 14:50:55 2012
3.15% done, estimate finish Sun Feb 26 14:50:50 2012
3.16% done, estimate finish Sun Feb 26 14:50:45 2012
3.16% done, estimate finish Sun Feb 26 14:50:40 2012
3.17% done, estimate finish Sun Feb 26 14:51:06 2012
3.17% done, estimate finish Sun Feb 26 14:51:01 2012
3.18% done, estimate finish Sun Feb 26 14:50:56 2012
3.18% done, estimate finish Sun Feb 26 14:50:51 2012
3.19% done, estimate finish Sun Feb 26 14:50:46 2012
3.19% done, estimate finish Sun Feb 26 14:50:41 2012
3.20% done, estimate finish Sun Feb 26 14:50:36 2012
3.20% done, estimate finish Sun Feb 26 14:50:31 2012
3.21% done, estimate finish Sun Feb 26 14:50:57 2012
3.21% done, estimate finish Sun Feb 26 14:50:52 2012
3.22% done, estimate finish Sun Feb 26 14:50:47 2012
3.22% done, estimate finish Sun Feb 26 14:50:42 2012
3.23% done, estimate finish Sun Feb 26 14:50:37 2012
3.23% done, estimate finish Sun Feb 26 14:50:32 2012
3.23% done, estimate finish Sun Feb 26 14:50:58 2012
3.24% done, estimate finish Sun Feb 26 14:50:53 2012
3.24% done, estimate finish Sun Feb 26 14:50:48 2012
3.25% done, estimate finish Sun Feb 26 14:50:43 2012
3.25% done, estimate finish Sun Feb 26 14:50:38 2012
3.26% done, estimate finish Sun Feb 26 14:50:33 2012
3.26% done, estimate finish Sun Feb 26 14:50:28 2012
3.27% done, estimate finish Sun Feb 26 14:50:23 2012
3.27% done, estimate finish Sun Feb 26 14:50:18 2012
3.28% done, estimate finish Sun Feb 26 14:50:13 2012
3.28% done, estimate finish Sun Feb 26 14:50:09 2012
3.29% done, estimate finish Sun Feb 26 14:50:04 2012
3.29% done, estimate finish Sun Feb 26 14:50:29 2012
3.30% done, estimate finish Sun Feb 26 14:50:24 2012
3.30% done, estimate finish Sun Feb 26 14:50:20 2012
3.31% done, estimate finish Sun Feb 26 14:50:15 2012
3.31% done, estimate finish Sun Feb 26 14:50:10 2012
3.31% done, estimate finish Sun Feb 26 14:50:05 2012
3.32% done, estimate finish Sun Feb 26 14:50:30 2012
3.32% done, estimate finish Sun Feb 26 14:50:26 2012
3.33% done, estimate finish Sun Feb 26 14:50:21 2012
3.33% done, estimate finish Sun Feb 26 14:50:16 2012
3.34% done, estimate finish Sun Feb 26 14:50:11 2012
3.34% done, estimate finish Sun Feb 26 14:50:06 2012
3.35% done, estimate finish Sun Feb 26 14:50:02 2012
3.35% done, estimate finish Sun Feb 26 14:49:57 2012
3.36% done, estimate finish Sun Feb 26 14:49:52 2012
3.36% done, estimate finish Sun Feb 26 14:50:17 2012
3.37% done, estimate finish Sun Feb 26 14:50:12 2012
3.37% done, estimate finish Sun Feb 26 14:50:08 2012
3.38% done, estimate finish Sun Feb 26 14:50:03 2012
3.38% done, estimate finish Sun Feb 26 14:49:58 2012
3.39% done, estimate finish Sun Feb 26 14:49:54 2012
3.39% done, estimate finish Sun Feb 26 14:49:49 2012
3.40% done, estimate finish Sun Feb 26 14:49:44 2012
3.40% done, estimate finish Sun Feb 26 14:50:09 2012
3.40% done, estimate finish Sun Feb 26 14:50:04 2012
3.41% done, estimate finish Sun Feb 26 14:50:00 2012
3.41% done, estimate finish Sun Feb 26 14:49:55 2012
3.42% done, estimate finish Sun Feb 26 14:49:50 2012
3.42% done, estimate finish Sun Feb 26 14:49:46 2012
3.43% done, estimate finish Sun Feb 26 14:49:41 2012
3.43% done, estimate finish Sun Feb 26 14:50:06 2012
3.44% done, estimate finish Sun Feb 26 14:50:01 2012
3.44% done, estimate finish Sun Feb 26 14:49:56 2012
3.45% done, estimate finish Sun Feb 26 14:49:52 2012
3.45% done, estimate finish Sun Feb 26 14:49:47 2012
3.46% done, estimate finish Sun Feb 26 14:49:43 2012
3.46% done, estimate finish Sun Feb 26 14:49:38 2012
3.47% done, estimate finish Sun Feb 26 14:49:34 2012
3.47% done, estimate finish Sun Feb 26 14:49:29 2012
3.48% done, estimate finish Sun Feb 26 14:49:24 2012
3.48% done, estimate finish Sun Feb 26 14:49:20 2012
3.48% done, estimate finish Sun Feb 26 14:49:44 2012
3.49% done, estimate finish Sun Feb 26 14:49:40 2012
3.49% done, estimate finish Sun Feb 26 14:49:35 2012
3.50% done, estimate finish Sun Feb 26 14:49:31 2012
3.50% done, estimate finish Sun Feb 26 14:49:26 2012
3.51% done, estimate finish Sun Feb 26 14:49:22 2012
3.51% done, estimate finish Sun Feb 26 14:49:46 2012
3.52% done, estimate finish Sun Feb 26 14:49:41 2012
3.52% done, estimate finish Sun Feb 26 14:49:37 2012
3.53% done, estimate finish Sun Feb 26 14:49:32 2012
3.53% done, estimate finish Sun Feb 26 14:49:28 2012
3.54% done, estimate finish Sun Feb 26 14:49:23 2012
3.54% done, estimate finish Sun Feb 26 14:49:19 2012
3.55% done, estimate finish Sun Feb 26 14:49:14 2012
3.55% done, estimate finish Sun Feb 26 14:49:10 2012
3.56% done, estimate finish Sun Feb 26 14:49:06 2012
3.56% done, estimate finish Sun Feb 26 14:49:01 2012
3.56% done, estimate finish Sun Feb 26 14:49:25 2012
3.57% done, estimate finish Sun Feb 26 14:49:20 2012
3.57% done, estimate finish Sun Feb 26 14:49:16 2012
3.58% done, estimate finish Sun Feb 26 14:49:12 2012
3.58% done, estimate finish Sun Feb 26 14:49:07 2012
3.59% done, estimate finish Sun Feb 26 14:49:03 2012
3.59% done, estimate finish Sun Feb 26 14:48:59 2012
3.60% done, estimate finish Sun Feb 26 14:49:22 2012
3.60% done, estimate finish Sun Feb 26 14:49:18 2012
3.61% done, estimate finish Sun Feb 26 14:49:13 2012
3.61% done, estimate finish Sun Feb 26 14:49:09 2012
3.62% done, estimate finish Sun Feb 26 14:49:05 2012
3.62% done, estimate finish Sun Feb 26 14:49:00 2012
3.63% done, estimate finish Sun Feb 26 14:48:56 2012
3.63% done, estimate finish Sun Feb 26 14:49:19 2012
3.64% done, estimate finish Sun Feb 26 14:49:15 2012
3.64% done, estimate finish Sun Feb 26 14:49:11 2012
3.64% done, estimate finish Sun Feb 26 14:49:06 2012
3.65% done, estimate finish Sun Feb 26 14:49:02 2012
3.65% done, estimate finish Sun Feb 26 14:48:58 2012
3.66% done, estimate finish Sun Feb 26 14:48:54 2012
3.66% done, estimate finish Sun Feb 26 14:48:49 2012
3.67% done, estimate finish Sun Feb 26 14:48:45 2012
3.67% done, estimate finish Sun Feb 26 14:48:41 2012
3.68% done, estimate finish Sun Feb 26 14:49:04 2012
3.68% done, estimate finish Sun Feb 26 14:49:00 2012
3.69% done, estimate finish Sun Feb 26 14:48:55 2012
3.69% done, estimate finish Sun Feb 26 14:48:51 2012
3.70% done, estimate finish Sun Feb 26 14:48:47 2012
3.70% done, estimate finish Sun Feb 26 14:48:43 2012
3.71% done, estimate finish Sun Feb 26 14:49:06 2012
3.71% done, estimate finish Sun Feb 26 14:49:01 2012
3.72% done, estimate finish Sun Feb 26 14:48:57 2012
3.72% done, estimate finish Sun Feb 26 14:48:53 2012
3.72% done, estimate finish Sun Feb 26 14:48:49 2012
3.73% done, estimate finish Sun Feb 26 14:48:45 2012
3.73% done, estimate finish Sun Feb 26 14:48:41 2012
3.74% done, estimate finish Sun Feb 26 14:48:36 2012
3.74% done, estimate finish Sun Feb 26 14:48:32 2012
3.75% done, estimate finish Sun Feb 26 14:48:28 2012
3.75% done, estimate finish Sun Feb 26 14:48:24 2012
3.76% done, estimate finish Sun Feb 26 14:48:20 2012
3.76% done, estimate finish Sun Feb 26 14:48:42 2012
3.77% done, estimate finish Sun Feb 26 14:48:38 2012
3.77% done, estimate finish Sun Feb 26 14:48:34 2012
3.78% done, estimate finish Sun Feb 26 14:48:30 2012
3.78% done, estimate finish Sun Feb 26 14:48:26 2012
3.79% done, estimate finish Sun Feb 26 14:48:22 2012
3.79% done, estimate finish Sun Feb 26 14:48:44 2012
3.80% done, estimate finish Sun Feb 26 14:48:40 2012
3.80% done, estimate finish Sun Feb 26 14:48:36 2012
3.80% done, estimate finish Sun Feb 26 14:48:32 2012
3.81% done, estimate finish Sun Feb 26 14:48:28 2012
3.81% done, estimate finish Sun Feb 26 14:48:24 2012
3.82% done, estimate finish Sun Feb 26 14:48:20 2012
3.82% done, estimate finish Sun Feb 26 14:48:16 2012
3.83% done, estimate finish Sun Feb 26 14:48:12 2012
3.83% done, estimate finish Sun Feb 26 14:48:34 2012
3.84% done, estimate finish Sun Feb 26 14:48:30 2012
3.84% done, estimate finish Sun Feb 26 14:48:26 2012
3.85% done, estimate finish Sun Feb 26 14:48:22 2012
3.85% done, estimate finish Sun Feb 26 14:48:18 2012
3.86% done, estimate finish Sun Feb 26 14:48:14 2012
3.86% done, estimate finish Sun Feb 26 14:48:10 2012
3.87% done, estimate finish Sun Feb 26 14:48:06 2012
3.87% done, estimate finish Sun Feb 26 14:48:28 2012
3.88% done, estimate finish Sun Feb 26 14:48:24 2012
3.88% done, estimate finish Sun Feb 26 14:48:20 2012
3.88% done, estimate finish Sun Feb 26 14:48:16 2012
3.89% done, estimate finish Sun Feb 26 14:48:12 2012
3.89% done, estimate finish Sun Feb 26 14:48:08 2012
3.90% done, estimate finish Sun Feb 26 14:48:04 2012
3.90% done, estimate finish Sun Feb 26 14:48:26 2012
3.91% done, estimate finish Sun Feb 26 14:48:22 2012
3.91% done, estimate finish Sun Feb 26 14:48:18 2012
3.92% done, estimate finish Sun Feb 26 14:48:14 2012
3.92% done, estimate finish Sun Feb 26 14:48:10 2012
3.93% done, estimate finish Sun Feb 26 14:48:06 2012
3.93% done, estimate finish Sun Feb 26 14:48:02 2012
3.94% done, estimate finish Sun Feb 26 14:47:58 2012
3.94% done, estimate finish Sun Feb 26 14:47:54 2012
3.95% done, estimate finish Sun Feb 26 14:47:50 2012
3.95% done, estimate finish Sun Feb 26 14:47:46 2012
3.96% done, estimate finish Sun Feb 26 14:48:08 2012
3.96% done, estimate finish Sun Feb 26 14:48:04 2012
3.96% done, estimate finish Sun Feb 26 14:48:00 2012
3.97% done, estimate finish Sun Feb 26 14:47:56 2012
3.97% done, estimate finish Sun Feb 26 14:47:52 2012
3.98% done, estimate finish Sun Feb 26 14:47:49 2012
3.98% done, estimate finish Sun Feb 26 14:47:45 2012
3.99% done, estimate finish Sun Feb 26 14:48:06 2012
3.99% done, estimate finish Sun Feb 26 14:48:02 2012
4.00% done, estimate finish Sun Feb 26 14:47:58 2012
4.00% done, estimate finish Sun Feb 26 14:47:54 2012
4.01% done, estimate finish Sun Feb 26 14:47:51 2012
4.01% done, estimate finish Sun Feb 26 14:47:47 2012
4.02% done, estimate finish Sun Feb 26 14:47:43 2012
4.02% done, estimate finish Sun Feb 26 14:47:39 2012
4.03% done, estimate finish Sun Feb 26 14:47:35 2012
4.03% done, estimate finish Sun Feb 26 14:47:57 2012
4.04% done, estimate finish Sun Feb 26 14:47:53 2012
4.04% done, estimate finish Sun Feb 26 14:47:49 2012
4.04% done, estimate finish Sun Feb 26 14:47:45 2012
4.05% done, estimate finish Sun Feb 26 14:47:41 2012
4.05% done, estimate finish Sun Feb 26 14:47:38 2012
4.06% done, estimate finish Sun Feb 26 14:47:34 2012
4.06% done, estimate finish Sun Feb 26 14:47:30 2012
4.07% done, estimate finish Sun Feb 26 14:47:51 2012
4.07% done, estimate finish Sun Feb 26 14:47:47 2012
4.08% done, estimate finish Sun Feb 26 14:47:43 2012
4.08% done, estimate finish Sun Feb 26 14:47:40 2012
4.09% done, estimate finish Sun Feb 26 14:47:36 2012
4.09% done, estimate finish Sun Feb 26 14:47:32 2012
4.10% done, estimate finish Sun Feb 26 14:47:53 2012
4.10% done, estimate finish Sun Feb 26 14:47:49 2012
4.11% done, estimate finish Sun Feb 26 14:47:46 2012
4.11% done, estimate finish Sun Feb 26 14:47:42 2012
4.12% done, estimate finish Sun Feb 26 14:47:38 2012
4.12% done, estimate finish Sun Feb 26 14:47:34 2012
4.12% done, estimate finish Sun Feb 26 14:47:31 2012
4.13% done, estimate finish Sun Feb 26 14:47:27 2012
4.13% done, estimate finish Sun Feb 26 14:47:23 2012
4.14% done, estimate finish Sun Feb 26 14:47:20 2012
4.14% done, estimate finish Sun Feb 26 14:47:16 2012
4.15% done, estimate finish Sun Feb 26 14:47:37 2012
4.15% done, estimate finish Sun Feb 26 14:47:33 2012
4.16% done, estimate finish Sun Feb 26 14:47:29 2012
4.16% done, estimate finish Sun Feb 26 14:47:26 2012
4.17% done, estimate finish Sun Feb 26 14:47:22 2012
4.17% done, estimate finish Sun Feb 26 14:47:18 2012
4.18% done, estimate finish Sun Feb 26 14:47:15 2012
4.18% done, estimate finish Sun Feb 26 14:47:35 2012
4.19% done, estimate finish Sun Feb 26 14:47:31 2012
4.19% done, estimate finish Sun Feb 26 14:47:28 2012
4.20% done, estimate finish Sun Feb 26 14:47:24 2012
4.20% done, estimate finish Sun Feb 26 14:47:21 2012
4.20% done, estimate finish Sun Feb 26 14:47:17 2012
4.21% done, estimate finish Sun Feb 26 14:47:13 2012
4.21% done, estimate finish Sun Feb 26 14:47:10 2012
4.22% done, estimate finish Sun Feb 26 14:47:06 2012
4.22% done, estimate finish Sun Feb 26 14:47:03 2012
4.23% done, estimate finish Sun Feb 26 14:47:23 2012
4.23% done, estimate finish Sun Feb 26 14:47:19 2012
4.24% done, estimate finish Sun Feb 26 14:47:16 2012
4.24% done, estimate finish Sun Feb 26 14:47:12 2012
4.25% done, estimate finish Sun Feb 26 14:47:08 2012
4.25% done, estimate finish Sun Feb 26 14:47:05 2012
4.26% done, estimate finish Sun Feb 26 14:47:01 2012
4.26% done, estimate finish Sun Feb 26 14:47:21 2012
4.27% done, estimate finish Sun Feb 26 14:47:18 2012
4.27% done, estimate finish Sun Feb 26 14:47:14 2012
4.28% done, estimate finish Sun Feb 26 14:47:11 2012
4.28% done, estimate finish Sun Feb 26 14:47:07 2012
4.29% done, estimate finish Sun Feb 26 14:47:04 2012
4.29% done, estimate finish Sun Feb 26 14:47:23 2012
4.29% done, estimate finish Sun Feb 26 14:47:20 2012
4.30% done, estimate finish Sun Feb 26 14:47:16 2012
4.30% done, estimate finish Sun Feb 26 14:47:13 2012
4.31% done, estimate finish Sun Feb 26 14:47:09 2012
4.31% done, estimate finish Sun Feb 26 14:47:06 2012
4.32% done, estimate finish Sun Feb 26 14:47:02 2012
4.32% done, estimate finish Sun Feb 26 14:46:59 2012
4.33% done, estimate finish Sun Feb 26 14:46:55 2012
4.33% done, estimate finish Sun Feb 26 14:46:52 2012
4.34% done, estimate finish Sun Feb 26 14:46:49 2012
4.34% done, estimate finish Sun Feb 26 14:47:08 2012
4.35% done, estimate finish Sun Feb 26 14:47:05 2012
4.35% done, estimate finish Sun Feb 26 14:47:01 2012
4.36% done, estimate finish Sun Feb 26 14:46:58 2012
4.36% done, estimate finish Sun Feb 26 14:46:54 2012
4.37% done, estimate finish Sun Feb 26 14:46:51 2012
4.37% done, estimate finish Sun Feb 26 14:46:47 2012
4.37% done, estimate finish Sun Feb 26 14:47:07 2012
4.38% done, estimate finish Sun Feb 26 14:47:03 2012
4.38% done, estimate finish Sun Feb 26 14:47:00 2012
4.39% done, estimate finish Sun Feb 26 14:46:57 2012
4.39% done, estimate finish Sun Feb 26 14:46:53 2012
4.40% done, estimate finish Sun Feb 26 14:46:50 2012
4.40% done, estimate finish Sun Feb 26 14:46:46 2012
4.41% done, estimate finish Sun Feb 26 14:46:43 2012
4.41% done, estimate finish Sun Feb 26 14:46:40 2012
4.42% done, estimate finish Sun Feb 26 14:46:36 2012
4.42% done, estimate finish Sun Feb 26 14:46:33 2012
4.43% done, estimate finish Sun Feb 26 14:46:52 2012
4.43% done, estimate finish Sun Feb 26 14:46:49 2012
4.44% done, estimate finish Sun Feb 26 14:46:45 2012
4.44% done, estimate finish Sun Feb 26 14:46:42 2012
4.45% done, estimate finish Sun Feb 26 14:46:39 2012
4.45% done, estimate finish Sun Feb 26 14:46:35 2012
4.45% done, estimate finish Sun Feb 26 14:46:54 2012
4.46% done, estimate finish Sun Feb 26 14:46:51 2012
4.46% done, estimate finish Sun Feb 26 14:46:48 2012
4.47% done, estimate finish Sun Feb 26 14:46:44 2012
4.47% done, estimate finish Sun Feb 26 14:46:41 2012
4.48% done, estimate finish Sun Feb 26 14:46:37 2012
4.48% done, estimate finish Sun Feb 26 14:46:34 2012
4.49% done, estimate finish Sun Feb 26 14:46:53 2012
4.49% done, estimate finish Sun Feb 26 14:46:50 2012
4.50% done, estimate finish Sun Feb 26 14:46:46 2012
4.50% done, estimate finish Sun Feb 26 14:46:43 2012
4.51% done, estimate finish Sun Feb 26 14:46:40 2012
4.51% done, estimate finish Sun Feb 26 14:46:36 2012
4.52% done, estimate finish Sun Feb 26 14:46:33 2012
4.52% done, estimate finish Sun Feb 26 14:46:30 2012
4.53% done, estimate finish Sun Feb 26 14:46:27 2012
4.53% done, estimate finish Sun Feb 26 14:46:23 2012
4.53% done, estimate finish Sun Feb 26 14:46:20 2012
4.54% done, estimate finish Sun Feb 26 14:46:39 2012
4.54% done, estimate finish Sun Feb 26 14:46:36 2012
4.55% done, estimate finish Sun Feb 26 14:46:32 2012
4.55% done, estimate finish Sun Feb 26 14:46:29 2012
4.56% done, estimate finish Sun Feb 26 14:46:26 2012
4.56% done, estimate finish Sun Feb 26 14:46:22 2012
4.57% done, estimate finish Sun Feb 26 14:46:41 2012
4.57% done, estimate finish Sun Feb 26 14:46:38 2012
4.58% done, estimate finish Sun Feb 26 14:46:35 2012
4.58% done, estimate finish Sun Feb 26 14:46:31 2012
4.59% done, estimate finish Sun Feb 26 14:46:28 2012
4.59% done, estimate finish Sun Feb 26 14:46:25 2012
4.60% done, estimate finish Sun Feb 26 14:46:22 2012
4.60% done, estimate finish Sun Feb 26 14:46:18 2012
4.61% done, estimate finish Sun Feb 26 14:46:15 2012
4.61% done, estimate finish Sun Feb 26 14:46:12 2012
4.61% done, estimate finish Sun Feb 26 14:46:09 2012
4.62% done, estimate finish Sun Feb 26 14:46:27 2012
4.62% done, estimate finish Sun Feb 26 14:46:24 2012
4.63% done, estimate finish Sun Feb 26 14:46:21 2012
4.63% done, estimate finish Sun Feb 26 14:46:18 2012
4.64% done, estimate finish Sun Feb 26 14:46:14 2012
4.64% done, estimate finish Sun Feb 26 14:46:11 2012
4.65% done, estimate finish Sun Feb 26 14:46:29 2012
4.65% done, estimate finish Sun Feb 26 14:46:26 2012
4.66% done, estimate finish Sun Feb 26 14:46:23 2012
4.66% done, estimate finish Sun Feb 26 14:46:20 2012
4.67% done, estimate finish Sun Feb 26 14:46:17 2012
4.67% done, estimate finish Sun Feb 26 14:46:14 2012
4.68% done, estimate finish Sun Feb 26 14:46:10 2012
4.68% done, estimate finish Sun Feb 26 14:46:28 2012
4.69% done, estimate finish Sun Feb 26 14:46:25 2012
4.69% done, estimate finish Sun Feb 26 14:46:22 2012
4.69% done, estimate finish Sun Feb 26 14:46:19 2012
4.70% done, estimate finish Sun Feb 26 14:46:16 2012
4.70% done, estimate finish Sun Feb 26 14:46:13 2012
4.71% done, estimate finish Sun Feb 26 14:46:10 2012
4.71% done, estimate finish Sun Feb 26 14:46:06 2012
4.72% done, estimate finish Sun Feb 26 14:46:03 2012
4.72% done, estimate finish Sun Feb 26 14:46:00 2012
4.73% done, estimate finish Sun Feb 26 14:45:57 2012
4.73% done, estimate finish Sun Feb 26 14:46:15 2012
4.74% done, estimate finish Sun Feb 26 14:46:12 2012
4.74% done, estimate finish Sun Feb 26 14:46:09 2012
4.75% done, estimate finish Sun Feb 26 14:46:06 2012
4.75% done, estimate finish Sun Feb 26 14:46:03 2012
4.76% done, estimate finish Sun Feb 26 14:45:59 2012
4.76% done, estimate finish Sun Feb 26 14:46:17 2012
4.77% done, estimate finish Sun Feb 26 14:46:14 2012
4.77% done, estimate finish Sun Feb 26 14:46:11 2012
4.77% done, estimate finish Sun Feb 26 14:46:08 2012
4.78% done, estimate finish Sun Feb 26 14:46:05 2012
4.78% done, estimate finish Sun Feb 26 14:46:02 2012
4.79% done, estimate finish Sun Feb 26 14:45:59 2012
4.79% done, estimate finish Sun Feb 26 14:45:56 2012
4.80% done, estimate finish Sun Feb 26 14:45:53 2012
4.80% done, estimate finish Sun Feb 26 14:45:50 2012
4.81% done, estimate finish Sun Feb 26 14:45:47 2012
4.81% done, estimate finish Sun Feb 26 14:45:43 2012
4.82% done, estimate finish Sun Feb 26 14:46:01 2012
4.82% done, estimate finish Sun Feb 26 14:45:58 2012
4.83% done, estimate finish Sun Feb 26 14:45:55 2012
4.83% done, estimate finish Sun Feb 26 14:45:52 2012
4.84% done, estimate finish Sun Feb 26 14:45:49 2012
4.84% done, estimate finish Sun Feb 26 14:45:46 2012
4.85% done, estimate finish Sun Feb 26 14:46:04 2012
4.85% done, estimate finish Sun Feb 26 14:46:00 2012
4.85% done, estimate finish Sun Feb 26 14:45:57 2012
4.86% done, estimate finish Sun Feb 26 14:45:54 2012
4.86% done, estimate finish Sun Feb 26 14:45:51 2012
4.87% done, estimate finish Sun Feb 26 14:45:48 2012
4.87% done, estimate finish Sun Feb 26 14:45:45 2012
4.88% done, estimate finish Sun Feb 26 14:45:42 2012
4.88% done, estimate finish Sun Feb 26 14:45:39 2012
4.89% done, estimate finish Sun Feb 26 14:45:57 2012
4.89% done, estimate finish Sun Feb 26 14:45:54 2012
4.90% done, estimate finish Sun Feb 26 14:45:51 2012
4.90% done, estimate finish Sun Feb 26 14:45:48 2012
4.91% done, estimate finish Sun Feb 26 14:45:45 2012
4.91% done, estimate finish Sun Feb 26 14:45:42 2012
4.92% done, estimate finish Sun Feb 26 14:45:39 2012
4.92% done, estimate finish Sun Feb 26 14:45:36 2012
4.93% done, estimate finish Sun Feb 26 14:45:53 2012
4.93% done, estimate finish Sun Feb 26 14:45:50 2012
4.93% done, estimate finish Sun Feb 26 14:45:47 2012
4.94% done, estimate finish Sun Feb 26 14:45:44 2012
4.94% done, estimate finish Sun Feb 26 14:45:41 2012
4.95% done, estimate finish Sun Feb 26 14:45:38 2012
4.95% done, estimate finish Sun Feb 26 14:45:35 2012
4.96% done, estimate finish Sun Feb 26 14:45:53 2012
4.96% done, estimate finish Sun Feb 26 14:45:50 2012
4.97% done, estimate finish Sun Feb 26 14:45:47 2012
4.97% done, estimate finish Sun Feb 26 14:45:44 2012
4.98% done, estimate finish Sun Feb 26 14:45:41 2012
4.98% done, estimate finish Sun Feb 26 14:45:38 2012
4.99% done, estimate finish Sun Feb 26 14:45:35 2012
4.99% done, estimate finish Sun Feb 26 14:45:32 2012
5.00% done, estimate finish Sun Feb 26 14:45:29 2012
5.00% done, estimate finish Sun Feb 26 14:45:26 2012
5.01% done, estimate finish Sun Feb 26 14:45:23 2012
5.01% done, estimate finish Sun Feb 26 14:45:40 2012
5.01% done, estimate finish Sun Feb 26 14:45:37 2012
5.02% done, estimate finish Sun Feb 26 14:45:34 2012
5.02% done, estimate finish Sun Feb 26 14:45:31 2012
5.03% done, estimate finish Sun Feb 26 14:45:29 2012
5.03% done, estimate finish Sun Feb 26 14:45:26 2012
5.04% done, estimate finish Sun Feb 26 14:45:43 2012
5.04% done, estimate finish Sun Feb 26 14:45:40 2012
5.05% done, estimate finish Sun Feb 26 14:45:37 2012
5.05% done, estimate finish Sun Feb 26 14:45:34 2012
5.06% done, estimate finish Sun Feb 26 14:45:31 2012
5.06% done, estimate finish Sun Feb 26 14:45:28 2012
5.07% done, estimate finish Sun Feb 26 14:45:25 2012
5.07% done, estimate finish Sun Feb 26 14:45:22 2012
5.08% done, estimate finish Sun Feb 26 14:45:19 2012
5.08% done, estimate finish Sun Feb 26 14:45:17 2012
5.09% done, estimate finish Sun Feb 26 14:45:33 2012
5.09% done, estimate finish Sun Feb 26 14:45:31 2012
5.09% done, estimate finish Sun Feb 26 14:45:28 2012
5.10% done, estimate finish Sun Feb 26 14:45:25 2012
5.10% done, estimate finish Sun Feb 26 14:45:22 2012
5.11% done, estimate finish Sun Feb 26 14:45:19 2012
5.11% done, estimate finish Sun Feb 26 14:45:16 2012
5.12% done, estimate finish Sun Feb 26 14:45:33 2012
5.12% done, estimate finish Sun Feb 26 14:45:30 2012
5.13% done, estimate finish Sun Feb 26 14:45:27 2012
5.13% done, estimate finish Sun Feb 26 14:45:24 2012
5.14% done, estimate finish Sun Feb 26 14:45:22 2012
5.14% done, estimate finish Sun Feb 26 14:45:19 2012
5.15% done, estimate finish Sun Feb 26 14:45:16 2012
5.15% done, estimate finish Sun Feb 26 14:45:32 2012
5.16% done, estimate finish Sun Feb 26 14:45:30 2012
5.16% done, estimate finish Sun Feb 26 14:45:27 2012
5.17% done, estimate finish Sun Feb 26 14:45:24 2012
5.17% done, estimate finish Sun Feb 26 14:45:21 2012
5.17% done, estimate finish Sun Feb 26 14:45:18 2012
5.18% done, estimate finish Sun Feb 26 14:45:16 2012
5.18% done, estimate finish Sun Feb 26 14:45:13 2012
5.19% done, estimate finish Sun Feb 26 14:45:10 2012
5.19% done, estimate finish Sun Feb 26 14:45:07 2012
5.20% done, estimate finish Sun Feb 26 14:45:04 2012
5.20% done, estimate finish Sun Feb 26 14:45:21 2012
5.21% done, estimate finish Sun Feb 26 14:45:18 2012
5.21% done, estimate finish Sun Feb 26 14:45:15 2012
5.22% done, estimate finish Sun Feb 26 14:45:12 2012
5.22% done, estimate finish Sun Feb 26 14:45:10 2012
5.23% done, estimate finish Sun Feb 26 14:45:07 2012
5.23% done, estimate finish Sun Feb 26 14:45:04 2012
5.24% done, estimate finish Sun Feb 26 14:45:20 2012
5.24% done, estimate finish Sun Feb 26 14:45:18 2012
5.25% done, estimate finish Sun Feb 26 14:45:15 2012
5.25% done, estimate finish Sun Feb 26 14:45:12 2012
5.25% done, estimate finish Sun Feb 26 14:45:09 2012
5.26% done, estimate finish Sun Feb 26 14:45:07 2012
5.26% done, estimate finish Sun Feb 26 14:45:04 2012
5.27% done, estimate finish Sun Feb 26 14:45:01 2012
5.27% done, estimate finish Sun Feb 26 14:44:58 2012
5.28% done, estimate finish Sun Feb 26 14:45:15 2012
5.28% done, estimate finish Sun Feb 26 14:45:12 2012
5.29% done, estimate finish Sun Feb 26 14:45:09 2012
5.29% done, estimate finish Sun Feb 26 14:45:06 2012
5.30% done, estimate finish Sun Feb 26 14:45:04 2012
5.30% done, estimate finish Sun Feb 26 14:45:01 2012
5.31% done, estimate finish Sun Feb 26 14:44:58 2012
5.31% done, estimate finish Sun Feb 26 14:44:55 2012
5.32% done, estimate finish Sun Feb 26 14:45:11 2012
5.32% done, estimate finish Sun Feb 26 14:45:09 2012
5.33% done, estimate finish Sun Feb 26 14:45:06 2012
5.33% done, estimate finish Sun Feb 26 14:45:03 2012
5.33% done, estimate finish Sun Feb 26 14:45:01 2012
5.34% done, estimate finish Sun Feb 26 14:44:58 2012
5.34% done, estimate finish Sun Feb 26 14:44:55 2012
5.35% done, estimate finish Sun Feb 26 14:44:52 2012
5.35% done, estimate finish Sun Feb 26 14:45:08 2012
5.36% done, estimate finish Sun Feb 26 14:45:06 2012
5.36% done, estimate finish Sun Feb 26 14:45:03 2012
5.37% done, estimate finish Sun Feb 26 14:45:00 2012
5.37% done, estimate finish Sun Feb 26 14:44:58 2012
5.38% done, estimate finish Sun Feb 26 14:44:55 2012
5.38% done, estimate finish Sun Feb 26 14:44:52 2012
5.39% done, estimate finish Sun Feb 26 14:44:50 2012
5.39% done, estimate finish Sun Feb 26 14:44:47 2012
5.40% done, estimate finish Sun Feb 26 14:45:03 2012
5.40% done, estimate finish Sun Feb 26 14:45:00 2012
5.41% done, estimate finish Sun Feb 26 14:44:57 2012
5.41% done, estimate finish Sun Feb 26 14:44:55 2012
5.42% done, estimate finish Sun Feb 26 14:44:52 2012
5.42% done, estimate finish Sun Feb 26 14:44:49 2012
5.42% done, estimate finish Sun Feb 26 14:45:05 2012
5.43% done, estimate finish Sun Feb 26 14:45:02 2012
5.43% done, estimate finish Sun Feb 26 14:45:00 2012
5.44% done, estimate finish Sun Feb 26 14:44:57 2012
5.44% done, estimate finish Sun Feb 26 14:44:54 2012
5.45% done, estimate finish Sun Feb 26 14:44:52 2012
5.45% done, estimate finish Sun Feb 26 14:44:49 2012
5.46% done, estimate finish Sun Feb 26 14:44:47 2012
5.46% done, estimate finish Sun Feb 26 14:44:44 2012
5.47% done, estimate finish Sun Feb 26 14:44:41 2012
5.47% done, estimate finish Sun Feb 26 14:44:39 2012
5.48% done, estimate finish Sun Feb 26 14:44:36 2012
5.48% done, estimate finish Sun Feb 26 14:44:52 2012
5.49% done, estimate finish Sun Feb 26 14:44:49 2012
5.49% done, estimate finish Sun Feb 26 14:44:46 2012
5.50% done, estimate finish Sun Feb 26 14:44:44 2012
5.50% done, estimate finish Sun Feb 26 14:44:41 2012
5.50% done, estimate finish Sun Feb 26 14:44:39 2012
5.51% done, estimate finish Sun Feb 26 14:44:54 2012
5.51% done, estimate finish Sun Feb 26 14:44:51 2012
5.52% done, estimate finish Sun Feb 26 14:44:49 2012
5.52% done, estimate finish Sun Feb 26 14:44:46 2012
5.53% done, estimate finish Sun Feb 26 14:44:44 2012
5.53% done, estimate finish Sun Feb 26 14:44:41 2012
5.54% done, estimate finish Sun Feb 26 14:44:38 2012
5.54% done, estimate finish Sun Feb 26 14:44:54 2012
5.55% done, estimate finish Sun Feb 26 14:44:51 2012
5.55% done, estimate finish Sun Feb 26 14:44:49 2012
5.56% done, estimate finish Sun Feb 26 14:44:46 2012
5.56% done, estimate finish Sun Feb 26 14:44:43 2012
5.57% done, estimate finish Sun Feb 26 14:44:41 2012
5.57% done, estimate finish Sun Feb 26 14:44:38 2012
5.58% done, estimate finish Sun Feb 26 14:44:36 2012
5.58% done, estimate finish Sun Feb 26 14:44:33 2012
5.58% done, estimate finish Sun Feb 26 14:44:31 2012
5.59% done, estimate finish Sun Feb 26 14:44:46 2012
5.59% done, estimate finish Sun Feb 26 14:44:43 2012
5.60% done, estimate finish Sun Feb 26 14:44:41 2012
5.60% done, estimate finish Sun Feb 26 14:44:38 2012
5.61% done, estimate finish Sun Feb 26 14:44:36 2012
5.61% done, estimate finish Sun Feb 26 14:44:33 2012
5.62% done, estimate finish Sun Feb 26 14:44:48 2012
5.62% done, estimate finish Sun Feb 26 14:44:46 2012
5.63% done, estimate finish Sun Feb 26 14:44:43 2012
5.63% done, estimate finish Sun Feb 26 14:44:41 2012
5.64% done, estimate finish Sun Feb 26 14:44:38 2012
5.64% done, estimate finish Sun Feb 26 14:44:36 2012
5.65% done, estimate finish Sun Feb 26 14:44:33 2012
5.65% done, estimate finish Sun Feb 26 14:44:30 2012
5.66% done, estimate finish Sun Feb 26 14:44:28 2012
5.66% done, estimate finish Sun Feb 26 14:44:25 2012
5.66% done, estimate finish Sun Feb 26 14:44:23 2012
5.67% done, estimate finish Sun Feb 26 14:44:20 2012
5.67% done, estimate finish Sun Feb 26 14:44:35 2012
5.68% done, estimate finish Sun Feb 26 14:44:33 2012
5.68% done, estimate finish Sun Feb 26 14:44:30 2012
5.69% done, estimate finish Sun Feb 26 14:44:28 2012
5.69% done, estimate finish Sun Feb 26 14:44:25 2012
5.70% done, estimate finish Sun Feb 26 14:44:23 2012
5.70% done, estimate finish Sun Feb 26 14:44:38 2012
5.71% done, estimate finish Sun Feb 26 14:44:35 2012
5.71% done, estimate finish Sun Feb 26 14:44:33 2012
5.72% done, estimate finish Sun Feb 26 14:44:30 2012
5.72% done, estimate finish Sun Feb 26 14:44:28 2012
5.73% done, estimate finish Sun Feb 26 14:44:25 2012
5.73% done, estimate finish Sun Feb 26 14:44:23 2012
5.74% done, estimate finish Sun Feb 26 14:44:20 2012
5.74% done, estimate finish Sun Feb 26 14:44:18 2012
5.74% done, estimate finish Sun Feb 26 14:44:33 2012
5.75% done, estimate finish Sun Feb 26 14:44:30 2012
5.75% done, estimate finish Sun Feb 26 14:44:28 2012
5.76% done, estimate finish Sun Feb 26 14:44:25 2012
5.76% done, estimate finish Sun Feb 26 14:44:23 2012
5.77% done, estimate finish Sun Feb 26 14:44:20 2012
5.77% done, estimate finish Sun Feb 26 14:44:18 2012
5.78% done, estimate finish Sun Feb 26 14:44:15 2012
5.78% done, estimate finish Sun Feb 26 14:44:13 2012
5.79% done, estimate finish Sun Feb 26 14:44:28 2012
5.79% done, estimate finish Sun Feb 26 14:44:25 2012
5.80% done, estimate finish Sun Feb 26 14:44:23 2012
5.80% done, estimate finish Sun Feb 26 14:44:20 2012
5.81% done, estimate finish Sun Feb 26 14:44:18 2012
5.81% done, estimate finish Sun Feb 26 14:44:15 2012
5.82% done, estimate finish Sun Feb 26 14:44:30 2012
5.82% done, estimate finish Sun Feb 26 14:44:28 2012
5.82% done, estimate finish Sun Feb 26 14:44:25 2012
5.83% done, estimate finish Sun Feb 26 14:44:23 2012
5.83% done, estimate finish Sun Feb 26 14:44:20 2012
5.84% done, estimate finish Sun Feb 26 14:44:18 2012
5.84% done, estimate finish Sun Feb 26 14:44:15 2012
5.85% done, estimate finish Sun Feb 26 14:44:13 2012
5.85% done, estimate finish Sun Feb 26 14:44:11 2012
5.86% done, estimate finish Sun Feb 26 14:44:08 2012
5.86% done, estimate finish Sun Feb 26 14:44:06 2012
5.87% done, estimate finish Sun Feb 26 14:44:20 2012
5.87% done, estimate finish Sun Feb 26 14:44:18 2012
5.88% done, estimate finish Sun Feb 26 14:44:15 2012
5.88% done, estimate finish Sun Feb 26 14:44:13 2012
5.89% done, estimate finish Sun Feb 26 14:44:11 2012
5.89% done, estimate finish Sun Feb 26 14:44:08 2012
5.90% done, estimate finish Sun Feb 26 14:44:06 2012
5.90% done, estimate finish Sun Feb 26 14:44:20 2012
5.90% done, estimate finish Sun Feb 26 14:44:18 2012
5.91% done, estimate finish Sun Feb 26 14:44:16 2012
5.91% done, estimate finish Sun Feb 26 14:44:13 2012
5.92% done, estimate finish Sun Feb 26 14:44:11 2012
5.92% done, estimate finish Sun Feb 26 14:44:08 2012
5.93% done, estimate finish Sun Feb 26 14:44:06 2012
5.93% done, estimate finish Sun Feb 26 14:44:04 2012
5.94% done, estimate finish Sun Feb 26 14:44:01 2012
5.94% done, estimate finish Sun Feb 26 14:44:16 2012
5.95% done, estimate finish Sun Feb 26 14:44:13 2012
5.95% done, estimate finish Sun Feb 26 14:44:11 2012
5.96% done, estimate finish Sun Feb 26 14:44:08 2012
5.96% done, estimate finish Sun Feb 26 14:44:06 2012
5.97% done, estimate finish Sun Feb 26 14:44:04 2012
5.97% done, estimate finish Sun Feb 26 14:44:01 2012
5.98% done, estimate finish Sun Feb 26 14:43:59 2012
5.98% done, estimate finish Sun Feb 26 14:44:13 2012
5.98% done, estimate finish Sun Feb 26 14:44:11 2012
5.99% done, estimate finish Sun Feb 26 14:44:08 2012
5.99% done, estimate finish Sun Feb 26 14:44:06 2012
6.00% done, estimate finish Sun Feb 26 14:44:04 2012
6.00% done, estimate finish Sun Feb 26 14:44:01 2012
6.01% done, estimate finish Sun Feb 26 14:43:59 2012
6.01% done, estimate finish Sun Feb 26 14:43:57 2012
6.02% done, estimate finish Sun Feb 26 14:44:11 2012
6.02% done, estimate finish Sun Feb 26 14:44:08 2012
6.03% done, estimate finish Sun Feb 26 14:44:06 2012
6.03% done, estimate finish Sun Feb 26 14:44:04 2012
6.04% done, estimate finish Sun Feb 26 14:44:01 2012
6.04% done, estimate finish Sun Feb 26 14:43:59 2012
6.05% done, estimate finish Sun Feb 26 14:43:57 2012
6.05% done, estimate finish Sun Feb 26 14:43:54 2012
6.06% done, estimate finish Sun Feb 26 14:43:52 2012
6.06% done, estimate finish Sun Feb 26 14:44:06 2012
6.06% done, estimate finish Sun Feb 26 14:44:04 2012
6.07% done, estimate finish Sun Feb 26 14:44:02 2012
6.07% done, estimate finish Sun Feb 26 14:43:59 2012
6.08% done, estimate finish Sun Feb 26 14:43:57 2012
6.08% done, estimate finish Sun Feb 26 14:43:55 2012
6.09% done, estimate finish Sun Feb 26 14:43:52 2012
6.09% done, estimate finish Sun Feb 26 14:44:06 2012
6.10% done, estimate finish Sun Feb 26 14:44:04 2012
6.10% done, estimate finish Sun Feb 26 14:44:02 2012
6.11% done, estimate finish Sun Feb 26 14:43:59 2012
6.11% done, estimate finish Sun Feb 26 14:43:57 2012
6.12% done, estimate finish Sun Feb 26 14:43:55 2012
6.12% done, estimate finish Sun Feb 26 14:43:52 2012
6.13% done, estimate finish Sun Feb 26 14:43:50 2012
6.13% done, estimate finish Sun Feb 26 14:43:48 2012
6.14% done, estimate finish Sun Feb 26 14:43:45 2012
6.14% done, estimate finish Sun Feb 26 14:43:43 2012
6.14% done, estimate finish Sun Feb 26 14:43:57 2012
6.15% done, estimate finish Sun Feb 26 14:43:55 2012
6.15% done, estimate finish Sun Feb 26 14:43:52 2012
6.16% done, estimate finish Sun Feb 26 14:43:50 2012
6.16% done, estimate finish Sun Feb 26 14:43:48 2012
6.17% done, estimate finish Sun Feb 26 14:43:46 2012
6.17% done, estimate finish Sun Feb 26 14:44:00 2012
6.18% done, estimate finish Sun Feb 26 14:43:57 2012
6.18% done, estimate finish Sun Feb 26 14:43:55 2012
6.19% done, estimate finish Sun Feb 26 14:43:53 2012
6.19% done, estimate finish Sun Feb 26 14:43:50 2012
6.20% done, estimate finish Sun Feb 26 14:43:48 2012
6.20% done, estimate finish Sun Feb 26 14:43:46 2012
6.21% done, estimate finish Sun Feb 26 14:43:43 2012
6.21% done, estimate finish Sun Feb 26 14:43:41 2012
6.22% done, estimate finish Sun Feb 26 14:43:39 2012
6.22% done, estimate finish Sun Feb 26 14:43:53 2012
6.23% done, estimate finish Sun Feb 26 14:43:50 2012
6.23% done, estimate finish Sun Feb 26 14:43:48 2012
6.23% done, estimate finish Sun Feb 26 14:43:46 2012
6.24% done, estimate finish Sun Feb 26 14:43:44 2012
6.24% done, estimate finish Sun Feb 26 14:43:41 2012
6.25% done, estimate finish Sun Feb 26 14:43:39 2012
6.25% done, estimate finish Sun Feb 26 14:43:37 2012
6.26% done, estimate finish Sun Feb 26 14:43:51 2012
6.26% done, estimate finish Sun Feb 26 14:43:48 2012
6.27% done, estimate finish Sun Feb 26 14:43:46 2012
6.27% done, estimate finish Sun Feb 26 14:43:44 2012
6.28% done, estimate finish Sun Feb 26 14:43:42 2012
6.28% done, estimate finish Sun Feb 26 14:43:39 2012
6.29% done, estimate finish Sun Feb 26 14:43:53 2012
6.29% done, estimate finish Sun Feb 26 14:43:51 2012
6.30% done, estimate finish Sun Feb 26 14:43:49 2012
6.30% done, estimate finish Sun Feb 26 14:43:46 2012
6.31% done, estimate finish Sun Feb 26 14:43:44 2012
6.31% done, estimate finish Sun Feb 26 14:43:42 2012
6.31% done, estimate finish Sun Feb 26 14:43:40 2012
6.32% done, estimate finish Sun Feb 26 14:43:37 2012
6.32% done, estimate finish Sun Feb 26 14:43:35 2012
6.33% done, estimate finish Sun Feb 26 14:43:33 2012
6.33% done, estimate finish Sun Feb 26 14:43:31 2012
6.34% done, estimate finish Sun Feb 26 14:43:44 2012
6.34% done, estimate finish Sun Feb 26 14:43:42 2012
6.35% done, estimate finish Sun Feb 26 14:43:40 2012
6.35% done, estimate finish Sun Feb 26 14:43:38 2012
6.36% done, estimate finish Sun Feb 26 14:43:35 2012
6.36% done, estimate finish Sun Feb 26 14:43:33 2012
6.37% done, estimate finish Sun Feb 26 14:43:47 2012
6.37% done, estimate finish Sun Feb 26 14:43:45 2012
6.38% done, estimate finish Sun Feb 26 14:43:42 2012
6.38% done, estimate finish Sun Feb 26 14:43:40 2012
6.39% done, estimate finish Sun Feb 26 14:43:38 2012
6.39% done, estimate finish Sun Feb 26 14:43:36 2012
6.39% done, estimate finish Sun Feb 26 14:43:33 2012
6.40% done, estimate finish Sun Feb 26 14:43:31 2012
6.40% done, estimate finish Sun Feb 26 14:43:29 2012
6.41% done, estimate finish Sun Feb 26 14:43:27 2012
6.41% done, estimate finish Sun Feb 26 14:43:40 2012
6.42% done, estimate finish Sun Feb 26 14:43:38 2012
6.42% done, estimate finish Sun Feb 26 14:43:36 2012
6.43% done, estimate finish Sun Feb 26 14:43:34 2012
6.43% done, estimate finish Sun Feb 26 14:43:31 2012
6.44% done, estimate finish Sun Feb 26 14:43:29 2012
6.44% done, estimate finish Sun Feb 26 14:43:27 2012
6.45% done, estimate finish Sun Feb 26 14:43:25 2012
6.45% done, estimate finish Sun Feb 26 14:43:38 2012
6.46% done, estimate finish Sun Feb 26 14:43:36 2012
6.46% done, estimate finish Sun Feb 26 14:43:34 2012
6.47% done, estimate finish Sun Feb 26 14:43:32 2012
6.47% done, estimate finish Sun Feb 26 14:43:30 2012
6.47% done, estimate finish Sun Feb 26 14:43:27 2012
6.48% done, estimate finish Sun Feb 26 14:43:41 2012
6.48% done, estimate finish Sun Feb 26 14:43:39 2012
6.49% done, estimate finish Sun Feb 26 14:43:36 2012
6.49% done, estimate finish Sun Feb 26 14:43:34 2012
6.50% done, estimate finish Sun Feb 26 14:43:32 2012
6.50% done, estimate finish Sun Feb 26 14:43:30 2012
6.51% done, estimate finish Sun Feb 26 14:43:28 2012
6.51% done, estimate finish Sun Feb 26 14:43:26 2012
6.52% done, estimate finish Sun Feb 26 14:43:23 2012
6.52% done, estimate finish Sun Feb 26 14:43:21 2012
6.53% done, estimate finish Sun Feb 26 14:43:19 2012
6.53% done, estimate finish Sun Feb 26 14:43:17 2012
6.54% done, estimate finish Sun Feb 26 14:43:30 2012
6.54% done, estimate finish Sun Feb 26 14:43:28 2012
6.55% done, estimate finish Sun Feb 26 14:43:26 2012
6.55% done, estimate finish Sun Feb 26 14:43:24 2012
6.55% done, estimate finish Sun Feb 26 14:43:22 2012
6.56% done, estimate finish Sun Feb 26 14:43:19 2012
6.56% done, estimate finish Sun Feb 26 14:43:32 2012
6.57% done, estimate finish Sun Feb 26 14:43:30 2012
6.57% done, estimate finish Sun Feb 26 14:43:28 2012
6.58% done, estimate finish Sun Feb 26 14:43:26 2012
6.58% done, estimate finish Sun Feb 26 14:43:24 2012
6.59% done, estimate finish Sun Feb 26 14:43:22 2012
6.59% done, estimate finish Sun Feb 26 14:43:20 2012
6.60% done, estimate finish Sun Feb 26 14:43:18 2012
6.60% done, estimate finish Sun Feb 26 14:43:15 2012
6.61% done, estimate finish Sun Feb 26 14:43:13 2012
6.61% done, estimate finish Sun Feb 26 14:43:26 2012
6.62% done, estimate finish Sun Feb 26 14:43:24 2012
6.62% done, estimate finish Sun Feb 26 14:43:22 2012
6.63% done, estimate finish Sun Feb 26 14:43:20 2012
6.63% done, estimate finish Sun Feb 26 14:43:18 2012
6.63% done, estimate finish Sun Feb 26 14:43:16 2012
6.64% done, estimate finish Sun Feb 26 14:43:14 2012
6.64% done, estimate finish Sun Feb 26 14:43:27 2012
6.65% done, estimate finish Sun Feb 26 14:43:24 2012
6.65% done, estimate finish Sun Feb 26 14:43:22 2012
6.66% done, estimate finish Sun Feb 26 14:43:20 2012
6.66% done, estimate finish Sun Feb 26 14:43:18 2012
6.67% done, estimate finish Sun Feb 26 14:43:16 2012
6.67% done, estimate finish Sun Feb 26 14:43:29 2012
6.68% done, estimate finish Sun Feb 26 14:43:27 2012
6.68% done, estimate finish Sun Feb 26 14:43:25 2012
6.69% done, estimate finish Sun Feb 26 14:43:23 2012
6.69% done, estimate finish Sun Feb 26 14:43:21 2012
6.70% done, estimate finish Sun Feb 26 14:43:18 2012
6.70% done, estimate finish Sun Feb 26 14:43:16 2012
6.71% done, estimate finish Sun Feb 26 14:43:14 2012
6.71% done, estimate finish Sun Feb 26 14:43:12 2012
6.71% done, estimate finish Sun Feb 26 14:43:10 2012
6.72% done, estimate finish Sun Feb 26 14:43:08 2012
6.72% done, estimate finish Sun Feb 26 14:43:06 2012
6.73% done, estimate finish Sun Feb 26 14:43:19 2012
6.73% done, estimate finish Sun Feb 26 14:43:17 2012
6.74% done, estimate finish Sun Feb 26 14:43:15 2012
6.74% done, estimate finish Sun Feb 26 14:43:13 2012
6.75% done, estimate finish Sun Feb 26 14:43:11 2012
6.75% done, estimate finish Sun Feb 26 14:43:08 2012
6.76% done, estimate finish Sun Feb 26 14:43:21 2012
6.76% done, estimate finish Sun Feb 26 14:43:19 2012
6.77% done, estimate finish Sun Feb 26 14:43:17 2012
6.77% done, estimate finish Sun Feb 26 14:43:15 2012
6.78% done, estimate finish Sun Feb 26 14:43:13 2012
6.78% done, estimate finish Sun Feb 26 14:43:11 2012
6.79% done, estimate finish Sun Feb 26 14:43:09 2012
6.79% done, estimate finish Sun Feb 26 14:43:07 2012
6.79% done, estimate finish Sun Feb 26 14:43:05 2012
6.80% done, estimate finish Sun Feb 26 14:43:03 2012
6.80% done, estimate finish Sun Feb 26 14:43:01 2012
6.81% done, estimate finish Sun Feb 26 14:43:13 2012
6.81% done, estimate finish Sun Feb 26 14:43:11 2012
6.82% done, estimate finish Sun Feb 26 14:43:09 2012
6.82% done, estimate finish Sun Feb 26 14:43:07 2012
6.83% done, estimate finish Sun Feb 26 14:43:05 2012
6.83% done, estimate finish Sun Feb 26 14:43:03 2012
6.84% done, estimate finish Sun Feb 26 14:43:16 2012
6.84% done, estimate finish Sun Feb 26 14:43:14 2012
6.85% done, estimate finish Sun Feb 26 14:43:11 2012
6.85% done, estimate finish Sun Feb 26 14:43:09 2012
6.86% done, estimate finish Sun Feb 26 14:43:07 2012
6.86% done, estimate finish Sun Feb 26 14:43:05 2012
6.87% done, estimate finish Sun Feb 26 14:43:03 2012
6.87% done, estimate finish Sun Feb 26 14:43:16 2012
6.87% done, estimate finish Sun Feb 26 14:43:14 2012
6.88% done, estimate finish Sun Feb 26 14:43:12 2012
6.88% done, estimate finish Sun Feb 26 14:43:10 2012
6.89% done, estimate finish Sun Feb 26 14:43:08 2012
6.89% done, estimate finish Sun Feb 26 14:43:06 2012
6.90% done, estimate finish Sun Feb 26 14:43:04 2012
6.90% done, estimate finish Sun Feb 26 14:43:02 2012
6.91% done, estimate finish Sun Feb 26 14:43:00 2012
6.91% done, estimate finish Sun Feb 26 14:42:58 2012
6.92% done, estimate finish Sun Feb 26 14:42:56 2012
6.92% done, estimate finish Sun Feb 26 14:43:08 2012
6.93% done, estimate finish Sun Feb 26 14:43:06 2012
6.93% done, estimate finish Sun Feb 26 14:43:04 2012
6.94% done, estimate finish Sun Feb 26 14:43:02 2012
6.94% done, estimate finish Sun Feb 26 14:43:00 2012
6.95% done, estimate finish Sun Feb 26 14:42:58 2012
6.95% done, estimate finish Sun Feb 26 14:43:10 2012
6.95% done, estimate finish Sun Feb 26 14:43:08 2012
6.96% done, estimate finish Sun Feb 26 14:43:06 2012
6.96% done, estimate finish Sun Feb 26 14:43:04 2012
6.97% done, estimate finish Sun Feb 26 14:43:02 2012
6.97% done, estimate finish Sun Feb 26 14:43:00 2012
6.98% done, estimate finish Sun Feb 26 14:42:58 2012
6.98% done, estimate finish Sun Feb 26 14:42:56 2012
6.99% done, estimate finish Sun Feb 26 14:42:54 2012
6.99% done, estimate finish Sun Feb 26 14:42:53 2012
7.00% done, estimate finish Sun Feb 26 14:42:50 2012
7.00% done, estimate finish Sun Feb 26 14:42:49 2012
7.01% done, estimate finish Sun Feb 26 14:43:01 2012
7.01% done, estimate finish Sun Feb 26 14:42:59 2012
7.02% done, estimate finish Sun Feb 26 14:42:57 2012
7.02% done, estimate finish Sun Feb 26 14:42:55 2012
7.03% done, estimate finish Sun Feb 26 14:42:53 2012
7.03% done, estimate finish Sun Feb 26 14:42:51 2012
7.03% done, estimate finish Sun Feb 26 14:43:03 2012
7.04% done, estimate finish Sun Feb 26 14:43:01 2012
7.04% done, estimate finish Sun Feb 26 14:42:59 2012
7.05% done, estimate finish Sun Feb 26 14:42:57 2012
7.05% done, estimate finish Sun Feb 26 14:42:55 2012
7.06% done, estimate finish Sun Feb 26 14:42:53 2012
7.06% done, estimate finish Sun Feb 26 14:42:51 2012
7.07% done, estimate finish Sun Feb 26 14:43:04 2012
7.07% done, estimate finish Sun Feb 26 14:43:02 2012
7.08% done, estimate finish Sun Feb 26 14:43:00 2012
7.08% done, estimate finish Sun Feb 26 14:42:58 2012
7.09% done, estimate finish Sun Feb 26 14:42:56 2012
7.09% done, estimate finish Sun Feb 26 14:42:54 2012
7.10% done, estimate finish Sun Feb 26 14:42:52 2012
7.10% done, estimate finish Sun Feb 26 14:42:50 2012
7.11% done, estimate finish Sun Feb 26 14:42:48 2012
7.11% done, estimate finish Sun Feb 26 14:42:46 2012
7.11% done, estimate finish Sun Feb 26 14:42:58 2012
7.12% done, estimate finish Sun Feb 26 14:42:56 2012
7.12% done, estimate finish Sun Feb 26 14:42:54 2012
7.13% done, estimate finish Sun Feb 26 14:42:52 2012
7.13% done, estimate finish Sun Feb 26 14:42:50 2012
7.14% done, estimate finish Sun Feb 26 14:42:48 2012
7.14% done, estimate finish Sun Feb 26 14:43:00 2012
7.15% done, estimate finish Sun Feb 26 14:42:58 2012
7.15% done, estimate finish Sun Feb 26 14:42:56 2012
7.16% done, estimate finish Sun Feb 26 14:42:55 2012
7.16% done, estimate finish Sun Feb 26 14:42:53 2012
7.17% done, estimate finish Sun Feb 26 14:42:51 2012
7.17% done, estimate finish Sun Feb 26 14:42:49 2012
7.18% done, estimate finish Sun Feb 26 14:42:47 2012
7.18% done, estimate finish Sun Feb 26 14:42:45 2012
7.19% done, estimate finish Sun Feb 26 14:42:43 2012
7.19% done, estimate finish Sun Feb 26 14:42:41 2012
7.19% done, estimate finish Sun Feb 26 14:42:39 2012
7.20% done, estimate finish Sun Feb 26 14:42:51 2012
7.20% done, estimate finish Sun Feb 26 14:42:49 2012
7.21% done, estimate finish Sun Feb 26 14:42:47 2012
7.21% done, estimate finish Sun Feb 26 14:42:45 2012
7.22% done, estimate finish Sun Feb 26 14:42:43 2012
7.22% done, estimate finish Sun Feb 26 14:42:41 2012
7.23% done, estimate finish Sun Feb 26 14:42:53 2012
7.23% done, estimate finish Sun Feb 26 14:42:51 2012
7.24% done, estimate finish Sun Feb 26 14:42:50 2012
7.24% done, estimate finish Sun Feb 26 14:42:48 2012
7.25% done, estimate finish Sun Feb 26 14:42:46 2012
7.25% done, estimate finish Sun Feb 26 14:42:44 2012
7.26% done, estimate finish Sun Feb 26 14:42:42 2012
7.26% done, estimate finish Sun Feb 26 14:42:54 2012
7.27% done, estimate finish Sun Feb 26 14:42:52 2012
7.27% done, estimate finish Sun Feb 26 14:42:50 2012
7.27% done, estimate finish Sun Feb 26 14:42:48 2012
7.28% done, estimate finish Sun Feb 26 14:42:46 2012
7.28% done, estimate finish Sun Feb 26 14:42:44 2012
7.29% done, estimate finish Sun Feb 26 14:42:42 2012
7.29% done, estimate finish Sun Feb 26 14:42:40 2012
7.30% done, estimate finish Sun Feb 26 14:42:39 2012
7.30% done, estimate finish Sun Feb 26 14:42:37 2012
7.31% done, estimate finish Sun Feb 26 14:42:48 2012
7.31% done, estimate finish Sun Feb 26 14:42:47 2012
7.32% done, estimate finish Sun Feb 26 14:42:45 2012
7.32% done, estimate finish Sun Feb 26 14:42:43 2012
7.33% done, estimate finish Sun Feb 26 14:42:41 2012
7.33% done, estimate finish Sun Feb 26 14:42:39 2012
7.34% done, estimate finish Sun Feb 26 14:42:51 2012
7.34% done, estimate finish Sun Feb 26 14:42:49 2012
7.35% done, estimate finish Sun Feb 26 14:42:47 2012
7.35% done, estimate finish Sun Feb 26 14:42:45 2012
7.36% done, estimate finish Sun Feb 26 14:42:43 2012
7.36% done, estimate finish Sun Feb 26 14:42:41 2012
7.36% done, estimate finish Sun Feb 26 14:42:39 2012
7.37% done, estimate finish Sun Feb 26 14:42:38 2012
7.37% done, estimate finish Sun Feb 26 14:42:36 2012
7.38% done, estimate finish Sun Feb 26 14:42:34 2012
7.38% done, estimate finish Sun Feb 26 14:42:32 2012
7.39% done, estimate finish Sun Feb 26 14:42:30 2012
7.39% done, estimate finish Sun Feb 26 14:42:42 2012
7.40% done, estimate finish Sun Feb 26 14:42:40 2012
7.40% done, estimate finish Sun Feb 26 14:42:38 2012
7.41% done, estimate finish Sun Feb 26 14:42:36 2012
7.41% done, estimate finish Sun Feb 26 14:42:34 2012
7.42% done, estimate finish Sun Feb 26 14:42:32 2012
7.42% done, estimate finish Sun Feb 26 14:42:44 2012
7.43% done, estimate finish Sun Feb 26 14:42:42 2012
7.43% done, estimate finish Sun Feb 26 14:42:40 2012
7.44% done, estimate finish Sun Feb 26 14:42:39 2012
7.44% done, estimate finish Sun Feb 26 14:42:37 2012
7.44% done, estimate finish Sun Feb 26 14:42:35 2012
7.45% done, estimate finish Sun Feb 26 14:42:33 2012
7.45% done, estimate finish Sun Feb 26 14:42:31 2012
7.46% done, estimate finish Sun Feb 26 14:42:43 2012
7.46% done, estimate finish Sun Feb 26 14:42:41 2012
7.47% done, estimate finish Sun Feb 26 14:42:39 2012
7.47% done, estimate finish Sun Feb 26 14:42:37 2012
7.48% done, estimate finish Sun Feb 26 14:42:35 2012
7.48% done, estimate finish Sun Feb 26 14:42:33 2012
7.49% done, estimate finish Sun Feb 26 14:42:32 2012
7.49% done, estimate finish Sun Feb 26 14:42:30 2012
7.50% done, estimate finish Sun Feb 26 14:42:28 2012
7.50% done, estimate finish Sun Feb 26 14:42:26 2012
7.51% done, estimate finish Sun Feb 26 14:42:38 2012
7.51% done, estimate finish Sun Feb 26 14:42:36 2012
7.52% done, estimate finish Sun Feb 26 14:42:34 2012
7.52% done, estimate finish Sun Feb 26 14:42:32 2012
7.52% done, estimate finish Sun Feb 26 14:42:30 2012
7.53% done, estimate finish Sun Feb 26 14:42:28 2012
7.53% done, estimate finish Sun Feb 26 14:42:27 2012
7.54% done, estimate finish Sun Feb 26 14:42:38 2012
7.54% done, estimate finish Sun Feb 26 14:42:36 2012
7.55% done, estimate finish Sun Feb 26 14:42:34 2012
7.55% done, estimate finish Sun Feb 26 14:42:33 2012
7.56% done, estimate finish Sun Feb 26 14:42:31 2012
7.56% done, estimate finish Sun Feb 26 14:42:29 2012
7.57% done, estimate finish Sun Feb 26 14:42:27 2012
7.57% done, estimate finish Sun Feb 26 14:42:25 2012
7.58% done, estimate finish Sun Feb 26 14:42:23 2012
7.58% done, estimate finish Sun Feb 26 14:42:22 2012
7.59% done, estimate finish Sun Feb 26 14:42:33 2012
7.59% done, estimate finish Sun Feb 26 14:42:31 2012
7.60% done, estimate finish Sun Feb 26 14:42:29 2012
7.60% done, estimate finish Sun Feb 26 14:42:28 2012
7.60% done, estimate finish Sun Feb 26 14:42:26 2012
7.61% done, estimate finish Sun Feb 26 14:42:24 2012
7.61% done, estimate finish Sun Feb 26 14:42:22 2012
7.62% done, estimate finish Sun Feb 26 14:42:33 2012
7.62% done, estimate finish Sun Feb 26 14:42:32 2012
7.63% done, estimate finish Sun Feb 26 14:42:30 2012
7.63% done, estimate finish Sun Feb 26 14:42:28 2012
7.64% done, estimate finish Sun Feb 26 14:42:26 2012
7.64% done, estimate finish Sun Feb 26 14:42:24 2012
7.65% done, estimate finish Sun Feb 26 14:42:23 2012
7.65% done, estimate finish Sun Feb 26 14:42:21 2012
7.66% done, estimate finish Sun Feb 26 14:42:19 2012
7.66% done, estimate finish Sun Feb 26 14:42:30 2012
7.67% done, estimate finish Sun Feb 26 14:42:29 2012
7.67% done, estimate finish Sun Feb 26 14:42:27 2012
7.68% done, estimate finish Sun Feb 26 14:42:25 2012
7.68% done, estimate finish Sun Feb 26 14:42:23 2012
7.68% done, estimate finish Sun Feb 26 14:42:21 2012
7.69% done, estimate finish Sun Feb 26 14:42:20 2012
7.69% done, estimate finish Sun Feb 26 14:42:18 2012
7.70% done, estimate finish Sun Feb 26 14:42:29 2012
7.70% done, estimate finish Sun Feb 26 14:42:27 2012
7.71% done, estimate finish Sun Feb 26 14:42:25 2012
7.71% done, estimate finish Sun Feb 26 14:42:24 2012
7.72% done, estimate finish Sun Feb 26 14:42:22 2012
7.72% done, estimate finish Sun Feb 26 14:42:20 2012
7.73% done, estimate finish Sun Feb 26 14:42:18 2012
7.73% done, estimate finish Sun Feb 26 14:42:29 2012
7.74% done, estimate finish Sun Feb 26 14:42:28 2012
7.74% done, estimate finish Sun Feb 26 14:42:26 2012
7.75% done, estimate finish Sun Feb 26 14:42:24 2012
7.75% done, estimate finish Sun Feb 26 14:42:22 2012
7.76% done, estimate finish Sun Feb 26 14:42:21 2012
7.76% done, estimate finish Sun Feb 26 14:42:19 2012
7.76% done, estimate finish Sun Feb 26 14:42:17 2012
7.77% done, estimate finish Sun Feb 26 14:42:15 2012
7.77% done, estimate finish Sun Feb 26 14:42:14 2012
7.78% done, estimate finish Sun Feb 26 14:42:12 2012
7.78% done, estimate finish Sun Feb 26 14:42:23 2012
7.79% done, estimate finish Sun Feb 26 14:42:21 2012
7.79% done, estimate finish Sun Feb 26 14:42:19 2012
7.80% done, estimate finish Sun Feb 26 14:42:18 2012
7.80% done, estimate finish Sun Feb 26 14:42:16 2012
7.81% done, estimate finish Sun Feb 26 14:42:27 2012
7.81% done, estimate finish Sun Feb 26 14:42:25 2012
7.82% done, estimate finish Sun Feb 26 14:42:23 2012
7.82% done, estimate finish Sun Feb 26 14:42:22 2012
7.83% done, estimate finish Sun Feb 26 14:42:20 2012
7.83% done, estimate finish Sun Feb 26 14:42:18 2012
7.84% done, estimate finish Sun Feb 26 14:42:16 2012
7.84% done, estimate finish Sun Feb 26 14:42:15 2012
7.84% done, estimate finish Sun Feb 26 14:42:13 2012
7.85% done, estimate finish Sun Feb 26 14:42:11 2012
7.85% done, estimate finish Sun Feb 26 14:42:09 2012
7.86% done, estimate finish Sun Feb 26 14:42:20 2012
7.86% done, estimate finish Sun Feb 26 14:42:19 2012
7.87% done, estimate finish Sun Feb 26 14:42:17 2012
7.87% done, estimate finish Sun Feb 26 14:42:15 2012
7.88% done, estimate finish Sun Feb 26 14:42:13 2012
7.88% done, estimate finish Sun Feb 26 14:42:12 2012
7.89% done, estimate finish Sun Feb 26 14:42:10 2012
7.89% done, estimate finish Sun Feb 26 14:42:21 2012
7.90% done, estimate finish Sun Feb 26 14:42:19 2012
7.90% done, estimate finish Sun Feb 26 14:42:17 2012
7.91% done, estimate finish Sun Feb 26 14:42:16 2012
7.91% done, estimate finish Sun Feb 26 14:42:14 2012
7.92% done, estimate finish Sun Feb 26 14:42:12 2012
7.92% done, estimate finish Sun Feb 26 14:42:10 2012
7.92% done, estimate finish Sun Feb 26 14:42:09 2012
7.93% done, estimate finish Sun Feb 26 14:42:20 2012
7.93% done, estimate finish Sun Feb 26 14:42:18 2012
7.94% done, estimate finish Sun Feb 26 14:42:16 2012
7.94% done, estimate finish Sun Feb 26 14:42:14 2012
7.95% done, estimate finish Sun Feb 26 14:42:13 2012
7.95% done, estimate finish Sun Feb 26 14:42:11 2012
7.96% done, estimate finish Sun Feb 26 14:42:09 2012
7.96% done, estimate finish Sun Feb 26 14:42:08 2012
7.97% done, estimate finish Sun Feb 26 14:42:06 2012
7.97% done, estimate finish Sun Feb 26 14:42:04 2012
7.98% done, estimate finish Sun Feb 26 14:42:15 2012
7.98% done, estimate finish Sun Feb 26 14:42:13 2012
7.99% done, estimate finish Sun Feb 26 14:42:12 2012
7.99% done, estimate finish Sun Feb 26 14:42:10 2012
8.00% done, estimate finish Sun Feb 26 14:42:08 2012
8.00% done, estimate finish Sun Feb 26 14:42:06 2012
8.00% done, estimate finish Sun Feb 26 14:42:17 2012
8.01% done, estimate finish Sun Feb 26 14:42:16 2012
8.01% done, estimate finish Sun Feb 26 14:42:14 2012
8.02% done, estimate finish Sun Feb 26 14:42:12 2012
8.02% done, estimate finish Sun Feb 26 14:42:10 2012
8.03% done, estimate finish Sun Feb 26 14:42:09 2012
8.03% done, estimate finish Sun Feb 26 14:42:07 2012
8.04% done, estimate finish Sun Feb 26 14:42:05 2012
8.04% done, estimate finish Sun Feb 26 14:42:04 2012
8.05% done, estimate finish Sun Feb 26 14:42:02 2012
8.05% done, estimate finish Sun Feb 26 14:42:00 2012
8.06% done, estimate finish Sun Feb 26 14:42:11 2012
8.06% done, estimate finish Sun Feb 26 14:42:09 2012
8.07% done, estimate finish Sun Feb 26 14:42:08 2012
8.07% done, estimate finish Sun Feb 26 14:42:06 2012
8.08% done, estimate finish Sun Feb 26 14:42:04 2012
8.08% done, estimate finish Sun Feb 26 14:42:02 2012
8.08% done, estimate finish Sun Feb 26 14:42:13 2012
8.09% done, estimate finish Sun Feb 26 14:42:11 2012
8.09% done, estimate finish Sun Feb 26 14:42:10 2012
8.10% done, estimate finish Sun Feb 26 14:42:08 2012
8.10% done, estimate finish Sun Feb 26 14:42:06 2012
8.11% done, estimate finish Sun Feb 26 14:42:05 2012
8.11% done, estimate finish Sun Feb 26 14:42:03 2012
8.12% done, estimate finish Sun Feb 26 14:42:01 2012
8.12% done, estimate finish Sun Feb 26 14:42:00 2012
8.13% done, estimate finish Sun Feb 26 14:41:58 2012
8.13% done, estimate finish Sun Feb 26 14:42:09 2012
8.14% done, estimate finish Sun Feb 26 14:42:07 2012
8.14% done, estimate finish Sun Feb 26 14:42:05 2012
8.15% done, estimate finish Sun Feb 26 14:42:04 2012
8.15% done, estimate finish Sun Feb 26 14:42:02 2012
8.16% done, estimate finish Sun Feb 26 14:42:00 2012
8.16% done, estimate finish Sun Feb 26 14:41:59 2012
8.17% done, estimate finish Sun Feb 26 14:41:57 2012
8.17% done, estimate finish Sun Feb 26 14:42:07 2012
8.17% done, estimate finish Sun Feb 26 14:42:06 2012
8.18% done, estimate finish Sun Feb 26 14:42:04 2012
8.18% done, estimate finish Sun Feb 26 14:42:02 2012
8.19% done, estimate finish Sun Feb 26 14:42:01 2012
8.19% done, estimate finish Sun Feb 26 14:41:59 2012
8.20% done, estimate finish Sun Feb 26 14:42:10 2012
8.20% done, estimate finish Sun Feb 26 14:42:08 2012
8.21% done, estimate finish Sun Feb 26 14:42:06 2012
8.21% done, estimate finish Sun Feb 26 14:42:05 2012
8.22% done, estimate finish Sun Feb 26 14:42:03 2012
8.22% done, estimate finish Sun Feb 26 14:42:01 2012
8.23% done, estimate finish Sun Feb 26 14:42:00 2012
8.23% done, estimate finish Sun Feb 26 14:41:58 2012
8.24% done, estimate finish Sun Feb 26 14:41:56 2012
8.24% done, estimate finish Sun Feb 26 14:41:55 2012
8.25% done, estimate finish Sun Feb 26 14:41:53 2012
8.25% done, estimate finish Sun Feb 26 14:41:51 2012
8.25% done, estimate finish Sun Feb 26 14:42:02 2012
8.26% done, estimate finish Sun Feb 26 14:42:00 2012
8.26% done, estimate finish Sun Feb 26 14:41:59 2012
8.27% done, estimate finish Sun Feb 26 14:41:57 2012
8.27% done, estimate finish Sun Feb 26 14:41:55 2012
8.28% done, estimate finish Sun Feb 26 14:41:54 2012
8.28% done, estimate finish Sun Feb 26 14:42:04 2012
8.29% done, estimate finish Sun Feb 26 14:42:02 2012
8.29% done, estimate finish Sun Feb 26 14:42:01 2012
8.30% done, estimate finish Sun Feb 26 14:41:59 2012
8.30% done, estimate finish Sun Feb 26 14:41:58 2012
8.31% done, estimate finish Sun Feb 26 14:41:56 2012
8.31% done, estimate finish Sun Feb 26 14:41:54 2012
8.32% done, estimate finish Sun Feb 26 14:41:53 2012
8.32% done, estimate finish Sun Feb 26 14:41:51 2012
8.33% done, estimate finish Sun Feb 26 14:41:49 2012
8.33% done, estimate finish Sun Feb 26 14:42:00 2012
8.33% done, estimate finish Sun Feb 26 14:41:58 2012
8.34% done, estimate finish Sun Feb 26 14:41:56 2012
8.34% done, estimate finish Sun Feb 26 14:41:55 2012
8.35% done, estimate finish Sun Feb 26 14:41:53 2012
8.35% done, estimate finish Sun Feb 26 14:41:52 2012
8.36% done, estimate finish Sun Feb 26 14:41:50 2012
8.36% done, estimate finish Sun Feb 26 14:42:00 2012
8.37% done, estimate finish Sun Feb 26 14:41:59 2012
8.37% done, estimate finish Sun Feb 26 14:41:57 2012
8.38% done, estimate finish Sun Feb 26 14:41:55 2012
8.38% done, estimate finish Sun Feb 26 14:41:54 2012
8.39% done, estimate finish Sun Feb 26 14:41:52 2012
8.39% done, estimate finish Sun Feb 26 14:42:02 2012
8.40% done, estimate finish Sun Feb 26 14:42:01 2012
8.40% done, estimate finish Sun Feb 26 14:41:59 2012
8.41% done, estimate finish Sun Feb 26 14:41:58 2012
8.41% done, estimate finish Sun Feb 26 14:41:56 2012
8.41% done, estimate finish Sun Feb 26 14:41:54 2012
8.42% done, estimate finish Sun Feb 26 14:41:53 2012
8.42% done, estimate finish Sun Feb 26 14:41:51 2012
8.43% done, estimate finish Sun Feb 26 14:41:49 2012
8.43% done, estimate finish Sun Feb 26 14:41:48 2012
8.44% done, estimate finish Sun Feb 26 14:41:46 2012
8.44% done, estimate finish Sun Feb 26 14:41:45 2012
8.45% done, estimate finish Sun Feb 26 14:41:55 2012
8.45% done, estimate finish Sun Feb 26 14:41:53 2012
8.46% done, estimate finish Sun Feb 26 14:41:52 2012
8.46% done, estimate finish Sun Feb 26 14:41:50 2012
8.47% done, estimate finish Sun Feb 26 14:41:48 2012
8.47% done, estimate finish Sun Feb 26 14:41:47 2012
8.48% done, estimate finish Sun Feb 26 14:41:57 2012
8.48% done, estimate finish Sun Feb 26 14:41:56 2012
8.49% done, estimate finish Sun Feb 26 14:41:54 2012
8.49% done, estimate finish Sun Feb 26 14:41:52 2012
8.49% done, estimate finish Sun Feb 26 14:41:51 2012
8.50% done, estimate finish Sun Feb 26 14:41:49 2012
8.50% done, estimate finish Sun Feb 26 14:41:47 2012
8.51% done, estimate finish Sun Feb 26 14:41:46 2012
8.51% done, estimate finish Sun Feb 26 14:41:44 2012
8.52% done, estimate finish Sun Feb 26 14:41:43 2012
8.52% done, estimate finish Sun Feb 26 14:41:41 2012
8.53% done, estimate finish Sun Feb 26 14:41:51 2012
8.53% done, estimate finish Sun Feb 26 14:41:50 2012
8.54% done, estimate finish Sun Feb 26 14:41:48 2012
8.54% done, estimate finish Sun Feb 26 14:41:46 2012
8.55% done, estimate finish Sun Feb 26 14:41:45 2012
8.55% done, estimate finish Sun Feb 26 14:41:43 2012
8.56% done, estimate finish Sun Feb 26 14:41:53 2012
8.56% done, estimate finish Sun Feb 26 14:41:52 2012
8.57% done, estimate finish Sun Feb 26 14:41:50 2012
8.57% done, estimate finish Sun Feb 26 14:41:49 2012
8.57% done, estimate finish Sun Feb 26 14:41:47 2012
8.58% done, estimate finish Sun Feb 26 14:41:45 2012
8.58% done, estimate finish Sun Feb 26 14:41:56 2012
8.59% done, estimate finish Sun Feb 26 14:41:54 2012
8.59% done, estimate finish Sun Feb 26 14:41:52 2012
8.60% done, estimate finish Sun Feb 26 14:41:51 2012
8.60% done, estimate finish Sun Feb 26 14:41:49 2012
8.61% done, estimate finish Sun Feb 26 14:41:48 2012
8.61% done, estimate finish Sun Feb 26 14:41:46 2012
8.62% done, estimate finish Sun Feb 26 14:41:45 2012
8.62% done, estimate finish Sun Feb 26 14:41:43 2012
8.63% done, estimate finish Sun Feb 26 14:41:41 2012
8.63% done, estimate finish Sun Feb 26 14:41:40 2012
8.64% done, estimate finish Sun Feb 26 14:41:38 2012
8.64% done, estimate finish Sun Feb 26 14:41:48 2012
8.65% done, estimate finish Sun Feb 26 14:41:47 2012
8.65% done, estimate finish Sun Feb 26 14:41:45 2012
8.65% done, estimate finish Sun Feb 26 14:41:44 2012
8.66% done, estimate finish Sun Feb 26 14:41:42 2012
8.66% done, estimate finish Sun Feb 26 14:41:40 2012
8.67% done, estimate finish Sun Feb 26 14:41:50 2012
8.67% done, estimate finish Sun Feb 26 14:41:49 2012
8.68% done, estimate finish Sun Feb 26 14:41:47 2012
8.68% done, estimate finish Sun Feb 26 14:41:46 2012
8.69% done, estimate finish Sun Feb 26 14:41:44 2012
8.69% done, estimate finish Sun Feb 26 14:41:43 2012
8.70% done, estimate finish Sun Feb 26 14:41:41 2012
8.70% done, estimate finish Sun Feb 26 14:41:39 2012
8.71% done, estimate finish Sun Feb 26 14:41:38 2012
8.71% done, estimate finish Sun Feb 26 14:41:36 2012
8.72% done, estimate finish Sun Feb 26 14:41:35 2012
8.72% done, estimate finish Sun Feb 26 14:41:45 2012
8.73% done, estimate finish Sun Feb 26 14:41:43 2012
8.73% done, estimate finish Sun Feb 26 14:41:42 2012
8.73% done, estimate finish Sun Feb 26 14:41:40 2012
8.74% done, estimate finish Sun Feb 26 14:41:39 2012
8.74% done, estimate finish Sun Feb 26 14:41:37 2012
8.75% done, estimate finish Sun Feb 26 14:41:35 2012
8.75% done, estimate finish Sun Feb 26 14:41:45 2012
8.76% done, estimate finish Sun Feb 26 14:41:44 2012
8.76% done, estimate finish Sun Feb 26 14:41:42 2012
8.77% done, estimate finish Sun Feb 26 14:41:41 2012
8.77% done, estimate finish Sun Feb 26 14:41:39 2012
8.78% done, estimate finish Sun Feb 26 14:41:38 2012
8.78% done, estimate finish Sun Feb 26 14:41:47 2012
8.79% done, estimate finish Sun Feb 26 14:41:46 2012
8.79% done, estimate finish Sun Feb 26 14:41:44 2012
8.80% done, estimate finish Sun Feb 26 14:41:43 2012
8.80% done, estimate finish Sun Feb 26 14:41:41 2012
8.81% done, estimate finish Sun Feb 26 14:41:40 2012
8.81% done, estimate finish Sun Feb 26 14:41:38 2012
8.81% done, estimate finish Sun Feb 26 14:41:37 2012
8.82% done, estimate finish Sun Feb 26 14:41:35 2012
8.82% done, estimate finish Sun Feb 26 14:41:34 2012
8.83% done, estimate finish Sun Feb 26 14:41:32 2012
8.83% done, estimate finish Sun Feb 26 14:41:42 2012
8.84% done, estimate finish Sun Feb 26 14:41:40 2012
8.84% done, estimate finish Sun Feb 26 14:41:39 2012
8.85% done, estimate finish Sun Feb 26 14:41:37 2012
8.85% done, estimate finish Sun Feb 26 14:41:36 2012
8.86% done, estimate finish Sun Feb 26 14:41:34 2012
8.86% done, estimate finish Sun Feb 26 14:41:44 2012
8.87% done, estimate finish Sun Feb 26 14:41:42 2012
8.87% done, estimate finish Sun Feb 26 14:41:41 2012
8.88% done, estimate finish Sun Feb 26 14:41:39 2012
8.88% done, estimate finish Sun Feb 26 14:41:38 2012
8.89% done, estimate finish Sun Feb 26 14:41:36 2012
8.89% done, estimate finish Sun Feb 26 14:41:35 2012
8.89% done, estimate finish Sun Feb 26 14:41:33 2012
8.90% done, estimate finish Sun Feb 26 14:41:32 2012
8.90% done, estimate finish Sun Feb 26 14:41:30 2012
8.91% done, estimate finish Sun Feb 26 14:41:29 2012
8.91% done, estimate finish Sun Feb 26 14:41:39 2012
8.92% done, estimate finish Sun Feb 26 14:41:37 2012
8.92% done, estimate finish Sun Feb 26 14:41:35 2012
8.93% done, estimate finish Sun Feb 26 14:41:34 2012
8.93% done, estimate finish Sun Feb 26 14:41:32 2012
8.94% done, estimate finish Sun Feb 26 14:41:31 2012
8.94% done, estimate finish Sun Feb 26 14:41:29 2012
8.95% done, estimate finish Sun Feb 26 14:41:39 2012
8.95% done, estimate finish Sun Feb 26 14:41:38 2012
8.96% done, estimate finish Sun Feb 26 14:41:36 2012
8.96% done, estimate finish Sun Feb 26 14:41:35 2012
8.97% done, estimate finish Sun Feb 26 14:41:33 2012
8.97% done, estimate finish Sun Feb 26 14:41:32 2012
8.97% done, estimate finish Sun Feb 26 14:41:41 2012
8.98% done, estimate finish Sun Feb 26 14:41:40 2012
8.98% done, estimate finish Sun Feb 26 14:41:38 2012
8.99% done, estimate finish Sun Feb 26 14:41:37 2012
8.99% done, estimate finish Sun Feb 26 14:41:35 2012
9.00% done, estimate finish Sun Feb 26 14:41:34 2012
9.00% done, estimate finish Sun Feb 26 14:41:32 2012
9.01% done, estimate finish Sun Feb 26 14:41:31 2012
9.01% done, estimate finish Sun Feb 26 14:41:29 2012
9.02% done, estimate finish Sun Feb 26 14:41:28 2012
9.02% done, estimate finish Sun Feb 26 14:41:26 2012
9.03% done, estimate finish Sun Feb 26 14:41:25 2012
9.03% done, estimate finish Sun Feb 26 14:41:34 2012
9.04% done, estimate finish Sun Feb 26 14:41:33 2012
9.04% done, estimate finish Sun Feb 26 14:41:31 2012
9.05% done, estimate finish Sun Feb 26 14:41:30 2012
9.05% done, estimate finish Sun Feb 26 14:41:28 2012
9.05% done, estimate finish Sun Feb 26 14:41:38 2012
9.06% done, estimate finish Sun Feb 26 14:41:36 2012
9.06% done, estimate finish Sun Feb 26 14:41:35 2012
9.07% done, estimate finish Sun Feb 26 14:41:33 2012
9.07% done, estimate finish Sun Feb 26 14:41:32 2012
9.08% done, estimate finish Sun Feb 26 14:41:30 2012
9.08% done, estimate finish Sun Feb 26 14:41:29 2012
9.09% done, estimate finish Sun Feb 26 14:41:27 2012
9.09% done, estimate finish Sun Feb 26 14:41:26 2012
9.10% done, estimate finish Sun Feb 26 14:41:24 2012
9.10% done, estimate finish Sun Feb 26 14:41:23 2012
9.11% done, estimate finish Sun Feb 26 14:41:22 2012
9.11% done, estimate finish Sun Feb 26 14:41:31 2012
9.12% done, estimate finish Sun Feb 26 14:41:30 2012
9.12% done, estimate finish Sun Feb 26 14:41:28 2012
9.13% done, estimate finish Sun Feb 26 14:41:27 2012
9.13% done, estimate finish Sun Feb 26 14:41:25 2012
9.13% done, estimate finish Sun Feb 26 14:41:24 2012
9.14% done, estimate finish Sun Feb 26 14:41:33 2012
9.14% done, estimate finish Sun Feb 26 14:41:32 2012
9.15% done, estimate finish Sun Feb 26 14:41:30 2012
9.15% done, estimate finish Sun Feb 26 14:41:29 2012
9.16% done, estimate finish Sun Feb 26 14:41:27 2012
9.16% done, estimate finish Sun Feb 26 14:41:26 2012
9.17% done, estimate finish Sun Feb 26 14:41:24 2012
9.17% done, estimate finish Sun Feb 26 14:41:34 2012
9.18% done, estimate finish Sun Feb 26 14:41:32 2012
9.18% done, estimate finish Sun Feb 26 14:41:31 2012
9.19% done, estimate finish Sun Feb 26 14:41:29 2012
9.19% done, estimate finish Sun Feb 26 14:41:28 2012
9.20% done, estimate finish Sun Feb 26 14:41:26 2012
9.20% done, estimate finish Sun Feb 26 14:41:25 2012
9.21% done, estimate finish Sun Feb 26 14:41:23 2012
9.21% done, estimate finish Sun Feb 26 14:41:22 2012
9.21% done, estimate finish Sun Feb 26 14:41:21 2012
9.22% done, estimate finish Sun Feb 26 14:41:19 2012
9.22% done, estimate finish Sun Feb 26 14:41:28 2012
9.23% done, estimate finish Sun Feb 26 14:41:27 2012
9.23% done, estimate finish Sun Feb 26 14:41:26 2012
9.24% done, estimate finish Sun Feb 26 14:41:24 2012
9.24% done, estimate finish Sun Feb 26 14:41:23 2012
9.25% done, estimate finish Sun Feb 26 14:41:21 2012
9.25% done, estimate finish Sun Feb 26 14:41:20 2012
9.26% done, estimate finish Sun Feb 26 14:41:29 2012
9.26% done, estimate finish Sun Feb 26 14:41:28 2012
9.27% done, estimate finish Sun Feb 26 14:41:26 2012
9.27% done, estimate finish Sun Feb 26 14:41:25 2012
9.28% done, estimate finish Sun Feb 26 14:41:23 2012
9.28% done, estimate finish Sun Feb 26 14:41:22 2012
9.29% done, estimate finish Sun Feb 26 14:41:20 2012
9.29% done, estimate finish Sun Feb 26 14:41:19 2012
9.30% done, estimate finish Sun Feb 26 14:41:17 2012
9.30% done, estimate finish Sun Feb 26 14:41:27 2012
9.30% done, estimate finish Sun Feb 26 14:41:25 2012
9.31% done, estimate finish Sun Feb 26 14:41:24 2012
9.31% done, estimate finish Sun Feb 26 14:41:22 2012
9.32% done, estimate finish Sun Feb 26 14:41:21 2012
9.32% done, estimate finish Sun Feb 26 14:41:20 2012
9.33% done, estimate finish Sun Feb 26 14:41:18 2012
9.33% done, estimate finish Sun Feb 26 14:41:27 2012
9.34% done, estimate finish Sun Feb 26 14:41:26 2012
9.34% done, estimate finish Sun Feb 26 14:41:25 2012
9.35% done, estimate finish Sun Feb 26 14:41:23 2012
9.35% done, estimate finish Sun Feb 26 14:41:22 2012
9.36% done, estimate finish Sun Feb 26 14:41:20 2012
9.36% done, estimate finish Sun Feb 26 14:41:19 2012
9.37% done, estimate finish Sun Feb 26 14:41:17 2012
9.37% done, estimate finish Sun Feb 26 14:41:16 2012
9.38% done, estimate finish Sun Feb 26 14:41:14 2012
9.38% done, estimate finish Sun Feb 26 14:41:24 2012
9.38% done, estimate finish Sun Feb 26 14:41:22 2012
9.39% done, estimate finish Sun Feb 26 14:41:21 2012
9.39% done, estimate finish Sun Feb 26 14:41:19 2012
9.40% done, estimate finish Sun Feb 26 14:41:18 2012
9.40% done, estimate finish Sun Feb 26 14:41:17 2012
9.41% done, estimate finish Sun Feb 26 14:41:15 2012
9.41% done, estimate finish Sun Feb 26 14:41:14 2012
9.42% done, estimate finish Sun Feb 26 14:41:23 2012
9.42% done, estimate finish Sun Feb 26 14:41:21 2012
9.43% done, estimate finish Sun Feb 26 14:41:20 2012
9.43% done, estimate finish Sun Feb 26 14:41:19 2012
9.44% done, estimate finish Sun Feb 26 14:41:17 2012
9.44% done, estimate finish Sun Feb 26 14:41:16 2012
9.45% done, estimate finish Sun Feb 26 14:41:25 2012
9.45% done, estimate finish Sun Feb 26 14:41:23 2012
9.46% done, estimate finish Sun Feb 26 14:41:22 2012
9.46% done, estimate finish Sun Feb 26 14:41:21 2012
9.46% done, estimate finish Sun Feb 26 14:41:19 2012
9.47% done, estimate finish Sun Feb 26 14:41:18 2012
9.47% done, estimate finish Sun Feb 26 14:41:16 2012
9.48% done, estimate finish Sun Feb 26 14:41:15 2012
9.48% done, estimate finish Sun Feb 26 14:41:14 2012
9.49% done, estimate finish Sun Feb 26 14:41:12 2012
9.49% done, estimate finish Sun Feb 26 14:41:11 2012
9.50% done, estimate finish Sun Feb 26 14:41:09 2012
9.50% done, estimate finish Sun Feb 26 14:41:18 2012
9.51% done, estimate finish Sun Feb 26 14:41:17 2012
9.51% done, estimate finish Sun Feb 26 14:41:16 2012
9.52% done, estimate finish Sun Feb 26 14:41:14 2012
9.52% done, estimate finish Sun Feb 26 14:41:13 2012
9.53% done, estimate finish Sun Feb 26 14:41:11 2012
9.53% done, estimate finish Sun Feb 26 14:41:10 2012
9.54% done, estimate finish Sun Feb 26 14:41:19 2012
9.54% done, estimate finish Sun Feb 26 14:41:18 2012
9.54% done, estimate finish Sun Feb 26 14:41:16 2012
9.55% done, estimate finish Sun Feb 26 14:41:15 2012
9.55% done, estimate finish Sun Feb 26 14:41:13 2012
9.56% done, estimate finish Sun Feb 26 14:41:12 2012
9.56% done, estimate finish Sun Feb 26 14:41:11 2012
9.57% done, estimate finish Sun Feb 26 14:41:09 2012
9.57% done, estimate finish Sun Feb 26 14:41:18 2012
9.58% done, estimate finish Sun Feb 26 14:41:17 2012
9.58% done, estimate finish Sun Feb 26 14:41:15 2012
9.59% done, estimate finish Sun Feb 26 14:41:14 2012
9.59% done, estimate finish Sun Feb 26 14:41:13 2012
9.60% done, estimate finish Sun Feb 26 14:41:11 2012
9.60% done, estimate finish Sun Feb 26 14:41:10 2012
9.61% done, estimate finish Sun Feb 26 14:41:09 2012
9.61% done, estimate finish Sun Feb 26 14:41:18 2012
9.62% done, estimate finish Sun Feb 26 14:41:16 2012
9.62% done, estimate finish Sun Feb 26 14:41:15 2012
9.62% done, estimate finish Sun Feb 26 14:41:13 2012
9.63% done, estimate finish Sun Feb 26 14:41:12 2012
9.63% done, estimate finish Sun Feb 26 14:41:11 2012
9.64% done, estimate finish Sun Feb 26 14:41:09 2012
9.64% done, estimate finish Sun Feb 26 14:41:08 2012
9.65% done, estimate finish Sun Feb 26 14:41:06 2012
9.65% done, estimate finish Sun Feb 26 14:41:15 2012
9.66% done, estimate finish Sun Feb 26 14:41:14 2012
9.66% done, estimate finish Sun Feb 26 14:41:13 2012
9.67% done, estimate finish Sun Feb 26 14:41:11 2012
9.67% done, estimate finish Sun Feb 26 14:41:10 2012
9.68% done, estimate finish Sun Feb 26 14:41:08 2012
9.68% done, estimate finish Sun Feb 26 14:41:07 2012
9.69% done, estimate finish Sun Feb 26 14:41:06 2012
9.69% done, estimate finish Sun Feb 26 14:41:04 2012
9.70% done, estimate finish Sun Feb 26 14:41:13 2012
9.70% done, estimate finish Sun Feb 26 14:41:12 2012
9.70% done, estimate finish Sun Feb 26 14:41:10 2012
9.71% done, estimate finish Sun Feb 26 14:41:09 2012
9.71% done, estimate finish Sun Feb 26 14:41:08 2012
9.72% done, estimate finish Sun Feb 26 14:41:06 2012
9.72% done, estimate finish Sun Feb 26 14:41:15 2012
9.73% done, estimate finish Sun Feb 26 14:41:14 2012
9.73% done, estimate finish Sun Feb 26 14:41:12 2012
9.74% done, estimate finish Sun Feb 26 14:41:11 2012
9.74% done, estimate finish Sun Feb 26 14:41:10 2012
9.75% done, estimate finish Sun Feb 26 14:41:08 2012
9.75% done, estimate finish Sun Feb 26 14:41:07 2012
9.76% done, estimate finish Sun Feb 26 14:41:06 2012
9.76% done, estimate finish Sun Feb 26 14:41:04 2012
9.77% done, estimate finish Sun Feb 26 14:41:03 2012
9.77% done, estimate finish Sun Feb 26 14:41:02 2012
9.78% done, estimate finish Sun Feb 26 14:41:00 2012
9.78% done, estimate finish Sun Feb 26 14:41:09 2012
9.78% done, estimate finish Sun Feb 26 14:41:08 2012
9.79% done, estimate finish Sun Feb 26 14:41:06 2012
9.79% done, estimate finish Sun Feb 26 14:41:05 2012
9.80% done, estimate finish Sun Feb 26 14:41:04 2012
9.80% done, estimate finish Sun Feb 26 14:41:12 2012
9.81% done, estimate finish Sun Feb 26 14:41:11 2012
9.81% done, estimate finish Sun Feb 26 14:41:10 2012
9.82% done, estimate finish Sun Feb 26 14:41:08 2012
9.82% done, estimate finish Sun Feb 26 14:41:07 2012
9.83% done, estimate finish Sun Feb 26 14:41:06 2012
9.83% done, estimate finish Sun Feb 26 14:41:04 2012
9.84% done, estimate finish Sun Feb 26 14:41:03 2012
9.84% done, estimate finish Sun Feb 26 14:41:01 2012
9.85% done, estimate finish Sun Feb 26 14:41:10 2012
9.85% done, estimate finish Sun Feb 26 14:41:09 2012
9.86% done, estimate finish Sun Feb 26 14:41:08 2012
9.86% done, estimate finish Sun Feb 26 14:41:06 2012
9.86% done, estimate finish Sun Feb 26 14:41:05 2012
9.87% done, estimate finish Sun Feb 26 14:41:04 2012
9.87% done, estimate finish Sun Feb 26 14:41:02 2012
9.88% done, estimate finish Sun Feb 26 14:41:01 2012
9.88% done, estimate finish Sun Feb 26 14:40:59 2012
9.89% done, estimate finish Sun Feb 26 14:41:08 2012
9.89% done, estimate finish Sun Feb 26 14:41:07 2012
9.90% done, estimate finish Sun Feb 26 14:41:06 2012
9.90% done, estimate finish Sun Feb 26 14:41:04 2012
9.91% done, estimate finish Sun Feb 26 14:41:03 2012
9.91% done, estimate finish Sun Feb 26 14:41:01 2012
9.92% done, estimate finish Sun Feb 26 14:41:10 2012
9.92% done, estimate finish Sun Feb 26 14:41:09 2012
9.93% done, estimate finish Sun Feb 26 14:41:08 2012
9.93% done, estimate finish Sun Feb 26 14:41:06 2012
9.94% done, estimate finish Sun Feb 26 14:41:05 2012
9.94% done, estimate finish Sun Feb 26 14:41:03 2012
9.94% done, estimate finish Sun Feb 26 14:41:02 2012
9.95% done, estimate finish Sun Feb 26 14:41:01 2012
9.95% done, estimate finish Sun Feb 26 14:40:59 2012
9.96% done, estimate finish Sun Feb 26 14:40:58 2012
9.96% done, estimate finish Sun Feb 26 14:40:57 2012
9.97% done, estimate finish Sun Feb 26 14:40:55 2012
9.97% done, estimate finish Sun Feb 26 14:41:04 2012
9.98% done, estimate finish Sun Feb 26 14:41:03 2012
9.98% done, estimate finish Sun Feb 26 14:41:01 2012
9.99% done, estimate finish Sun Feb 26 14:41:00 2012
9.99% done, estimate finish Sun Feb 26 14:40:59 2012
10.00% done, estimate finish Sun Feb 26 14:40:57 2012
10.00% done, estimate finish Sun Feb 26 14:41:06 2012
10.01% done, estimate finish Sun Feb 26 14:41:05 2012
10.01% done, estimate finish Sun Feb 26 14:41:03 2012
10.02% done, estimate finish Sun Feb 26 14:41:02 2012
10.02% done, estimate finish Sun Feb 26 14:41:01 2012
10.02% done, estimate finish Sun Feb 26 14:40:59 2012
10.03% done, estimate finish Sun Feb 26 14:40:58 2012
10.03% done, estimate finish Sun Feb 26 14:40:57 2012
10.04% done, estimate finish Sun Feb 26 14:41:05 2012
10.04% done, estimate finish Sun Feb 26 14:41:04 2012
10.05% done, estimate finish Sun Feb 26 14:41:03 2012
10.05% done, estimate finish Sun Feb 26 14:41:01 2012
10.06% done, estimate finish Sun Feb 26 14:41:00 2012
10.06% done, estimate finish Sun Feb 26 14:40:59 2012
10.07% done, estimate finish Sun Feb 26 14:40:57 2012
10.07% done, estimate finish Sun Feb 26 14:40:56 2012
10.08% done, estimate finish Sun Feb 26 14:40:55 2012
10.08% done, estimate finish Sun Feb 26 14:41:03 2012
10.09% done, estimate finish Sun Feb 26 14:41:02 2012
10.09% done, estimate finish Sun Feb 26 14:41:01 2012
10.10% done, estimate finish Sun Feb 26 14:40:59 2012
10.10% done, estimate finish Sun Feb 26 14:40:58 2012
10.11% done, estimate finish Sun Feb 26 14:40:57 2012
10.11% done, estimate finish Sun Feb 26 14:41:05 2012
10.11% done, estimate finish Sun Feb 26 14:41:04 2012
10.12% done, estimate finish Sun Feb 26 14:41:03 2012
10.12% done, estimate finish Sun Feb 26 14:41:01 2012
10.13% done, estimate finish Sun Feb 26 14:41:00 2012
10.13% done, estimate finish Sun Feb 26 14:40:59 2012
10.14% done, estimate finish Sun Feb 26 14:40:57 2012
10.14% done, estimate finish Sun Feb 26 14:40:56 2012
10.15% done, estimate finish Sun Feb 26 14:40:55 2012
10.15% done, estimate finish Sun Feb 26 14:40:54 2012
10.16% done, estimate finish Sun Feb 26 14:40:52 2012
10.16% done, estimate finish Sun Feb 26 14:40:51 2012
10.17% done, estimate finish Sun Feb 26 14:40:59 2012
10.17% done, estimate finish Sun Feb 26 14:40:58 2012
10.18% done, estimate finish Sun Feb 26 14:40:57 2012
10.18% done, estimate finish Sun Feb 26 14:40:55 2012
10.19% done, estimate finish Sun Feb 26 14:40:54 2012
10.19% done, estimate finish Sun Feb 26 14:40:53 2012
10.19% done, estimate finish Sun Feb 26 14:41:01 2012
10.20% done, estimate finish Sun Feb 26 14:41:00 2012
10.20% done, estimate finish Sun Feb 26 14:40:59 2012
10.21% done, estimate finish Sun Feb 26 14:40:57 2012
10.21% done, estimate finish Sun Feb 26 14:40:56 2012
10.22% done, estimate finish Sun Feb 26 14:40:55 2012
10.22% done, estimate finish Sun Feb 26 14:40:54 2012
10.23% done, estimate finish Sun Feb 26 14:40:52 2012
10.23% done, estimate finish Sun Feb 26 14:40:51 2012
10.24% done, estimate finish Sun Feb 26 14:40:59 2012
10.24% done, estimate finish Sun Feb 26 14:40:58 2012
10.25% done, estimate finish Sun Feb 26 14:40:57 2012
10.25% done, estimate finish Sun Feb 26 14:40:56 2012
10.26% done, estimate finish Sun Feb 26 14:40:54 2012
10.26% done, estimate finish Sun Feb 26 14:40:53 2012
10.27% done, estimate finish Sun Feb 26 14:40:52 2012
10.27% done, estimate finish Sun Feb 26 14:40:50 2012
10.27% done, estimate finish Sun Feb 26 14:40:49 2012
10.28% done, estimate finish Sun Feb 26 14:40:57 2012
10.28% done, estimate finish Sun Feb 26 14:40:56 2012
10.29% done, estimate finish Sun Feb 26 14:40:55 2012
10.29% done, estimate finish Sun Feb 26 14:40:54 2012
10.30% done, estimate finish Sun Feb 26 14:40:52 2012
10.30% done, estimate finish Sun Feb 26 14:41:01 2012
10.31% done, estimate finish Sun Feb 26 14:40:59 2012
10.31% done, estimate finish Sun Feb 26 14:40:58 2012
10.32% done, estimate finish Sun Feb 26 14:40:57 2012
10.32% done, estimate finish Sun Feb 26 14:40:56 2012
10.33% done, estimate finish Sun Feb 26 14:40:54 2012
10.33% done, estimate finish Sun Feb 26 14:40:53 2012
10.34% done, estimate finish Sun Feb 26 14:40:52 2012
10.34% done, estimate finish Sun Feb 26 14:40:50 2012
10.35% done, estimate finish Sun Feb 26 14:40:49 2012
10.35% done, estimate finish Sun Feb 26 14:40:48 2012
10.35% done, estimate finish Sun Feb 26 14:40:47 2012
10.36% done, estimate finish Sun Feb 26 14:40:55 2012
10.36% done, estimate finish Sun Feb 26 14:40:54 2012
10.37% done, estimate finish Sun Feb 26 14:40:52 2012
10.37% done, estimate finish Sun Feb 26 14:40:51 2012
10.38% done, estimate finish Sun Feb 26 14:40:50 2012
10.38% done, estimate finish Sun Feb 26 14:40:48 2012
10.39% done, estimate finish Sun Feb 26 14:40:57 2012
10.39% done, estimate finish Sun Feb 26 14:40:56 2012
10.40% done, estimate finish Sun Feb 26 14:40:54 2012
10.40% done, estimate finish Sun Feb 26 14:40:53 2012
10.41% done, estimate finish Sun Feb 26 14:40:52 2012
10.41% done, estimate finish Sun Feb 26 14:40:50 2012
10.42% done, estimate finish Sun Feb 26 14:40:49 2012
10.42% done, estimate finish Sun Feb 26 14:40:48 2012
10.43% done, estimate finish Sun Feb 26 14:40:47 2012
10.43% done, estimate finish Sun Feb 26 14:40:45 2012
10.43% done, estimate finish Sun Feb 26 14:40:54 2012
10.44% done, estimate finish Sun Feb 26 14:40:52 2012
10.44% done, estimate finish Sun Feb 26 14:40:51 2012
10.45% done, estimate finish Sun Feb 26 14:40:50 2012
10.45% done, estimate finish Sun Feb 26 14:40:49 2012
10.46% done, estimate finish Sun Feb 26 14:40:47 2012
10.46% done, estimate finish Sun Feb 26 14:40:46 2012
10.47% done, estimate finish Sun Feb 26 14:40:45 2012
10.47% done, estimate finish Sun Feb 26 14:40:53 2012
10.48% done, estimate finish Sun Feb 26 14:40:52 2012
10.48% done, estimate finish Sun Feb 26 14:40:50 2012
10.49% done, estimate finish Sun Feb 26 14:40:49 2012
10.49% done, estimate finish Sun Feb 26 14:40:48 2012
10.50% done, estimate finish Sun Feb 26 14:40:47 2012
10.50% done, estimate finish Sun Feb 26 14:40:55 2012
10.51% done, estimate finish Sun Feb 26 14:40:54 2012
10.51% done, estimate finish Sun Feb 26 14:40:52 2012
10.51% done, estimate finish Sun Feb 26 14:40:51 2012
10.52% done, estimate finish Sun Feb 26 14:40:50 2012
10.52% done, estimate finish Sun Feb 26 14:40:49 2012
10.53% done, estimate finish Sun Feb 26 14:40:47 2012
10.53% done, estimate finish Sun Feb 26 14:40:46 2012
10.54% done, estimate finish Sun Feb 26 14:40:45 2012
10.54% done, estimate finish Sun Feb 26 14:40:44 2012
10.55% done, estimate finish Sun Feb 26 14:40:42 2012
10.55% done, estimate finish Sun Feb 26 14:40:51 2012
10.56% done, estimate finish Sun Feb 26 14:40:49 2012
10.56% done, estimate finish Sun Feb 26 14:40:48 2012
10.57% done, estimate finish Sun Feb 26 14:40:47 2012
10.57% done, estimate finish Sun Feb 26 14:40:46 2012
10.58% done, estimate finish Sun Feb 26 14:40:44 2012
10.58% done, estimate finish Sun Feb 26 14:40:52 2012
10.59% done, estimate finish Sun Feb 26 14:40:51 2012
10.59% done, estimate finish Sun Feb 26 14:40:50 2012
10.59% done, estimate finish Sun Feb 26 14:40:49 2012
10.60% done, estimate finish Sun Feb 26 14:40:47 2012
10.60% done, estimate finish Sun Feb 26 14:40:46 2012
10.61% done, estimate finish Sun Feb 26 14:40:45 2012
10.61% done, estimate finish Sun Feb 26 14:40:44 2012
10.62% done, estimate finish Sun Feb 26 14:40:42 2012
10.62% done, estimate finish Sun Feb 26 14:40:41 2012
10.63% done, estimate finish Sun Feb 26 14:40:49 2012
10.63% done, estimate finish Sun Feb 26 14:40:48 2012
10.64% done, estimate finish Sun Feb 26 14:40:47 2012
10.64% done, estimate finish Sun Feb 26 14:40:46 2012
10.65% done, estimate finish Sun Feb 26 14:40:44 2012
10.65% done, estimate finish Sun Feb 26 14:40:43 2012
10.66% done, estimate finish Sun Feb 26 14:40:42 2012
10.66% done, estimate finish Sun Feb 26 14:40:41 2012
10.67% done, estimate finish Sun Feb 26 14:40:49 2012
10.67% done, estimate finish Sun Feb 26 14:40:47 2012
10.67% done, estimate finish Sun Feb 26 14:40:46 2012
10.68% done, estimate finish Sun Feb 26 14:40:45 2012
10.68% done, estimate finish Sun Feb 26 14:40:44 2012
10.69% done, estimate finish Sun Feb 26 14:40:43 2012
10.69% done, estimate finish Sun Feb 26 14:40:51 2012
10.70% done, estimate finish Sun Feb 26 14:40:49 2012
10.70% done, estimate finish Sun Feb 26 14:40:48 2012
10.71% done, estimate finish Sun Feb 26 14:40:47 2012
10.71% done, estimate finish Sun Feb 26 14:40:46 2012
10.72% done, estimate finish Sun Feb 26 14:40:44 2012
10.72% done, estimate finish Sun Feb 26 14:40:43 2012
10.73% done, estimate finish Sun Feb 26 14:40:42 2012
10.73% done, estimate finish Sun Feb 26 14:40:41 2012
10.74% done, estimate finish Sun Feb 26 14:40:39 2012
10.74% done, estimate finish Sun Feb 26 14:40:38 2012
10.75% done, estimate finish Sun Feb 26 14:40:37 2012
10.75% done, estimate finish Sun Feb 26 14:40:45 2012
10.75% done, estimate finish Sun Feb 26 14:40:44 2012
10.76% done, estimate finish Sun Feb 26 14:40:43 2012
10.76% done, estimate finish Sun Feb 26 14:40:41 2012
10.77% done, estimate finish Sun Feb 26 14:40:40 2012
10.77% done, estimate finish Sun Feb 26 14:40:48 2012
10.78% done, estimate finish Sun Feb 26 14:40:47 2012
10.78% done, estimate finish Sun Feb 26 14:40:46 2012
10.79% done, estimate finish Sun Feb 26 14:40:45 2012
10.79% done, estimate finish Sun Feb 26 14:40:43 2012
10.80% done, estimate finish Sun Feb 26 14:40:42 2012
10.80% done, estimate finish Sun Feb 26 14:40:41 2012
10.81% done, estimate finish Sun Feb 26 14:40:40 2012
10.81% done, estimate finish Sun Feb 26 14:40:38 2012
10.82% done, estimate finish Sun Feb 26 14:40:37 2012
10.82% done, estimate finish Sun Feb 26 14:40:45 2012
10.83% done, estimate finish Sun Feb 26 14:40:44 2012
10.83% done, estimate finish Sun Feb 26 14:40:43 2012
10.83% done, estimate finish Sun Feb 26 14:40:42 2012
10.84% done, estimate finish Sun Feb 26 14:40:40 2012
10.84% done, estimate finish Sun Feb 26 14:40:39 2012
10.85% done, estimate finish Sun Feb 26 14:40:38 2012
10.85% done, estimate finish Sun Feb 26 14:40:37 2012
10.86% done, estimate finish Sun Feb 26 14:40:45 2012
10.86% done, estimate finish Sun Feb 26 14:40:43 2012
10.87% done, estimate finish Sun Feb 26 14:40:42 2012
10.87% done, estimate finish Sun Feb 26 14:40:41 2012
10.88% done, estimate finish Sun Feb 26 14:40:40 2012
10.88% done, estimate finish Sun Feb 26 14:40:39 2012
10.89% done, estimate finish Sun Feb 26 14:40:46 2012
10.89% done, estimate finish Sun Feb 26 14:40:45 2012
10.90% done, estimate finish Sun Feb 26 14:40:44 2012
10.90% done, estimate finish Sun Feb 26 14:40:43 2012
10.91% done, estimate finish Sun Feb 26 14:40:42 2012
10.91% done, estimate finish Sun Feb 26 14:40:40 2012
10.91% done, estimate finish Sun Feb 26 14:40:39 2012
10.92% done, estimate finish Sun Feb 26 14:40:38 2012
10.92% done, estimate finish Sun Feb 26 14:40:37 2012
10.93% done, estimate finish Sun Feb 26 14:40:36 2012
10.93% done, estimate finish Sun Feb 26 14:40:34 2012
10.94% done, estimate finish Sun Feb 26 14:40:33 2012
10.94% done, estimate finish Sun Feb 26 14:40:41 2012
10.95% done, estimate finish Sun Feb 26 14:40:40 2012
10.95% done, estimate finish Sun Feb 26 14:40:39 2012
10.96% done, estimate finish Sun Feb 26 14:40:37 2012
10.96% done, estimate finish Sun Feb 26 14:40:36 2012
10.97% done, estimate finish Sun Feb 26 14:40:35 2012
10.97% done, estimate finish Sun Feb 26 14:40:34 2012
10.98% done, estimate finish Sun Feb 26 14:40:42 2012
10.98% done, estimate finish Sun Feb 26 14:40:41 2012
10.99% done, estimate finish Sun Feb 26 14:40:39 2012
10.99% done, estimate finish Sun Feb 26 14:40:38 2012
10.99% done, estimate finish Sun Feb 26 14:40:37 2012
11.00% done, estimate finish Sun Feb 26 14:40:36 2012
11.00% done, estimate finish Sun Feb 26 14:40:34 2012
11.01% done, estimate finish Sun Feb 26 14:40:33 2012
11.01% done, estimate finish Sun Feb 26 14:40:32 2012
11.02% done, estimate finish Sun Feb 26 14:40:40 2012
11.02% done, estimate finish Sun Feb 26 14:40:39 2012
11.03% done, estimate finish Sun Feb 26 14:40:38 2012
11.03% done, estimate finish Sun Feb 26 14:40:36 2012
11.04% done, estimate finish Sun Feb 26 14:40:35 2012
11.04% done, estimate finish Sun Feb 26 14:40:34 2012
11.05% done, estimate finish Sun Feb 26 14:40:33 2012
11.05% done, estimate finish Sun Feb 26 14:40:41 2012
11.06% done, estimate finish Sun Feb 26 14:40:39 2012
11.06% done, estimate finish Sun Feb 26 14:40:38 2012
11.07% done, estimate finish Sun Feb 26 14:40:37 2012
11.07% done, estimate finish Sun Feb 26 14:40:36 2012
11.07% done, estimate finish Sun Feb 26 14:40:35 2012
11.08% done, estimate finish Sun Feb 26 14:40:33 2012
11.08% done, estimate finish Sun Feb 26 14:40:32 2012
11.09% done, estimate finish Sun Feb 26 14:40:31 2012
11.09% done, estimate finish Sun Feb 26 14:40:39 2012
11.10% done, estimate finish Sun Feb 26 14:40:38 2012
11.10% done, estimate finish Sun Feb 26 14:40:36 2012
11.11% done, estimate finish Sun Feb 26 14:40:35 2012
11.11% done, estimate finish Sun Feb 26 14:40:34 2012
11.12% done, estimate finish Sun Feb 26 14:40:33 2012
11.12% done, estimate finish Sun Feb 26 14:40:32 2012
11.13% done, estimate finish Sun Feb 26 14:40:31 2012
11.13% done, estimate finish Sun Feb 26 14:40:29 2012
11.14% done, estimate finish Sun Feb 26 14:40:37 2012
11.14% done, estimate finish Sun Feb 26 14:40:36 2012
11.15% done, estimate finish Sun Feb 26 14:40:35 2012
11.15% done, estimate finish Sun Feb 26 14:40:34 2012
11.15% done, estimate finish Sun Feb 26 14:40:32 2012
11.16% done, estimate finish Sun Feb 26 14:40:31 2012
11.16% done, estimate finish Sun Feb 26 14:40:39 2012
11.17% done, estimate finish Sun Feb 26 14:40:38 2012
11.17% done, estimate finish Sun Feb 26 14:40:37 2012
11.18% done, estimate finish Sun Feb 26 14:40:35 2012
11.18% done, estimate finish Sun Feb 26 14:40:34 2012
11.19% done, estimate finish Sun Feb 26 14:40:33 2012
11.19% done, estimate finish Sun Feb 26 14:40:32 2012
11.20% done, estimate finish Sun Feb 26 14:40:31 2012
11.20% done, estimate finish Sun Feb 26 14:40:30 2012
11.21% done, estimate finish Sun Feb 26 14:40:28 2012
11.21% done, estimate finish Sun Feb 26 14:40:27 2012
11.22% done, estimate finish Sun Feb 26 14:40:26 2012
11.22% done, estimate finish Sun Feb 26 14:40:34 2012
11.23% done, estimate finish Sun Feb 26 14:40:33 2012
11.23% done, estimate finish Sun Feb 26 14:40:31 2012
11.24% done, estimate finish Sun Feb 26 14:40:30 2012
11.24% done, estimate finish Sun Feb 26 14:40:29 2012
11.24% done, estimate finish Sun Feb 26 14:40:28 2012
11.25% done, estimate finish Sun Feb 26 14:40:36 2012
11.25% done, estimate finish Sun Feb 26 14:40:34 2012
11.26% done, estimate finish Sun Feb 26 14:40:33 2012
11.26% done, estimate finish Sun Feb 26 14:40:32 2012
11.27% done, estimate finish Sun Feb 26 14:40:31 2012
11.27% done, estimate finish Sun Feb 26 14:40:30 2012
11.28% done, estimate finish Sun Feb 26 14:40:29 2012
11.28% done, estimate finish Sun Feb 26 14:40:27 2012
11.29% done, estimate finish Sun Feb 26 14:40:26 2012
11.29% done, estimate finish Sun Feb 26 14:40:34 2012
11.30% done, estimate finish Sun Feb 26 14:40:33 2012
11.30% done, estimate finish Sun Feb 26 14:40:32 2012
11.31% done, estimate finish Sun Feb 26 14:40:30 2012
11.31% done, estimate finish Sun Feb 26 14:40:29 2012
11.32% done, estimate finish Sun Feb 26 14:40:28 2012
11.32% done, estimate finish Sun Feb 26 14:40:27 2012
11.32% done, estimate finish Sun Feb 26 14:40:26 2012
11.33% done, estimate finish Sun Feb 26 14:40:33 2012
11.33% done, estimate finish Sun Feb 26 14:40:32 2012
11.34% done, estimate finish Sun Feb 26 14:40:31 2012
11.34% done, estimate finish Sun Feb 26 14:40:30 2012
11.35% done, estimate finish Sun Feb 26 14:40:29 2012
11.35% done, estimate finish Sun Feb 26 14:40:28 2012
11.36% done, estimate finish Sun Feb 26 14:40:26 2012
11.36% done, estimate finish Sun Feb 26 14:40:25 2012
11.37% done, estimate finish Sun Feb 26 14:40:33 2012
11.37% done, estimate finish Sun Feb 26 14:40:32 2012
11.38% done, estimate finish Sun Feb 26 14:40:31 2012
11.38% done, estimate finish Sun Feb 26 14:40:29 2012
11.39% done, estimate finish Sun Feb 26 14:40:28 2012
11.39% done, estimate finish Sun Feb 26 14:40:27 2012
11.40% done, estimate finish Sun Feb 26 14:40:26 2012
11.40% done, estimate finish Sun Feb 26 14:40:25 2012
11.40% done, estimate finish Sun Feb 26 14:40:24 2012
11.41% done, estimate finish Sun Feb 26 14:40:22 2012
11.41% done, estimate finish Sun Feb 26 14:40:30 2012
11.42% done, estimate finish Sun Feb 26 14:40:29 2012
11.42% done, estimate finish Sun Feb 26 14:40:28 2012
11.43% done, estimate finish Sun Feb 26 14:40:27 2012
11.43% done, estimate finish Sun Feb 26 14:40:25 2012
11.44% done, estimate finish Sun Feb 26 14:40:24 2012
11.44% done, estimate finish Sun Feb 26 14:40:32 2012
11.45% done, estimate finish Sun Feb 26 14:40:31 2012
11.45% done, estimate finish Sun Feb 26 14:40:30 2012
11.46% done, estimate finish Sun Feb 26 14:40:28 2012
11.46% done, estimate finish Sun Feb 26 14:40:27 2012
11.47% done, estimate finish Sun Feb 26 14:40:26 2012
11.47% done, estimate finish Sun Feb 26 14:40:25 2012
11.48% done, estimate finish Sun Feb 26 14:40:24 2012
11.48% done, estimate finish Sun Feb 26 14:40:23 2012
11.48% done, estimate finish Sun Feb 26 14:40:22 2012
11.49% done, estimate finish Sun Feb 26 14:40:20 2012
11.49% done, estimate finish Sun Feb 26 14:40:19 2012
11.50% done, estimate finish Sun Feb 26 14:40:27 2012
11.50% done, estimate finish Sun Feb 26 14:40:26 2012
11.51% done, estimate finish Sun Feb 26 14:40:25 2012
11.51% done, estimate finish Sun Feb 26 14:40:23 2012
11.52% done, estimate finish Sun Feb 26 14:40:22 2012
11.52% done, estimate finish Sun Feb 26 14:40:30 2012
11.53% done, estimate finish Sun Feb 26 14:40:29 2012
11.53% done, estimate finish Sun Feb 26 14:40:27 2012
11.54% done, estimate finish Sun Feb 26 14:40:26 2012
11.54% done, estimate finish Sun Feb 26 14:40:25 2012
11.55% done, estimate finish Sun Feb 26 14:40:24 2012
11.55% done, estimate finish Sun Feb 26 14:40:23 2012
11.56% done, estimate finish Sun Feb 26 14:40:30 2012
11.56% done, estimate finish Sun Feb 26 14:40:29 2012
11.56% done, estimate finish Sun Feb 26 14:40:28 2012
11.57% done, estimate finish Sun Feb 26 14:40:27 2012
11.57% done, estimate finish Sun Feb 26 14:40:26 2012
11.58% done, estimate finish Sun Feb 26 14:40:25 2012
11.58% done, estimate finish Sun Feb 26 14:40:24 2012
11.59% done, estimate finish Sun Feb 26 14:40:22 2012
11.59% done, estimate finish Sun Feb 26 14:40:21 2012
11.60% done, estimate finish Sun Feb 26 14:40:20 2012
11.60% done, estimate finish Sun Feb 26 14:40:19 2012
11.61% done, estimate finish Sun Feb 26 14:40:27 2012
11.61% done, estimate finish Sun Feb 26 14:40:25 2012
11.62% done, estimate finish Sun Feb 26 14:40:24 2012
11.62% done, estimate finish Sun Feb 26 14:40:23 2012
11.63% done, estimate finish Sun Feb 26 14:40:22 2012
11.63% done, estimate finish Sun Feb 26 14:40:21 2012
11.64% done, estimate finish Sun Feb 26 14:40:28 2012
11.64% done, estimate finish Sun Feb 26 14:40:27 2012
11.64% done, estimate finish Sun Feb 26 14:40:26 2012
11.65% done, estimate finish Sun Feb 26 14:40:25 2012
11.65% done, estimate finish Sun Feb 26 14:40:24 2012
11.66% done, estimate finish Sun Feb 26 14:40:23 2012
11.66% done, estimate finish Sun Feb 26 14:40:22 2012
11.67% done, estimate finish Sun Feb 26 14:40:20 2012
11.67% done, estimate finish Sun Feb 26 14:40:19 2012
11.68% done, estimate finish Sun Feb 26 14:40:18 2012
11.68% done, estimate finish Sun Feb 26 14:40:17 2012
11.69% done, estimate finish Sun Feb 26 14:40:16 2012
11.69% done, estimate finish Sun Feb 26 14:40:23 2012
11.70% done, estimate finish Sun Feb 26 14:40:22 2012
11.70% done, estimate finish Sun Feb 26 14:40:21 2012
11.71% done, estimate finish Sun Feb 26 14:40:20 2012
11.71% done, estimate finish Sun Feb 26 14:40:19 2012
11.72% done, estimate finish Sun Feb 26 14:40:18 2012
11.72% done, estimate finish Sun Feb 26 14:40:25 2012
11.72% done, estimate finish Sun Feb 26 14:40:24 2012
11.73% done, estimate finish Sun Feb 26 14:40:23 2012
11.73% done, estimate finish Sun Feb 26 14:40:22 2012
11.74% done, estimate finish Sun Feb 26 14:40:21 2012
11.74% done, estimate finish Sun Feb 26 14:40:19 2012
11.75% done, estimate finish Sun Feb 26 14:40:18 2012
11.75% done, estimate finish Sun Feb 26 14:40:17 2012
11.76% done, estimate finish Sun Feb 26 14:40:25 2012
11.76% done, estimate finish Sun Feb 26 14:40:24 2012
11.77% done, estimate finish Sun Feb 26 14:40:22 2012
11.77% done, estimate finish Sun Feb 26 14:40:21 2012
11.78% done, estimate finish Sun Feb 26 14:40:20 2012
11.78% done, estimate finish Sun Feb 26 14:40:19 2012
11.79% done, estimate finish Sun Feb 26 14:40:18 2012
11.79% done, estimate finish Sun Feb 26 14:40:17 2012
11.80% done, estimate finish Sun Feb 26 14:40:16 2012
11.80% done, estimate finish Sun Feb 26 14:40:23 2012
11.80% done, estimate finish Sun Feb 26 14:40:22 2012
11.81% done, estimate finish Sun Feb 26 14:40:21 2012
11.81% done, estimate finish Sun Feb 26 14:40:20 2012
11.82% done, estimate finish Sun Feb 26 14:40:19 2012
11.82% done, estimate finish Sun Feb 26 14:40:18 2012
11.83% done, estimate finish Sun Feb 26 14:40:25 2012
11.83% done, estimate finish Sun Feb 26 14:40:24 2012
11.84% done, estimate finish Sun Feb 26 14:40:23 2012
11.84% done, estimate finish Sun Feb 26 14:40:22 2012
11.85% done, estimate finish Sun Feb 26 14:40:20 2012
11.85% done, estimate finish Sun Feb 26 14:40:19 2012
11.86% done, estimate finish Sun Feb 26 14:40:18 2012
11.86% done, estimate finish Sun Feb 26 14:40:17 2012
11.87% done, estimate finish Sun Feb 26 14:40:16 2012
11.87% done, estimate finish Sun Feb 26 14:40:15 2012
11.88% done, estimate finish Sun Feb 26 14:40:14 2012
11.88% done, estimate finish Sun Feb 26 14:40:13 2012
11.88% done, estimate finish Sun Feb 26 14:40:20 2012
11.89% done, estimate finish Sun Feb 26 14:40:19 2012
11.89% done, estimate finish Sun Feb 26 14:40:18 2012
11.90% done, estimate finish Sun Feb 26 14:40:17 2012
11.90% done, estimate finish Sun Feb 26 14:40:16 2012
11.91% done, estimate finish Sun Feb 26 14:40:14 2012
11.91% done, estimate finish Sun Feb 26 14:40:22 2012
11.92% done, estimate finish Sun Feb 26 14:40:21 2012
11.92% done, estimate finish Sun Feb 26 14:40:20 2012
11.93% done, estimate finish Sun Feb 26 14:40:18 2012
11.93% done, estimate finish Sun Feb 26 14:40:17 2012
11.94% done, estimate finish Sun Feb 26 14:40:16 2012
11.94% done, estimate finish Sun Feb 26 14:40:15 2012
11.95% done, estimate finish Sun Feb 26 14:40:14 2012
11.95% done, estimate finish Sun Feb 26 14:40:13 2012
11.96% done, estimate finish Sun Feb 26 14:40:20 2012
11.96% done, estimate finish Sun Feb 26 14:40:19 2012
11.96% done, estimate finish Sun Feb 26 14:40:18 2012
11.97% done, estimate finish Sun Feb 26 14:40:17 2012
11.97% done, estimate finish Sun Feb 26 14:40:16 2012
11.98% done, estimate finish Sun Feb 26 14:40:15 2012
11.98% done, estimate finish Sun Feb 26 14:40:14 2012
11.99% done, estimate finish Sun Feb 26 14:40:12 2012
11.99% done, estimate finish Sun Feb 26 14:40:11 2012
12.00% done, estimate finish Sun Feb 26 14:40:19 2012
12.00% done, estimate finish Sun Feb 26 14:40:18 2012
12.01% done, estimate finish Sun Feb 26 14:40:16 2012
12.01% done, estimate finish Sun Feb 26 14:40:15 2012
12.02% done, estimate finish Sun Feb 26 14:40:14 2012
12.02% done, estimate finish Sun Feb 26 14:40:13 2012
12.03% done, estimate finish Sun Feb 26 14:40:20 2012
12.03% done, estimate finish Sun Feb 26 14:40:19 2012
12.04% done, estimate finish Sun Feb 26 14:40:18 2012
12.04% done, estimate finish Sun Feb 26 14:40:17 2012
12.05% done, estimate finish Sun Feb 26 14:40:16 2012
12.05% done, estimate finish Sun Feb 26 14:40:15 2012
12.05% done, estimate finish Sun Feb 26 14:40:14 2012
12.06% done, estimate finish Sun Feb 26 14:40:13 2012
12.06% done, estimate finish Sun Feb 26 14:40:12 2012
12.07% done, estimate finish Sun Feb 26 14:40:11 2012
12.07% done, estimate finish Sun Feb 26 14:40:10 2012
12.08% done, estimate finish Sun Feb 26 14:40:17 2012
12.08% done, estimate finish Sun Feb 26 14:40:16 2012
12.09% done, estimate finish Sun Feb 26 14:40:15 2012
12.09% done, estimate finish Sun Feb 26 14:40:13 2012
12.10% done, estimate finish Sun Feb 26 14:40:12 2012
12.10% done, estimate finish Sun Feb 26 14:40:11 2012
12.11% done, estimate finish Sun Feb 26 14:40:18 2012
12.11% done, estimate finish Sun Feb 26 14:40:17 2012
12.12% done, estimate finish Sun Feb 26 14:40:16 2012
12.12% done, estimate finish Sun Feb 26 14:40:15 2012
12.13% done, estimate finish Sun Feb 26 14:40:14 2012
12.13% done, estimate finish Sun Feb 26 14:40:13 2012
12.13% done, estimate finish Sun Feb 26 14:40:12 2012
12.14% done, estimate finish Sun Feb 26 14:40:11 2012
12.14% done, estimate finish Sun Feb 26 14:40:10 2012
12.15% done, estimate finish Sun Feb 26 14:40:17 2012
12.15% done, estimate finish Sun Feb 26 14:40:16 2012
12.16% done, estimate finish Sun Feb 26 14:40:15 2012
12.16% done, estimate finish Sun Feb 26 14:40:14 2012
12.17% done, estimate finish Sun Feb 26 14:40:13 2012
12.17% done, estimate finish Sun Feb 26 14:40:12 2012
12.18% done, estimate finish Sun Feb 26 14:40:10 2012
12.18% done, estimate finish Sun Feb 26 14:40:09 2012
12.19% done, estimate finish Sun Feb 26 14:40:08 2012
12.19% done, estimate finish Sun Feb 26 14:40:15 2012
12.20% done, estimate finish Sun Feb 26 14:40:14 2012
12.20% done, estimate finish Sun Feb 26 14:40:13 2012
12.21% done, estimate finish Sun Feb 26 14:40:12 2012
12.21% done, estimate finish Sun Feb 26 14:40:11 2012
12.21% done, estimate finish Sun Feb 26 14:40:10 2012
12.22% done, estimate finish Sun Feb 26 14:40:17 2012
12.22% done, estimate finish Sun Feb 26 14:40:16 2012
12.23% done, estimate finish Sun Feb 26 14:40:15 2012
12.23% done, estimate finish Sun Feb 26 14:40:14 2012
12.24% done, estimate finish Sun Feb 26 14:40:13 2012
12.24% done, estimate finish Sun Feb 26 14:40:12 2012
12.25% done, estimate finish Sun Feb 26 14:40:11 2012
12.25% done, estimate finish Sun Feb 26 14:40:10 2012
12.26% done, estimate finish Sun Feb 26 14:40:09 2012
12.26% done, estimate finish Sun Feb 26 14:40:08 2012
12.27% done, estimate finish Sun Feb 26 14:40:06 2012
12.27% done, estimate finish Sun Feb 26 14:40:14 2012
12.28% done, estimate finish Sun Feb 26 14:40:12 2012
12.28% done, estimate finish Sun Feb 26 14:40:11 2012
12.29% done, estimate finish Sun Feb 26 14:40:10 2012
12.29% done, estimate finish Sun Feb 26 14:40:09 2012
12.29% done, estimate finish Sun Feb 26 14:40:08 2012
12.30% done, estimate finish Sun Feb 26 14:40:15 2012
12.30% done, estimate finish Sun Feb 26 14:40:14 2012
12.31% done, estimate finish Sun Feb 26 14:40:13 2012
12.31% done, estimate finish Sun Feb 26 14:40:12 2012
12.32% done, estimate finish Sun Feb 26 14:40:11 2012
12.32% done, estimate finish Sun Feb 26 14:40:10 2012
12.33% done, estimate finish Sun Feb 26 14:40:09 2012
12.33% done, estimate finish Sun Feb 26 14:40:08 2012
12.34% done, estimate finish Sun Feb 26 14:40:07 2012
12.34% done, estimate finish Sun Feb 26 14:40:06 2012
12.35% done, estimate finish Sun Feb 26 14:40:13 2012
12.35% done, estimate finish Sun Feb 26 14:40:12 2012
12.36% done, estimate finish Sun Feb 26 14:40:11 2012
12.36% done, estimate finish Sun Feb 26 14:40:10 2012
12.37% done, estimate finish Sun Feb 26 14:40:08 2012
12.37% done, estimate finish Sun Feb 26 14:40:07 2012
12.37% done, estimate finish Sun Feb 26 14:40:06 2012
12.38% done, estimate finish Sun Feb 26 14:40:05 2012
12.38% done, estimate finish Sun Feb 26 14:40:12 2012
12.39% done, estimate finish Sun Feb 26 14:40:11 2012
12.39% done, estimate finish Sun Feb 26 14:40:10 2012
12.40% done, estimate finish Sun Feb 26 14:40:09 2012
12.40% done, estimate finish Sun Feb 26 14:40:08 2012
12.41% done, estimate finish Sun Feb 26 14:40:07 2012
12.41% done, estimate finish Sun Feb 26 14:40:14 2012
12.42% done, estimate finish Sun Feb 26 14:40:13 2012
12.42% done, estimate finish Sun Feb 26 14:40:12 2012
12.43% done, estimate finish Sun Feb 26 14:40:11 2012
12.43% done, estimate finish Sun Feb 26 14:40:10 2012
12.44% done, estimate finish Sun Feb 26 14:40:09 2012
12.44% done, estimate finish Sun Feb 26 14:40:08 2012
12.45% done, estimate finish Sun Feb 26 14:40:07 2012
12.45% done, estimate finish Sun Feb 26 14:40:06 2012
12.45% done, estimate finish Sun Feb 26 14:40:05 2012
12.46% done, estimate finish Sun Feb 26 14:40:04 2012
12.46% done, estimate finish Sun Feb 26 14:40:02 2012
12.47% done, estimate finish Sun Feb 26 14:40:09 2012
12.47% done, estimate finish Sun Feb 26 14:40:08 2012
12.48% done, estimate finish Sun Feb 26 14:40:07 2012
12.48% done, estimate finish Sun Feb 26 14:40:06 2012
12.49% done, estimate finish Sun Feb 26 14:40:05 2012
12.49% done, estimate finish Sun Feb 26 14:40:04 2012
12.50% done, estimate finish Sun Feb 26 14:40:11 2012
12.50% done, estimate finish Sun Feb 26 14:40:10 2012
12.51% done, estimate finish Sun Feb 26 14:40:09 2012
12.51% done, estimate finish Sun Feb 26 14:40:08 2012
12.52% done, estimate finish Sun Feb 26 14:40:07 2012
12.52% done, estimate finish Sun Feb 26 14:40:06 2012
12.53% done, estimate finish Sun Feb 26 14:40:05 2012
12.53% done, estimate finish Sun Feb 26 14:40:04 2012
12.53% done, estimate finish Sun Feb 26 14:40:11 2012
12.54% done, estimate finish Sun Feb 26 14:40:10 2012
12.54% done, estimate finish Sun Feb 26 14:40:09 2012
12.55% done, estimate finish Sun Feb 26 14:40:08 2012
12.55% done, estimate finish Sun Feb 26 14:40:07 2012
12.56% done, estimate finish Sun Feb 26 14:40:06 2012
12.56% done, estimate finish Sun Feb 26 14:40:05 2012
12.57% done, estimate finish Sun Feb 26 14:40:03 2012
12.57% done, estimate finish Sun Feb 26 14:40:02 2012
12.58% done, estimate finish Sun Feb 26 14:40:09 2012
12.58% done, estimate finish Sun Feb 26 14:40:08 2012
12.59% done, estimate finish Sun Feb 26 14:40:07 2012
12.59% done, estimate finish Sun Feb 26 14:40:06 2012
12.60% done, estimate finish Sun Feb 26 14:40:05 2012
12.60% done, estimate finish Sun Feb 26 14:40:04 2012
12.61% done, estimate finish Sun Feb 26 14:40:11 2012
12.61% done, estimate finish Sun Feb 26 14:40:10 2012
12.61% done, estimate finish Sun Feb 26 14:40:09 2012
12.62% done, estimate finish Sun Feb 26 14:40:08 2012
12.62% done, estimate finish Sun Feb 26 14:40:07 2012
12.63% done, estimate finish Sun Feb 26 14:40:06 2012
12.63% done, estimate finish Sun Feb 26 14:40:05 2012
12.64% done, estimate finish Sun Feb 26 14:40:04 2012
12.64% done, estimate finish Sun Feb 26 14:40:03 2012
12.65% done, estimate finish Sun Feb 26 14:40:02 2012
12.65% done, estimate finish Sun Feb 26 14:40:01 2012
12.66% done, estimate finish Sun Feb 26 14:40:00 2012
12.66% done, estimate finish Sun Feb 26 14:40:07 2012
12.67% done, estimate finish Sun Feb 26 14:40:05 2012
12.67% done, estimate finish Sun Feb 26 14:40:04 2012
12.68% done, estimate finish Sun Feb 26 14:40:03 2012
12.68% done, estimate finish Sun Feb 26 14:40:02 2012
12.69% done, estimate finish Sun Feb 26 14:40:01 2012
12.69% done, estimate finish Sun Feb 26 14:40:08 2012
12.69% done, estimate finish Sun Feb 26 14:40:07 2012
12.70% done, estimate finish Sun Feb 26 14:40:06 2012
12.70% done, estimate finish Sun Feb 26 14:40:05 2012
12.71% done, estimate finish Sun Feb 26 14:40:04 2012
12.71% done, estimate finish Sun Feb 26 14:40:03 2012
12.72% done, estimate finish Sun Feb 26 14:40:02 2012
12.72% done, estimate finish Sun Feb 26 14:40:01 2012
12.73% done, estimate finish Sun Feb 26 14:40:00 2012
12.73% done, estimate finish Sun Feb 26 14:40:07 2012
12.74% done, estimate finish Sun Feb 26 14:40:06 2012
12.74% done, estimate finish Sun Feb 26 14:40:05 2012
12.75% done, estimate finish Sun Feb 26 14:40:04 2012
12.75% done, estimate finish Sun Feb 26 14:40:03 2012
12.76% done, estimate finish Sun Feb 26 14:40:02 2012
12.76% done, estimate finish Sun Feb 26 14:40:01 2012
12.77% done, estimate finish Sun Feb 26 14:40:00 2012
12.77% done, estimate finish Sun Feb 26 14:40:06 2012
12.77% done, estimate finish Sun Feb 26 14:40:05 2012
12.78% done, estimate finish Sun Feb 26 14:40:04 2012
12.78% done, estimate finish Sun Feb 26 14:40:03 2012
12.79% done, estimate finish Sun Feb 26 14:40:02 2012
12.79% done, estimate finish Sun Feb 26 14:40:01 2012
12.80% done, estimate finish Sun Feb 26 14:40:00 2012
12.80% done, estimate finish Sun Feb 26 14:40:07 2012
12.81% done, estimate finish Sun Feb 26 14:40:06 2012
12.81% done, estimate finish Sun Feb 26 14:40:05 2012
12.82% done, estimate finish Sun Feb 26 14:40:04 2012
12.82% done, estimate finish Sun Feb 26 14:40:03 2012
12.83% done, estimate finish Sun Feb 26 14:40:02 2012
12.83% done, estimate finish Sun Feb 26 14:40:01 2012
12.84% done, estimate finish Sun Feb 26 14:40:00 2012
12.84% done, estimate finish Sun Feb 26 14:39:59 2012
12.85% done, estimate finish Sun Feb 26 14:39:58 2012
12.85% done, estimate finish Sun Feb 26 14:39:57 2012
12.85% done, estimate finish Sun Feb 26 14:40:04 2012
12.86% done, estimate finish Sun Feb 26 14:40:03 2012
12.86% done, estimate finish Sun Feb 26 14:40:02 2012
12.87% done, estimate finish Sun Feb 26 14:40:01 2012
12.87% done, estimate finish Sun Feb 26 14:40:00 2012
12.88% done, estimate finish Sun Feb 26 14:39:59 2012
12.88% done, estimate finish Sun Feb 26 14:39:58 2012
12.89% done, estimate finish Sun Feb 26 14:40:04 2012
12.89% done, estimate finish Sun Feb 26 14:40:03 2012
12.90% done, estimate finish Sun Feb 26 14:40:02 2012
12.90% done, estimate finish Sun Feb 26 14:40:01 2012
12.91% done, estimate finish Sun Feb 26 14:40:00 2012
12.91% done, estimate finish Sun Feb 26 14:39:59 2012
12.92% done, estimate finish Sun Feb 26 14:39:58 2012
12.92% done, estimate finish Sun Feb 26 14:39:57 2012
12.93% done, estimate finish Sun Feb 26 14:39:56 2012
12.93% done, estimate finish Sun Feb 26 14:40:03 2012
12.93% done, estimate finish Sun Feb 26 14:40:02 2012
12.94% done, estimate finish Sun Feb 26 14:40:01 2012
12.94% done, estimate finish Sun Feb 26 14:40:00 2012
12.95% done, estimate finish Sun Feb 26 14:39:59 2012
12.95% done, estimate finish Sun Feb 26 14:39:58 2012
12.96% done, estimate finish Sun Feb 26 14:39:57 2012
12.96% done, estimate finish Sun Feb 26 14:39:56 2012
12.97% done, estimate finish Sun Feb 26 14:40:03 2012
12.97% done, estimate finish Sun Feb 26 14:40:02 2012
12.98% done, estimate finish Sun Feb 26 14:40:01 2012
12.98% done, estimate finish Sun Feb 26 14:40:00 2012
12.99% done, estimate finish Sun Feb 26 14:39:59 2012
12.99% done, estimate finish Sun Feb 26 14:39:58 2012
13.00% done, estimate finish Sun Feb 26 14:39:57 2012
13.00% done, estimate finish Sun Feb 26 14:39:56 2012
13.01% done, estimate finish Sun Feb 26 14:40:02 2012
13.01% done, estimate finish Sun Feb 26 14:40:01 2012
13.01% done, estimate finish Sun Feb 26 14:40:00 2012
13.02% done, estimate finish Sun Feb 26 14:39:59 2012
13.02% done, estimate finish Sun Feb 26 14:39:58 2012
13.03% done, estimate finish Sun Feb 26 14:39:57 2012
13.03% done, estimate finish Sun Feb 26 14:39:56 2012
13.04% done, estimate finish Sun Feb 26 14:39:55 2012
13.04% done, estimate finish Sun Feb 26 14:39:54 2012
13.05% done, estimate finish Sun Feb 26 14:40:01 2012
13.05% done, estimate finish Sun Feb 26 14:40:00 2012
13.06% done, estimate finish Sun Feb 26 14:39:59 2012
13.06% done, estimate finish Sun Feb 26 14:39:58 2012
13.07% done, estimate finish Sun Feb 26 14:39:57 2012
13.07% done, estimate finish Sun Feb 26 14:39:56 2012
13.08% done, estimate finish Sun Feb 26 14:40:03 2012
13.08% done, estimate finish Sun Feb 26 14:40:02 2012
13.09% done, estimate finish Sun Feb 26 14:40:01 2012
13.09% done, estimate finish Sun Feb 26 14:40:00 2012
13.09% done, estimate finish Sun Feb 26 14:39:59 2012
13.10% done, estimate finish Sun Feb 26 14:39:58 2012
13.10% done, estimate finish Sun Feb 26 14:39:57 2012
13.11% done, estimate finish Sun Feb 26 14:39:56 2012
13.11% done, estimate finish Sun Feb 26 14:39:55 2012
13.12% done, estimate finish Sun Feb 26 14:39:54 2012
13.12% done, estimate finish Sun Feb 26 14:39:53 2012
13.13% done, estimate finish Sun Feb 26 14:39:59 2012
13.13% done, estimate finish Sun Feb 26 14:39:58 2012
13.14% done, estimate finish Sun Feb 26 14:39:57 2012
13.14% done, estimate finish Sun Feb 26 14:39:56 2012
13.15% done, estimate finish Sun Feb 26 14:39:55 2012
13.15% done, estimate finish Sun Feb 26 14:39:54 2012
13.16% done, estimate finish Sun Feb 26 14:39:53 2012
13.16% done, estimate finish Sun Feb 26 14:40:00 2012
13.17% done, estimate finish Sun Feb 26 14:39:59 2012
13.17% done, estimate finish Sun Feb 26 14:39:58 2012
13.18% done, estimate finish Sun Feb 26 14:39:57 2012
13.18% done, estimate finish Sun Feb 26 14:39:56 2012
13.18% done, estimate finish Sun Feb 26 14:39:55 2012
13.19% done, estimate finish Sun Feb 26 14:40:02 2012
13.19% done, estimate finish Sun Feb 26 14:40:00 2012
13.20% done, estimate finish Sun Feb 26 14:40:00 2012
13.20% done, estimate finish Sun Feb 26 14:39:59 2012
13.21% done, estimate finish Sun Feb 26 14:39:58 2012
13.21% done, estimate finish Sun Feb 26 14:39:57 2012
13.22% done, estimate finish Sun Feb 26 14:39:56 2012
13.22% done, estimate finish Sun Feb 26 14:39:55 2012
13.23% done, estimate finish Sun Feb 26 14:39:54 2012
13.23% done, estimate finish Sun Feb 26 14:39:53 2012
13.24% done, estimate finish Sun Feb 26 14:39:52 2012
13.24% done, estimate finish Sun Feb 26 14:39:51 2012
13.25% done, estimate finish Sun Feb 26 14:39:57 2012
13.25% done, estimate finish Sun Feb 26 14:39:56 2012
13.26% done, estimate finish Sun Feb 26 14:39:55 2012
13.26% done, estimate finish Sun Feb 26 14:39:54 2012
13.26% done, estimate finish Sun Feb 26 14:39:53 2012
13.27% done, estimate finish Sun Feb 26 14:39:52 2012
13.27% done, estimate finish Sun Feb 26 14:39:51 2012
13.28% done, estimate finish Sun Feb 26 14:39:58 2012
13.28% done, estimate finish Sun Feb 26 14:39:57 2012
13.29% done, estimate finish Sun Feb 26 14:39:56 2012
13.29% done, estimate finish Sun Feb 26 14:39:55 2012
13.30% done, estimate finish Sun Feb 26 14:39:54 2012
13.30% done, estimate finish Sun Feb 26 14:39:53 2012
13.31% done, estimate finish Sun Feb 26 14:39:52 2012
13.31% done, estimate finish Sun Feb 26 14:39:51 2012
13.32% done, estimate finish Sun Feb 26 14:39:50 2012
13.32% done, estimate finish Sun Feb 26 14:39:49 2012
13.33% done, estimate finish Sun Feb 26 14:39:56 2012
13.33% done, estimate finish Sun Feb 26 14:39:55 2012
13.34% done, estimate finish Sun Feb 26 14:39:54 2012
13.34% done, estimate finish Sun Feb 26 14:39:53 2012
13.34% done, estimate finish Sun Feb 26 14:39:52 2012
13.35% done, estimate finish Sun Feb 26 14:39:51 2012
13.35% done, estimate finish Sun Feb 26 14:39:57 2012
13.36% done, estimate finish Sun Feb 26 14:39:56 2012
13.36% done, estimate finish Sun Feb 26 14:39:55 2012
13.37% done, estimate finish Sun Feb 26 14:39:54 2012
13.37% done, estimate finish Sun Feb 26 14:39:53 2012
13.38% done, estimate finish Sun Feb 26 14:39:52 2012
13.38% done, estimate finish Sun Feb 26 14:39:51 2012
13.39% done, estimate finish Sun Feb 26 14:39:50 2012
13.39% done, estimate finish Sun Feb 26 14:39:49 2012
13.40% done, estimate finish Sun Feb 26 14:39:48 2012
13.40% done, estimate finish Sun Feb 26 14:39:55 2012
13.41% done, estimate finish Sun Feb 26 14:39:54 2012
13.41% done, estimate finish Sun Feb 26 14:39:53 2012
13.42% done, estimate finish Sun Feb 26 14:39:52 2012
13.42% done, estimate finish Sun Feb 26 14:39:51 2012
13.42% done, estimate finish Sun Feb 26 14:39:50 2012
13.43% done, estimate finish Sun Feb 26 14:39:49 2012
13.43% done, estimate finish Sun Feb 26 14:39:48 2012
13.44% done, estimate finish Sun Feb 26 14:39:55 2012
13.44% done, estimate finish Sun Feb 26 14:39:54 2012
13.45% done, estimate finish Sun Feb 26 14:39:53 2012
13.45% done, estimate finish Sun Feb 26 14:39:52 2012
13.46% done, estimate finish Sun Feb 26 14:39:51 2012
13.46% done, estimate finish Sun Feb 26 14:39:50 2012
13.47% done, estimate finish Sun Feb 26 14:39:56 2012
13.47% done, estimate finish Sun Feb 26 14:39:55 2012
13.48% done, estimate finish Sun Feb 26 14:39:54 2012
13.48% done, estimate finish Sun Feb 26 14:39:53 2012
13.49% done, estimate finish Sun Feb 26 14:39:52 2012
13.49% done, estimate finish Sun Feb 26 14:39:51 2012
13.50% done, estimate finish Sun Feb 26 14:39:50 2012
13.50% done, estimate finish Sun Feb 26 14:39:49 2012
=== last message repeated 2 times. ===
13.51% done, estimate finish Sun Feb 26 14:39:48 2012
13.51% done, estimate finish Sun Feb 26 14:39:47 2012
13.52% done, estimate finish Sun Feb 26 14:39:53 2012
13.52% done, estimate finish Sun Feb 26 14:39:52 2012
13.53% done, estimate finish Sun Feb 26 14:39:51 2012
13.53% done, estimate finish Sun Feb 26 14:39:50 2012
13.54% done, estimate finish Sun Feb 26 14:39:49 2012
13.54% done, estimate finish Sun Feb 26 14:39:48 2012
13.55% done, estimate finish Sun Feb 26 14:39:47 2012
13.55% done, estimate finish Sun Feb 26 14:39:54 2012
13.56% done, estimate finish Sun Feb 26 14:39:53 2012
13.56% done, estimate finish Sun Feb 26 14:39:52 2012
13.57% done, estimate finish Sun Feb 26 14:39:51 2012
13.57% done, estimate finish Sun Feb 26 14:39:50 2012
13.58% done, estimate finish Sun Feb 26 14:39:49 2012
13.58% done, estimate finish Sun Feb 26 14:39:48 2012
13.58% done, estimate finish Sun Feb 26 14:39:47 2012
13.59% done, estimate finish Sun Feb 26 14:39:46 2012
13.59% done, estimate finish Sun Feb 26 14:39:52 2012
13.60% done, estimate finish Sun Feb 26 14:39:51 2012
13.60% done, estimate finish Sun Feb 26 14:39:50 2012
13.61% done, estimate finish Sun Feb 26 14:39:50 2012
13.61% done, estimate finish Sun Feb 26 14:39:49 2012
13.62% done, estimate finish Sun Feb 26 14:39:48 2012
13.62% done, estimate finish Sun Feb 26 14:39:47 2012
13.63% done, estimate finish Sun Feb 26 14:39:46 2012
13.63% done, estimate finish Sun Feb 26 14:39:52 2012
13.64% done, estimate finish Sun Feb 26 14:39:51 2012
13.64% done, estimate finish Sun Feb 26 14:39:50 2012
13.65% done, estimate finish Sun Feb 26 14:39:49 2012
13.65% done, estimate finish Sun Feb 26 14:39:48 2012
13.66% done, estimate finish Sun Feb 26 14:39:47 2012
13.66% done, estimate finish Sun Feb 26 14:39:54 2012
13.66% done, estimate finish Sun Feb 26 14:39:53 2012
13.67% done, estimate finish Sun Feb 26 14:39:52 2012
13.67% done, estimate finish Sun Feb 26 14:39:51 2012
13.68% done, estimate finish Sun Feb 26 14:39:50 2012
13.68% done, estimate finish Sun Feb 26 14:39:49 2012
13.69% done, estimate finish Sun Feb 26 14:39:48 2012
13.69% done, estimate finish Sun Feb 26 14:39:47 2012
13.70% done, estimate finish Sun Feb 26 14:39:46 2012
13.70% done, estimate finish Sun Feb 26 14:39:45 2012
13.71% done, estimate finish Sun Feb 26 14:39:44 2012
13.71% done, estimate finish Sun Feb 26 14:39:43 2012
13.72% done, estimate finish Sun Feb 26 14:39:50 2012
13.72% done, estimate finish Sun Feb 26 14:39:49 2012
13.73% done, estimate finish Sun Feb 26 14:39:48 2012
13.73% done, estimate finish Sun Feb 26 14:39:47 2012
13.74% done, estimate finish Sun Feb 26 14:39:46 2012
13.74% done, estimate finish Sun Feb 26 14:39:45 2012
13.74% done, estimate finish Sun Feb 26 14:39:44 2012
13.75% done, estimate finish Sun Feb 26 14:39:50 2012
13.75% done, estimate finish Sun Feb 26 14:39:49 2012
13.76% done, estimate finish Sun Feb 26 14:39:48 2012
13.76% done, estimate finish Sun Feb 26 14:39:47 2012
13.77% done, estimate finish Sun Feb 26 14:39:46 2012
=== last message repeated 2 times. ===
13.78% done, estimate finish Sun Feb 26 14:39:45 2012
13.78% done, estimate finish Sun Feb 26 14:39:44 2012
13.79% done, estimate finish Sun Feb 26 14:39:43 2012
13.79% done, estimate finish Sun Feb 26 14:39:49 2012
13.80% done, estimate finish Sun Feb 26 14:39:48 2012
13.80% done, estimate finish Sun Feb 26 14:39:47 2012
13.81% done, estimate finish Sun Feb 26 14:39:46 2012
13.81% done, estimate finish Sun Feb 26 14:39:45 2012
13.82% done, estimate finish Sun Feb 26 14:39:44 2012
13.82% done, estimate finish Sun Feb 26 14:39:43 2012
13.82% done, estimate finish Sun Feb 26 14:39:50 2012
13.83% done, estimate finish Sun Feb 26 14:39:49 2012
13.83% done, estimate finish Sun Feb 26 14:39:48 2012
13.84% done, estimate finish Sun Feb 26 14:39:47 2012
13.84% done, estimate finish Sun Feb 26 14:39:46 2012
13.85% done, estimate finish Sun Feb 26 14:39:45 2012
13.85% done, estimate finish Sun Feb 26 14:39:44 2012
13.86% done, estimate finish Sun Feb 26 14:39:43 2012
13.86% done, estimate finish Sun Feb 26 14:39:42 2012
13.87% done, estimate finish Sun Feb 26 14:39:48 2012
13.87% done, estimate finish Sun Feb 26 14:39:47 2012
13.88% done, estimate finish Sun Feb 26 14:39:47 2012
13.88% done, estimate finish Sun Feb 26 14:39:46 2012
13.89% done, estimate finish Sun Feb 26 14:39:45 2012
13.89% done, estimate finish Sun Feb 26 14:39:44 2012
13.90% done, estimate finish Sun Feb 26 14:39:43 2012
13.90% done, estimate finish Sun Feb 26 14:39:42 2012
13.90% done, estimate finish Sun Feb 26 14:39:41 2012
13.91% done, estimate finish Sun Feb 26 14:39:47 2012
13.91% done, estimate finish Sun Feb 26 14:39:46 2012
13.92% done, estimate finish Sun Feb 26 14:39:45 2012
13.92% done, estimate finish Sun Feb 26 14:39:44 2012
13.93% done, estimate finish Sun Feb 26 14:39:43 2012
=== last message repeated 2 times. ===
13.94% done, estimate finish Sun Feb 26 14:39:49 2012
13.94% done, estimate finish Sun Feb 26 14:39:48 2012
13.95% done, estimate finish Sun Feb 26 14:39:47 2012
13.95% done, estimate finish Sun Feb 26 14:39:46 2012
13.96% done, estimate finish Sun Feb 26 14:39:45 2012
13.96% done, estimate finish Sun Feb 26 14:39:44 2012
13.97% done, estimate finish Sun Feb 26 14:39:43 2012
13.97% done, estimate finish Sun Feb 26 14:39:42 2012
13.98% done, estimate finish Sun Feb 26 14:39:41 2012
13.98% done, estimate finish Sun Feb 26 14:39:40 2012
13.99% done, estimate finish Sun Feb 26 14:39:39 2012
13.99% done, estimate finish Sun Feb 26 14:39:46 2012
13.99% done, estimate finish Sun Feb 26 14:39:45 2012
14.00% done, estimate finish Sun Feb 26 14:39:44 2012
14.00% done, estimate finish Sun Feb 26 14:39:43 2012
14.01% done, estimate finish Sun Feb 26 14:39:42 2012
14.01% done, estimate finish Sun Feb 26 14:39:41 2012
14.02% done, estimate finish Sun Feb 26 14:39:40 2012
14.02% done, estimate finish Sun Feb 26 14:39:46 2012
14.03% done, estimate finish Sun Feb 26 14:39:45 2012
14.03% done, estimate finish Sun Feb 26 14:39:44 2012
14.04% done, estimate finish Sun Feb 26 14:39:44 2012
14.04% done, estimate finish Sun Feb 26 14:39:43 2012
14.05% done, estimate finish Sun Feb 26 14:39:42 2012
14.05% done, estimate finish Sun Feb 26 14:39:41 2012
14.06% done, estimate finish Sun Feb 26 14:39:40 2012
14.06% done, estimate finish Sun Feb 26 14:39:39 2012
14.07% done, estimate finish Sun Feb 26 14:39:45 2012
14.07% done, estimate finish Sun Feb 26 14:39:44 2012
14.07% done, estimate finish Sun Feb 26 14:39:43 2012
14.08% done, estimate finish Sun Feb 26 14:39:42 2012
14.08% done, estimate finish Sun Feb 26 14:39:41 2012
14.09% done, estimate finish Sun Feb 26 14:39:41 2012
14.09% done, estimate finish Sun Feb 26 14:39:40 2012
14.10% done, estimate finish Sun Feb 26 14:39:39 2012
14.10% done, estimate finish Sun Feb 26 14:39:45 2012
14.11% done, estimate finish Sun Feb 26 14:39:44 2012
14.11% done, estimate finish Sun Feb 26 14:39:43 2012
14.12% done, estimate finish Sun Feb 26 14:39:42 2012
14.12% done, estimate finish Sun Feb 26 14:39:41 2012
14.13% done, estimate finish Sun Feb 26 14:39:40 2012
14.13% done, estimate finish Sun Feb 26 14:39:46 2012
14.14% done, estimate finish Sun Feb 26 14:39:45 2012
=== last message repeated 2 times. ===
14.15% done, estimate finish Sun Feb 26 14:39:44 2012
14.15% done, estimate finish Sun Feb 26 14:39:43 2012
14.15% done, estimate finish Sun Feb 26 14:39:42 2012
14.16% done, estimate finish Sun Feb 26 14:39:41 2012
14.16% done, estimate finish Sun Feb 26 14:39:40 2012
14.17% done, estimate finish Sun Feb 26 14:39:39 2012
14.17% done, estimate finish Sun Feb 26 14:39:38 2012
14.18% done, estimate finish Sun Feb 26 14:39:37 2012
14.18% done, estimate finish Sun Feb 26 14:39:36 2012
14.19% done, estimate finish Sun Feb 26 14:39:42 2012
=== last message repeated 2 times. ===
14.20% done, estimate finish Sun Feb 26 14:39:41 2012
14.20% done, estimate finish Sun Feb 26 14:39:40 2012
14.21% done, estimate finish Sun Feb 26 14:39:39 2012
14.21% done, estimate finish Sun Feb 26 14:39:38 2012
14.22% done, estimate finish Sun Feb 26 14:39:44 2012
14.22% done, estimate finish Sun Feb 26 14:39:43 2012
14.23% done, estimate finish Sun Feb 26 14:39:42 2012
14.23% done, estimate finish Sun Feb 26 14:39:41 2012
14.23% done, estimate finish Sun Feb 26 14:39:40 2012
14.24% done, estimate finish Sun Feb 26 14:39:39 2012
=== last message repeated 2 times. ===
14.25% done, estimate finish Sun Feb 26 14:39:38 2012
14.25% done, estimate finish Sun Feb 26 14:39:37 2012
14.26% done, estimate finish Sun Feb 26 14:39:43 2012
14.26% done, estimate finish Sun Feb 26 14:39:42 2012
14.27% done, estimate finish Sun Feb 26 14:39:41 2012
14.27% done, estimate finish Sun Feb 26 14:39:40 2012
14.28% done, estimate finish Sun Feb 26 14:39:39 2012
14.28% done, estimate finish Sun Feb 26 14:39:38 2012
14.29% done, estimate finish Sun Feb 26 14:39:37 2012
14.29% done, estimate finish Sun Feb 26 14:39:36 2012
14.30% done, estimate finish Sun Feb 26 14:39:43 2012
14.30% done, estimate finish Sun Feb 26 14:39:42 2012
14.31% done, estimate finish Sun Feb 26 14:39:41 2012
14.31% done, estimate finish Sun Feb 26 14:39:40 2012
14.31% done, estimate finish Sun Feb 26 14:39:39 2012
14.32% done, estimate finish Sun Feb 26 14:39:38 2012
14.32% done, estimate finish Sun Feb 26 14:39:44 2012
14.33% done, estimate finish Sun Feb 26 14:39:43 2012
14.33% done, estimate finish Sun Feb 26 14:39:42 2012
14.34% done, estimate finish Sun Feb 26 14:39:41 2012
14.34% done, estimate finish Sun Feb 26 14:39:40 2012
14.35% done, estimate finish Sun Feb 26 14:39:40 2012
14.35% done, estimate finish Sun Feb 26 14:39:39 2012
14.36% done, estimate finish Sun Feb 26 14:39:38 2012
14.36% done, estimate finish Sun Feb 26 14:39:37 2012
14.37% done, estimate finish Sun Feb 26 14:39:36 2012
14.37% done, estimate finish Sun Feb 26 14:39:35 2012
14.38% done, estimate finish Sun Feb 26 14:39:34 2012
14.38% done, estimate finish Sun Feb 26 14:39:40 2012
14.39% done, estimate finish Sun Feb 26 14:39:39 2012
14.39% done, estimate finish Sun Feb 26 14:39:38 2012
=== last message repeated 2 times. ===
14.40% done, estimate finish Sun Feb 26 14:39:37 2012
14.40% done, estimate finish Sun Feb 26 14:39:36 2012
14.41% done, estimate finish Sun Feb 26 14:39:42 2012
14.41% done, estimate finish Sun Feb 26 14:39:41 2012
14.42% done, estimate finish Sun Feb 26 14:39:40 2012
14.42% done, estimate finish Sun Feb 26 14:39:39 2012
14.43% done, estimate finish Sun Feb 26 14:39:38 2012
14.43% done, estimate finish Sun Feb 26 14:39:37 2012
14.44% done, estimate finish Sun Feb 26 14:39:36 2012
14.44% done, estimate finish Sun Feb 26 14:39:35 2012
14.45% done, estimate finish Sun Feb 26 14:39:35 2012
14.45% done, estimate finish Sun Feb 26 14:39:41 2012
14.46% done, estimate finish Sun Feb 26 14:39:40 2012
14.46% done, estimate finish Sun Feb 26 14:39:39 2012
14.47% done, estimate finish Sun Feb 26 14:39:38 2012
14.47% done, estimate finish Sun Feb 26 14:39:37 2012
14.47% done, estimate finish Sun Feb 26 14:39:36 2012
14.48% done, estimate finish Sun Feb 26 14:39:35 2012
14.48% done, estimate finish Sun Feb 26 14:39:34 2012
14.49% done, estimate finish Sun Feb 26 14:39:33 2012
14.49% done, estimate finish Sun Feb 26 14:39:39 2012
14.50% done, estimate finish Sun Feb 26 14:39:39 2012
14.50% done, estimate finish Sun Feb 26 14:39:38 2012
14.51% done, estimate finish Sun Feb 26 14:39:37 2012
14.51% done, estimate finish Sun Feb 26 14:39:36 2012
14.52% done, estimate finish Sun Feb 26 14:39:42 2012
14.52% done, estimate finish Sun Feb 26 14:39:41 2012
14.53% done, estimate finish Sun Feb 26 14:39:40 2012
14.53% done, estimate finish Sun Feb 26 14:39:39 2012
14.54% done, estimate finish Sun Feb 26 14:39:38 2012
14.54% done, estimate finish Sun Feb 26 14:39:37 2012
14.55% done, estimate finish Sun Feb 26 14:39:37 2012
14.55% done, estimate finish Sun Feb 26 14:39:36 2012
14.55% done, estimate finish Sun Feb 26 14:39:35 2012
14.56% done, estimate finish Sun Feb 26 14:39:34 2012
14.56% done, estimate finish Sun Feb 26 14:39:33 2012
14.57% done, estimate finish Sun Feb 26 14:39:32 2012
14.57% done, estimate finish Sun Feb 26 14:39:38 2012
14.58% done, estimate finish Sun Feb 26 14:39:37 2012
14.58% done, estimate finish Sun Feb 26 14:39:36 2012
14.59% done, estimate finish Sun Feb 26 14:39:35 2012
=== last message repeated 2 times. ===
14.60% done, estimate finish Sun Feb 26 14:39:34 2012
14.60% done, estimate finish Sun Feb 26 14:39:40 2012
14.61% done, estimate finish Sun Feb 26 14:39:39 2012
14.61% done, estimate finish Sun Feb 26 14:39:38 2012
14.62% done, estimate finish Sun Feb 26 14:39:37 2012
14.62% done, estimate finish Sun Feb 26 14:39:36 2012
14.63% done, estimate finish Sun Feb 26 14:39:35 2012
14.63% done, estimate finish Sun Feb 26 14:39:34 2012
14.63% done, estimate finish Sun Feb 26 14:39:33 2012
14.64% done, estimate finish Sun Feb 26 14:39:33 2012
14.64% done, estimate finish Sun Feb 26 14:39:38 2012
14.65% done, estimate finish Sun Feb 26 14:39:38 2012
14.65% done, estimate finish Sun Feb 26 14:39:37 2012
14.66% done, estimate finish Sun Feb 26 14:39:36 2012
14.66% done, estimate finish Sun Feb 26 14:39:35 2012
14.67% done, estimate finish Sun Feb 26 14:39:34 2012
14.67% done, estimate finish Sun Feb 26 14:39:33 2012
14.68% done, estimate finish Sun Feb 26 14:39:32 2012
14.68% done, estimate finish Sun Feb 26 14:39:31 2012
14.69% done, estimate finish Sun Feb 26 14:39:37 2012
14.69% done, estimate finish Sun Feb 26 14:39:36 2012
14.70% done, estimate finish Sun Feb 26 14:39:36 2012
14.70% done, estimate finish Sun Feb 26 14:39:35 2012
14.71% done, estimate finish Sun Feb 26 14:39:34 2012
14.71% done, estimate finish Sun Feb 26 14:39:33 2012
14.71% done, estimate finish Sun Feb 26 14:39:39 2012
14.72% done, estimate finish Sun Feb 26 14:39:38 2012
14.72% done, estimate finish Sun Feb 26 14:39:37 2012
14.73% done, estimate finish Sun Feb 26 14:39:36 2012
14.73% done, estimate finish Sun Feb 26 14:39:35 2012
14.74% done, estimate finish Sun Feb 26 14:39:34 2012
=== last message repeated 2 times. ===
14.75% done, estimate finish Sun Feb 26 14:39:33 2012
14.75% done, estimate finish Sun Feb 26 14:39:32 2012
14.76% done, estimate finish Sun Feb 26 14:39:31 2012
14.76% done, estimate finish Sun Feb 26 14:39:30 2012
14.77% done, estimate finish Sun Feb 26 14:39:36 2012
14.77% done, estimate finish Sun Feb 26 14:39:35 2012
14.78% done, estimate finish Sun Feb 26 14:39:34 2012
14.78% done, estimate finish Sun Feb 26 14:39:33 2012
14.79% done, estimate finish Sun Feb 26 14:39:32 2012
=== last message repeated 2 times. ===
14.79% done, estimate finish Sun Feb 26 14:39:31 2012
14.80% done, estimate finish Sun Feb 26 14:39:37 2012
14.80% done, estimate finish Sun Feb 26 14:39:36 2012
14.81% done, estimate finish Sun Feb 26 14:39:35 2012
14.81% done, estimate finish Sun Feb 26 14:39:34 2012
14.82% done, estimate finish Sun Feb 26 14:39:33 2012
14.82% done, estimate finish Sun Feb 26 14:39:32 2012
14.83% done, estimate finish Sun Feb 26 14:39:31 2012
14.83% done, estimate finish Sun Feb 26 14:39:30 2012
14.84% done, estimate finish Sun Feb 26 14:39:30 2012
14.84% done, estimate finish Sun Feb 26 14:39:35 2012
14.85% done, estimate finish Sun Feb 26 14:39:35 2012
14.85% done, estimate finish Sun Feb 26 14:39:34 2012
14.86% done, estimate finish Sun Feb 26 14:39:33 2012
14.86% done, estimate finish Sun Feb 26 14:39:32 2012
14.87% done, estimate finish Sun Feb 26 14:39:31 2012
14.87% done, estimate finish Sun Feb 26 14:39:30 2012
14.87% done, estimate finish Sun Feb 26 14:39:29 2012
14.88% done, estimate finish Sun Feb 26 14:39:35 2012
14.88% done, estimate finish Sun Feb 26 14:39:34 2012
14.89% done, estimate finish Sun Feb 26 14:39:33 2012
=== last message repeated 2 times. ===
14.90% done, estimate finish Sun Feb 26 14:39:32 2012
14.90% done, estimate finish Sun Feb 26 14:39:31 2012
14.91% done, estimate finish Sun Feb 26 14:39:30 2012
14.91% done, estimate finish Sun Feb 26 14:39:29 2012
14.92% done, estimate finish Sun Feb 26 14:39:35 2012
14.92% done, estimate finish Sun Feb 26 14:39:34 2012
14.93% done, estimate finish Sun Feb 26 14:39:33 2012
14.93% done, estimate finish Sun Feb 26 14:39:32 2012
14.94% done, estimate finish Sun Feb 26 14:39:32 2012
14.94% done, estimate finish Sun Feb 26 14:39:31 2012
14.95% done, estimate finish Sun Feb 26 14:39:30 2012
14.95% done, estimate finish Sun Feb 26 14:39:29 2012
14.95% done, estimate finish Sun Feb 26 14:39:28 2012
14.96% done, estimate finish Sun Feb 26 14:39:34 2012
14.96% done, estimate finish Sun Feb 26 14:39:33 2012
14.97% done, estimate finish Sun Feb 26 14:39:32 2012
14.97% done, estimate finish Sun Feb 26 14:39:31 2012
14.98% done, estimate finish Sun Feb 26 14:39:30 2012
=== last message repeated 2 times. ===
14.99% done, estimate finish Sun Feb 26 14:39:35 2012
=== last message repeated 2 times. ===
15.00% done, estimate finish Sun Feb 26 14:39:34 2012
15.00% done, estimate finish Sun Feb 26 14:39:33 2012
15.01% done, estimate finish Sun Feb 26 14:39:32 2012
15.01% done, estimate finish Sun Feb 26 14:39:31 2012
15.02% done, estimate finish Sun Feb 26 14:39:30 2012
15.02% done, estimate finish Sun Feb 26 14:39:29 2012
15.03% done, estimate finish Sun Feb 26 14:39:28 2012
=== last message repeated 2 times. ===
15.03% done, estimate finish Sun Feb 26 14:39:33 2012
15.04% done, estimate finish Sun Feb 26 14:39:33 2012
15.04% done, estimate finish Sun Feb 26 14:39:32 2012
15.05% done, estimate finish Sun Feb 26 14:39:31 2012
15.05% done, estimate finish Sun Feb 26 14:39:30 2012
15.06% done, estimate finish Sun Feb 26 14:39:29 2012
15.06% done, estimate finish Sun Feb 26 14:39:28 2012
15.07% done, estimate finish Sun Feb 26 14:39:27 2012
15.07% done, estimate finish Sun Feb 26 14:39:33 2012
15.08% done, estimate finish Sun Feb 26 14:39:32 2012
15.08% done, estimate finish Sun Feb 26 14:39:31 2012
15.09% done, estimate finish Sun Feb 26 14:39:31 2012
15.09% done, estimate finish Sun Feb 26 14:39:30 2012
15.10% done, estimate finish Sun Feb 26 14:39:29 2012
15.10% done, estimate finish Sun Feb 26 14:39:28 2012
15.11% done, estimate finish Sun Feb 26 14:39:27 2012
15.11% done, estimate finish Sun Feb 26 14:39:33 2012
15.12% done, estimate finish Sun Feb 26 14:39:32 2012
15.12% done, estimate finish Sun Feb 26 14:39:31 2012
15.12% done, estimate finish Sun Feb 26 14:39:30 2012
15.13% done, estimate finish Sun Feb 26 14:39:30 2012
15.13% done, estimate finish Sun Feb 26 14:39:29 2012
15.14% done, estimate finish Sun Feb 26 14:39:28 2012
15.14% done, estimate finish Sun Feb 26 14:39:27 2012
15.15% done, estimate finish Sun Feb 26 14:39:26 2012
15.15% done, estimate finish Sun Feb 26 14:39:32 2012
15.16% done, estimate finish Sun Feb 26 14:39:31 2012
15.16% done, estimate finish Sun Feb 26 14:39:30 2012
15.17% done, estimate finish Sun Feb 26 14:39:29 2012
15.17% done, estimate finish Sun Feb 26 14:39:28 2012
15.18% done, estimate finish Sun Feb 26 14:39:28 2012
15.18% done, estimate finish Sun Feb 26 14:39:27 2012
15.19% done, estimate finish Sun Feb 26 14:39:33 2012
15.19% done, estimate finish Sun Feb 26 14:39:32 2012
15.20% done, estimate finish Sun Feb 26 14:39:31 2012
15.20% done, estimate finish Sun Feb 26 14:39:30 2012
15.20% done, estimate finish Sun Feb 26 14:39:29 2012
15.21% done, estimate finish Sun Feb 26 14:39:28 2012
15.21% done, estimate finish Sun Feb 26 14:39:27 2012
15.22% done, estimate finish Sun Feb 26 14:39:27 2012
15.22% done, estimate finish Sun Feb 26 14:39:26 2012
15.23% done, estimate finish Sun Feb 26 14:39:25 2012
15.23% done, estimate finish Sun Feb 26 14:39:31 2012
15.24% done, estimate finish Sun Feb 26 14:39:30 2012
15.24% done, estimate finish Sun Feb 26 14:39:29 2012
15.25% done, estimate finish Sun Feb 26 14:39:28 2012
15.25% done, estimate finish Sun Feb 26 14:39:27 2012
15.26% done, estimate finish Sun Feb 26 14:39:26 2012
=== last message repeated 2 times. ===
15.27% done, estimate finish Sun Feb 26 14:39:31 2012
15.27% done, estimate finish Sun Feb 26 14:39:30 2012
15.28% done, estimate finish Sun Feb 26 14:39:30 2012
15.28% done, estimate finish Sun Feb 26 14:39:29 2012
15.28% done, estimate finish Sun Feb 26 14:39:28 2012
15.29% done, estimate finish Sun Feb 26 14:39:27 2012
15.29% done, estimate finish Sun Feb 26 14:39:33 2012
15.30% done, estimate finish Sun Feb 26 14:39:32 2012
15.30% done, estimate finish Sun Feb 26 14:39:31 2012
15.31% done, estimate finish Sun Feb 26 14:39:30 2012
15.31% done, estimate finish Sun Feb 26 14:39:29 2012
15.32% done, estimate finish Sun Feb 26 14:39:28 2012
=== last message repeated 2 times. ===
15.33% done, estimate finish Sun Feb 26 14:39:27 2012
15.33% done, estimate finish Sun Feb 26 14:39:26 2012
15.34% done, estimate finish Sun Feb 26 14:39:25 2012
15.34% done, estimate finish Sun Feb 26 14:39:24 2012
15.35% done, estimate finish Sun Feb 26 14:39:23 2012
15.35% done, estimate finish Sun Feb 26 14:39:29 2012
15.36% done, estimate finish Sun Feb 26 14:39:28 2012
15.36% done, estimate finish Sun Feb 26 14:39:27 2012
=== last message repeated 2 times. ===
15.37% done, estimate finish Sun Feb 26 14:39:26 2012
15.37% done, estimate finish Sun Feb 26 14:39:25 2012
15.38% done, estimate finish Sun Feb 26 14:39:31 2012
15.38% done, estimate finish Sun Feb 26 14:39:30 2012
15.39% done, estimate finish Sun Feb 26 14:39:29 2012
15.39% done, estimate finish Sun Feb 26 14:39:28 2012
15.40% done, estimate finish Sun Feb 26 14:39:27 2012
15.40% done, estimate finish Sun Feb 26 14:39:26 2012
15.41% done, estimate finish Sun Feb 26 14:39:26 2012
15.41% done, estimate finish Sun Feb 26 14:39:25 2012
15.42% done, estimate finish Sun Feb 26 14:39:24 2012
15.42% done, estimate finish Sun Feb 26 14:39:23 2012
15.43% done, estimate finish Sun Feb 26 14:39:22 2012
15.43% done, estimate finish Sun Feb 26 14:39:21 2012
15.44% done, estimate finish Sun Feb 26 14:39:27 2012
15.44% done, estimate finish Sun Feb 26 14:39:26 2012
15.44% done, estimate finish Sun Feb 26 14:39:25 2012
15.45% done, estimate finish Sun Feb 26 14:39:24 2012
=== last message repeated 2 times. ===
15.46% done, estimate finish Sun Feb 26 14:39:23 2012
15.46% done, estimate finish Sun Feb 26 14:39:28 2012
15.47% done, estimate finish Sun Feb 26 14:39:28 2012
15.47% done, estimate finish Sun Feb 26 14:39:27 2012
15.48% done, estimate finish Sun Feb 26 14:39:26 2012
15.48% done, estimate finish Sun Feb 26 14:39:25 2012
15.49% done, estimate finish Sun Feb 26 14:39:24 2012
15.49% done, estimate finish Sun Feb 26 14:39:23 2012
15.50% done, estimate finish Sun Feb 26 14:39:29 2012
15.50% done, estimate finish Sun Feb 26 14:39:28 2012
15.51% done, estimate finish Sun Feb 26 14:39:27 2012
=== last message repeated 2 times. ===
15.52% done, estimate finish Sun Feb 26 14:39:26 2012
15.52% done, estimate finish Sun Feb 26 14:39:25 2012
15.52% done, estimate finish Sun Feb 26 14:39:24 2012
15.53% done, estimate finish Sun Feb 26 14:39:23 2012
15.53% done, estimate finish Sun Feb 26 14:39:22 2012
15.54% done, estimate finish Sun Feb 26 14:39:22 2012
15.54% done, estimate finish Sun Feb 26 14:39:27 2012
15.55% done, estimate finish Sun Feb 26 14:39:26 2012
=== last message repeated 2 times. ===
15.56% done, estimate finish Sun Feb 26 14:39:25 2012
15.56% done, estimate finish Sun Feb 26 14:39:24 2012
15.57% done, estimate finish Sun Feb 26 14:39:23 2012
15.57% done, estimate finish Sun Feb 26 14:39:22 2012
15.58% done, estimate finish Sun Feb 26 14:39:21 2012
15.58% done, estimate finish Sun Feb 26 14:39:27 2012
15.59% done, estimate finish Sun Feb 26 14:39:26 2012
15.59% done, estimate finish Sun Feb 26 14:39:25 2012
15.60% done, estimate finish Sun Feb 26 14:39:25 2012
15.60% done, estimate finish Sun Feb 26 14:39:24 2012
15.60% done, estimate finish Sun Feb 26 14:39:23 2012
15.61% done, estimate finish Sun Feb 26 14:39:22 2012
15.61% done, estimate finish Sun Feb 26 14:39:21 2012
15.62% done, estimate finish Sun Feb 26 14:39:20 2012
=== last message repeated 2 times. ===
15.63% done, estimate finish Sun Feb 26 14:39:25 2012
15.63% done, estimate finish Sun Feb 26 14:39:24 2012
15.64% done, estimate finish Sun Feb 26 14:39:23 2012
=== last message repeated 2 times. ===
15.65% done, estimate finish Sun Feb 26 14:39:22 2012
15.65% done, estimate finish Sun Feb 26 14:39:21 2012
15.66% done, estimate finish Sun Feb 26 14:39:27 2012
15.66% done, estimate finish Sun Feb 26 14:39:26 2012
15.67% done, estimate finish Sun Feb 26 14:39:25 2012
15.67% done, estimate finish Sun Feb 26 14:39:24 2012
15.68% done, estimate finish Sun Feb 26 14:39:23 2012
15.68% done, estimate finish Sun Feb 26 14:39:22 2012
=== last message repeated 2 times. ===
15.69% done, estimate finish Sun Feb 26 14:39:21 2012
15.69% done, estimate finish Sun Feb 26 14:39:20 2012
15.70% done, estimate finish Sun Feb 26 14:39:19 2012
15.70% done, estimate finish Sun Feb 26 14:39:25 2012
15.71% done, estimate finish Sun Feb 26 14:39:24 2012
15.71% done, estimate finish Sun Feb 26 14:39:23 2012
15.72% done, estimate finish Sun Feb 26 14:39:22 2012
15.72% done, estimate finish Sun Feb 26 14:39:21 2012
15.73% done, estimate finish Sun Feb 26 14:39:21 2012
15.73% done, estimate finish Sun Feb 26 14:39:20 2012
15.74% done, estimate finish Sun Feb 26 14:39:25 2012
=== last message repeated 2 times. ===
15.75% done, estimate finish Sun Feb 26 14:39:24 2012
15.75% done, estimate finish Sun Feb 26 14:39:23 2012
15.76% done, estimate finish Sun Feb 26 14:39:22 2012
15.76% done, estimate finish Sun Feb 26 14:39:21 2012
15.76% done, estimate finish Sun Feb 26 14:39:20 2012
15.77% done, estimate finish Sun Feb 26 14:39:26 2012
15.77% done, estimate finish Sun Feb 26 14:39:25 2012
15.78% done, estimate finish Sun Feb 26 14:39:24 2012
=== last message repeated 2 times. ===
15.79% done, estimate finish Sun Feb 26 14:39:23 2012
15.79% done, estimate finish Sun Feb 26 14:39:22 2012
15.80% done, estimate finish Sun Feb 26 14:39:21 2012
15.80% done, estimate finish Sun Feb 26 14:39:20 2012
15.81% done, estimate finish Sun Feb 26 14:39:19 2012
=== last message repeated 2 times. ===
15.82% done, estimate finish Sun Feb 26 14:39:18 2012
15.82% done, estimate finish Sun Feb 26 14:39:23 2012
15.83% done, estimate finish Sun Feb 26 14:39:23 2012
15.83% done, estimate finish Sun Feb 26 14:39:22 2012
15.84% done, estimate finish Sun Feb 26 14:39:21 2012
15.84% done, estimate finish Sun Feb 26 14:39:20 2012
15.84% done, estimate finish Sun Feb 26 14:39:19 2012
15.85% done, estimate finish Sun Feb 26 14:39:25 2012
15.85% done, estimate finish Sun Feb 26 14:39:24 2012
15.86% done, estimate finish Sun Feb 26 14:39:23 2012
15.86% done, estimate finish Sun Feb 26 14:39:22 2012
15.87% done, estimate finish Sun Feb 26 14:39:21 2012
=== last message repeated 2 times. ===
15.88% done, estimate finish Sun Feb 26 14:39:20 2012
15.88% done, estimate finish Sun Feb 26 14:39:19 2012
15.89% done, estimate finish Sun Feb 26 14:39:18 2012
15.89% done, estimate finish Sun Feb 26 14:39:17 2012
15.90% done, estimate finish Sun Feb 26 14:39:17 2012
15.90% done, estimate finish Sun Feb 26 14:39:16 2012
15.91% done, estimate finish Sun Feb 26 14:39:21 2012
15.91% done, estimate finish Sun Feb 26 14:39:20 2012
15.92% done, estimate finish Sun Feb 26 14:39:20 2012
15.92% done, estimate finish Sun Feb 26 14:39:19 2012
15.92% done, estimate finish Sun Feb 26 14:39:18 2012
15.93% done, estimate finish Sun Feb 26 14:39:17 2012
15.93% done, estimate finish Sun Feb 26 14:39:23 2012
15.94% done, estimate finish Sun Feb 26 14:39:22 2012
15.94% done, estimate finish Sun Feb 26 14:39:21 2012
15.95% done, estimate finish Sun Feb 26 14:39:20 2012
15.95% done, estimate finish Sun Feb 26 14:39:19 2012
15.96% done, estimate finish Sun Feb 26 14:39:19 2012
15.96% done, estimate finish Sun Feb 26 14:39:18 2012
15.97% done, estimate finish Sun Feb 26 14:39:23 2012
=== last message repeated 2 times. ===
15.98% done, estimate finish Sun Feb 26 14:39:22 2012
15.98% done, estimate finish Sun Feb 26 14:39:21 2012
15.99% done, estimate finish Sun Feb 26 14:39:20 2012
15.99% done, estimate finish Sun Feb 26 14:39:19 2012
16.00% done, estimate finish Sun Feb 26 14:39:19 2012
16.00% done, estimate finish Sun Feb 26 14:39:18 2012
16.01% done, estimate finish Sun Feb 26 14:39:17 2012
16.01% done, estimate finish Sun Feb 26 14:39:16 2012
16.01% done, estimate finish Sun Feb 26 14:39:22 2012
16.02% done, estimate finish Sun Feb 26 14:39:21 2012
16.02% done, estimate finish Sun Feb 26 14:39:20 2012
16.03% done, estimate finish Sun Feb 26 14:39:19 2012
16.03% done, estimate finish Sun Feb 26 14:39:18 2012
16.04% done, estimate finish Sun Feb 26 14:39:18 2012
16.04% done, estimate finish Sun Feb 26 14:39:23 2012
16.05% done, estimate finish Sun Feb 26 14:39:22 2012
16.05% done, estimate finish Sun Feb 26 14:39:21 2012
16.06% done, estimate finish Sun Feb 26 14:39:21 2012
16.06% done, estimate finish Sun Feb 26 14:39:20 2012
16.07% done, estimate finish Sun Feb 26 14:39:19 2012
16.07% done, estimate finish Sun Feb 26 14:39:18 2012
16.08% done, estimate finish Sun Feb 26 14:39:17 2012
=== last message repeated 2 times. ===
16.09% done, estimate finish Sun Feb 26 14:39:16 2012
16.09% done, estimate finish Sun Feb 26 14:39:15 2012
16.09% done, estimate finish Sun Feb 26 14:39:14 2012
16.10% done, estimate finish Sun Feb 26 14:39:20 2012
16.10% done, estimate finish Sun Feb 26 14:39:19 2012
16.11% done, estimate finish Sun Feb 26 14:39:18 2012
16.11% done, estimate finish Sun Feb 26 14:39:17 2012
16.12% done, estimate finish Sun Feb 26 14:39:16 2012
=== last message repeated 2 times. ===
16.13% done, estimate finish Sun Feb 26 14:39:21 2012
16.13% done, estimate finish Sun Feb 26 14:39:20 2012
16.14% done, estimate finish Sun Feb 26 14:39:19 2012
=== last message repeated 2 times. ===
16.15% done, estimate finish Sun Feb 26 14:39:18 2012
16.15% done, estimate finish Sun Feb 26 14:39:17 2012
16.16% done, estimate finish Sun Feb 26 14:39:16 2012
16.16% done, estimate finish Sun Feb 26 14:39:15 2012
16.17% done, estimate finish Sun Feb 26 14:39:21 2012
16.17% done, estimate finish Sun Feb 26 14:39:20 2012
16.17% done, estimate finish Sun Feb 26 14:39:19 2012
16.18% done, estimate finish Sun Feb 26 14:39:18 2012
=== last message repeated 2 times. ===
16.19% done, estimate finish Sun Feb 26 14:39:17 2012
16.19% done, estimate finish Sun Feb 26 14:39:16 2012
16.20% done, estimate finish Sun Feb 26 14:39:15 2012
16.20% done, estimate finish Sun Feb 26 14:39:14 2012
16.21% done, estimate finish Sun Feb 26 14:39:14 2012
16.21% done, estimate finish Sun Feb 26 14:39:19 2012
16.22% done, estimate finish Sun Feb 26 14:39:18 2012
16.22% done, estimate finish Sun Feb 26 14:39:17 2012
16.23% done, estimate finish Sun Feb 26 14:39:17 2012
16.23% done, estimate finish Sun Feb 26 14:39:16 2012
16.24% done, estimate finish Sun Feb 26 14:39:21 2012
16.24% done, estimate finish Sun Feb 26 14:39:20 2012
16.25% done, estimate finish Sun Feb 26 14:39:20 2012
16.25% done, estimate finish Sun Feb 26 14:39:19 2012
16.25% done, estimate finish Sun Feb 26 14:39:18 2012
16.26% done, estimate finish Sun Feb 26 14:39:17 2012
16.26% done, estimate finish Sun Feb 26 14:39:16 2012
16.27% done, estimate finish Sun Feb 26 14:39:16 2012
16.27% done, estimate finish Sun Feb 26 14:39:15 2012
16.28% done, estimate finish Sun Feb 26 14:39:14 2012
16.28% done, estimate finish Sun Feb 26 14:39:13 2012
16.29% done, estimate finish Sun Feb 26 14:39:13 2012
16.29% done, estimate finish Sun Feb 26 14:39:18 2012
16.30% done, estimate finish Sun Feb 26 14:39:17 2012
16.30% done, estimate finish Sun Feb 26 14:39:16 2012
16.31% done, estimate finish Sun Feb 26 14:39:15 2012
=== last message repeated 2 times. ===
16.32% done, estimate finish Sun Feb 26 14:39:14 2012
16.32% done, estimate finish Sun Feb 26 14:39:19 2012
16.33% done, estimate finish Sun Feb 26 14:39:18 2012
=== last message repeated 2 times. ===
16.33% done, estimate finish Sun Feb 26 14:39:17 2012
16.34% done, estimate finish Sun Feb 26 14:39:16 2012
16.34% done, estimate finish Sun Feb 26 14:39:15 2012
16.35% done, estimate finish Sun Feb 26 14:39:15 2012
16.35% done, estimate finish Sun Feb 26 14:39:20 2012
16.36% done, estimate finish Sun Feb 26 14:39:19 2012
16.36% done, estimate finish Sun Feb 26 14:39:18 2012
16.37% done, estimate finish Sun Feb 26 14:39:18 2012
16.37% done, estimate finish Sun Feb 26 14:39:17 2012
16.38% done, estimate finish Sun Feb 26 14:39:16 2012
16.38% done, estimate finish Sun Feb 26 14:39:15 2012
16.39% done, estimate finish Sun Feb 26 14:39:14 2012
=== last message repeated 2 times. ===
16.40% done, estimate finish Sun Feb 26 14:39:13 2012
16.40% done, estimate finish Sun Feb 26 14:39:12 2012
16.41% done, estimate finish Sun Feb 26 14:39:17 2012
=== last message repeated 2 times. ===
16.41% done, estimate finish Sun Feb 26 14:39:16 2012
16.42% done, estimate finish Sun Feb 26 14:39:15 2012
16.42% done, estimate finish Sun Feb 26 14:39:14 2012
16.43% done, estimate finish Sun Feb 26 14:39:13 2012
16.43% done, estimate finish Sun Feb 26 14:39:19 2012
16.44% done, estimate finish Sun Feb 26 14:39:18 2012
16.44% done, estimate finish Sun Feb 26 14:39:17 2012
16.45% done, estimate finish Sun Feb 26 14:39:16 2012
=== last message repeated 2 times. ===
16.46% done, estimate finish Sun Feb 26 14:39:15 2012
16.46% done, estimate finish Sun Feb 26 14:39:14 2012
16.47% done, estimate finish Sun Feb 26 14:39:13 2012
16.47% done, estimate finish Sun Feb 26 14:39:12 2012
16.48% done, estimate finish Sun Feb 26 14:39:12 2012
16.48% done, estimate finish Sun Feb 26 14:39:11 2012
16.49% done, estimate finish Sun Feb 26 14:39:16 2012
16.49% done, estimate finish Sun Feb 26 14:39:15 2012
=== last message repeated 2 times. ===
16.50% done, estimate finish Sun Feb 26 14:39:14 2012
16.50% done, estimate finish Sun Feb 26 14:39:13 2012
16.51% done, estimate finish Sun Feb 26 14:39:12 2012
16.51% done, estimate finish Sun Feb 26 14:39:18 2012
16.52% done, estimate finish Sun Feb 26 14:39:17 2012
16.52% done, estimate finish Sun Feb 26 14:39:16 2012
16.53% done, estimate finish Sun Feb 26 14:39:15 2012
16.53% done, estimate finish Sun Feb 26 14:39:14 2012
16.54% done, estimate finish Sun Feb 26 14:39:14 2012
16.54% done, estimate finish Sun Feb 26 14:39:13 2012
16.55% done, estimate finish Sun Feb 26 14:39:12 2012
16.55% done, estimate finish Sun Feb 26 14:39:17 2012
16.56% done, estimate finish Sun Feb 26 14:39:17 2012
16.56% done, estimate finish Sun Feb 26 14:39:16 2012
16.57% done, estimate finish Sun Feb 26 14:39:15 2012
16.57% done, estimate finish Sun Feb 26 14:39:14 2012
=== last message repeated 2 times. ===
16.58% done, estimate finish Sun Feb 26 14:39:13 2012
16.58% done, estimate finish Sun Feb 26 14:39:12 2012
16.59% done, estimate finish Sun Feb 26 14:39:11 2012
16.59% done, estimate finish Sun Feb 26 14:39:10 2012
16.60% done, estimate finish Sun Feb 26 14:39:16 2012
16.60% done, estimate finish Sun Feb 26 14:39:15 2012
16.61% done, estimate finish Sun Feb 26 14:39:14 2012
16.61% done, estimate finish Sun Feb 26 14:39:13 2012
16.62% done, estimate finish Sun Feb 26 14:39:13 2012
16.62% done, estimate finish Sun Feb 26 14:39:12 2012
16.63% done, estimate finish Sun Feb 26 14:39:17 2012
16.63% done, estimate finish Sun Feb 26 14:39:16 2012
16.64% done, estimate finish Sun Feb 26 14:39:16 2012
16.64% done, estimate finish Sun Feb 26 14:39:15 2012
16.65% done, estimate finish Sun Feb 26 14:39:14 2012
16.65% done, estimate finish Sun Feb 26 14:39:13 2012
16.65% done, estimate finish Sun Feb 26 14:39:12 2012
16.66% done, estimate finish Sun Feb 26 14:39:12 2012
16.66% done, estimate finish Sun Feb 26 14:39:11 2012
16.67% done, estimate finish Sun Feb 26 14:39:10 2012
16.67% done, estimate finish Sun Feb 26 14:39:09 2012
16.68% done, estimate finish Sun Feb 26 14:39:09 2012
16.68% done, estimate finish Sun Feb 26 14:39:14 2012
16.69% done, estimate finish Sun Feb 26 14:39:13 2012
16.69% done, estimate finish Sun Feb 26 14:39:12 2012
16.70% done, estimate finish Sun Feb 26 14:39:12 2012
16.70% done, estimate finish Sun Feb 26 14:39:11 2012
16.71% done, estimate finish Sun Feb 26 14:39:10 2012
16.71% done, estimate finish Sun Feb 26 14:39:15 2012
16.72% done, estimate finish Sun Feb 26 14:39:14 2012
=== last message repeated 2 times. ===
16.73% done, estimate finish Sun Feb 26 14:39:13 2012
16.73% done, estimate finish Sun Feb 26 14:39:12 2012
16.73% done, estimate finish Sun Feb 26 14:39:11 2012
16.74% done, estimate finish Sun Feb 26 14:39:17 2012
16.74% done, estimate finish Sun Feb 26 14:39:16 2012
16.75% done, estimate finish Sun Feb 26 14:39:15 2012
16.75% done, estimate finish Sun Feb 26 14:39:14 2012
16.76% done, estimate finish Sun Feb 26 14:39:13 2012
=== last message repeated 2 times. ===
16.77% done, estimate finish Sun Feb 26 14:39:12 2012
16.77% done, estimate finish Sun Feb 26 14:39:11 2012
16.78% done, estimate finish Sun Feb 26 14:39:10 2012
=== last message repeated 2 times. ===
16.79% done, estimate finish Sun Feb 26 14:39:09 2012
16.79% done, estimate finish Sun Feb 26 14:39:14 2012
16.80% done, estimate finish Sun Feb 26 14:39:13 2012
=== last message repeated 2 times. ===
16.81% done, estimate finish Sun Feb 26 14:39:12 2012
16.81% done, estimate finish Sun Feb 26 14:39:11 2012
16.81% done, estimate finish Sun Feb 26 14:39:10 2012
16.82% done, estimate finish Sun Feb 26 14:39:15 2012
=== last message repeated 2 times. ===
16.83% done, estimate finish Sun Feb 26 14:39:14 2012
16.83% done, estimate finish Sun Feb 26 14:39:13 2012
16.84% done, estimate finish Sun Feb 26 14:39:12 2012
=== last message repeated 2 times. ===
16.85% done, estimate finish Sun Feb 26 14:39:11 2012
16.85% done, estimate finish Sun Feb 26 14:39:10 2012
16.86% done, estimate finish Sun Feb 26 14:39:09 2012
=== last message repeated 2 times. ===
16.87% done, estimate finish Sun Feb 26 14:39:08 2012
16.87% done, estimate finish Sun Feb 26 14:39:07 2012
16.88% done, estimate finish Sun Feb 26 14:39:12 2012
16.88% done, estimate finish Sun Feb 26 14:39:11 2012
16.89% done, estimate finish Sun Feb 26 14:39:11 2012
16.89% done, estimate finish Sun Feb 26 14:39:10 2012
16.89% done, estimate finish Sun Feb 26 14:39:09 2012
16.90% done, estimate finish Sun Feb 26 14:39:08 2012
16.90% done, estimate finish Sun Feb 26 14:39:14 2012
16.91% done, estimate finish Sun Feb 26 14:39:13 2012
16.91% done, estimate finish Sun Feb 26 14:39:12 2012
16.92% done, estimate finish Sun Feb 26 14:39:11 2012
=== last message repeated 2 times. ===
16.93% done, estimate finish Sun Feb 26 14:39:10 2012
16.93% done, estimate finish Sun Feb 26 14:39:09 2012
16.94% done, estimate finish Sun Feb 26 14:39:14 2012
16.94% done, estimate finish Sun Feb 26 14:39:13 2012
16.95% done, estimate finish Sun Feb 26 14:39:13 2012
16.95% done, estimate finish Sun Feb 26 14:39:12 2012
16.96% done, estimate finish Sun Feb 26 14:39:11 2012
16.96% done, estimate finish Sun Feb 26 14:39:10 2012
16.97% done, estimate finish Sun Feb 26 14:39:10 2012
16.97% done, estimate finish Sun Feb 26 14:39:09 2012
16.97% done, estimate finish Sun Feb 26 14:39:08 2012
16.98% done, estimate finish Sun Feb 26 14:39:07 2012
16.98% done, estimate finish Sun Feb 26 14:39:13 2012
16.99% done, estimate finish Sun Feb 26 14:39:12 2012
16.99% done, estimate finish Sun Feb 26 14:39:11 2012
17.00% done, estimate finish Sun Feb 26 14:39:10 2012
=== last message repeated 2 times. ===
17.01% done, estimate finish Sun Feb 26 14:39:09 2012
17.01% done, estimate finish Sun Feb 26 14:39:08 2012
17.02% done, estimate finish Sun Feb 26 14:39:13 2012
17.02% done, estimate finish Sun Feb 26 14:39:12 2012
17.03% done, estimate finish Sun Feb 26 14:39:12 2012
17.03% done, estimate finish Sun Feb 26 14:39:11 2012
17.04% done, estimate finish Sun Feb 26 14:39:10 2012
17.04% done, estimate finish Sun Feb 26 14:39:09 2012
17.05% done, estimate finish Sun Feb 26 14:39:09 2012
17.05% done, estimate finish Sun Feb 26 14:39:08 2012
17.06% done, estimate finish Sun Feb 26 14:39:07 2012
17.06% done, estimate finish Sun Feb 26 14:39:06 2012
=== last message repeated 2 times. ===
17.07% done, estimate finish Sun Feb 26 14:39:11 2012
17.07% done, estimate finish Sun Feb 26 14:39:10 2012
17.08% done, estimate finish Sun Feb 26 14:39:09 2012
17.08% done, estimate finish Sun Feb 26 14:39:08 2012
17.09% done, estimate finish Sun Feb 26 14:39:08 2012
17.09% done, estimate finish Sun Feb 26 14:39:07 2012
17.10% done, estimate finish Sun Feb 26 14:39:12 2012
17.10% done, estimate finish Sun Feb 26 14:39:11 2012
17.11% done, estimate finish Sun Feb 26 14:39:11 2012
17.11% done, estimate finish Sun Feb 26 14:39:10 2012
17.12% done, estimate finish Sun Feb 26 14:39:09 2012
17.12% done, estimate finish Sun Feb 26 14:39:08 2012
17.13% done, estimate finish Sun Feb 26 14:39:08 2012
17.13% done, estimate finish Sun Feb 26 14:39:13 2012
17.14% done, estimate finish Sun Feb 26 14:39:12 2012
17.14% done, estimate finish Sun Feb 26 14:39:11 2012
17.14% done, estimate finish Sun Feb 26 14:39:10 2012
17.15% done, estimate finish Sun Feb 26 14:39:10 2012
17.15% done, estimate finish Sun Feb 26 14:39:09 2012
17.16% done, estimate finish Sun Feb 26 14:39:08 2012
17.16% done, estimate finish Sun Feb 26 14:39:07 2012
17.17% done, estimate finish Sun Feb 26 14:39:07 2012
17.17% done, estimate finish Sun Feb 26 14:39:06 2012
17.18% done, estimate finish Sun Feb 26 14:39:05 2012
17.18% done, estimate finish Sun Feb 26 14:39:10 2012
17.19% done, estimate finish Sun Feb 26 14:39:09 2012
=== last message repeated 2 times. ===
17.20% done, estimate finish Sun Feb 26 14:39:08 2012
17.20% done, estimate finish Sun Feb 26 14:39:07 2012
17.21% done, estimate finish Sun Feb 26 14:39:07 2012
17.21% done, estimate finish Sun Feb 26 14:39:06 2012
17.22% done, estimate finish Sun Feb 26 14:39:11 2012
17.22% done, estimate finish Sun Feb 26 14:39:10 2012
17.22% done, estimate finish Sun Feb 26 14:39:09 2012
17.23% done, estimate finish Sun Feb 26 14:39:09 2012
17.23% done, estimate finish Sun Feb 26 14:39:08 2012
17.24% done, estimate finish Sun Feb 26 14:39:07 2012
17.24% done, estimate finish Sun Feb 26 14:39:06 2012
17.25% done, estimate finish Sun Feb 26 14:39:06 2012
17.25% done, estimate finish Sun Feb 26 14:39:05 2012
17.26% done, estimate finish Sun Feb 26 14:39:10 2012
17.26% done, estimate finish Sun Feb 26 14:39:09 2012
17.27% done, estimate finish Sun Feb 26 14:39:08 2012
=== last message repeated 2 times. ===
17.28% done, estimate finish Sun Feb 26 14:39:07 2012
17.28% done, estimate finish Sun Feb 26 14:39:06 2012
17.29% done, estimate finish Sun Feb 26 14:39:05 2012
17.29% done, estimate finish Sun Feb 26 14:39:11 2012
17.30% done, estimate finish Sun Feb 26 14:39:10 2012
17.30% done, estimate finish Sun Feb 26 14:39:09 2012
17.30% done, estimate finish Sun Feb 26 14:39:08 2012
17.31% done, estimate finish Sun Feb 26 14:39:08 2012
17.31% done, estimate finish Sun Feb 26 14:39:07 2012
17.32% done, estimate finish Sun Feb 26 14:39:06 2012
17.32% done, estimate finish Sun Feb 26 14:39:05 2012
17.33% done, estimate finish Sun Feb 26 14:39:05 2012
17.33% done, estimate finish Sun Feb 26 14:39:04 2012
17.34% done, estimate finish Sun Feb 26 14:39:09 2012
17.34% done, estimate finish Sun Feb 26 14:39:08 2012
17.35% done, estimate finish Sun Feb 26 14:39:07 2012
=== last message repeated 2 times. ===
17.36% done, estimate finish Sun Feb 26 14:39:06 2012
17.36% done, estimate finish Sun Feb 26 14:39:05 2012
17.37% done, estimate finish Sun Feb 26 14:39:04 2012
=== last message repeated 2 times. ===
17.38% done, estimate finish Sun Feb 26 14:39:09 2012
17.38% done, estimate finish Sun Feb 26 14:39:08 2012
17.38% done, estimate finish Sun Feb 26 14:39:07 2012
17.39% done, estimate finish Sun Feb 26 14:39:07 2012
17.39% done, estimate finish Sun Feb 26 14:39:06 2012
17.40% done, estimate finish Sun Feb 26 14:39:05 2012
17.40% done, estimate finish Sun Feb 26 14:39:10 2012
17.41% done, estimate finish Sun Feb 26 14:39:09 2012
=== last message repeated 2 times. ===
17.42% done, estimate finish Sun Feb 26 14:39:08 2012
17.42% done, estimate finish Sun Feb 26 14:39:07 2012
17.43% done, estimate finish Sun Feb 26 14:39:06 2012
=== last message repeated 2 times. ===
17.44% done, estimate finish Sun Feb 26 14:39:05 2012
17.44% done, estimate finish Sun Feb 26 14:39:04 2012
17.45% done, estimate finish Sun Feb 26 14:39:03 2012
=== last message repeated 2 times. ===
17.46% done, estimate finish Sun Feb 26 14:39:02 2012
17.46% done, estimate finish Sun Feb 26 14:39:07 2012
17.46% done, estimate finish Sun Feb 26 14:39:06 2012
17.47% done, estimate finish Sun Feb 26 14:39:06 2012
17.47% done, estimate finish Sun Feb 26 14:39:05 2012
17.48% done, estimate finish Sun Feb 26 14:39:04 2012
17.48% done, estimate finish Sun Feb 26 14:39:03 2012
17.49% done, estimate finish Sun Feb 26 14:39:08 2012
=== last message repeated 2 times. ===
17.50% done, estimate finish Sun Feb 26 14:39:07 2012
17.50% done, estimate finish Sun Feb 26 14:39:06 2012
17.51% done, estimate finish Sun Feb 26 14:39:05 2012
=== last message repeated 2 times. ===
17.52% done, estimate finish Sun Feb 26 14:39:04 2012
17.52% done, estimate finish Sun Feb 26 14:39:03 2012
17.53% done, estimate finish Sun Feb 26 14:39:02 2012
=== last message repeated 2 times. ===
17.54% done, estimate finish Sun Feb 26 14:39:07 2012
17.54% done, estimate finish Sun Feb 26 14:39:06 2012
17.54% done, estimate finish Sun Feb 26 14:39:05 2012
17.55% done, estimate finish Sun Feb 26 14:39:05 2012
17.55% done, estimate finish Sun Feb 26 14:39:04 2012
17.56% done, estimate finish Sun Feb 26 14:39:03 2012
17.56% done, estimate finish Sun Feb 26 14:39:02 2012
17.57% done, estimate finish Sun Feb 26 14:39:07 2012
=== last message repeated 2 times. ===
17.58% done, estimate finish Sun Feb 26 14:39:06 2012
17.58% done, estimate finish Sun Feb 26 14:39:05 2012
17.59% done, estimate finish Sun Feb 26 14:39:04 2012
=== last message repeated 2 times. ===
17.60% done, estimate finish Sun Feb 26 14:39:03 2012
17.60% done, estimate finish Sun Feb 26 14:39:02 2012
17.61% done, estimate finish Sun Feb 26 14:39:07 2012
17.61% done, estimate finish Sun Feb 26 14:39:06 2012
17.62% done, estimate finish Sun Feb 26 14:39:06 2012
17.62% done, estimate finish Sun Feb 26 14:39:05 2012
17.62% done, estimate finish Sun Feb 26 14:39:04 2012
17.63% done, estimate finish Sun Feb 26 14:39:04 2012
17.63% done, estimate finish Sun Feb 26 14:39:03 2012
17.64% done, estimate finish Sun Feb 26 14:39:02 2012
17.64% done, estimate finish Sun Feb 26 14:39:01 2012
17.65% done, estimate finish Sun Feb 26 14:39:01 2012
17.65% done, estimate finish Sun Feb 26 14:39:06 2012
17.66% done, estimate finish Sun Feb 26 14:39:05 2012
17.66% done, estimate finish Sun Feb 26 14:39:04 2012
17.67% done, estimate finish Sun Feb 26 14:39:03 2012
=== last message repeated 2 times. ===
17.68% done, estimate finish Sun Feb 26 14:39:02 2012
17.68% done, estimate finish Sun Feb 26 14:39:07 2012
17.69% done, estimate finish Sun Feb 26 14:39:06 2012
17.69% done, estimate finish Sun Feb 26 14:39:05 2012
17.70% done, estimate finish Sun Feb 26 14:39:05 2012
17.70% done, estimate finish Sun Feb 26 14:39:04 2012
17.70% done, estimate finish Sun Feb 26 14:39:03 2012
17.71% done, estimate finish Sun Feb 26 14:39:03 2012
17.71% done, estimate finish Sun Feb 26 14:39:02 2012
17.72% done, estimate finish Sun Feb 26 14:39:01 2012
17.72% done, estimate finish Sun Feb 26 14:39:00 2012
17.73% done, estimate finish Sun Feb 26 14:39:05 2012
=== last message repeated 2 times. ===
17.74% done, estimate finish Sun Feb 26 14:39:04 2012
17.74% done, estimate finish Sun Feb 26 14:39:03 2012
17.75% done, estimate finish Sun Feb 26 14:39:02 2012
=== last message repeated 2 times. ===
17.76% done, estimate finish Sun Feb 26 14:39:01 2012
17.76% done, estimate finish Sun Feb 26 14:39:06 2012
17.77% done, estimate finish Sun Feb 26 14:39:05 2012
17.77% done, estimate finish Sun Feb 26 14:39:04 2012
17.78% done, estimate finish Sun Feb 26 14:39:04 2012
17.78% done, estimate finish Sun Feb 26 14:39:03 2012
17.78% done, estimate finish Sun Feb 26 14:39:02 2012
17.79% done, estimate finish Sun Feb 26 14:39:02 2012
17.79% done, estimate finish Sun Feb 26 14:39:01 2012
17.80% done, estimate finish Sun Feb 26 14:39:06 2012
17.80% done, estimate finish Sun Feb 26 14:39:05 2012
17.81% done, estimate finish Sun Feb 26 14:39:04 2012
=== last message repeated 2 times. ===
17.82% done, estimate finish Sun Feb 26 14:39:03 2012
17.82% done, estimate finish Sun Feb 26 14:39:02 2012
17.83% done, estimate finish Sun Feb 26 14:39:01 2012
=== last message repeated 2 times. ===
17.84% done, estimate finish Sun Feb 26 14:39:00 2012
17.84% done, estimate finish Sun Feb 26 14:38:59 2012
17.85% done, estimate finish Sun Feb 26 14:39:04 2012
17.85% done, estimate finish Sun Feb 26 14:39:03 2012
17.86% done, estimate finish Sun Feb 26 14:39:03 2012
17.86% done, estimate finish Sun Feb 26 14:39:02 2012
17.86% done, estimate finish Sun Feb 26 14:39:01 2012
17.87% done, estimate finish Sun Feb 26 14:39:01 2012
17.87% done, estimate finish Sun Feb 26 14:39:05 2012
17.88% done, estimate finish Sun Feb 26 14:39:05 2012
17.88% done, estimate finish Sun Feb 26 14:39:04 2012
17.89% done, estimate finish Sun Feb 26 14:39:03 2012
=== last message repeated 2 times. ===
17.90% done, estimate finish Sun Feb 26 14:39:02 2012
17.90% done, estimate finish Sun Feb 26 14:39:01 2012
17.91% done, estimate finish Sun Feb 26 14:39:00 2012
=== last message repeated 2 times. ===
17.92% done, estimate finish Sun Feb 26 14:38:59 2012
17.92% done, estimate finish Sun Feb 26 14:38:58 2012
17.93% done, estimate finish Sun Feb 26 14:38:58 2012
17.93% done, estimate finish Sun Feb 26 14:39:02 2012
17.94% done, estimate finish Sun Feb 26 14:39:02 2012
17.94% done, estimate finish Sun Feb 26 14:39:01 2012
17.94% done, estimate finish Sun Feb 26 14:39:00 2012
17.95% done, estimate finish Sun Feb 26 14:39:00 2012
17.95% done, estimate finish Sun Feb 26 14:39:05 2012
17.96% done, estimate finish Sun Feb 26 14:39:04 2012
17.96% done, estimate finish Sun Feb 26 14:39:03 2012
17.97% done, estimate finish Sun Feb 26 14:39:02 2012
=== last message repeated 2 times. ===
17.98% done, estimate finish Sun Feb 26 14:39:01 2012
17.98% done, estimate finish Sun Feb 26 14:39:00 2012
17.99% done, estimate finish Sun Feb 26 14:39:00 2012
17.99% done, estimate finish Sun Feb 26 14:39:04 2012
18.00% done, estimate finish Sun Feb 26 14:39:04 2012
18.00% done, estimate finish Sun Feb 26 14:39:03 2012
18.01% done, estimate finish Sun Feb 26 14:39:02 2012
=== last message repeated 2 times. ===
18.02% done, estimate finish Sun Feb 26 14:39:01 2012
18.02% done, estimate finish Sun Feb 26 14:39:00 2012
18.03% done, estimate finish Sun Feb 26 14:38:59 2012
=== last message repeated 2 times. ===
18.03% done, estimate finish Sun Feb 26 14:38:58 2012
18.04% done, estimate finish Sun Feb 26 14:39:03 2012
18.04% done, estimate finish Sun Feb 26 14:39:02 2012
18.05% done, estimate finish Sun Feb 26 14:39:01 2012
=== last message repeated 2 times. ===
18.06% done, estimate finish Sun Feb 26 14:39:00 2012
18.06% done, estimate finish Sun Feb 26 14:38:59 2012
18.07% done, estimate finish Sun Feb 26 14:38:59 2012
18.07% done, estimate finish Sun Feb 26 14:38:58 2012
18.08% done, estimate finish Sun Feb 26 14:39:03 2012
18.08% done, estimate finish Sun Feb 26 14:39:02 2012
18.09% done, estimate finish Sun Feb 26 14:39:01 2012
=== last message repeated 2 times. ===
18.10% done, estimate finish Sun Feb 26 14:39:00 2012
18.10% done, estimate finish Sun Feb 26 14:38:59 2012
18.11% done, estimate finish Sun Feb 26 14:38:58 2012
=== last message repeated 2 times. ===
18.11% done, estimate finish Sun Feb 26 14:38:57 2012
18.12% done, estimate finish Sun Feb 26 14:39:02 2012
18.12% done, estimate finish Sun Feb 26 14:39:01 2012
18.13% done, estimate finish Sun Feb 26 14:39:00 2012
=== last message repeated 2 times. ===
18.14% done, estimate finish Sun Feb 26 14:38:59 2012
18.14% done, estimate finish Sun Feb 26 14:38:58 2012
18.15% done, estimate finish Sun Feb 26 14:38:58 2012
18.15% done, estimate finish Sun Feb 26 14:39:02 2012
18.16% done, estimate finish Sun Feb 26 14:39:02 2012
18.16% done, estimate finish Sun Feb 26 14:39:01 2012
18.17% done, estimate finish Sun Feb 26 14:39:00 2012
=== last message repeated 2 times. ===
18.18% done, estimate finish Sun Feb 26 14:38:59 2012
18.18% done, estimate finish Sun Feb 26 14:38:58 2012
18.19% done, estimate finish Sun Feb 26 14:38:57 2012
=== last message repeated 2 times. ===
18.19% done, estimate finish Sun Feb 26 14:39:02 2012
18.20% done, estimate finish Sun Feb 26 14:39:01 2012
18.20% done, estimate finish Sun Feb 26 14:39:00 2012
18.21% done, estimate finish Sun Feb 26 14:38:59 2012
=== last message repeated 2 times. ===
18.22% done, estimate finish Sun Feb 26 14:38:58 2012
18.22% done, estimate finish Sun Feb 26 14:38:57 2012
18.23% done, estimate finish Sun Feb 26 14:38:57 2012
18.23% done, estimate finish Sun Feb 26 14:39:01 2012
18.24% done, estimate finish Sun Feb 26 14:39:01 2012
18.24% done, estimate finish Sun Feb 26 14:39:00 2012
18.25% done, estimate finish Sun Feb 26 14:38:59 2012
=== last message repeated 2 times. ===
18.26% done, estimate finish Sun Feb 26 14:38:58 2012
18.26% done, estimate finish Sun Feb 26 14:38:57 2012
18.27% done, estimate finish Sun Feb 26 14:39:02 2012
18.27% done, estimate finish Sun Feb 26 14:39:01 2012
=== last message repeated 2 times. ===
18.28% done, estimate finish Sun Feb 26 14:39:00 2012
18.28% done, estimate finish Sun Feb 26 14:38:59 2012
18.29% done, estimate finish Sun Feb 26 14:38:59 2012
18.29% done, estimate finish Sun Feb 26 14:38:58 2012
18.30% done, estimate finish Sun Feb 26 14:38:57 2012
18.30% done, estimate finish Sun Feb 26 14:38:56 2012
18.31% done, estimate finish Sun Feb 26 14:38:56 2012
18.31% done, estimate finish Sun Feb 26 14:38:55 2012
18.32% done, estimate finish Sun Feb 26 14:39:00 2012
18.32% done, estimate finish Sun Feb 26 14:38:59 2012
18.33% done, estimate finish Sun Feb 26 14:38:58 2012
=== last message repeated 2 times. ===
18.34% done, estimate finish Sun Feb 26 14:38:57 2012
18.34% done, estimate finish Sun Feb 26 14:38:56 2012
18.35% done, estimate finish Sun Feb 26 14:38:56 2012
18.35% done, estimate finish Sun Feb 26 14:39:00 2012
=== last message repeated 2 times. ===
18.36% done, estimate finish Sun Feb 26 14:38:59 2012
18.36% done, estimate finish Sun Feb 26 14:38:58 2012
18.37% done, estimate finish Sun Feb 26 14:38:58 2012
18.37% done, estimate finish Sun Feb 26 14:38:57 2012
18.38% done, estimate finish Sun Feb 26 14:38:56 2012
=== last message repeated 2 times. ===
18.39% done, estimate finish Sun Feb 26 14:38:55 2012
18.39% done, estimate finish Sun Feb 26 14:38:54 2012
18.40% done, estimate finish Sun Feb 26 14:38:59 2012
18.40% done, estimate finish Sun Feb 26 14:38:58 2012
18.41% done, estimate finish Sun Feb 26 14:38:58 2012
18.41% done, estimate finish Sun Feb 26 14:38:57 2012
18.42% done, estimate finish Sun Feb 26 14:38:56 2012
18.42% done, estimate finish Sun Feb 26 14:38:55 2012
18.43% done, estimate finish Sun Feb 26 14:38:55 2012
18.43% done, estimate finish Sun Feb 26 14:38:59 2012
=== last message repeated 2 times. ===
18.44% done, estimate finish Sun Feb 26 14:38:58 2012
18.44% done, estimate finish Sun Feb 26 14:38:57 2012
18.45% done, estimate finish Sun Feb 26 14:38:57 2012
18.45% done, estimate finish Sun Feb 26 14:38:56 2012
18.46% done, estimate finish Sun Feb 26 14:39:01 2012
18.46% done, estimate finish Sun Feb 26 14:39:00 2012
18.47% done, estimate finish Sun Feb 26 14:38:59 2012
=== last message repeated 2 times. ===
18.48% done, estimate finish Sun Feb 26 14:38:58 2012
18.48% done, estimate finish Sun Feb 26 14:38:57 2012
18.49% done, estimate finish Sun Feb 26 14:38:57 2012
18.49% done, estimate finish Sun Feb 26 14:38:56 2012
18.50% done, estimate finish Sun Feb 26 14:38:55 2012
=== last message repeated 2 times. ===
18.51% done, estimate finish Sun Feb 26 14:38:54 2012
18.51% done, estimate finish Sun Feb 26 14:38:59 2012
18.51% done, estimate finish Sun Feb 26 14:38:58 2012
18.52% done, estimate finish Sun Feb 26 14:38:57 2012
18.52% done, estimate finish Sun Feb 26 14:38:56 2012
18.53% done, estimate finish Sun Feb 26 14:38:56 2012
18.53% done, estimate finish Sun Feb 26 14:38:55 2012
18.54% done, estimate finish Sun Feb 26 14:39:00 2012
18.54% done, estimate finish Sun Feb 26 14:38:59 2012
18.55% done, estimate finish Sun Feb 26 14:38:58 2012
=== last message repeated 2 times. ===
18.56% done, estimate finish Sun Feb 26 14:38:57 2012
18.56% done, estimate finish Sun Feb 26 14:38:56 2012
18.57% done, estimate finish Sun Feb 26 14:38:56 2012
18.57% done, estimate finish Sun Feb 26 14:38:55 2012
18.58% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
18.59% done, estimate finish Sun Feb 26 14:38:53 2012
18.59% done, estimate finish Sun Feb 26 14:38:52 2012
18.59% done, estimate finish Sun Feb 26 14:38:57 2012
18.60% done, estimate finish Sun Feb 26 14:38:56 2012
=== last message repeated 2 times. ===
18.61% done, estimate finish Sun Feb 26 14:38:55 2012
18.61% done, estimate finish Sun Feb 26 14:38:54 2012
18.62% done, estimate finish Sun Feb 26 14:38:54 2012
18.62% done, estimate finish Sun Feb 26 14:38:58 2012
18.63% done, estimate finish Sun Feb 26 14:38:58 2012
18.63% done, estimate finish Sun Feb 26 14:38:57 2012
18.64% done, estimate finish Sun Feb 26 14:38:56 2012
18.64% done, estimate finish Sun Feb 26 14:38:55 2012
18.65% done, estimate finish Sun Feb 26 14:38:55 2012
18.65% done, estimate finish Sun Feb 26 14:38:59 2012
18.66% done, estimate finish Sun Feb 26 14:38:59 2012
18.66% done, estimate finish Sun Feb 26 14:38:58 2012
18.67% done, estimate finish Sun Feb 26 14:38:57 2012
=== last message repeated 2 times. ===
18.67% done, estimate finish Sun Feb 26 14:38:56 2012
18.68% done, estimate finish Sun Feb 26 14:38:55 2012
=== last message repeated 2 times. ===
18.69% done, estimate finish Sun Feb 26 14:38:54 2012
18.69% done, estimate finish Sun Feb 26 14:38:53 2012
18.70% done, estimate finish Sun Feb 26 14:38:53 2012
18.70% done, estimate finish Sun Feb 26 14:38:57 2012
18.71% done, estimate finish Sun Feb 26 14:38:57 2012
18.71% done, estimate finish Sun Feb 26 14:38:56 2012
18.72% done, estimate finish Sun Feb 26 14:38:55 2012
=== last message repeated 2 times. ===
18.73% done, estimate finish Sun Feb 26 14:38:54 2012
18.73% done, estimate finish Sun Feb 26 14:38:59 2012
18.74% done, estimate finish Sun Feb 26 14:38:58 2012
18.74% done, estimate finish Sun Feb 26 14:38:57 2012
18.75% done, estimate finish Sun Feb 26 14:38:56 2012
=== last message repeated 2 times. ===
18.75% done, estimate finish Sun Feb 26 14:38:55 2012
18.76% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
18.77% done, estimate finish Sun Feb 26 14:38:53 2012
18.77% done, estimate finish Sun Feb 26 14:38:52 2012
18.78% done, estimate finish Sun Feb 26 14:38:52 2012
18.78% done, estimate finish Sun Feb 26 14:38:56 2012
18.79% done, estimate finish Sun Feb 26 14:38:56 2012
18.79% done, estimate finish Sun Feb 26 14:38:55 2012
18.80% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
18.81% done, estimate finish Sun Feb 26 14:38:53 2012
18.81% done, estimate finish Sun Feb 26 14:38:52 2012
18.82% done, estimate finish Sun Feb 26 14:38:57 2012
18.82% done, estimate finish Sun Feb 26 14:38:56 2012
18.83% done, estimate finish Sun Feb 26 14:38:56 2012
18.83% done, estimate finish Sun Feb 26 14:38:55 2012
18.83% done, estimate finish Sun Feb 26 14:38:54 2012
18.84% done, estimate finish Sun Feb 26 14:38:54 2012
18.84% done, estimate finish Sun Feb 26 14:38:58 2012
18.85% done, estimate finish Sun Feb 26 14:38:58 2012
18.85% done, estimate finish Sun Feb 26 14:38:57 2012
18.86% done, estimate finish Sun Feb 26 14:38:56 2012
18.86% done, estimate finish Sun Feb 26 14:38:55 2012
18.87% done, estimate finish Sun Feb 26 14:38:55 2012
18.87% done, estimate finish Sun Feb 26 14:38:54 2012
18.88% done, estimate finish Sun Feb 26 14:38:53 2012
=== last message repeated 2 times. ===
18.89% done, estimate finish Sun Feb 26 14:38:52 2012
18.89% done, estimate finish Sun Feb 26 14:38:51 2012
18.90% done, estimate finish Sun Feb 26 14:38:51 2012
18.90% done, estimate finish Sun Feb 26 14:38:55 2012
18.91% done, estimate finish Sun Feb 26 14:38:55 2012
18.91% done, estimate finish Sun Feb 26 14:38:54 2012
18.91% done, estimate finish Sun Feb 26 14:38:53 2012
18.92% done, estimate finish Sun Feb 26 14:38:53 2012
18.92% done, estimate finish Sun Feb 26 14:38:52 2012
18.93% done, estimate finish Sun Feb 26 14:38:57 2012
18.93% done, estimate finish Sun Feb 26 14:38:56 2012
18.94% done, estimate finish Sun Feb 26 14:38:55 2012
=== last message repeated 2 times. ===
18.95% done, estimate finish Sun Feb 26 14:38:54 2012
18.95% done, estimate finish Sun Feb 26 14:38:53 2012
18.96% done, estimate finish Sun Feb 26 14:38:53 2012
18.96% done, estimate finish Sun Feb 26 14:38:52 2012
18.97% done, estimate finish Sun Feb 26 14:38:51 2012
=== last message repeated 2 times. ===
18.98% done, estimate finish Sun Feb 26 14:38:55 2012
18.98% done, estimate finish Sun Feb 26 14:38:54 2012
18.99% done, estimate finish Sun Feb 26 14:38:54 2012
18.99% done, estimate finish Sun Feb 26 14:38:53 2012
19.00% done, estimate finish Sun Feb 26 14:38:52 2012
=== last message repeated 2 times. ===
19.00% done, estimate finish Sun Feb 26 14:38:51 2012
19.01% done, estimate finish Sun Feb 26 14:38:56 2012
19.01% done, estimate finish Sun Feb 26 14:38:55 2012
19.02% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
19.03% done, estimate finish Sun Feb 26 14:38:53 2012
19.03% done, estimate finish Sun Feb 26 14:38:52 2012
19.04% done, estimate finish Sun Feb 26 14:38:57 2012
19.04% done, estimate finish Sun Feb 26 14:38:56 2012
19.05% done, estimate finish Sun Feb 26 14:38:56 2012
19.05% done, estimate finish Sun Feb 26 14:38:55 2012
19.06% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
19.07% done, estimate finish Sun Feb 26 14:38:53 2012
19.07% done, estimate finish Sun Feb 26 14:38:52 2012
19.08% done, estimate finish Sun Feb 26 14:38:52 2012
19.08% done, estimate finish Sun Feb 26 14:38:51 2012
19.08% done, estimate finish Sun Feb 26 14:38:50 2012
19.09% done, estimate finish Sun Feb 26 14:38:50 2012
19.09% done, estimate finish Sun Feb 26 14:38:54 2012
19.10% done, estimate finish Sun Feb 26 14:38:54 2012
19.10% done, estimate finish Sun Feb 26 14:38:53 2012
19.11% done, estimate finish Sun Feb 26 14:38:52 2012
19.11% done, estimate finish Sun Feb 26 14:38:51 2012
19.12% done, estimate finish Sun Feb 26 14:38:51 2012
19.12% done, estimate finish Sun Feb 26 14:38:55 2012
19.13% done, estimate finish Sun Feb 26 14:38:55 2012
19.13% done, estimate finish Sun Feb 26 14:38:54 2012
19.14% done, estimate finish Sun Feb 26 14:38:53 2012
=== last message repeated 2 times. ===
19.15% done, estimate finish Sun Feb 26 14:38:52 2012
19.15% done, estimate finish Sun Feb 26 14:38:51 2012
19.16% done, estimate finish Sun Feb 26 14:38:51 2012
19.16% done, estimate finish Sun Feb 26 14:38:50 2012
19.16% done, estimate finish Sun Feb 26 14:38:49 2012
19.17% done, estimate finish Sun Feb 26 14:38:54 2012
19.17% done, estimate finish Sun Feb 26 14:38:53 2012
19.18% done, estimate finish Sun Feb 26 14:38:53 2012
19.18% done, estimate finish Sun Feb 26 14:38:52 2012
19.19% done, estimate finish Sun Feb 26 14:38:51 2012
=== last message repeated 2 times. ===
19.20% done, estimate finish Sun Feb 26 14:38:50 2012
19.20% done, estimate finish Sun Feb 26 14:38:55 2012
19.21% done, estimate finish Sun Feb 26 14:38:54 2012
19.21% done, estimate finish Sun Feb 26 14:38:53 2012
19.22% done, estimate finish Sun Feb 26 14:38:53 2012
19.22% done, estimate finish Sun Feb 26 14:38:52 2012
19.23% done, estimate finish Sun Feb 26 14:38:51 2012
19.23% done, estimate finish Sun Feb 26 14:38:56 2012
19.24% done, estimate finish Sun Feb 26 14:38:55 2012
19.24% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
19.25% done, estimate finish Sun Feb 26 14:38:53 2012
19.25% done, estimate finish Sun Feb 26 14:38:52 2012
19.26% done, estimate finish Sun Feb 26 14:38:52 2012
19.26% done, estimate finish Sun Feb 26 14:38:51 2012
19.27% done, estimate finish Sun Feb 26 14:38:50 2012
=== last message repeated 2 times. ===
19.28% done, estimate finish Sun Feb 26 14:38:49 2012
19.28% done, estimate finish Sun Feb 26 14:38:48 2012
19.29% done, estimate finish Sun Feb 26 14:38:53 2012
19.29% done, estimate finish Sun Feb 26 14:38:52 2012
19.30% done, estimate finish Sun Feb 26 14:38:52 2012
19.30% done, estimate finish Sun Feb 26 14:38:51 2012
19.31% done, estimate finish Sun Feb 26 14:38:50 2012
=== last message repeated 2 times. ===
19.32% done, estimate finish Sun Feb 26 14:38:54 2012
=== last message repeated 2 times. ===
19.32% done, estimate finish Sun Feb 26 14:38:53 2012
19.33% done, estimate finish Sun Feb 26 14:38:52 2012
=== last message repeated 2 times. ===
19.34% done, estimate finish Sun Feb 26 14:38:51 2012
19.34% done, estimate finish Sun Feb 26 14:38:50 2012
19.35% done, estimate finish Sun Feb 26 14:38:50 2012
19.35% done, estimate finish Sun Feb 26 14:38:49 2012
19.36% done, estimate finish Sun Feb 26 14:38:53 2012
=== last message repeated 2 times. ===
19.37% done, estimate finish Sun Feb 26 14:38:52 2012
19.37% done, estimate finish Sun Feb 26 14:38:51 2012
19.38% done, estimate finish Sun Feb 26 14:38:51 2012
19.38% done, estimate finish Sun Feb 26 14:38:50 2012
19.39% done, estimate finish Sun Feb 26 14:38:50 2012
19.39% done, estimate finish Sun Feb 26 14:38:49 2012
19.40% done, estimate finish Sun Feb 26 14:38:48 2012
19.40% done, estimate finish Sun Feb 26 14:38:53 2012
19.40% done, estimate finish Sun Feb 26 14:38:52 2012
19.41% done, estimate finish Sun Feb 26 14:38:51 2012
=== last message repeated 2 times. ===
19.42% done, estimate finish Sun Feb 26 14:38:50 2012
19.42% done, estimate finish Sun Feb 26 14:38:49 2012
19.43% done, estimate finish Sun Feb 26 14:38:54 2012
19.43% done, estimate finish Sun Feb 26 14:38:53 2012
19.44% done, estimate finish Sun Feb 26 14:38:53 2012
19.44% done, estimate finish Sun Feb 26 14:38:52 2012
19.45% done, estimate finish Sun Feb 26 14:38:51 2012
=== last message repeated 2 times. ===
19.46% done, estimate finish Sun Feb 26 14:38:50 2012
19.46% done, estimate finish Sun Feb 26 14:38:49 2012
19.47% done, estimate finish Sun Feb 26 14:38:49 2012
19.47% done, estimate finish Sun Feb 26 14:38:48 2012
19.48% done, estimate finish Sun Feb 26 14:38:47 2012
19.48% done, estimate finish Sun Feb 26 14:38:52 2012
19.48% done, estimate finish Sun Feb 26 14:38:51 2012
19.49% done, estimate finish Sun Feb 26 14:38:51 2012
19.49% done, estimate finish Sun Feb 26 14:38:50 2012
19.50% done, estimate finish Sun Feb 26 14:38:49 2012
=== last message repeated 2 times. ===
19.51% done, estimate finish Sun Feb 26 14:38:53 2012
19.51% done, estimate finish Sun Feb 26 14:38:52 2012
19.52% done, estimate finish Sun Feb 26 14:38:52 2012
19.52% done, estimate finish Sun Feb 26 14:38:51 2012
19.53% done, estimate finish Sun Feb 26 14:38:50 2012
=== last message repeated 2 times. ===
19.54% done, estimate finish Sun Feb 26 14:38:49 2012
19.54% done, estimate finish Sun Feb 26 14:38:48 2012
19.55% done, estimate finish Sun Feb 26 14:38:48 2012
19.55% done, estimate finish Sun Feb 26 14:38:52 2012
19.56% done, estimate finish Sun Feb 26 14:38:52 2012
19.56% done, estimate finish Sun Feb 26 14:38:51 2012
19.56% done, estimate finish Sun Feb 26 14:38:50 2012
19.57% done, estimate finish Sun Feb 26 14:38:50 2012
19.57% done, estimate finish Sun Feb 26 14:38:49 2012
19.58% done, estimate finish Sun Feb 26 14:38:48 2012
=== last message repeated 2 times. ===
19.59% done, estimate finish Sun Feb 26 14:38:47 2012
19.59% done, estimate finish Sun Feb 26 14:38:52 2012
19.60% done, estimate finish Sun Feb 26 14:38:51 2012
19.60% done, estimate finish Sun Feb 26 14:38:50 2012
19.61% done, estimate finish Sun Feb 26 14:38:50 2012
19.61% done, estimate finish Sun Feb 26 14:38:49 2012
19.62% done, estimate finish Sun Feb 26 14:38:48 2012
19.62% done, estimate finish Sun Feb 26 14:38:53 2012
19.63% done, estimate finish Sun Feb 26 14:38:52 2012
19.63% done, estimate finish Sun Feb 26 14:38:51 2012
19.64% done, estimate finish Sun Feb 26 14:38:51 2012
19.64% done, estimate finish Sun Feb 26 14:38:50 2012
=== last message repeated 2 times. ===
19.65% done, estimate finish Sun Feb 26 14:38:49 2012
19.65% done, estimate finish Sun Feb 26 14:38:48 2012
19.66% done, estimate finish Sun Feb 26 14:38:48 2012
19.66% done, estimate finish Sun Feb 26 14:38:47 2012
19.67% done, estimate finish Sun Feb 26 14:38:46 2012
=== last message repeated 2 times. ===
19.68% done, estimate finish Sun Feb 26 14:38:50 2012
19.68% done, estimate finish Sun Feb 26 14:38:49 2012
19.69% done, estimate finish Sun Feb 26 14:38:49 2012
19.69% done, estimate finish Sun Feb 26 14:38:48 2012
19.70% done, estimate finish Sun Feb 26 14:38:47 2012
=== last message repeated 2 times. ===
19.71% done, estimate finish Sun Feb 26 14:38:51 2012
=== last message repeated 2 times. ===
19.72% done, estimate finish Sun Feb 26 14:38:50 2012
19.72% done, estimate finish Sun Feb 26 14:38:49 2012
=== last message repeated 2 times. ===
19.73% done, estimate finish Sun Feb 26 14:38:48 2012
19.73% done, estimate finish Sun Feb 26 14:38:47 2012
19.74% done, estimate finish Sun Feb 26 14:38:47 2012
19.74% done, estimate finish Sun Feb 26 14:38:46 2012
19.75% done, estimate finish Sun Feb 26 14:38:51 2012
19.75% done, estimate finish Sun Feb 26 14:38:50 2012
19.76% done, estimate finish Sun Feb 26 14:38:49 2012
=== last message repeated 2 times. ===
19.77% done, estimate finish Sun Feb 26 14:38:48 2012
19.77% done, estimate finish Sun Feb 26 14:38:47 2012
19.78% done, estimate finish Sun Feb 26 14:38:47 2012
19.78% done, estimate finish Sun Feb 26 14:38:46 2012
19.79% done, estimate finish Sun Feb 26 14:38:50 2012
=== last message repeated 2 times. ===
19.80% done, estimate finish Sun Feb 26 14:38:49 2012
19.80% done, estimate finish Sun Feb 26 14:38:48 2012
=== last message repeated 2 times. ===
19.81% done, estimate finish Sun Feb 26 14:38:47 2012
=== last message repeated 2 times. ===
19.82% done, estimate finish Sun Feb 26 14:38:51 2012
19.82% done, estimate finish Sun Feb 26 14:38:50 2012
19.83% done, estimate finish Sun Feb 26 14:38:50 2012
19.83% done, estimate finish Sun Feb 26 14:38:49 2012
19.84% done, estimate finish Sun Feb 26 14:38:48 2012
=== last message repeated 2 times. ===
19.85% done, estimate finish Sun Feb 26 14:38:47 2012
19.85% done, estimate finish Sun Feb 26 14:38:46 2012
19.86% done, estimate finish Sun Feb 26 14:38:46 2012
19.86% done, estimate finish Sun Feb 26 14:38:45 2012
19.87% done, estimate finish Sun Feb 26 14:38:45 2012
19.87% done, estimate finish Sun Feb 26 14:38:49 2012
19.88% done, estimate finish Sun Feb 26 14:38:48 2012
=== last message repeated 2 times. ===
19.88% done, estimate finish Sun Feb 26 14:38:47 2012
19.89% done, estimate finish Sun Feb 26 14:38:46 2012
=== last message repeated 2 times. ===
19.90% done, estimate finish Sun Feb 26 14:38:50 2012
19.90% done, estimate finish Sun Feb 26 14:38:49 2012
19.91% done, estimate finish Sun Feb 26 14:38:49 2012
19.91% done, estimate finish Sun Feb 26 14:38:48 2012
19.92% done, estimate finish Sun Feb 26 14:38:48 2012
19.92% done, estimate finish Sun Feb 26 14:38:47 2012
19.93% done, estimate finish Sun Feb 26 14:38:46 2012
=== last message repeated 2 times. ===
19.94% done, estimate finish Sun Feb 26 14:38:45 2012
19.94% done, estimate finish Sun Feb 26 14:38:44 2012
19.95% done, estimate finish Sun Feb 26 14:38:44 2012
19.95% done, estimate finish Sun Feb 26 14:38:48 2012
19.96% done, estimate finish Sun Feb 26 14:38:47 2012
=== last message repeated 2 times. ===
19.96% done, estimate finish Sun Feb 26 14:38:46 2012
19.97% done, estimate finish Sun Feb 26 14:38:46 2012
19.97% done, estimate finish Sun Feb 26 14:38:45 2012
19.98% done, estimate finish Sun Feb 26 14:38:49 2012
=== last message repeated 2 times. ===
19.99% done, estimate finish Sun Feb 26 14:38:48 2012
19.99% done, estimate finish Sun Feb 26 14:38:47 2012
20.00% done, estimate finish Sun Feb 26 14:38:47 2012
20.00% done, estimate finish Sun Feb 26 14:38:46 2012
20.01% done, estimate finish Sun Feb 26 14:38:46 2012
20.01% done, estimate finish Sun Feb 26 14:38:45 2012
20.02% done, estimate finish Sun Feb 26 14:38:49 2012
=== last message repeated 2 times. ===
20.03% done, estimate finish Sun Feb 26 14:38:48 2012
20.03% done, estimate finish Sun Feb 26 14:38:47 2012
20.04% done, estimate finish Sun Feb 26 14:38:47 2012
20.04% done, estimate finish Sun Feb 26 14:38:46 2012
20.05% done, estimate finish Sun Feb 26 14:38:45 2012
=== last message repeated 2 times. ===
20.05% done, estimate finish Sun Feb 26 14:38:44 2012
20.06% done, estimate finish Sun Feb 26 14:38:44 2012
20.06% done, estimate finish Sun Feb 26 14:38:48 2012
20.07% done, estimate finish Sun Feb 26 14:38:47 2012
=== last message repeated 2 times. ===
20.08% done, estimate finish Sun Feb 26 14:38:46 2012
20.08% done, estimate finish Sun Feb 26 14:38:45 2012
20.09% done, estimate finish Sun Feb 26 14:38:45 2012
20.09% done, estimate finish Sun Feb 26 14:38:49 2012
20.10% done, estimate finish Sun Feb 26 14:38:48 2012
=== last message repeated 2 times. ===
20.11% done, estimate finish Sun Feb 26 14:38:47 2012
=== last message repeated 2 times. ===
20.12% done, estimate finish Sun Feb 26 14:38:46 2012
20.12% done, estimate finish Sun Feb 26 14:38:45 2012
20.13% done, estimate finish Sun Feb 26 14:38:45 2012
20.13% done, estimate finish Sun Feb 26 14:38:44 2012
20.13% done, estimate finish Sun Feb 26 14:38:43 2012
20.14% done, estimate finish Sun Feb 26 14:38:43 2012
20.14% done, estimate finish Sun Feb 26 14:38:42 2012
20.15% done, estimate finish Sun Feb 26 14:38:46 2012
=== last message repeated 2 times. ===
20.16% done, estimate finish Sun Feb 26 14:38:45 2012
=== last message repeated 2 times. ===
20.17% done, estimate finish Sun Feb 26 14:38:44 2012
20.17% done, estimate finish Sun Feb 26 14:38:43 2012
20.18% done, estimate finish Sun Feb 26 14:38:48 2012
20.18% done, estimate finish Sun Feb 26 14:38:47 2012
20.19% done, estimate finish Sun Feb 26 14:38:46 2012
=== last message repeated 2 times. ===
20.20% done, estimate finish Sun Feb 26 14:38:45 2012
20.20% done, estimate finish Sun Feb 26 14:38:44 2012
20.21% done, estimate finish Sun Feb 26 14:38:44 2012
20.21% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.22% done, estimate finish Sun Feb 26 14:38:42 2012
20.22% done, estimate finish Sun Feb 26 14:38:46 2012
20.23% done, estimate finish Sun Feb 26 14:38:46 2012
20.23% done, estimate finish Sun Feb 26 14:38:45 2012
20.24% done, estimate finish Sun Feb 26 14:38:44 2012
=== last message repeated 2 times. ===
20.25% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.26% done, estimate finish Sun Feb 26 14:38:47 2012
20.26% done, estimate finish Sun Feb 26 14:38:46 2012
20.27% done, estimate finish Sun Feb 26 14:38:46 2012
20.27% done, estimate finish Sun Feb 26 14:38:45 2012
20.28% done, estimate finish Sun Feb 26 14:38:44 2012
=== last message repeated 2 times. ===
20.29% done, estimate finish Sun Feb 26 14:38:43 2012
20.29% done, estimate finish Sun Feb 26 14:38:47 2012
=== last message repeated 2 times. ===
20.30% done, estimate finish Sun Feb 26 14:38:46 2012
20.30% done, estimate finish Sun Feb 26 14:38:45 2012
20.31% done, estimate finish Sun Feb 26 14:38:45 2012
20.31% done, estimate finish Sun Feb 26 14:38:44 2012
20.32% done, estimate finish Sun Feb 26 14:38:44 2012
20.32% done, estimate finish Sun Feb 26 14:38:43 2012
20.33% done, estimate finish Sun Feb 26 14:38:42 2012
=== last message repeated 2 times. ===
20.34% done, estimate finish Sun Feb 26 14:38:41 2012
20.34% done, estimate finish Sun Feb 26 14:38:45 2012
20.35% done, estimate finish Sun Feb 26 14:38:45 2012
20.35% done, estimate finish Sun Feb 26 14:38:44 2012
20.36% done, estimate finish Sun Feb 26 14:38:44 2012
20.36% done, estimate finish Sun Feb 26 14:38:43 2012
20.37% done, estimate finish Sun Feb 26 14:38:42 2012
20.37% done, estimate finish Sun Feb 26 14:38:47 2012
20.37% done, estimate finish Sun Feb 26 14:38:46 2012
20.38% done, estimate finish Sun Feb 26 14:38:45 2012
=== last message repeated 2 times. ===
20.39% done, estimate finish Sun Feb 26 14:38:44 2012
20.39% done, estimate finish Sun Feb 26 14:38:43 2012
20.40% done, estimate finish Sun Feb 26 14:38:43 2012
20.40% done, estimate finish Sun Feb 26 14:38:42 2012
20.41% done, estimate finish Sun Feb 26 14:38:42 2012
20.41% done, estimate finish Sun Feb 26 14:38:41 2012
20.42% done, estimate finish Sun Feb 26 14:38:40 2012
=== last message repeated 2 times. ===
20.43% done, estimate finish Sun Feb 26 14:38:44 2012
20.43% done, estimate finish Sun Feb 26 14:38:43 2012
20.44% done, estimate finish Sun Feb 26 14:38:43 2012
20.44% done, estimate finish Sun Feb 26 14:38:42 2012
20.45% done, estimate finish Sun Feb 26 14:38:41 2012
20.45% done, estimate finish Sun Feb 26 14:38:46 2012
20.45% done, estimate finish Sun Feb 26 14:38:45 2012
20.46% done, estimate finish Sun Feb 26 14:38:45 2012
20.46% done, estimate finish Sun Feb 26 14:38:44 2012
20.47% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.48% done, estimate finish Sun Feb 26 14:38:42 2012
20.48% done, estimate finish Sun Feb 26 14:38:41 2012
20.49% done, estimate finish Sun Feb 26 14:38:46 2012
20.49% done, estimate finish Sun Feb 26 14:38:45 2012
20.50% done, estimate finish Sun Feb 26 14:38:44 2012
=== last message repeated 2 times. ===
20.51% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.52% done, estimate finish Sun Feb 26 14:38:42 2012
20.52% done, estimate finish Sun Feb 26 14:38:41 2012
20.53% done, estimate finish Sun Feb 26 14:38:41 2012
20.53% done, estimate finish Sun Feb 26 14:38:40 2012
20.53% done, estimate finish Sun Feb 26 14:38:44 2012
20.54% done, estimate finish Sun Feb 26 14:38:44 2012
20.54% done, estimate finish Sun Feb 26 14:38:43 2012
20.55% done, estimate finish Sun Feb 26 14:38:43 2012
20.55% done, estimate finish Sun Feb 26 14:38:42 2012
20.56% done, estimate finish Sun Feb 26 14:38:41 2012
20.56% done, estimate finish Sun Feb 26 14:38:46 2012
20.57% done, estimate finish Sun Feb 26 14:38:45 2012
20.57% done, estimate finish Sun Feb 26 14:38:44 2012
20.58% done, estimate finish Sun Feb 26 14:38:44 2012
20.58% done, estimate finish Sun Feb 26 14:38:43 2012
20.59% done, estimate finish Sun Feb 26 14:38:42 2012
=== last message repeated 2 times. ===
20.60% done, estimate finish Sun Feb 26 14:38:41 2012
=== last message repeated 2 times. ===
20.61% done, estimate finish Sun Feb 26 14:38:40 2012
20.61% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
20.62% done, estimate finish Sun Feb 26 14:38:43 2012
20.62% done, estimate finish Sun Feb 26 14:38:42 2012
20.63% done, estimate finish Sun Feb 26 14:38:42 2012
20.63% done, estimate finish Sun Feb 26 14:38:41 2012
20.64% done, estimate finish Sun Feb 26 14:38:41 2012
20.64% done, estimate finish Sun Feb 26 14:38:40 2012
20.65% done, estimate finish Sun Feb 26 14:38:44 2012
=== last message repeated 2 times. ===
20.66% done, estimate finish Sun Feb 26 14:38:43 2012
20.66% done, estimate finish Sun Feb 26 14:38:42 2012
20.67% done, estimate finish Sun Feb 26 14:38:42 2012
20.67% done, estimate finish Sun Feb 26 14:38:41 2012
20.68% done, estimate finish Sun Feb 26 14:38:40 2012
=== last message repeated 2 times. ===
20.69% done, estimate finish Sun Feb 26 14:38:44 2012
20.69% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.70% done, estimate finish Sun Feb 26 14:38:42 2012
=== last message repeated 2 times. ===
20.71% done, estimate finish Sun Feb 26 14:38:41 2012
20.71% done, estimate finish Sun Feb 26 14:38:40 2012
20.72% done, estimate finish Sun Feb 26 14:38:40 2012
20.72% done, estimate finish Sun Feb 26 14:38:39 2012
20.73% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.74% done, estimate finish Sun Feb 26 14:38:42 2012
=== last message repeated 2 times. ===
20.75% done, estimate finish Sun Feb 26 14:38:41 2012
20.75% done, estimate finish Sun Feb 26 14:38:40 2012
20.76% done, estimate finish Sun Feb 26 14:38:45 2012
20.76% done, estimate finish Sun Feb 26 14:38:44 2012
20.77% done, estimate finish Sun Feb 26 14:38:43 2012
=== last message repeated 2 times. ===
20.77% done, estimate finish Sun Feb 26 14:38:42 2012
20.78% done, estimate finish Sun Feb 26 14:38:41 2012
=== last message repeated 2 times. ===
20.79% done, estimate finish Sun Feb 26 14:38:40 2012
=== last message repeated 2 times. ===
20.80% done, estimate finish Sun Feb 26 14:38:39 2012
20.80% done, estimate finish Sun Feb 26 14:38:38 2012
20.81% done, estimate finish Sun Feb 26 14:38:38 2012
20.81% done, estimate finish Sun Feb 26 14:38:42 2012
20.82% done, estimate finish Sun Feb 26 14:38:41 2012
=== last message repeated 2 times. ===
20.83% done, estimate finish Sun Feb 26 14:38:40 2012
=== last message repeated 2 times. ===
20.84% done, estimate finish Sun Feb 26 14:38:39 2012
20.84% done, estimate finish Sun Feb 26 14:38:43 2012
20.85% done, estimate finish Sun Feb 26 14:38:43 2012
20.85% done, estimate finish Sun Feb 26 14:38:42 2012
20.85% done, estimate finish Sun Feb 26 14:38:41 2012
20.86% done, estimate finish Sun Feb 26 14:38:41 2012
20.86% done, estimate finish Sun Feb 26 14:38:40 2012
20.87% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
20.88% done, estimate finish Sun Feb 26 14:38:38 2012
20.88% done, estimate finish Sun Feb 26 14:38:42 2012
20.89% done, estimate finish Sun Feb 26 14:38:42 2012
20.89% done, estimate finish Sun Feb 26 14:38:41 2012
20.90% done, estimate finish Sun Feb 26 14:38:41 2012
20.90% done, estimate finish Sun Feb 26 14:38:40 2012
20.91% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
20.92% done, estimate finish Sun Feb 26 14:38:38 2012
20.92% done, estimate finish Sun Feb 26 14:38:42 2012
20.93% done, estimate finish Sun Feb 26 14:38:42 2012
20.93% done, estimate finish Sun Feb 26 14:38:41 2012
20.94% done, estimate finish Sun Feb 26 14:38:41 2012
20.94% done, estimate finish Sun Feb 26 14:38:40 2012
20.94% done, estimate finish Sun Feb 26 14:38:39 2012
20.95% done, estimate finish Sun Feb 26 14:38:39 2012
20.95% done, estimate finish Sun Feb 26 14:38:43 2012
20.96% done, estimate finish Sun Feb 26 14:38:42 2012
=== last message repeated 2 times. ===
20.97% done, estimate finish Sun Feb 26 14:38:41 2012
20.97% done, estimate finish Sun Feb 26 14:38:40 2012
20.98% done, estimate finish Sun Feb 26 14:38:40 2012
20.98% done, estimate finish Sun Feb 26 14:38:39 2012
20.99% done, estimate finish Sun Feb 26 14:38:39 2012
20.99% done, estimate finish Sun Feb 26 14:38:38 2012
21.00% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.01% done, estimate finish Sun Feb 26 14:38:41 2012
21.01% done, estimate finish Sun Feb 26 14:38:40 2012
21.02% done, estimate finish Sun Feb 26 14:38:40 2012
21.02% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
21.03% done, estimate finish Sun Feb 26 14:38:38 2012
21.03% done, estimate finish Sun Feb 26 14:38:42 2012
21.04% done, estimate finish Sun Feb 26 14:38:42 2012
21.04% done, estimate finish Sun Feb 26 14:38:41 2012
21.05% done, estimate finish Sun Feb 26 14:38:40 2012
=== last message repeated 2 times. ===
21.06% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
21.07% done, estimate finish Sun Feb 26 14:38:38 2012
21.07% done, estimate finish Sun Feb 26 14:38:37 2012
21.08% done, estimate finish Sun Feb 26 14:38:41 2012
=== last message repeated 2 times. ===
21.09% done, estimate finish Sun Feb 26 14:38:40 2012
=== last message repeated 2 times. ===
21.10% done, estimate finish Sun Feb 26 14:38:39 2012
21.10% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.11% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.12% done, estimate finish Sun Feb 26 14:38:41 2012
21.12% done, estimate finish Sun Feb 26 14:38:40 2012
21.13% done, estimate finish Sun Feb 26 14:38:40 2012
21.13% done, estimate finish Sun Feb 26 14:38:39 2012
21.14% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.15% done, estimate finish Sun Feb 26 14:38:42 2012
21.15% done, estimate finish Sun Feb 26 14:38:41 2012
21.16% done, estimate finish Sun Feb 26 14:38:41 2012
21.16% done, estimate finish Sun Feb 26 14:38:40 2012
21.17% done, estimate finish Sun Feb 26 14:38:40 2012
21.17% done, estimate finish Sun Feb 26 14:38:39 2012
21.18% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.18% done, estimate finish Sun Feb 26 14:38:37 2012
21.19% done, estimate finish Sun Feb 26 14:38:37 2012
21.19% done, estimate finish Sun Feb 26 14:38:36 2012
21.20% done, estimate finish Sun Feb 26 14:38:40 2012
21.20% done, estimate finish Sun Feb 26 14:38:39 2012
21.21% done, estimate finish Sun Feb 26 14:38:39 2012
21.21% done, estimate finish Sun Feb 26 14:38:38 2012
21.22% done, estimate finish Sun Feb 26 14:38:38 2012
21.22% done, estimate finish Sun Feb 26 14:38:37 2012
21.23% done, estimate finish Sun Feb 26 14:38:41 2012
=== last message repeated 2 times. ===
21.24% done, estimate finish Sun Feb 26 14:38:40 2012
21.24% done, estimate finish Sun Feb 26 14:38:39 2012
21.25% done, estimate finish Sun Feb 26 14:38:39 2012
21.25% done, estimate finish Sun Feb 26 14:38:38 2012
21.26% done, estimate finish Sun Feb 26 14:38:38 2012
21.26% done, estimate finish Sun Feb 26 14:38:37 2012
21.26% done, estimate finish Sun Feb 26 14:38:36 2012
21.27% done, estimate finish Sun Feb 26 14:38:36 2012
21.27% done, estimate finish Sun Feb 26 14:38:40 2012
21.28% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
21.29% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.30% done, estimate finish Sun Feb 26 14:38:37 2012
21.30% done, estimate finish Sun Feb 26 14:38:36 2012
21.31% done, estimate finish Sun Feb 26 14:38:36 2012
21.31% done, estimate finish Sun Feb 26 14:38:40 2012
21.32% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
21.33% done, estimate finish Sun Feb 26 14:38:38 2012
21.33% done, estimate finish Sun Feb 26 14:38:37 2012
21.34% done, estimate finish Sun Feb 26 14:38:37 2012
21.34% done, estimate finish Sun Feb 26 14:38:41 2012
21.34% done, estimate finish Sun Feb 26 14:38:40 2012
21.35% done, estimate finish Sun Feb 26 14:38:40 2012
21.35% done, estimate finish Sun Feb 26 14:38:39 2012
21.36% done, estimate finish Sun Feb 26 14:38:39 2012
21.36% done, estimate finish Sun Feb 26 14:38:38 2012
21.37% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.38% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
21.39% done, estimate finish Sun Feb 26 14:38:35 2012
21.39% done, estimate finish Sun Feb 26 14:38:34 2012
21.40% done, estimate finish Sun Feb 26 14:38:39 2012
21.40% done, estimate finish Sun Feb 26 14:38:38 2012
21.41% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.42% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
21.42% done, estimate finish Sun Feb 26 14:38:40 2012
21.43% done, estimate finish Sun Feb 26 14:38:39 2012
21.43% done, estimate finish Sun Feb 26 14:38:38 2012
21.44% done, estimate finish Sun Feb 26 14:38:38 2012
21.44% done, estimate finish Sun Feb 26 14:38:37 2012
21.45% done, estimate finish Sun Feb 26 14:38:37 2012
21.45% done, estimate finish Sun Feb 26 14:38:36 2012
21.46% done, estimate finish Sun Feb 26 14:38:36 2012
21.46% done, estimate finish Sun Feb 26 14:38:40 2012
21.47% done, estimate finish Sun Feb 26 14:38:39 2012
21.47% done, estimate finish Sun Feb 26 14:38:38 2012
21.48% done, estimate finish Sun Feb 26 14:38:38 2012
21.48% done, estimate finish Sun Feb 26 14:38:37 2012
21.49% done, estimate finish Sun Feb 26 14:38:37 2012
21.49% done, estimate finish Sun Feb 26 14:38:36 2012
21.50% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
21.50% done, estimate finish Sun Feb 26 14:38:39 2012
21.51% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.52% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.53% done, estimate finish Sun Feb 26 14:38:36 2012
21.53% done, estimate finish Sun Feb 26 14:38:40 2012
21.54% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
21.55% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.56% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.57% done, estimate finish Sun Feb 26 14:38:36 2012
21.57% done, estimate finish Sun Feb 26 14:38:35 2012
21.58% done, estimate finish Sun Feb 26 14:38:35 2012
21.58% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
21.59% done, estimate finish Sun Feb 26 14:38:38 2012
21.59% done, estimate finish Sun Feb 26 14:38:37 2012
21.60% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
21.61% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
21.62% done, estimate finish Sun Feb 26 14:38:39 2012
21.62% done, estimate finish Sun Feb 26 14:38:38 2012
21.63% done, estimate finish Sun Feb 26 14:38:38 2012
21.63% done, estimate finish Sun Feb 26 14:38:37 2012
21.64% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
21.65% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
21.66% done, estimate finish Sun Feb 26 14:38:39 2012
21.66% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.67% done, estimate finish Sun Feb 26 14:38:37 2012
21.67% done, estimate finish Sun Feb 26 14:38:36 2012
21.68% done, estimate finish Sun Feb 26 14:38:36 2012
21.68% done, estimate finish Sun Feb 26 14:38:35 2012
21.69% done, estimate finish Sun Feb 26 14:38:35 2012
21.69% done, estimate finish Sun Feb 26 14:38:34 2012
21.70% done, estimate finish Sun Feb 26 14:38:38 2012
21.70% done, estimate finish Sun Feb 26 14:38:37 2012
21.71% done, estimate finish Sun Feb 26 14:38:37 2012
21.71% done, estimate finish Sun Feb 26 14:38:36 2012
21.72% done, estimate finish Sun Feb 26 14:38:36 2012
21.72% done, estimate finish Sun Feb 26 14:38:35 2012
21.73% done, estimate finish Sun Feb 26 14:38:39 2012
=== last message repeated 2 times. ===
21.74% done, estimate finish Sun Feb 26 14:38:38 2012
21.74% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.75% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
21.76% done, estimate finish Sun Feb 26 14:38:35 2012
21.76% done, estimate finish Sun Feb 26 14:38:34 2012
21.77% done, estimate finish Sun Feb 26 14:38:34 2012
21.77% done, estimate finish Sun Feb 26 14:38:33 2012
21.78% done, estimate finish Sun Feb 26 14:38:33 2012
21.78% done, estimate finish Sun Feb 26 14:38:37 2012
21.79% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
21.80% done, estimate finish Sun Feb 26 14:38:35 2012
21.80% done, estimate finish Sun Feb 26 14:38:34 2012
21.81% done, estimate finish Sun Feb 26 14:38:34 2012
21.81% done, estimate finish Sun Feb 26 14:38:38 2012
21.82% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
21.82% done, estimate finish Sun Feb 26 14:38:36 2012
21.83% done, estimate finish Sun Feb 26 14:38:36 2012
21.83% done, estimate finish Sun Feb 26 14:38:35 2012
21.84% done, estimate finish Sun Feb 26 14:38:34 2012
21.84% done, estimate finish Sun Feb 26 14:38:38 2012
21.85% done, estimate finish Sun Feb 26 14:38:38 2012
21.85% done, estimate finish Sun Feb 26 14:38:37 2012
21.86% done, estimate finish Sun Feb 26 14:38:37 2012
21.86% done, estimate finish Sun Feb 26 14:38:36 2012
21.87% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
21.88% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
21.89% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
21.90% done, estimate finish Sun Feb 26 14:38:37 2012
21.90% done, estimate finish Sun Feb 26 14:38:36 2012
21.90% done, estimate finish Sun Feb 26 14:38:35 2012
21.91% done, estimate finish Sun Feb 26 14:38:35 2012
21.91% done, estimate finish Sun Feb 26 14:38:34 2012
21.92% done, estimate finish Sun Feb 26 14:38:38 2012
=== last message repeated 2 times. ===
21.93% done, estimate finish Sun Feb 26 14:38:37 2012
21.93% done, estimate finish Sun Feb 26 14:38:36 2012
21.94% done, estimate finish Sun Feb 26 14:38:36 2012
21.94% done, estimate finish Sun Feb 26 14:38:35 2012
21.95% done, estimate finish Sun Feb 26 14:38:35 2012
21.95% done, estimate finish Sun Feb 26 14:38:34 2012
21.96% done, estimate finish Sun Feb 26 14:38:34 2012
21.96% done, estimate finish Sun Feb 26 14:38:33 2012
21.97% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
21.98% done, estimate finish Sun Feb 26 14:38:36 2012
21.98% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
21.99% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
22.00% done, estimate finish Sun Feb 26 14:38:33 2012
22.00% done, estimate finish Sun Feb 26 14:38:37 2012
22.01% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
22.02% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
22.03% done, estimate finish Sun Feb 26 14:38:34 2012
22.03% done, estimate finish Sun Feb 26 14:38:33 2012
22.04% done, estimate finish Sun Feb 26 14:38:37 2012
=== last message repeated 2 times. ===
22.05% done, estimate finish Sun Feb 26 14:38:36 2012
=== last message repeated 2 times. ===
22.06% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
22.07% done, estimate finish Sun Feb 26 14:38:34 2012
22.07% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.08% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.09% done, estimate finish Sun Feb 26 14:38:36 2012
22.09% done, estimate finish Sun Feb 26 14:38:35 2012
22.10% done, estimate finish Sun Feb 26 14:38:35 2012
22.10% done, estimate finish Sun Feb 26 14:38:34 2012
22.11% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.12% done, estimate finish Sun Feb 26 14:38:32 2012
22.12% done, estimate finish Sun Feb 26 14:38:36 2012
22.13% done, estimate finish Sun Feb 26 14:38:36 2012
22.13% done, estimate finish Sun Feb 26 14:38:35 2012
22.14% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
22.15% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.15% done, estimate finish Sun Feb 26 14:38:32 2012
22.16% done, estimate finish Sun Feb 26 14:38:32 2012
22.16% done, estimate finish Sun Feb 26 14:38:36 2012
22.17% done, estimate finish Sun Feb 26 14:38:35 2012
22.17% done, estimate finish Sun Feb 26 14:38:34 2012
22.18% done, estimate finish Sun Feb 26 14:38:34 2012
22.18% done, estimate finish Sun Feb 26 14:38:33 2012
22.19% done, estimate finish Sun Feb 26 14:38:33 2012
22.19% done, estimate finish Sun Feb 26 14:38:32 2012
22.20% done, estimate finish Sun Feb 26 14:38:36 2012
22.20% done, estimate finish Sun Feb 26 14:38:35 2012
22.21% done, estimate finish Sun Feb 26 14:38:35 2012
22.21% done, estimate finish Sun Feb 26 14:38:34 2012
22.22% done, estimate finish Sun Feb 26 14:38:34 2012
22.22% done, estimate finish Sun Feb 26 14:38:33 2012
22.23% done, estimate finish Sun Feb 26 14:38:33 2012
22.23% done, estimate finish Sun Feb 26 14:38:32 2012
22.23% done, estimate finish Sun Feb 26 14:38:31 2012
22.24% done, estimate finish Sun Feb 26 14:38:31 2012
22.24% done, estimate finish Sun Feb 26 14:38:35 2012
22.25% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
22.26% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.27% done, estimate finish Sun Feb 26 14:38:32 2012
22.27% done, estimate finish Sun Feb 26 14:38:31 2012
22.28% done, estimate finish Sun Feb 26 14:38:31 2012
22.28% done, estimate finish Sun Feb 26 14:38:35 2012
22.29% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
22.30% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.31% done, estimate finish Sun Feb 26 14:38:32 2012
22.31% done, estimate finish Sun Feb 26 14:38:36 2012
22.31% done, estimate finish Sun Feb 26 14:38:35 2012
22.32% done, estimate finish Sun Feb 26 14:38:35 2012
22.32% done, estimate finish Sun Feb 26 14:38:34 2012
22.33% done, estimate finish Sun Feb 26 14:38:34 2012
22.33% done, estimate finish Sun Feb 26 14:38:33 2012
22.34% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.35% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.36% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.37% done, estimate finish Sun Feb 26 14:38:34 2012
22.37% done, estimate finish Sun Feb 26 14:38:33 2012
22.38% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.39% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.39% done, estimate finish Sun Feb 26 14:38:35 2012
22.40% done, estimate finish Sun Feb 26 14:38:34 2012
22.40% done, estimate finish Sun Feb 26 14:38:33 2012
22.41% done, estimate finish Sun Feb 26 14:38:33 2012
22.41% done, estimate finish Sun Feb 26 14:38:32 2012
22.42% done, estimate finish Sun Feb 26 14:38:32 2012
22.42% done, estimate finish Sun Feb 26 14:38:31 2012
22.43% done, estimate finish Sun Feb 26 14:38:35 2012
=== last message repeated 2 times. ===
22.44% done, estimate finish Sun Feb 26 14:38:34 2012
22.44% done, estimate finish Sun Feb 26 14:38:33 2012
22.45% done, estimate finish Sun Feb 26 14:38:33 2012
22.45% done, estimate finish Sun Feb 26 14:38:32 2012
22.46% done, estimate finish Sun Feb 26 14:38:32 2012
22.46% done, estimate finish Sun Feb 26 14:38:31 2012
22.47% done, estimate finish Sun Feb 26 14:38:31 2012
22.47% done, estimate finish Sun Feb 26 14:38:30 2012
22.47% done, estimate finish Sun Feb 26 14:38:34 2012
22.48% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.49% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.50% done, estimate finish Sun Feb 26 14:38:31 2012
22.50% done, estimate finish Sun Feb 26 14:38:35 2012
22.51% done, estimate finish Sun Feb 26 14:38:34 2012
=== last message repeated 2 times. ===
22.52% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.53% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.54% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.55% done, estimate finish Sun Feb 26 14:38:30 2012
22.55% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
22.56% done, estimate finish Sun Feb 26 14:38:33 2012
22.56% done, estimate finish Sun Feb 26 14:38:32 2012
22.57% done, estimate finish Sun Feb 26 14:38:32 2012
22.57% done, estimate finish Sun Feb 26 14:38:31 2012
22.58% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.59% done, estimate finish Sun Feb 26 14:38:34 2012
22.59% done, estimate finish Sun Feb 26 14:38:33 2012
22.60% done, estimate finish Sun Feb 26 14:38:33 2012
22.60% done, estimate finish Sun Feb 26 14:38:32 2012
22.61% done, estimate finish Sun Feb 26 14:38:32 2012
22.61% done, estimate finish Sun Feb 26 14:38:31 2012
22.62% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.63% done, estimate finish Sun Feb 26 14:38:29 2012
22.63% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.64% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.65% done, estimate finish Sun Feb 26 14:38:31 2012
22.65% done, estimate finish Sun Feb 26 14:38:30 2012
22.66% done, estimate finish Sun Feb 26 14:38:30 2012
22.66% done, estimate finish Sun Feb 26 14:38:29 2012
22.67% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.68% done, estimate finish Sun Feb 26 14:38:32 2012
22.68% done, estimate finish Sun Feb 26 14:38:31 2012
22.69% done, estimate finish Sun Feb 26 14:38:31 2012
22.69% done, estimate finish Sun Feb 26 14:38:30 2012
22.70% done, estimate finish Sun Feb 26 14:38:30 2012
22.70% done, estimate finish Sun Feb 26 14:38:34 2012
22.71% done, estimate finish Sun Feb 26 14:38:33 2012
=== last message repeated 2 times. ===
22.71% done, estimate finish Sun Feb 26 14:38:32 2012
22.72% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.73% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.74% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
22.75% done, estimate finish Sun Feb 26 14:38:28 2012
22.75% done, estimate finish Sun Feb 26 14:38:32 2012
22.76% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.77% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.78% done, estimate finish Sun Feb 26 14:38:29 2012
22.78% done, estimate finish Sun Feb 26 14:38:33 2012
22.79% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.79% done, estimate finish Sun Feb 26 14:38:31 2012
22.80% done, estimate finish Sun Feb 26 14:38:31 2012
22.80% done, estimate finish Sun Feb 26 14:38:30 2012
22.81% done, estimate finish Sun Feb 26 14:38:30 2012
22.81% done, estimate finish Sun Feb 26 14:38:29 2012
22.82% done, estimate finish Sun Feb 26 14:38:29 2012
22.82% done, estimate finish Sun Feb 26 14:38:28 2012
22.83% done, estimate finish Sun Feb 26 14:38:32 2012
22.83% done, estimate finish Sun Feb 26 14:38:31 2012
22.84% done, estimate finish Sun Feb 26 14:38:31 2012
22.84% done, estimate finish Sun Feb 26 14:38:30 2012
22.85% done, estimate finish Sun Feb 26 14:38:30 2012
22.85% done, estimate finish Sun Feb 26 14:38:29 2012
22.86% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
22.87% done, estimate finish Sun Feb 26 14:38:32 2012
22.87% done, estimate finish Sun Feb 26 14:38:31 2012
22.88% done, estimate finish Sun Feb 26 14:38:31 2012
22.88% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.89% done, estimate finish Sun Feb 26 14:38:29 2012
22.89% done, estimate finish Sun Feb 26 14:38:33 2012
22.90% done, estimate finish Sun Feb 26 14:38:32 2012
=== last message repeated 2 times. ===
22.91% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.92% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
22.93% done, estimate finish Sun Feb 26 14:38:29 2012
22.93% done, estimate finish Sun Feb 26 14:38:28 2012
22.94% done, estimate finish Sun Feb 26 14:38:28 2012
22.94% done, estimate finish Sun Feb 26 14:38:27 2012
22.95% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
22.96% done, estimate finish Sun Feb 26 14:38:30 2012
22.96% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
22.97% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
22.98% done, estimate finish Sun Feb 26 14:38:32 2012
22.98% done, estimate finish Sun Feb 26 14:38:31 2012
22.99% done, estimate finish Sun Feb 26 14:38:31 2012
22.99% done, estimate finish Sun Feb 26 14:38:30 2012
23.00% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.01% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.02% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.03% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
23.04% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.04% done, estimate finish Sun Feb 26 14:38:28 2012
23.05% done, estimate finish Sun Feb 26 14:38:28 2012
23.05% done, estimate finish Sun Feb 26 14:38:27 2012
23.06% done, estimate finish Sun Feb 26 14:38:31 2012
23.06% done, estimate finish Sun Feb 26 14:38:30 2012
23.07% done, estimate finish Sun Feb 26 14:38:30 2012
23.07% done, estimate finish Sun Feb 26 14:38:29 2012
23.08% done, estimate finish Sun Feb 26 14:38:29 2012
23.08% done, estimate finish Sun Feb 26 14:38:28 2012
23.09% done, estimate finish Sun Feb 26 14:38:32 2012
23.09% done, estimate finish Sun Feb 26 14:38:31 2012
23.10% done, estimate finish Sun Feb 26 14:38:31 2012
23.10% done, estimate finish Sun Feb 26 14:38:30 2012
23.11% done, estimate finish Sun Feb 26 14:38:30 2012
23.11% done, estimate finish Sun Feb 26 14:38:29 2012
23.12% done, estimate finish Sun Feb 26 14:38:29 2012
23.12% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.13% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.14% done, estimate finish Sun Feb 26 14:38:26 2012
23.14% done, estimate finish Sun Feb 26 14:38:30 2012
23.15% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.16% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.17% done, estimate finish Sun Feb 26 14:38:31 2012
=== last message repeated 2 times. ===
23.18% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
23.19% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.20% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.20% done, estimate finish Sun Feb 26 14:38:27 2012
23.21% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.22% done, estimate finish Sun Feb 26 14:38:25 2012
23.22% done, estimate finish Sun Feb 26 14:38:29 2012
23.23% done, estimate finish Sun Feb 26 14:38:29 2012
23.23% done, estimate finish Sun Feb 26 14:38:28 2012
23.24% done, estimate finish Sun Feb 26 14:38:28 2012
23.24% done, estimate finish Sun Feb 26 14:38:27 2012
23.25% done, estimate finish Sun Feb 26 14:38:26 2012
23.25% done, estimate finish Sun Feb 26 14:38:30 2012
23.26% done, estimate finish Sun Feb 26 14:38:30 2012
23.26% done, estimate finish Sun Feb 26 14:38:29 2012
23.27% done, estimate finish Sun Feb 26 14:38:29 2012
23.27% done, estimate finish Sun Feb 26 14:38:28 2012
23.28% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.28% done, estimate finish Sun Feb 26 14:38:31 2012
23.29% done, estimate finish Sun Feb 26 14:38:30 2012
=== last message repeated 2 times. ===
23.30% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.31% done, estimate finish Sun Feb 26 14:38:28 2012
23.31% done, estimate finish Sun Feb 26 14:38:27 2012
23.32% done, estimate finish Sun Feb 26 14:38:27 2012
23.32% done, estimate finish Sun Feb 26 14:38:26 2012
23.33% done, estimate finish Sun Feb 26 14:38:26 2012
23.33% done, estimate finish Sun Feb 26 14:38:25 2012
23.34% done, estimate finish Sun Feb 26 14:38:29 2012
23.34% done, estimate finish Sun Feb 26 14:38:28 2012
23.35% done, estimate finish Sun Feb 26 14:38:28 2012
23.35% done, estimate finish Sun Feb 26 14:38:27 2012
23.36% done, estimate finish Sun Feb 26 14:38:27 2012
23.36% done, estimate finish Sun Feb 26 14:38:26 2012
23.36% done, estimate finish Sun Feb 26 14:38:30 2012
23.37% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.38% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.39% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.40% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.41% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.42% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.43% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.44% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.44% done, estimate finish Sun Feb 26 14:38:29 2012
23.45% done, estimate finish Sun Feb 26 14:38:29 2012
23.45% done, estimate finish Sun Feb 26 14:38:28 2012
23.46% done, estimate finish Sun Feb 26 14:38:28 2012
23.46% done, estimate finish Sun Feb 26 14:38:27 2012
23.47% done, estimate finish Sun Feb 26 14:38:27 2012
23.47% done, estimate finish Sun Feb 26 14:38:26 2012
23.48% done, estimate finish Sun Feb 26 14:38:26 2012
23.48% done, estimate finish Sun Feb 26 14:38:25 2012
23.49% done, estimate finish Sun Feb 26 14:38:29 2012
23.49% done, estimate finish Sun Feb 26 14:38:28 2012
23.50% done, estimate finish Sun Feb 26 14:38:28 2012
23.50% done, estimate finish Sun Feb 26 14:38:27 2012
23.51% done, estimate finish Sun Feb 26 14:38:27 2012
23.51% done, estimate finish Sun Feb 26 14:38:26 2012
23.52% done, estimate finish Sun Feb 26 14:38:26 2012
23.52% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.53% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.54% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.55% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.56% done, estimate finish Sun Feb 26 14:38:29 2012
=== last message repeated 2 times. ===
23.57% done, estimate finish Sun Feb 26 14:38:28 2012
=== last message repeated 2 times. ===
23.58% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.59% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.60% done, estimate finish Sun Feb 26 14:38:25 2012
23.60% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
23.61% done, estimate finish Sun Feb 26 14:38:23 2012
23.61% done, estimate finish Sun Feb 26 14:38:27 2012
23.62% done, estimate finish Sun Feb 26 14:38:27 2012
23.62% done, estimate finish Sun Feb 26 14:38:26 2012
23.63% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.64% done, estimate finish Sun Feb 26 14:38:24 2012
23.64% done, estimate finish Sun Feb 26 14:38:28 2012
23.65% done, estimate finish Sun Feb 26 14:38:28 2012
23.65% done, estimate finish Sun Feb 26 14:38:27 2012
23.66% done, estimate finish Sun Feb 26 14:38:27 2012
23.66% done, estimate finish Sun Feb 26 14:38:26 2012
23.67% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.68% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
23.68% done, estimate finish Sun Feb 26 14:38:23 2012
23.69% done, estimate finish Sun Feb 26 14:38:27 2012
23.69% done, estimate finish Sun Feb 26 14:38:26 2012
23.70% done, estimate finish Sun Feb 26 14:38:26 2012
23.70% done, estimate finish Sun Feb 26 14:38:25 2012
23.71% done, estimate finish Sun Feb 26 14:38:25 2012
23.71% done, estimate finish Sun Feb 26 14:38:24 2012
23.72% done, estimate finish Sun Feb 26 14:38:24 2012
23.72% done, estimate finish Sun Feb 26 14:38:27 2012
23.73% done, estimate finish Sun Feb 26 14:38:27 2012
23.73% done, estimate finish Sun Feb 26 14:38:26 2012
23.74% done, estimate finish Sun Feb 26 14:38:26 2012
23.74% done, estimate finish Sun Feb 26 14:38:25 2012
23.75% done, estimate finish Sun Feb 26 14:38:25 2012
23.75% done, estimate finish Sun Feb 26 14:38:29 2012
23.76% done, estimate finish Sun Feb 26 14:38:28 2012
23.76% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.77% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.78% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.79% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
23.80% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
23.81% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.82% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.83% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
23.84% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.84% done, estimate finish Sun Feb 26 14:38:26 2012
23.85% done, estimate finish Sun Feb 26 14:38:26 2012
23.85% done, estimate finish Sun Feb 26 14:38:25 2012
23.86% done, estimate finish Sun Feb 26 14:38:25 2012
23.86% done, estimate finish Sun Feb 26 14:38:24 2012
23.87% done, estimate finish Sun Feb 26 14:38:24 2012
23.87% done, estimate finish Sun Feb 26 14:38:23 2012
23.88% done, estimate finish Sun Feb 26 14:38:23 2012
23.88% done, estimate finish Sun Feb 26 14:38:26 2012
23.89% done, estimate finish Sun Feb 26 14:38:26 2012
23.89% done, estimate finish Sun Feb 26 14:38:25 2012
23.90% done, estimate finish Sun Feb 26 14:38:25 2012
23.90% done, estimate finish Sun Feb 26 14:38:24 2012
23.91% done, estimate finish Sun Feb 26 14:38:24 2012
23.91% done, estimate finish Sun Feb 26 14:38:23 2012
23.92% done, estimate finish Sun Feb 26 14:38:27 2012
23.92% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.93% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.94% done, estimate finish Sun Feb 26 14:38:24 2012
23.94% done, estimate finish Sun Feb 26 14:38:28 2012
23.95% done, estimate finish Sun Feb 26 14:38:27 2012
=== last message repeated 2 times. ===
23.96% done, estimate finish Sun Feb 26 14:38:26 2012
=== last message repeated 2 times. ===
23.97% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
23.98% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
23.99% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.00% done, estimate finish Sun Feb 26 14:38:22 2012
24.00% done, estimate finish Sun Feb 26 14:38:26 2012
24.01% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
24.01% done, estimate finish Sun Feb 26 14:38:24 2012
24.02% done, estimate finish Sun Feb 26 14:38:24 2012
24.02% done, estimate finish Sun Feb 26 14:38:23 2012
24.03% done, estimate finish Sun Feb 26 14:38:27 2012
24.03% done, estimate finish Sun Feb 26 14:38:26 2012
24.04% done, estimate finish Sun Feb 26 14:38:26 2012
24.04% done, estimate finish Sun Feb 26 14:38:25 2012
24.05% done, estimate finish Sun Feb 26 14:38:25 2012
24.05% done, estimate finish Sun Feb 26 14:38:24 2012
24.06% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.07% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.08% done, estimate finish Sun Feb 26 14:38:21 2012
24.08% done, estimate finish Sun Feb 26 14:38:25 2012
24.09% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.09% done, estimate finish Sun Feb 26 14:38:23 2012
24.10% done, estimate finish Sun Feb 26 14:38:23 2012
24.10% done, estimate finish Sun Feb 26 14:38:22 2012
24.11% done, estimate finish Sun Feb 26 14:38:22 2012
24.11% done, estimate finish Sun Feb 26 14:38:26 2012
24.12% done, estimate finish Sun Feb 26 14:38:25 2012
24.12% done, estimate finish Sun Feb 26 14:38:24 2012
24.13% done, estimate finish Sun Feb 26 14:38:24 2012
24.13% done, estimate finish Sun Feb 26 14:38:23 2012
24.14% done, estimate finish Sun Feb 26 14:38:23 2012
24.14% done, estimate finish Sun Feb 26 14:38:27 2012
24.15% done, estimate finish Sun Feb 26 14:38:26 2012
24.15% done, estimate finish Sun Feb 26 14:38:25 2012
24.16% done, estimate finish Sun Feb 26 14:38:25 2012
24.16% done, estimate finish Sun Feb 26 14:38:24 2012
24.17% done, estimate finish Sun Feb 26 14:38:24 2012
24.17% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.18% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.19% done, estimate finish Sun Feb 26 14:38:21 2012
24.19% done, estimate finish Sun Feb 26 14:38:25 2012
24.20% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.21% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.22% done, estimate finish Sun Feb 26 14:38:22 2012
24.22% done, estimate finish Sun Feb 26 14:38:26 2012
24.23% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
24.24% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.25% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.25% done, estimate finish Sun Feb 26 14:38:22 2012
24.26% done, estimate finish Sun Feb 26 14:38:22 2012
24.26% done, estimate finish Sun Feb 26 14:38:21 2012
24.27% done, estimate finish Sun Feb 26 14:38:25 2012
24.27% done, estimate finish Sun Feb 26 14:38:24 2012
24.28% done, estimate finish Sun Feb 26 14:38:24 2012
24.28% done, estimate finish Sun Feb 26 14:38:23 2012
24.29% done, estimate finish Sun Feb 26 14:38:23 2012
24.29% done, estimate finish Sun Feb 26 14:38:22 2012
24.30% done, estimate finish Sun Feb 26 14:38:22 2012
24.30% done, estimate finish Sun Feb 26 14:38:21 2012
24.31% done, estimate finish Sun Feb 26 14:38:25 2012
24.31% done, estimate finish Sun Feb 26 14:38:24 2012
24.32% done, estimate finish Sun Feb 26 14:38:24 2012
24.32% done, estimate finish Sun Feb 26 14:38:23 2012
24.33% done, estimate finish Sun Feb 26 14:38:23 2012
24.33% done, estimate finish Sun Feb 26 14:38:22 2012
24.33% done, estimate finish Sun Feb 26 14:38:26 2012
24.34% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
24.35% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.36% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.37% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.38% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.39% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.40% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.41% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.41% done, estimate finish Sun Feb 26 14:38:21 2012
24.42% done, estimate finish Sun Feb 26 14:38:25 2012
24.42% done, estimate finish Sun Feb 26 14:38:24 2012
24.43% done, estimate finish Sun Feb 26 14:38:24 2012
24.43% done, estimate finish Sun Feb 26 14:38:23 2012
24.44% done, estimate finish Sun Feb 26 14:38:23 2012
24.44% done, estimate finish Sun Feb 26 14:38:22 2012
24.45% done, estimate finish Sun Feb 26 14:38:22 2012
24.45% done, estimate finish Sun Feb 26 14:38:21 2012
24.46% done, estimate finish Sun Feb 26 14:38:21 2012
24.46% done, estimate finish Sun Feb 26 14:38:24 2012
24.47% done, estimate finish Sun Feb 26 14:38:24 2012
24.47% done, estimate finish Sun Feb 26 14:38:23 2012
24.48% done, estimate finish Sun Feb 26 14:38:23 2012
24.48% done, estimate finish Sun Feb 26 14:38:22 2012
24.49% done, estimate finish Sun Feb 26 14:38:22 2012
24.49% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.50% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.51% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.52% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.53% done, estimate finish Sun Feb 26 14:38:25 2012
=== last message repeated 2 times. ===
24.54% done, estimate finish Sun Feb 26 14:38:24 2012
=== last message repeated 2 times. ===
24.55% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.56% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.57% done, estimate finish Sun Feb 26 14:38:21 2012
24.57% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
24.58% done, estimate finish Sun Feb 26 14:38:19 2012
24.58% done, estimate finish Sun Feb 26 14:38:23 2012
24.59% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.60% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.61% done, estimate finish Sun Feb 26 14:38:20 2012
24.61% done, estimate finish Sun Feb 26 14:38:24 2012
24.62% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.63% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.64% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.65% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
24.65% done, estimate finish Sun Feb 26 14:38:23 2012
24.66% done, estimate finish Sun Feb 26 14:38:23 2012
24.66% done, estimate finish Sun Feb 26 14:38:22 2012
24.67% done, estimate finish Sun Feb 26 14:38:22 2012
24.67% done, estimate finish Sun Feb 26 14:38:21 2012
24.68% done, estimate finish Sun Feb 26 14:38:21 2012
24.68% done, estimate finish Sun Feb 26 14:38:20 2012
24.69% done, estimate finish Sun Feb 26 14:38:20 2012
24.69% done, estimate finish Sun Feb 26 14:38:23 2012
24.70% done, estimate finish Sun Feb 26 14:38:23 2012
24.70% done, estimate finish Sun Feb 26 14:38:22 2012
24.71% done, estimate finish Sun Feb 26 14:38:22 2012
24.71% done, estimate finish Sun Feb 26 14:38:21 2012
24.72% done, estimate finish Sun Feb 26 14:38:21 2012
24.72% done, estimate finish Sun Feb 26 14:38:24 2012
24.73% done, estimate finish Sun Feb 26 14:38:24 2012
24.73% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.74% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.75% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.76% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
24.77% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
24.78% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.79% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.80% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
24.81% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.82% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.82% done, estimate finish Sun Feb 26 14:38:21 2012
24.83% done, estimate finish Sun Feb 26 14:38:21 2012
24.83% done, estimate finish Sun Feb 26 14:38:20 2012
24.84% done, estimate finish Sun Feb 26 14:38:20 2012
24.84% done, estimate finish Sun Feb 26 14:38:19 2012
24.85% done, estimate finish Sun Feb 26 14:38:23 2012
24.85% done, estimate finish Sun Feb 26 14:38:22 2012
24.86% done, estimate finish Sun Feb 26 14:38:22 2012
24.86% done, estimate finish Sun Feb 26 14:38:21 2012
24.87% done, estimate finish Sun Feb 26 14:38:21 2012
24.87% done, estimate finish Sun Feb 26 14:38:20 2012
24.88% done, estimate finish Sun Feb 26 14:38:20 2012
24.88% done, estimate finish Sun Feb 26 14:38:19 2012
24.89% done, estimate finish Sun Feb 26 14:38:19 2012
24.89% done, estimate finish Sun Feb 26 14:38:22 2012
24.90% done, estimate finish Sun Feb 26 14:38:22 2012
24.90% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.91% done, estimate finish Sun Feb 26 14:38:20 2012
24.91% done, estimate finish Sun Feb 26 14:38:24 2012
24.92% done, estimate finish Sun Feb 26 14:38:23 2012
=== last message repeated 2 times. ===
24.93% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
24.94% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.95% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
24.96% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
24.97% done, estimate finish Sun Feb 26 14:38:18 2012
24.97% done, estimate finish Sun Feb 26 14:38:22 2012
24.98% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
24.98% done, estimate finish Sun Feb 26 14:38:20 2012
24.99% done, estimate finish Sun Feb 26 14:38:20 2012
24.99% done, estimate finish Sun Feb 26 14:38:19 2012
25.00% done, estimate finish Sun Feb 26 14:38:23 2012
25.00% done, estimate finish Sun Feb 26 14:38:22 2012
25.01% done, estimate finish Sun Feb 26 14:38:22 2012
25.01% done, estimate finish Sun Feb 26 14:38:21 2012
25.02% done, estimate finish Sun Feb 26 14:38:21 2012
25.02% done, estimate finish Sun Feb 26 14:38:20 2012
25.03% done, estimate finish Sun Feb 26 14:38:20 2012
25.03% done, estimate finish Sun Feb 26 14:38:23 2012
25.04% done, estimate finish Sun Feb 26 14:38:23 2012
25.04% done, estimate finish Sun Feb 26 14:38:22 2012
25.05% done, estimate finish Sun Feb 26 14:38:22 2012
25.05% done, estimate finish Sun Feb 26 14:38:21 2012
25.06% done, estimate finish Sun Feb 26 14:38:21 2012
25.06% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.07% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.08% done, estimate finish Sun Feb 26 14:38:18 2012
25.08% done, estimate finish Sun Feb 26 14:38:22 2012
25.09% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
25.10% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.11% done, estimate finish Sun Feb 26 14:38:19 2012
25.11% done, estimate finish Sun Feb 26 14:38:23 2012
25.12% done, estimate finish Sun Feb 26 14:38:22 2012
=== last message repeated 2 times. ===
25.13% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
25.14% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.14% done, estimate finish Sun Feb 26 14:38:19 2012
25.15% done, estimate finish Sun Feb 26 14:38:19 2012
25.15% done, estimate finish Sun Feb 26 14:38:18 2012
25.16% done, estimate finish Sun Feb 26 14:38:18 2012
25.16% done, estimate finish Sun Feb 26 14:38:21 2012
25.17% done, estimate finish Sun Feb 26 14:38:21 2012
25.17% done, estimate finish Sun Feb 26 14:38:20 2012
25.18% done, estimate finish Sun Feb 26 14:38:20 2012
25.18% done, estimate finish Sun Feb 26 14:38:19 2012
25.19% done, estimate finish Sun Feb 26 14:38:19 2012
25.19% done, estimate finish Sun Feb 26 14:38:22 2012
25.20% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
25.21% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.22% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.22% done, estimate finish Sun Feb 26 14:38:18 2012
25.23% done, estimate finish Sun Feb 26 14:38:22 2012
25.23% done, estimate finish Sun Feb 26 14:38:21 2012
25.24% done, estimate finish Sun Feb 26 14:38:21 2012
25.24% done, estimate finish Sun Feb 26 14:38:20 2012
25.25% done, estimate finish Sun Feb 26 14:38:20 2012
25.25% done, estimate finish Sun Feb 26 14:38:19 2012
25.26% done, estimate finish Sun Feb 26 14:38:19 2012
25.26% done, estimate finish Sun Feb 26 14:38:18 2012
25.27% done, estimate finish Sun Feb 26 14:38:18 2012
25.27% done, estimate finish Sun Feb 26 14:38:17 2012
25.28% done, estimate finish Sun Feb 26 14:38:21 2012
25.28% done, estimate finish Sun Feb 26 14:38:20 2012
25.29% done, estimate finish Sun Feb 26 14:38:20 2012
25.29% done, estimate finish Sun Feb 26 14:38:19 2012
25.30% done, estimate finish Sun Feb 26 14:38:19 2012
25.30% done, estimate finish Sun Feb 26 14:38:18 2012
25.30% done, estimate finish Sun Feb 26 14:38:22 2012
25.31% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
25.32% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.33% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.34% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.35% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.36% done, estimate finish Sun Feb 26 14:38:16 2012
25.36% done, estimate finish Sun Feb 26 14:38:20 2012
25.37% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.38% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.38% done, estimate finish Sun Feb 26 14:38:17 2012
25.39% done, estimate finish Sun Feb 26 14:38:21 2012
25.39% done, estimate finish Sun Feb 26 14:38:20 2012
25.40% done, estimate finish Sun Feb 26 14:38:20 2012
25.40% done, estimate finish Sun Feb 26 14:38:19 2012
25.41% done, estimate finish Sun Feb 26 14:38:19 2012
25.41% done, estimate finish Sun Feb 26 14:38:18 2012
25.42% done, estimate finish Sun Feb 26 14:38:18 2012
25.42% done, estimate finish Sun Feb 26 14:38:17 2012
25.43% done, estimate finish Sun Feb 26 14:38:17 2012
25.43% done, estimate finish Sun Feb 26 14:38:20 2012
25.44% done, estimate finish Sun Feb 26 14:38:20 2012
25.44% done, estimate finish Sun Feb 26 14:38:19 2012
25.45% done, estimate finish Sun Feb 26 14:38:19 2012
25.45% done, estimate finish Sun Feb 26 14:38:18 2012
25.46% done, estimate finish Sun Feb 26 14:38:18 2012
25.46% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.47% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.48% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.49% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.50% done, estimate finish Sun Feb 26 14:38:21 2012
=== last message repeated 2 times. ===
25.51% done, estimate finish Sun Feb 26 14:38:20 2012
=== last message repeated 2 times. ===
25.52% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.53% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.54% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.54% done, estimate finish Sun Feb 26 14:38:16 2012
25.55% done, estimate finish Sun Feb 26 14:38:16 2012
25.55% done, estimate finish Sun Feb 26 14:38:19 2012
25.56% done, estimate finish Sun Feb 26 14:38:19 2012
25.56% done, estimate finish Sun Feb 26 14:38:18 2012
25.57% done, estimate finish Sun Feb 26 14:38:18 2012
25.57% done, estimate finish Sun Feb 26 14:38:17 2012
25.58% done, estimate finish Sun Feb 26 14:38:17 2012
25.58% done, estimate finish Sun Feb 26 14:38:16 2012
25.59% done, estimate finish Sun Feb 26 14:38:20 2012
25.59% done, estimate finish Sun Feb 26 14:38:19 2012
25.60% done, estimate finish Sun Feb 26 14:38:19 2012
25.60% done, estimate finish Sun Feb 26 14:38:18 2012
25.61% done, estimate finish Sun Feb 26 14:38:18 2012
25.61% done, estimate finish Sun Feb 26 14:38:17 2012
25.62% done, estimate finish Sun Feb 26 14:38:17 2012
25.62% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
25.63% done, estimate finish Sun Feb 26 14:38:15 2012
25.63% done, estimate finish Sun Feb 26 14:38:19 2012
25.64% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.65% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.66% done, estimate finish Sun Feb 26 14:38:16 2012
25.66% done, estimate finish Sun Feb 26 14:38:20 2012
25.67% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.68% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.69% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.70% done, estimate finish Sun Feb 26 14:38:16 2012
25.70% done, estimate finish Sun Feb 26 14:38:20 2012
25.70% done, estimate finish Sun Feb 26 14:38:19 2012
25.71% done, estimate finish Sun Feb 26 14:38:19 2012
25.71% done, estimate finish Sun Feb 26 14:38:18 2012
25.72% done, estimate finish Sun Feb 26 14:38:18 2012
25.72% done, estimate finish Sun Feb 26 14:38:17 2012
25.73% done, estimate finish Sun Feb 26 14:38:17 2012
25.73% done, estimate finish Sun Feb 26 14:38:16 2012
25.74% done, estimate finish Sun Feb 26 14:38:16 2012
25.74% done, estimate finish Sun Feb 26 14:38:15 2012
25.75% done, estimate finish Sun Feb 26 14:38:19 2012
25.75% done, estimate finish Sun Feb 26 14:38:18 2012
25.76% done, estimate finish Sun Feb 26 14:38:18 2012
25.76% done, estimate finish Sun Feb 26 14:38:17 2012
25.77% done, estimate finish Sun Feb 26 14:38:17 2012
25.77% done, estimate finish Sun Feb 26 14:38:16 2012
25.78% done, estimate finish Sun Feb 26 14:38:16 2012
25.78% done, estimate finish Sun Feb 26 14:38:19 2012
=== last message repeated 2 times. ===
25.79% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.80% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.81% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
25.82% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
25.83% done, estimate finish Sun Feb 26 14:38:18 2012
=== last message repeated 2 times. ===
25.84% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.85% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
25.86% done, estimate finish Sun Feb 26 14:38:15 2012
25.86% done, estimate finish Sun Feb 26 14:38:19 2012
25.86% done, estimate finish Sun Feb 26 14:38:18 2012
25.87% done, estimate finish Sun Feb 26 14:38:18 2012
25.87% done, estimate finish Sun Feb 26 14:38:17 2012
25.88% done, estimate finish Sun Feb 26 14:38:17 2012
25.88% done, estimate finish Sun Feb 26 14:38:16 2012
25.89% done, estimate finish Sun Feb 26 14:38:16 2012
25.89% done, estimate finish Sun Feb 26 14:38:15 2012
25.90% done, estimate finish Sun Feb 26 14:38:15 2012
25.90% done, estimate finish Sun Feb 26 14:38:18 2012
25.91% done, estimate finish Sun Feb 26 14:38:18 2012
25.91% done, estimate finish Sun Feb 26 14:38:17 2012
25.92% done, estimate finish Sun Feb 26 14:38:17 2012
25.92% done, estimate finish Sun Feb 26 14:38:16 2012
25.93% done, estimate finish Sun Feb 26 14:38:16 2012
25.93% done, estimate finish Sun Feb 26 14:38:15 2012
25.94% done, estimate finish Sun Feb 26 14:38:15 2012
25.94% done, estimate finish Sun Feb 26 14:38:18 2012
25.95% done, estimate finish Sun Feb 26 14:38:18 2012
25.95% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
25.96% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
25.97% done, estimate finish Sun Feb 26 14:38:15 2012
25.97% done, estimate finish Sun Feb 26 14:38:18 2012
25.98% done, estimate finish Sun Feb 26 14:38:18 2012
25.98% done, estimate finish Sun Feb 26 14:38:17 2012
25.99% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
26.00% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
26.01% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.02% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.03% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
26.03% done, estimate finish Sun Feb 26 14:38:16 2012
26.04% done, estimate finish Sun Feb 26 14:38:16 2012
26.04% done, estimate finish Sun Feb 26 14:38:15 2012
26.05% done, estimate finish Sun Feb 26 14:38:15 2012
26.05% done, estimate finish Sun Feb 26 14:38:18 2012
26.06% done, estimate finish Sun Feb 26 14:38:17 2012
=== last message repeated 2 times. ===
26.07% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
26.08% done, estimate finish Sun Feb 26 14:38:16 2012
26.08% done, estimate finish Sun Feb 26 14:38:15 2012
26.09% done, estimate finish Sun Feb 26 14:38:15 2012
26.09% done, estimate finish Sun Feb 26 14:38:14 2012
26.10% done, estimate finish Sun Feb 26 14:38:14 2012
26.10% done, estimate finish Sun Feb 26 14:38:13 2012
26.11% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 3 times. ===
26.12% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.13% done, estimate finish Sun Feb 26 14:38:14 2012
26.13% done, estimate finish Sun Feb 26 14:38:17 2012
26.14% done, estimate finish Sun Feb 26 14:38:17 2012
26.14% done, estimate finish Sun Feb 26 14:38:16 2012
26.15% done, estimate finish Sun Feb 26 14:38:16 2012
26.15% done, estimate finish Sun Feb 26 14:38:15 2012
26.16% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.17% done, estimate finish Sun Feb 26 14:38:14 2012
26.17% done, estimate finish Sun Feb 26 14:38:17 2012
26.18% done, estimate finish Sun Feb 26 14:38:17 2012
26.18% done, estimate finish Sun Feb 26 14:38:16 2012
26.19% done, estimate finish Sun Feb 26 14:38:16 2012
26.19% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.20% done, estimate finish Sun Feb 26 14:38:15 2012
26.20% done, estimate finish Sun Feb 26 14:38:14 2012
26.21% done, estimate finish Sun Feb 26 14:38:14 2012
26.21% done, estimate finish Sun Feb 26 14:38:13 2012
26.22% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
26.23% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.24% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.25% done, estimate finish Sun Feb 26 14:38:14 2012
26.25% done, estimate finish Sun Feb 26 14:38:17 2012
26.26% done, estimate finish Sun Feb 26 14:38:16 2012
=== last message repeated 2 times. ===
26.27% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.27% done, estimate finish Sun Feb 26 14:38:14 2012
26.28% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.29% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.30% done, estimate finish Sun Feb 26 14:38:12 2012
26.30% done, estimate finish Sun Feb 26 14:38:15 2012
26.31% done, estimate finish Sun Feb 26 14:38:15 2012
26.31% done, estimate finish Sun Feb 26 14:38:14 2012
26.32% done, estimate finish Sun Feb 26 14:38:14 2012
26.32% done, estimate finish Sun Feb 26 14:38:13 2012
26.33% done, estimate finish Sun Feb 26 14:38:13 2012
26.33% done, estimate finish Sun Feb 26 14:38:16 2012
26.34% done, estimate finish Sun Feb 26 14:38:16 2012
26.34% done, estimate finish Sun Feb 26 14:38:15 2012
26.35% done, estimate finish Sun Feb 26 14:38:15 2012
26.35% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.36% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.37% done, estimate finish Sun Feb 26 14:38:13 2012
26.37% done, estimate finish Sun Feb 26 14:38:12 2012
26.38% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.39% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.40% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.41% done, estimate finish Sun Feb 26 14:38:13 2012
26.41% done, estimate finish Sun Feb 26 14:38:16 2012
26.42% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.43% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.43% done, estimate finish Sun Feb 26 14:38:13 2012
26.44% done, estimate finish Sun Feb 26 14:38:13 2012
26.44% done, estimate finish Sun Feb 26 14:38:12 2012
26.45% done, estimate finish Sun Feb 26 14:38:16 2012
26.45% done, estimate finish Sun Feb 26 14:38:15 2012
26.46% done, estimate finish Sun Feb 26 14:38:15 2012
26.46% done, estimate finish Sun Feb 26 14:38:14 2012
26.47% done, estimate finish Sun Feb 26 14:38:14 2012
26.47% done, estimate finish Sun Feb 26 14:38:13 2012
26.48% done, estimate finish Sun Feb 26 14:38:13 2012
26.48% done, estimate finish Sun Feb 26 14:38:12 2012
26.49% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.50% done, estimate finish Sun Feb 26 14:38:15 2012
26.50% done, estimate finish Sun Feb 26 14:38:14 2012
26.51% done, estimate finish Sun Feb 26 14:38:14 2012
26.51% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.52% done, estimate finish Sun Feb 26 14:38:12 2012
26.52% done, estimate finish Sun Feb 26 14:38:16 2012
26.53% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.54% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.55% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.56% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.57% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
26.58% done, estimate finish Sun Feb 26 14:38:11 2012
26.58% done, estimate finish Sun Feb 26 14:38:14 2012
26.59% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.59% done, estimate finish Sun Feb 26 14:38:12 2012
26.60% done, estimate finish Sun Feb 26 14:38:12 2012
26.60% done, estimate finish Sun Feb 26 14:38:11 2012
26.61% done, estimate finish Sun Feb 26 14:38:15 2012
26.61% done, estimate finish Sun Feb 26 14:38:14 2012
26.62% done, estimate finish Sun Feb 26 14:38:14 2012
26.62% done, estimate finish Sun Feb 26 14:38:13 2012
26.63% done, estimate finish Sun Feb 26 14:38:13 2012
26.63% done, estimate finish Sun Feb 26 14:38:12 2012
26.64% done, estimate finish Sun Feb 26 14:38:12 2012
26.64% done, estimate finish Sun Feb 26 14:38:15 2012
26.65% done, estimate finish Sun Feb 26 14:38:15 2012
26.65% done, estimate finish Sun Feb 26 14:38:14 2012
26.66% done, estimate finish Sun Feb 26 14:38:14 2012
26.66% done, estimate finish Sun Feb 26 14:38:13 2012
26.67% done, estimate finish Sun Feb 26 14:38:13 2012
26.67% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.68% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
26.69% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.70% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.71% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.72% done, estimate finish Sun Feb 26 14:38:15 2012
=== last message repeated 2 times. ===
26.73% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.74% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.75% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.76% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
26.76% done, estimate finish Sun Feb 26 14:38:10 2012
26.77% done, estimate finish Sun Feb 26 14:38:10 2012
26.77% done, estimate finish Sun Feb 26 14:38:13 2012
26.78% done, estimate finish Sun Feb 26 14:38:13 2012
26.78% done, estimate finish Sun Feb 26 14:38:12 2012
26.79% done, estimate finish Sun Feb 26 14:38:12 2012
26.79% done, estimate finish Sun Feb 26 14:38:11 2012
26.80% done, estimate finish Sun Feb 26 14:38:11 2012
26.80% done, estimate finish Sun Feb 26 14:38:14 2012
26.81% done, estimate finish Sun Feb 26 14:38:14 2012
26.81% done, estimate finish Sun Feb 26 14:38:13 2012
26.82% done, estimate finish Sun Feb 26 14:38:13 2012
26.82% done, estimate finish Sun Feb 26 14:38:12 2012
26.83% done, estimate finish Sun Feb 26 14:38:12 2012
26.83% done, estimate finish Sun Feb 26 14:38:15 2012
26.84% done, estimate finish Sun Feb 26 14:38:15 2012
26.84% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.85% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.86% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.87% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
26.88% done, estimate finish Sun Feb 26 14:38:10 2012
26.88% done, estimate finish Sun Feb 26 14:38:14 2012
26.89% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
26.90% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
26.91% done, estimate finish Sun Feb 26 14:38:11 2012
26.91% done, estimate finish Sun Feb 26 14:38:15 2012
26.92% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
26.92% done, estimate finish Sun Feb 26 14:38:13 2012
26.93% done, estimate finish Sun Feb 26 14:38:13 2012
26.93% done, estimate finish Sun Feb 26 14:38:12 2012
26.94% done, estimate finish Sun Feb 26 14:38:12 2012
26.94% done, estimate finish Sun Feb 26 14:38:11 2012
26.95% done, estimate finish Sun Feb 26 14:38:11 2012
26.95% done, estimate finish Sun Feb 26 14:38:10 2012
26.96% done, estimate finish Sun Feb 26 14:38:10 2012
26.96% done, estimate finish Sun Feb 26 14:38:09 2012
26.97% done, estimate finish Sun Feb 26 14:38:13 2012
26.97% done, estimate finish Sun Feb 26 14:38:12 2012
26.98% done, estimate finish Sun Feb 26 14:38:12 2012
26.98% done, estimate finish Sun Feb 26 14:38:11 2012
26.99% done, estimate finish Sun Feb 26 14:38:11 2012
26.99% done, estimate finish Sun Feb 26 14:38:10 2012
27.00% done, estimate finish Sun Feb 26 14:38:14 2012
27.00% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
27.01% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.02% done, estimate finish Sun Feb 26 14:38:11 2012
27.02% done, estimate finish Sun Feb 26 14:38:15 2012
27.03% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
27.04% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
27.05% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.06% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.07% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.08% done, estimate finish Sun Feb 26 14:38:09 2012
27.08% done, estimate finish Sun Feb 26 14:38:13 2012
27.08% done, estimate finish Sun Feb 26 14:38:12 2012
27.09% done, estimate finish Sun Feb 26 14:38:12 2012
27.09% done, estimate finish Sun Feb 26 14:38:11 2012
27.10% done, estimate finish Sun Feb 26 14:38:11 2012
27.10% done, estimate finish Sun Feb 26 14:38:10 2012
27.11% done, estimate finish Sun Feb 26 14:38:14 2012
27.11% done, estimate finish Sun Feb 26 14:38:13 2012
27.12% done, estimate finish Sun Feb 26 14:38:13 2012
27.12% done, estimate finish Sun Feb 26 14:38:12 2012
27.13% done, estimate finish Sun Feb 26 14:38:12 2012
27.13% done, estimate finish Sun Feb 26 14:38:11 2012
27.14% done, estimate finish Sun Feb 26 14:38:11 2012
27.14% done, estimate finish Sun Feb 26 14:38:10 2012
27.15% done, estimate finish Sun Feb 26 14:38:10 2012
27.15% done, estimate finish Sun Feb 26 14:38:09 2012
27.16% done, estimate finish Sun Feb 26 14:38:09 2012
27.16% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.17% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.18% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.19% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
27.20% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.21% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.22% done, estimate finish Sun Feb 26 14:38:14 2012
=== last message repeated 2 times. ===
27.23% done, estimate finish Sun Feb 26 14:38:13 2012
=== last message repeated 2 times. ===
27.24% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.24% done, estimate finish Sun Feb 26 14:38:11 2012
27.25% done, estimate finish Sun Feb 26 14:38:11 2012
27.25% done, estimate finish Sun Feb 26 14:38:10 2012
27.26% done, estimate finish Sun Feb 26 14:38:10 2012
27.26% done, estimate finish Sun Feb 26 14:38:09 2012
27.27% done, estimate finish Sun Feb 26 14:38:09 2012
27.27% done, estimate finish Sun Feb 26 14:38:12 2012
27.28% done, estimate finish Sun Feb 26 14:38:12 2012
27.28% done, estimate finish Sun Feb 26 14:38:11 2012
27.29% done, estimate finish Sun Feb 26 14:38:11 2012
27.29% done, estimate finish Sun Feb 26 14:38:10 2012
27.30% done, estimate finish Sun Feb 26 14:38:10 2012
27.30% done, estimate finish Sun Feb 26 14:38:13 2012
27.31% done, estimate finish Sun Feb 26 14:38:13 2012
27.31% done, estimate finish Sun Feb 26 14:38:12 2012
27.32% done, estimate finish Sun Feb 26 14:38:12 2012
27.32% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.33% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.34% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.35% done, estimate finish Sun Feb 26 14:38:08 2012
27.35% done, estimate finish Sun Feb 26 14:38:12 2012
27.36% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.37% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.38% done, estimate finish Sun Feb 26 14:38:09 2012
27.38% done, estimate finish Sun Feb 26 14:38:13 2012
27.39% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.40% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.40% done, estimate finish Sun Feb 26 14:38:10 2012
27.41% done, estimate finish Sun Feb 26 14:38:10 2012
27.41% done, estimate finish Sun Feb 26 14:38:13 2012
27.42% done, estimate finish Sun Feb 26 14:38:13 2012
27.42% done, estimate finish Sun Feb 26 14:38:12 2012
27.43% done, estimate finish Sun Feb 26 14:38:12 2012
27.43% done, estimate finish Sun Feb 26 14:38:11 2012
27.44% done, estimate finish Sun Feb 26 14:38:11 2012
27.44% done, estimate finish Sun Feb 26 14:38:10 2012
27.45% done, estimate finish Sun Feb 26 14:38:10 2012
27.45% done, estimate finish Sun Feb 26 14:38:09 2012
27.46% done, estimate finish Sun Feb 26 14:38:09 2012
27.46% done, estimate finish Sun Feb 26 14:38:08 2012
27.47% done, estimate finish Sun Feb 26 14:38:12 2012
27.47% done, estimate finish Sun Feb 26 14:38:11 2012
27.48% done, estimate finish Sun Feb 26 14:38:11 2012
27.48% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.49% done, estimate finish Sun Feb 26 14:38:09 2012
27.49% done, estimate finish Sun Feb 26 14:38:13 2012
27.50% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.51% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.52% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.53% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.54% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
27.55% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.56% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.56% done, estimate finish Sun Feb 26 14:38:09 2012
27.57% done, estimate finish Sun Feb 26 14:38:09 2012
27.57% done, estimate finish Sun Feb 26 14:38:08 2012
27.58% done, estimate finish Sun Feb 26 14:38:12 2012
27.58% done, estimate finish Sun Feb 26 14:38:11 2012
27.59% done, estimate finish Sun Feb 26 14:38:11 2012
27.59% done, estimate finish Sun Feb 26 14:38:10 2012
27.60% done, estimate finish Sun Feb 26 14:38:10 2012
27.60% done, estimate finish Sun Feb 26 14:38:13 2012
27.61% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.62% done, estimate finish Sun Feb 26 14:38:12 2012
27.62% done, estimate finish Sun Feb 26 14:38:11 2012
27.63% done, estimate finish Sun Feb 26 14:38:11 2012
27.63% done, estimate finish Sun Feb 26 14:38:10 2012
27.64% done, estimate finish Sun Feb 26 14:38:10 2012
27.64% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.65% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
27.66% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.67% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.68% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.69% done, estimate finish Sun Feb 26 14:38:12 2012
=== last message repeated 2 times. ===
27.70% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.71% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.72% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.72% done, estimate finish Sun Feb 26 14:38:08 2012
27.73% done, estimate finish Sun Feb 26 14:38:08 2012
27.73% done, estimate finish Sun Feb 26 14:38:11 2012
27.74% done, estimate finish Sun Feb 26 14:38:11 2012
27.74% done, estimate finish Sun Feb 26 14:38:10 2012
27.75% done, estimate finish Sun Feb 26 14:38:10 2012
27.75% done, estimate finish Sun Feb 26 14:38:09 2012
27.76% done, estimate finish Sun Feb 26 14:38:09 2012
27.76% done, estimate finish Sun Feb 26 14:38:08 2012
27.77% done, estimate finish Sun Feb 26 14:38:08 2012
27.77% done, estimate finish Sun Feb 26 14:38:11 2012
27.78% done, estimate finish Sun Feb 26 14:38:11 2012
27.78% done, estimate finish Sun Feb 26 14:38:10 2012
27.79% done, estimate finish Sun Feb 26 14:38:10 2012
27.79% done, estimate finish Sun Feb 26 14:38:09 2012
27.80% done, estimate finish Sun Feb 26 14:38:09 2012
27.80% done, estimate finish Sun Feb 26 14:38:12 2012
27.80% done, estimate finish Sun Feb 26 14:38:11 2012
27.81% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.82% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.83% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.84% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
27.85% done, estimate finish Sun Feb 26 14:38:07 2012
27.85% done, estimate finish Sun Feb 26 14:38:11 2012
27.86% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.87% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.88% done, estimate finish Sun Feb 26 14:38:08 2012
27.88% done, estimate finish Sun Feb 26 14:38:11 2012
27.89% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.89% done, estimate finish Sun Feb 26 14:38:10 2012
27.90% done, estimate finish Sun Feb 26 14:38:10 2012
27.90% done, estimate finish Sun Feb 26 14:38:09 2012
27.91% done, estimate finish Sun Feb 26 14:38:09 2012
27.91% done, estimate finish Sun Feb 26 14:38:08 2012
27.92% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
27.93% done, estimate finish Sun Feb 26 14:38:11 2012
27.93% done, estimate finish Sun Feb 26 14:38:10 2012
27.94% done, estimate finish Sun Feb 26 14:38:10 2012
27.94% done, estimate finish Sun Feb 26 14:38:09 2012
27.95% done, estimate finish Sun Feb 26 14:38:09 2012
27.95% done, estimate finish Sun Feb 26 14:38:08 2012
27.96% done, estimate finish Sun Feb 26 14:38:08 2012
27.96% done, estimate finish Sun Feb 26 14:38:07 2012
27.97% done, estimate finish Sun Feb 26 14:38:11 2012
27.97% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
27.98% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
27.99% done, estimate finish Sun Feb 26 14:38:08 2012
27.99% done, estimate finish Sun Feb 26 14:38:11 2012
28.00% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
28.01% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.02% done, estimate finish Sun Feb 26 14:38:09 2012
28.02% done, estimate finish Sun Feb 26 14:38:12 2012
28.03% done, estimate finish Sun Feb 26 14:38:12 2012
28.03% done, estimate finish Sun Feb 26 14:38:11 2012
28.04% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
28.05% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.05% done, estimate finish Sun Feb 26 14:38:09 2012
28.06% done, estimate finish Sun Feb 26 14:38:09 2012
28.06% done, estimate finish Sun Feb 26 14:38:08 2012
28.07% done, estimate finish Sun Feb 26 14:38:08 2012
28.07% done, estimate finish Sun Feb 26 14:38:11 2012
28.08% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.09% done, estimate finish Sun Feb 26 14:38:10 2012
28.09% done, estimate finish Sun Feb 26 14:38:09 2012
28.10% done, estimate finish Sun Feb 26 14:38:09 2012
28.10% done, estimate finish Sun Feb 26 14:38:08 2012
28.11% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
28.12% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.13% done, estimate finish Sun Feb 26 14:38:10 2012
28.13% done, estimate finish Sun Feb 26 14:38:09 2012
28.13% done, estimate finish Sun Feb 26 14:38:12 2012
28.14% done, estimate finish Sun Feb 26 14:38:12 2012
28.14% done, estimate finish Sun Feb 26 14:38:11 2012
28.15% done, estimate finish Sun Feb 26 14:38:11 2012
28.15% done, estimate finish Sun Feb 26 14:38:10 2012
28.16% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.17% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.18% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.19% done, estimate finish Sun Feb 26 14:38:11 2012
28.19% done, estimate finish Sun Feb 26 14:38:10 2012
28.20% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.21% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.21% done, estimate finish Sun Feb 26 14:38:12 2012
28.22% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
28.23% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.24% done, estimate finish Sun Feb 26 14:38:10 2012
28.24% done, estimate finish Sun Feb 26 14:38:09 2012
28.25% done, estimate finish Sun Feb 26 14:38:09 2012
28.25% done, estimate finish Sun Feb 26 14:38:08 2012
28.26% done, estimate finish Sun Feb 26 14:38:08 2012
28.26% done, estimate finish Sun Feb 26 14:38:07 2012
28.27% done, estimate finish Sun Feb 26 14:38:07 2012
28.27% done, estimate finish Sun Feb 26 14:38:10 2012
28.28% done, estimate finish Sun Feb 26 14:38:10 2012
28.28% done, estimate finish Sun Feb 26 14:38:09 2012
28.29% done, estimate finish Sun Feb 26 14:38:09 2012
28.29% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.30% done, estimate finish Sun Feb 26 14:38:11 2012
28.30% done, estimate finish Sun Feb 26 14:38:10 2012
28.31% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.32% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.33% done, estimate finish Sun Feb 26 14:38:08 2012
28.33% done, estimate finish Sun Feb 26 14:38:11 2012
28.34% done, estimate finish Sun Feb 26 14:38:11 2012
28.34% done, estimate finish Sun Feb 26 14:38:10 2012
28.35% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.36% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.37% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.37% done, estimate finish Sun Feb 26 14:38:07 2012
28.38% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.39% done, estimate finish Sun Feb 26 14:38:10 2012
28.39% done, estimate finish Sun Feb 26 14:38:09 2012
28.40% done, estimate finish Sun Feb 26 14:38:09 2012
28.40% done, estimate finish Sun Feb 26 14:38:08 2012
28.41% done, estimate finish Sun Feb 26 14:38:11 2012
=== last message repeated 2 times. ===
28.42% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.43% done, estimate finish Sun Feb 26 14:38:10 2012
28.43% done, estimate finish Sun Feb 26 14:38:09 2012
28.44% done, estimate finish Sun Feb 26 14:38:09 2012
28.44% done, estimate finish Sun Feb 26 14:38:08 2012
28.45% done, estimate finish Sun Feb 26 14:38:08 2012
28.45% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.46% done, estimate finish Sun Feb 26 14:38:06 2012
28.46% done, estimate finish Sun Feb 26 14:38:09 2012
28.47% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.48% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.49% done, estimate finish Sun Feb 26 14:38:07 2012
28.49% done, estimate finish Sun Feb 26 14:38:10 2012
28.50% done, estimate finish Sun Feb 26 14:38:10 2012
28.50% done, estimate finish Sun Feb 26 14:38:09 2012
28.51% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.52% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.53% done, estimate finish Sun Feb 26 14:38:07 2012
28.53% done, estimate finish Sun Feb 26 14:38:10 2012
=== last message repeated 2 times. ===
28.54% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.55% done, estimate finish Sun Feb 26 14:38:09 2012
28.55% done, estimate finish Sun Feb 26 14:38:08 2012
28.56% done, estimate finish Sun Feb 26 14:38:08 2012
28.56% done, estimate finish Sun Feb 26 14:38:07 2012
28.57% done, estimate finish Sun Feb 26 14:38:07 2012
28.57% done, estimate finish Sun Feb 26 14:38:06 2012
28.58% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.59% done, estimate finish Sun Feb 26 14:38:09 2012
28.59% done, estimate finish Sun Feb 26 14:38:08 2012
28.60% done, estimate finish Sun Feb 26 14:38:08 2012
28.60% done, estimate finish Sun Feb 26 14:38:07 2012
28.61% done, estimate finish Sun Feb 26 14:38:07 2012
28.61% done, estimate finish Sun Feb 26 14:38:10 2012
28.61% done, estimate finish Sun Feb 26 14:38:09 2012
28.62% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.63% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.64% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.65% done, estimate finish Sun Feb 26 14:38:06 2012
28.65% done, estimate finish Sun Feb 26 14:38:09 2012
28.66% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.67% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.68% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.69% done, estimate finish Sun Feb 26 14:38:10 2012
28.69% done, estimate finish Sun Feb 26 14:38:09 2012
28.70% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.70% done, estimate finish Sun Feb 26 14:38:08 2012
28.71% done, estimate finish Sun Feb 26 14:38:08 2012
28.71% done, estimate finish Sun Feb 26 14:38:07 2012
28.72% done, estimate finish Sun Feb 26 14:38:07 2012
28.72% done, estimate finish Sun Feb 26 14:38:06 2012
28.73% done, estimate finish Sun Feb 26 14:38:06 2012
28.73% done, estimate finish Sun Feb 26 14:38:09 2012
28.74% done, estimate finish Sun Feb 26 14:38:09 2012
28.74% done, estimate finish Sun Feb 26 14:38:08 2012
28.75% done, estimate finish Sun Feb 26 14:38:08 2012
28.75% done, estimate finish Sun Feb 26 14:38:07 2012
28.76% done, estimate finish Sun Feb 26 14:38:07 2012
28.76% done, estimate finish Sun Feb 26 14:38:06 2012
28.77% done, estimate finish Sun Feb 26 14:38:06 2012
28.77% done, estimate finish Sun Feb 26 14:38:09 2012
28.78% done, estimate finish Sun Feb 26 14:38:09 2012
28.78% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.79% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.80% done, estimate finish Sun Feb 26 14:38:10 2012
28.80% done, estimate finish Sun Feb 26 14:38:09 2012
28.81% done, estimate finish Sun Feb 26 14:38:09 2012
=== last message repeated 2 times. ===
28.82% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.83% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.84% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
28.85% done, estimate finish Sun Feb 26 14:38:05 2012
28.85% done, estimate finish Sun Feb 26 14:38:09 2012
28.86% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.86% done, estimate finish Sun Feb 26 14:38:07 2012
28.87% done, estimate finish Sun Feb 26 14:38:07 2012
28.87% done, estimate finish Sun Feb 26 14:38:06 2012
28.88% done, estimate finish Sun Feb 26 14:38:06 2012
28.88% done, estimate finish Sun Feb 26 14:38:09 2012
28.89% done, estimate finish Sun Feb 26 14:38:09 2012
28.89% done, estimate finish Sun Feb 26 14:38:08 2012
28.90% done, estimate finish Sun Feb 26 14:38:08 2012
28.90% done, estimate finish Sun Feb 26 14:38:07 2012
28.91% done, estimate finish Sun Feb 26 14:38:07 2012
28.91% done, estimate finish Sun Feb 26 14:38:06 2012
28.92% done, estimate finish Sun Feb 26 14:38:06 2012
28.92% done, estimate finish Sun Feb 26 14:38:09 2012
28.93% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.94% done, estimate finish Sun Feb 26 14:38:08 2012
28.94% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.95% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
28.96% done, estimate finish Sun Feb 26 14:38:05 2012
28.96% done, estimate finish Sun Feb 26 14:38:08 2012
28.97% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
28.98% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
28.99% done, estimate finish Sun Feb 26 14:38:06 2012
28.99% done, estimate finish Sun Feb 26 14:38:09 2012
29.00% done, estimate finish Sun Feb 26 14:38:09 2012
29.00% done, estimate finish Sun Feb 26 14:38:08 2012
29.01% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
29.02% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.02% done, estimate finish Sun Feb 26 14:38:06 2012
29.03% done, estimate finish Sun Feb 26 14:38:06 2012
29.03% done, estimate finish Sun Feb 26 14:38:05 2012
29.04% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.05% done, estimate finish Sun Feb 26 14:38:08 2012
29.05% done, estimate finish Sun Feb 26 14:38:07 2012
29.06% done, estimate finish Sun Feb 26 14:38:07 2012
29.06% done, estimate finish Sun Feb 26 14:38:06 2012
29.07% done, estimate finish Sun Feb 26 14:38:06 2012
29.07% done, estimate finish Sun Feb 26 14:38:05 2012
29.08% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
29.09% done, estimate finish Sun Feb 26 14:38:08 2012
29.09% done, estimate finish Sun Feb 26 14:38:07 2012
29.10% done, estimate finish Sun Feb 26 14:38:07 2012
29.10% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.11% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.12% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
29.13% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.14% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.15% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.16% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
29.17% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.18% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.18% done, estimate finish Sun Feb 26 14:38:05 2012
29.19% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
29.20% done, estimate finish Sun Feb 26 14:38:08 2012
29.20% done, estimate finish Sun Feb 26 14:38:07 2012
29.21% done, estimate finish Sun Feb 26 14:38:07 2012
29.21% done, estimate finish Sun Feb 26 14:38:06 2012
29.22% done, estimate finish Sun Feb 26 14:38:06 2012
29.22% done, estimate finish Sun Feb 26 14:38:05 2012
29.23% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.24% done, estimate finish Sun Feb 26 14:38:04 2012
29.24% done, estimate finish Sun Feb 26 14:38:07 2012
29.25% done, estimate finish Sun Feb 26 14:38:07 2012
29.25% done, estimate finish Sun Feb 26 14:38:06 2012
29.26% done, estimate finish Sun Feb 26 14:38:06 2012
29.26% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.27% done, estimate finish Sun Feb 26 14:38:08 2012
=== last message repeated 2 times. ===
29.28% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.29% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.30% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.31% done, estimate finish Sun Feb 26 14:38:05 2012
29.31% done, estimate finish Sun Feb 26 14:38:04 2012
29.32% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.33% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.34% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 3 times. ===
29.35% done, estimate finish Sun Feb 26 14:38:08 2012
29.35% done, estimate finish Sun Feb 26 14:38:07 2012
29.36% done, estimate finish Sun Feb 26 14:38:07 2012
29.36% done, estimate finish Sun Feb 26 14:38:06 2012
29.37% done, estimate finish Sun Feb 26 14:38:06 2012
29.37% done, estimate finish Sun Feb 26 14:38:05 2012
29.38% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.39% done, estimate finish Sun Feb 26 14:38:04 2012
29.39% done, estimate finish Sun Feb 26 14:38:07 2012
29.40% done, estimate finish Sun Feb 26 14:38:07 2012
29.40% done, estimate finish Sun Feb 26 14:38:06 2012
29.41% done, estimate finish Sun Feb 26 14:38:06 2012
29.41% done, estimate finish Sun Feb 26 14:38:05 2012
29.42% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.42% done, estimate finish Sun Feb 26 14:38:04 2012
29.43% done, estimate finish Sun Feb 26 14:38:04 2012
29.43% done, estimate finish Sun Feb 26 14:38:07 2012
29.44% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.45% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.46% done, estimate finish Sun Feb 26 14:38:05 2012
29.46% done, estimate finish Sun Feb 26 14:38:04 2012
29.47% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.48% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.49% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.50% done, estimate finish Sun Feb 26 14:38:05 2012
29.50% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.51% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
29.52% done, estimate finish Sun Feb 26 14:38:06 2012
29.52% done, estimate finish Sun Feb 26 14:38:05 2012
29.53% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.54% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.55% done, estimate finish Sun Feb 26 14:38:07 2012
29.55% done, estimate finish Sun Feb 26 14:38:06 2012
29.56% done, estimate finish Sun Feb 26 14:38:06 2012
29.56% done, estimate finish Sun Feb 26 14:38:05 2012
29.57% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.58% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.58% done, estimate finish Sun Feb 26 14:38:03 2012
29.59% done, estimate finish Sun Feb 26 14:38:03 2012
29.59% done, estimate finish Sun Feb 26 14:38:02 2012
29.60% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.61% done, estimate finish Sun Feb 26 14:38:05 2012
29.61% done, estimate finish Sun Feb 26 14:38:04 2012
29.62% done, estimate finish Sun Feb 26 14:38:04 2012
29.62% done, estimate finish Sun Feb 26 14:38:03 2012
29.63% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.64% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.65% done, estimate finish Sun Feb 26 14:38:05 2012
29.65% done, estimate finish Sun Feb 26 14:38:04 2012
29.66% done, estimate finish Sun Feb 26 14:38:07 2012
=== last message repeated 2 times. ===
29.66% done, estimate finish Sun Feb 26 14:38:06 2012
29.67% done, estimate finish Sun Feb 26 14:38:06 2012
29.67% done, estimate finish Sun Feb 26 14:38:05 2012
29.68% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.69% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.70% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
29.71% done, estimate finish Sun Feb 26 14:38:02 2012
29.71% done, estimate finish Sun Feb 26 14:38:05 2012
29.72% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.73% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.74% done, estimate finish Sun Feb 26 14:38:03 2012
29.74% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.75% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.76% done, estimate finish Sun Feb 26 14:38:05 2012
29.76% done, estimate finish Sun Feb 26 14:38:04 2012
29.77% done, estimate finish Sun Feb 26 14:38:04 2012
29.77% done, estimate finish Sun Feb 26 14:38:03 2012
29.78% done, estimate finish Sun Feb 26 14:38:03 2012
29.78% done, estimate finish Sun Feb 26 14:38:02 2012
29.79% done, estimate finish Sun Feb 26 14:38:02 2012
29.79% done, estimate finish Sun Feb 26 14:38:05 2012
29.80% done, estimate finish Sun Feb 26 14:38:05 2012
29.80% done, estimate finish Sun Feb 26 14:38:04 2012
29.81% done, estimate finish Sun Feb 26 14:38:04 2012
29.81% done, estimate finish Sun Feb 26 14:38:03 2012
29.82% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.83% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 3 times. ===
29.84% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.85% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
29.86% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
29.87% done, estimate finish Sun Feb 26 14:38:02 2012
29.87% done, estimate finish Sun Feb 26 14:38:04 2012
29.88% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.89% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
29.90% done, estimate finish Sun Feb 26 14:38:02 2012
29.90% done, estimate finish Sun Feb 26 14:38:05 2012
29.91% done, estimate finish Sun Feb 26 14:38:05 2012
29.91% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.92% done, estimate finish Sun Feb 26 14:38:04 2012
29.92% done, estimate finish Sun Feb 26 14:38:03 2012
29.93% done, estimate finish Sun Feb 26 14:38:06 2012
=== last message repeated 2 times. ===
29.94% done, estimate finish Sun Feb 26 14:38:05 2012
=== last message repeated 2 times. ===
29.95% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
29.96% done, estimate finish Sun Feb 26 14:38:04 2012
29.96% done, estimate finish Sun Feb 26 14:38:03 2012
29.97% done, estimate finish Sun Feb 26 14:38:03 2012
29.97% done, estimate finish Sun Feb 26 14:38:02 2012
29.98% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
29.99% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 3 times. ===
30.00% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.01% done, estimate finish Sun Feb 26 14:38:02 2012
30.01% done, estimate finish Sun Feb 26 14:38:05 2012
30.02% done, estimate finish Sun Feb 26 14:38:05 2012
30.02% done, estimate finish Sun Feb 26 14:38:04 2012
30.03% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.04% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.05% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.06% done, estimate finish Sun Feb 26 14:38:02 2012
30.06% done, estimate finish Sun Feb 26 14:38:01 2012
30.07% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.07% done, estimate finish Sun Feb 26 14:38:03 2012
30.08% done, estimate finish Sun Feb 26 14:38:03 2012
30.08% done, estimate finish Sun Feb 26 14:38:02 2012
30.09% done, estimate finish Sun Feb 26 14:38:02 2012
30.09% done, estimate finish Sun Feb 26 14:38:05 2012
30.10% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.11% done, estimate finish Sun Feb 26 14:38:04 2012
30.11% done, estimate finish Sun Feb 26 14:38:03 2012
30.12% done, estimate finish Sun Feb 26 14:38:03 2012
30.12% done, estimate finish Sun Feb 26 14:38:02 2012
30.13% done, estimate finish Sun Feb 26 14:38:02 2012
30.13% done, estimate finish Sun Feb 26 14:38:05 2012
30.14% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.15% done, estimate finish Sun Feb 26 14:38:04 2012
30.15% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.16% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.17% done, estimate finish Sun Feb 26 14:38:02 2012
30.17% done, estimate finish Sun Feb 26 14:38:01 2012
30.18% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.19% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.20% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.21% done, estimate finish Sun Feb 26 14:38:05 2012
30.21% done, estimate finish Sun Feb 26 14:38:04 2012
30.22% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.23% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.23% done, estimate finish Sun Feb 26 14:38:02 2012
30.24% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.25% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.26% done, estimate finish Sun Feb 26 14:38:00 2012
30.26% done, estimate finish Sun Feb 26 14:38:03 2012
30.27% done, estimate finish Sun Feb 26 14:38:03 2012
30.27% done, estimate finish Sun Feb 26 14:38:02 2012
30.28% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.29% done, estimate finish Sun Feb 26 14:38:01 2012
30.29% done, estimate finish Sun Feb 26 14:38:04 2012
30.30% done, estimate finish Sun Feb 26 14:38:04 2012
30.30% done, estimate finish Sun Feb 26 14:38:03 2012
30.31% done, estimate finish Sun Feb 26 14:38:03 2012
30.31% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.32% done, estimate finish Sun Feb 26 14:38:02 2012
30.32% done, estimate finish Sun Feb 26 14:38:01 2012
30.33% done, estimate finish Sun Feb 26 14:38:01 2012
30.33% done, estimate finish Sun Feb 26 14:38:04 2012
30.34% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.35% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.36% done, estimate finish Sun Feb 26 14:38:02 2012
30.36% done, estimate finish Sun Feb 26 14:38:01 2012
30.37% done, estimate finish Sun Feb 26 14:38:01 2012
30.37% done, estimate finish Sun Feb 26 14:38:04 2012
30.38% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.39% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 3 times. ===
30.40% done, estimate finish Sun Feb 26 14:38:04 2012
=== last message repeated 2 times. ===
30.41% done, estimate finish Sun Feb 26 14:38:04 2012
30.41% done, estimate finish Sun Feb 26 14:38:03 2012
30.42% done, estimate finish Sun Feb 26 14:38:03 2012
30.42% done, estimate finish Sun Feb 26 14:38:02 2012
30.43% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.44% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.45% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.46% done, estimate finish Sun Feb 26 14:38:03 2012
30.46% done, estimate finish Sun Feb 26 14:38:02 2012
30.47% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.47% done, estimate finish Sun Feb 26 14:38:01 2012
30.48% done, estimate finish Sun Feb 26 14:38:01 2012
30.48% done, estimate finish Sun Feb 26 14:38:04 2012
30.49% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.50% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.51% done, estimate finish Sun Feb 26 14:38:02 2012
30.51% done, estimate finish Sun Feb 26 14:38:01 2012
30.52% done, estimate finish Sun Feb 26 14:38:01 2012
30.52% done, estimate finish Sun Feb 26 14:38:00 2012
30.53% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.54% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.55% done, estimate finish Sun Feb 26 14:38:02 2012
30.55% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.56% done, estimate finish Sun Feb 26 14:38:00 2012
30.56% done, estimate finish Sun Feb 26 14:38:03 2012
30.57% done, estimate finish Sun Feb 26 14:38:03 2012
30.57% done, estimate finish Sun Feb 26 14:38:02 2012
30.58% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.59% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.60% done, estimate finish Sun Feb 26 14:38:04 2012
30.60% done, estimate finish Sun Feb 26 14:38:03 2012
30.61% done, estimate finish Sun Feb 26 14:38:03 2012
30.61% done, estimate finish Sun Feb 26 14:38:02 2012
30.62% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.63% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.64% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 3 times. ===
30.65% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.66% done, estimate finish Sun Feb 26 14:38:02 2012
30.66% done, estimate finish Sun Feb 26 14:38:01 2012
30.67% done, estimate finish Sun Feb 26 14:38:01 2012
30.67% done, estimate finish Sun Feb 26 14:38:00 2012
30.68% done, estimate finish Sun Feb 26 14:38:03 2012
=== last message repeated 2 times. ===
30.69% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.70% done, estimate finish Sun Feb 26 14:38:02 2012
30.70% done, estimate finish Sun Feb 26 14:38:01 2012
30.71% done, estimate finish Sun Feb 26 14:38:01 2012
30.71% done, estimate finish Sun Feb 26 14:38:00 2012
30.72% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.72% done, estimate finish Sun Feb 26 14:37:59 2012
30.73% done, estimate finish Sun Feb 26 14:37:59 2012
30.73% done, estimate finish Sun Feb 26 14:38:02 2012
30.74% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.75% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.76% done, estimate finish Sun Feb 26 14:38:00 2012
30.76% done, estimate finish Sun Feb 26 14:38:02 2012
30.77% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.78% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.79% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.80% done, estimate finish Sun Feb 26 14:38:03 2012
30.80% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.81% done, estimate finish Sun Feb 26 14:38:02 2012
30.81% done, estimate finish Sun Feb 26 14:38:01 2012
30.82% done, estimate finish Sun Feb 26 14:38:01 2012
30.82% done, estimate finish Sun Feb 26 14:38:00 2012
30.83% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.84% done, estimate finish Sun Feb 26 14:37:59 2012
30.84% done, estimate finish Sun Feb 26 14:38:02 2012
30.85% done, estimate finish Sun Feb 26 14:38:02 2012
30.85% done, estimate finish Sun Feb 26 14:38:01 2012
30.86% done, estimate finish Sun Feb 26 14:38:01 2012
30.86% done, estimate finish Sun Feb 26 14:38:00 2012
30.87% done, estimate finish Sun Feb 26 14:38:00 2012
30.87% done, estimate finish Sun Feb 26 14:38:03 2012
30.88% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 3 times. ===
30.89% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.90% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.91% done, estimate finish Sun Feb 26 14:38:00 2012
30.91% done, estimate finish Sun Feb 26 14:37:59 2012
30.92% done, estimate finish Sun Feb 26 14:37:59 2012
30.92% done, estimate finish Sun Feb 26 14:37:58 2012
30.93% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
30.94% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.95% done, estimate finish Sun Feb 26 14:38:00 2012
30.95% done, estimate finish Sun Feb 26 14:37:59 2012
30.96% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
30.96% done, estimate finish Sun Feb 26 14:38:01 2012
30.97% done, estimate finish Sun Feb 26 14:38:01 2012
30.97% done, estimate finish Sun Feb 26 14:38:00 2012
30.98% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
30.99% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
31.00% done, estimate finish Sun Feb 26 14:38:02 2012
31.00% done, estimate finish Sun Feb 26 14:38:01 2012
31.01% done, estimate finish Sun Feb 26 14:38:01 2012
31.01% done, estimate finish Sun Feb 26 14:38:00 2012
31.02% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.03% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.04% done, estimate finish Sun Feb 26 14:37:58 2012
31.04% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
31.05% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.06% done, estimate finish Sun Feb 26 14:38:00 2012
31.06% done, estimate finish Sun Feb 26 14:38:02 2012
31.07% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
31.08% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
31.09% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.10% done, estimate finish Sun Feb 26 14:38:00 2012
31.10% done, estimate finish Sun Feb 26 14:37:59 2012
31.11% done, estimate finish Sun Feb 26 14:37:59 2012
31.11% done, estimate finish Sun Feb 26 14:37:58 2012
31.12% done, estimate finish Sun Feb 26 14:37:58 2012
31.12% done, estimate finish Sun Feb 26 14:38:01 2012
31.12% done, estimate finish Sun Feb 26 14:38:00 2012
31.13% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.14% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.15% done, estimate finish Sun Feb 26 14:38:02 2012
31.15% done, estimate finish Sun Feb 26 14:38:01 2012
31.16% done, estimate finish Sun Feb 26 14:38:01 2012
31.16% done, estimate finish Sun Feb 26 14:38:00 2012
31.17% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.18% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
31.19% done, estimate finish Sun Feb 26 14:38:02 2012
31.19% done, estimate finish Sun Feb 26 14:38:01 2012
31.20% done, estimate finish Sun Feb 26 14:38:01 2012
31.20% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.21% done, estimate finish Sun Feb 26 14:38:00 2012
31.21% done, estimate finish Sun Feb 26 14:37:59 2012
31.22% done, estimate finish Sun Feb 26 14:37:59 2012
31.22% done, estimate finish Sun Feb 26 14:37:58 2012
31.23% done, estimate finish Sun Feb 26 14:37:58 2012
31.23% done, estimate finish Sun Feb 26 14:38:01 2012
31.24% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.25% done, estimate finish Sun Feb 26 14:38:00 2012
31.25% done, estimate finish Sun Feb 26 14:37:59 2012
31.26% done, estimate finish Sun Feb 26 14:37:59 2012
31.26% done, estimate finish Sun Feb 26 14:38:02 2012
31.27% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
31.28% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 3 times. ===
31.29% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.30% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.31% done, estimate finish Sun Feb 26 14:38:01 2012
31.31% done, estimate finish Sun Feb 26 14:38:00 2012
31.32% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.33% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.34% done, estimate finish Sun Feb 26 14:37:58 2012
31.34% done, estimate finish Sun Feb 26 14:38:01 2012
31.35% done, estimate finish Sun Feb 26 14:38:01 2012
31.35% done, estimate finish Sun Feb 26 14:38:00 2012
31.36% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.36% done, estimate finish Sun Feb 26 14:37:59 2012
31.37% done, estimate finish Sun Feb 26 14:38:02 2012
=== last message repeated 2 times. ===
31.38% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
31.39% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.40% done, estimate finish Sun Feb 26 14:38:00 2012
31.40% done, estimate finish Sun Feb 26 14:37:59 2012
31.41% done, estimate finish Sun Feb 26 14:37:59 2012
31.41% done, estimate finish Sun Feb 26 14:37:58 2012
31.42% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.43% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.44% done, estimate finish Sun Feb 26 14:38:00 2012
31.44% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.45% done, estimate finish Sun Feb 26 14:37:58 2012
31.45% done, estimate finish Sun Feb 26 14:38:01 2012
31.46% done, estimate finish Sun Feb 26 14:38:01 2012
31.46% done, estimate finish Sun Feb 26 14:38:00 2012
31.47% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.48% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.49% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.50% done, estimate finish Sun Feb 26 14:38:01 2012
31.50% done, estimate finish Sun Feb 26 14:38:00 2012
31.51% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.52% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.52% done, estimate finish Sun Feb 26 14:37:58 2012
31.53% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.54% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.55% done, estimate finish Sun Feb 26 14:38:00 2012
31.55% done, estimate finish Sun Feb 26 14:37:59 2012
31.56% done, estimate finish Sun Feb 26 14:37:59 2012
31.56% done, estimate finish Sun Feb 26 14:38:02 2012
31.57% done, estimate finish Sun Feb 26 14:38:01 2012
=== last message repeated 2 times. ===
31.58% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.59% done, estimate finish Sun Feb 26 14:38:00 2012
31.59% done, estimate finish Sun Feb 26 14:37:59 2012
31.60% done, estimate finish Sun Feb 26 14:37:59 2012
31.60% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.61% done, estimate finish Sun Feb 26 14:37:58 2012
31.61% done, estimate finish Sun Feb 26 14:37:57 2012
31.62% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.63% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.64% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.65% done, estimate finish Sun Feb 26 14:38:01 2012
31.65% done, estimate finish Sun Feb 26 14:38:00 2012
31.66% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.67% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.68% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 3 times. ===
31.69% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.70% done, estimate finish Sun Feb 26 14:38:00 2012
31.70% done, estimate finish Sun Feb 26 14:37:59 2012
31.71% done, estimate finish Sun Feb 26 14:37:59 2012
31.71% done, estimate finish Sun Feb 26 14:37:58 2012
31.72% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.73% done, estimate finish Sun Feb 26 14:37:57 2012
31.73% done, estimate finish Sun Feb 26 14:38:00 2012
31.74% done, estimate finish Sun Feb 26 14:38:00 2012
31.74% done, estimate finish Sun Feb 26 14:37:59 2012
31.75% done, estimate finish Sun Feb 26 14:37:59 2012
31.75% done, estimate finish Sun Feb 26 14:37:58 2012
31.76% done, estimate finish Sun Feb 26 14:37:58 2012
31.76% done, estimate finish Sun Feb 26 14:38:01 2012
31.77% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 3 times. ===
31.78% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.79% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.80% done, estimate finish Sun Feb 26 14:37:58 2012
31.80% done, estimate finish Sun Feb 26 14:37:57 2012
31.81% done, estimate finish Sun Feb 26 14:37:57 2012
31.81% done, estimate finish Sun Feb 26 14:38:00 2012
31.82% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.83% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.84% done, estimate finish Sun Feb 26 14:37:58 2012
31.84% done, estimate finish Sun Feb 26 14:38:00 2012
31.85% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.85% done, estimate finish Sun Feb 26 14:37:59 2012
31.86% done, estimate finish Sun Feb 26 14:37:59 2012
31.86% done, estimate finish Sun Feb 26 14:37:58 2012
31.87% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.88% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.89% done, estimate finish Sun Feb 26 14:38:00 2012
31.89% done, estimate finish Sun Feb 26 14:37:59 2012
31.90% done, estimate finish Sun Feb 26 14:37:59 2012
31.90% done, estimate finish Sun Feb 26 14:37:58 2012
31.91% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.92% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
31.93% done, estimate finish Sun Feb 26 14:38:00 2012
31.93% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.94% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.95% done, estimate finish Sun Feb 26 14:37:58 2012
31.95% done, estimate finish Sun Feb 26 14:38:00 2012
31.96% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
31.97% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
31.98% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
31.99% done, estimate finish Sun Feb 26 14:37:58 2012
31.99% done, estimate finish Sun Feb 26 14:37:57 2012
32.00% done, estimate finish Sun Feb 26 14:37:57 2012
32.00% done, estimate finish Sun Feb 26 14:37:56 2012
32.01% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
32.01% done, estimate finish Sun Feb 26 14:37:58 2012
32.02% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.03% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.04% done, estimate finish Sun Feb 26 14:38:00 2012
32.04% done, estimate finish Sun Feb 26 14:37:59 2012
32.05% done, estimate finish Sun Feb 26 14:37:59 2012
32.05% done, estimate finish Sun Feb 26 14:37:58 2012
32.06% done, estimate finish Sun Feb 26 14:37:58 2012
32.06% done, estimate finish Sun Feb 26 14:38:01 2012
32.07% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
32.08% done, estimate finish Sun Feb 26 14:38:00 2012
32.08% done, estimate finish Sun Feb 26 14:37:59 2012
32.09% done, estimate finish Sun Feb 26 14:37:59 2012
32.09% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.10% done, estimate finish Sun Feb 26 14:37:58 2012
32.10% done, estimate finish Sun Feb 26 14:37:57 2012
32.11% done, estimate finish Sun Feb 26 14:37:57 2012
32.11% done, estimate finish Sun Feb 26 14:37:56 2012
32.12% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
32.13% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.14% done, estimate finish Sun Feb 26 14:37:58 2012
32.14% done, estimate finish Sun Feb 26 14:37:57 2012
32.15% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
32.16% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
32.17% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 3 times. ===
32.18% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.19% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.20% done, estimate finish Sun Feb 26 14:37:59 2012
32.20% done, estimate finish Sun Feb 26 14:37:58 2012
32.21% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.22% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.23% done, estimate finish Sun Feb 26 14:37:56 2012
32.23% done, estimate finish Sun Feb 26 14:37:59 2012
32.24% done, estimate finish Sun Feb 26 14:37:59 2012
32.24% done, estimate finish Sun Feb 26 14:37:58 2012
32.25% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.25% done, estimate finish Sun Feb 26 14:37:57 2012
32.26% done, estimate finish Sun Feb 26 14:38:00 2012
=== last message repeated 2 times. ===
32.27% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
32.28% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.29% done, estimate finish Sun Feb 26 14:37:58 2012
32.29% done, estimate finish Sun Feb 26 14:37:57 2012
32.30% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.31% done, estimate finish Sun Feb 26 14:37:56 2012
32.31% done, estimate finish Sun Feb 26 14:37:59 2012
32.32% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.33% done, estimate finish Sun Feb 26 14:37:58 2012
32.33% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.34% done, estimate finish Sun Feb 26 14:38:00 2012
32.34% done, estimate finish Sun Feb 26 14:37:59 2012
32.35% done, estimate finish Sun Feb 26 14:37:59 2012
32.35% done, estimate finish Sun Feb 26 14:37:58 2012
32.36% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.37% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.38% done, estimate finish Sun Feb 26 14:37:57 2012
32.38% done, estimate finish Sun Feb 26 14:37:56 2012
32.39% done, estimate finish Sun Feb 26 14:37:56 2012
32.39% done, estimate finish Sun Feb 26 14:37:55 2012
32.40% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.41% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 3 times. ===
32.42% done, estimate finish Sun Feb 26 14:37:56 2012
32.42% done, estimate finish Sun Feb 26 14:37:59 2012
32.43% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.44% done, estimate finish Sun Feb 26 14:37:58 2012
32.44% done, estimate finish Sun Feb 26 14:37:57 2012
32.45% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.46% done, estimate finish Sun Feb 26 14:37:59 2012
=== last message repeated 2 times. ===
32.47% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.48% done, estimate finish Sun Feb 26 14:37:58 2012
32.48% done, estimate finish Sun Feb 26 14:37:57 2012
32.49% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.49% done, estimate finish Sun Feb 26 14:37:56 2012
32.50% done, estimate finish Sun Feb 26 14:37:56 2012
32.50% done, estimate finish Sun Feb 26 14:37:55 2012
32.51% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.52% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.53% done, estimate finish Sun Feb 26 14:37:57 2012
32.53% done, estimate finish Sun Feb 26 14:37:56 2012
32.54% done, estimate finish Sun Feb 26 14:37:59 2012
32.54% done, estimate finish Sun Feb 26 14:37:58 2012
32.55% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.56% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.57% done, estimate finish Sun Feb 26 14:37:57 2012
32.57% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.58% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
32.59% done, estimate finish Sun Feb 26 14:37:58 2012
32.59% done, estimate finish Sun Feb 26 14:37:57 2012
32.60% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.61% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.62% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.63% done, estimate finish Sun Feb 26 14:37:58 2012
32.63% done, estimate finish Sun Feb 26 14:37:57 2012
32.64% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.65% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.66% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 3 times. ===
32.67% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.68% done, estimate finish Sun Feb 26 14:37:57 2012
32.68% done, estimate finish Sun Feb 26 14:37:56 2012
32.69% done, estimate finish Sun Feb 26 14:37:56 2012
32.69% done, estimate finish Sun Feb 26 14:37:55 2012
32.70% done, estimate finish Sun Feb 26 14:37:55 2012
32.70% done, estimate finish Sun Feb 26 14:37:58 2012
32.71% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.72% done, estimate finish Sun Feb 26 14:37:57 2012
32.72% done, estimate finish Sun Feb 26 14:37:56 2012
32.73% done, estimate finish Sun Feb 26 14:37:56 2012
32.73% done, estimate finish Sun Feb 26 14:37:58 2012
32.74% done, estimate finish Sun Feb 26 14:37:58 2012
=== last message repeated 2 times. ===
32.74% done, estimate finish Sun Feb 26 14:37:57 2012
32.75% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.76% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.77% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
32.78% done, estimate finish Sun Feb 26 14:37:55 2012
32.78% done, estimate finish Sun Feb 26 14:37:57 2012
32.79% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.80% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.81% done, estimate finish Sun Feb 26 14:37:55 2012
32.81% done, estimate finish Sun Feb 26 14:37:58 2012
32.82% done, estimate finish Sun Feb 26 14:37:58 2012
32.82% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.83% done, estimate finish Sun Feb 26 14:37:57 2012
32.83% done, estimate finish Sun Feb 26 14:37:56 2012
32.84% done, estimate finish Sun Feb 26 14:37:56 2012
32.84% done, estimate finish Sun Feb 26 14:37:55 2012
32.85% done, estimate finish Sun Feb 26 14:37:55 2012
32.85% done, estimate finish Sun Feb 26 14:37:58 2012
32.86% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.87% done, estimate finish Sun Feb 26 14:37:57 2012
32.87% done, estimate finish Sun Feb 26 14:37:56 2012
32.88% done, estimate finish Sun Feb 26 14:37:56 2012
32.88% done, estimate finish Sun Feb 26 14:37:55 2012
32.89% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
32.90% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 3 times. ===
32.91% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.92% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
32.93% done, estimate finish Sun Feb 26 14:37:55 2012
32.93% done, estimate finish Sun Feb 26 14:37:57 2012
32.94% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
32.95% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
32.96% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
32.97% done, estimate finish Sun Feb 26 14:37:55 2012
32.97% done, estimate finish Sun Feb 26 14:37:54 2012
32.98% done, estimate finish Sun Feb 26 14:37:54 2012
32.98% done, estimate finish Sun Feb 26 14:37:57 2012
32.98% done, estimate finish Sun Feb 26 14:37:56 2012
32.99% done, estimate finish Sun Feb 26 14:37:56 2012
32.99% done, estimate finish Sun Feb 26 14:37:55 2012
33.00% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.01% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
33.02% done, estimate finish Sun Feb 26 14:37:57 2012
33.02% done, estimate finish Sun Feb 26 14:37:56 2012
33.03% done, estimate finish Sun Feb 26 14:37:56 2012
33.03% done, estimate finish Sun Feb 26 14:37:55 2012
33.04% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.05% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.06% done, estimate finish Sun Feb 26 14:37:57 2012
33.06% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.07% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.08% done, estimate finish Sun Feb 26 14:37:55 2012
33.08% done, estimate finish Sun Feb 26 14:37:54 2012
33.09% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
33.10% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.11% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.12% done, estimate finish Sun Feb 26 14:37:58 2012
33.12% done, estimate finish Sun Feb 26 14:37:57 2012
33.13% done, estimate finish Sun Feb 26 14:37:57 2012
=== last message repeated 2 times. ===
33.14% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.14% done, estimate finish Sun Feb 26 14:37:55 2012
33.15% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.16% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.17% done, estimate finish Sun Feb 26 14:37:54 2012
33.17% done, estimate finish Sun Feb 26 14:37:56 2012
33.18% done, estimate finish Sun Feb 26 14:37:56 2012
33.18% done, estimate finish Sun Feb 26 14:37:55 2012
33.19% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.20% done, estimate finish Sun Feb 26 14:37:54 2012
33.20% done, estimate finish Sun Feb 26 14:37:57 2012
33.21% done, estimate finish Sun Feb 26 14:37:57 2012
33.21% done, estimate finish Sun Feb 26 14:37:56 2012
33.22% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.22% done, estimate finish Sun Feb 26 14:37:55 2012
33.23% done, estimate finish Sun Feb 26 14:37:55 2012
33.23% done, estimate finish Sun Feb 26 14:37:54 2012
33.24% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.25% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.26% done, estimate finish Sun Feb 26 14:37:56 2012
33.26% done, estimate finish Sun Feb 26 14:37:55 2012
33.27% done, estimate finish Sun Feb 26 14:37:55 2012
33.27% done, estimate finish Sun Feb 26 14:37:54 2012
33.28% done, estimate finish Sun Feb 26 14:37:54 2012
33.28% done, estimate finish Sun Feb 26 14:37:57 2012
33.29% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.30% done, estimate finish Sun Feb 26 14:37:56 2012
33.30% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.31% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.32% done, estimate finish Sun Feb 26 14:37:57 2012
33.32% done, estimate finish Sun Feb 26 14:37:56 2012
33.33% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.34% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.35% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.36% done, estimate finish Sun Feb 26 14:37:54 2012
33.36% done, estimate finish Sun Feb 26 14:37:53 2012
33.37% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.38% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.38% done, estimate finish Sun Feb 26 14:37:54 2012
33.39% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.40% done, estimate finish Sun Feb 26 14:37:53 2012
33.40% done, estimate finish Sun Feb 26 14:37:56 2012
33.41% done, estimate finish Sun Feb 26 14:37:56 2012
33.41% done, estimate finish Sun Feb 26 14:37:55 2012
33.42% done, estimate finish Sun Feb 26 14:37:55 2012
33.42% done, estimate finish Sun Feb 26 14:37:54 2012
33.43% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.44% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.45% done, estimate finish Sun Feb 26 14:37:53 2012
33.45% done, estimate finish Sun Feb 26 14:37:55 2012
33.46% done, estimate finish Sun Feb 26 14:37:55 2012
33.46% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.47% done, estimate finish Sun Feb 26 14:37:54 2012
33.47% done, estimate finish Sun Feb 26 14:37:53 2012
33.48% done, estimate finish Sun Feb 26 14:37:56 2012
=== last message repeated 2 times. ===
33.49% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.50% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.51% done, estimate finish Sun Feb 26 14:37:54 2012
33.51% done, estimate finish Sun Feb 26 14:37:53 2012
33.52% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.53% done, estimate finish Sun Feb 26 14:37:52 2012
33.53% done, estimate finish Sun Feb 26 14:37:55 2012
33.54% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 3 times. ===
33.55% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.56% done, estimate finish Sun Feb 26 14:37:56 2012
33.56% done, estimate finish Sun Feb 26 14:37:55 2012
33.57% done, estimate finish Sun Feb 26 14:37:55 2012
33.57% done, estimate finish Sun Feb 26 14:37:54 2012
33.58% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.59% done, estimate finish Sun Feb 26 14:37:53 2012
33.59% done, estimate finish Sun Feb 26 14:37:56 2012
33.60% done, estimate finish Sun Feb 26 14:37:56 2012
33.60% done, estimate finish Sun Feb 26 14:37:55 2012
33.61% done, estimate finish Sun Feb 26 14:37:55 2012
33.61% done, estimate finish Sun Feb 26 14:37:54 2012
33.62% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.62% done, estimate finish Sun Feb 26 14:37:53 2012
33.63% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.64% done, estimate finish Sun Feb 26 14:37:52 2012
33.64% done, estimate finish Sun Feb 26 14:37:55 2012
33.65% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.66% done, estimate finish Sun Feb 26 14:37:54 2012
33.66% done, estimate finish Sun Feb 26 14:37:53 2012
33.67% done, estimate finish Sun Feb 26 14:37:53 2012
33.67% done, estimate finish Sun Feb 26 14:37:56 2012
33.68% done, estimate finish Sun Feb 26 14:37:55 2012
=== last message repeated 2 times. ===
33.69% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.70% done, estimate finish Sun Feb 26 14:37:54 2012
33.70% done, estimate finish Sun Feb 26 14:37:53 2012
33.71% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.71% done, estimate finish Sun Feb 26 14:37:52 2012
33.72% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
33.73% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.74% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.75% done, estimate finish Sun Feb 26 14:37:53 2012
33.75% done, estimate finish Sun Feb 26 14:37:52 2012
33.76% done, estimate finish Sun Feb 26 14:37:55 2012
33.76% done, estimate finish Sun Feb 26 14:37:54 2012
33.77% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.78% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.79% done, estimate finish Sun Feb 26 14:37:53 2012
33.79% done, estimate finish Sun Feb 26 14:37:52 2012
33.79% done, estimate finish Sun Feb 26 14:37:55 2012
33.80% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.81% done, estimate finish Sun Feb 26 14:37:54 2012
33.81% done, estimate finish Sun Feb 26 14:37:53 2012
33.82% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.83% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
33.84% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.85% done, estimate finish Sun Feb 26 14:37:54 2012
33.85% done, estimate finish Sun Feb 26 14:37:53 2012
33.86% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.87% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
33.87% done, estimate finish Sun Feb 26 14:37:55 2012
33.88% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.89% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.90% done, estimate finish Sun Feb 26 14:37:53 2012
33.90% done, estimate finish Sun Feb 26 14:37:52 2012
33.91% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
33.92% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
33.93% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.94% done, estimate finish Sun Feb 26 14:37:53 2012
33.94% done, estimate finish Sun Feb 26 14:37:52 2012
33.95% done, estimate finish Sun Feb 26 14:37:52 2012
33.95% done, estimate finish Sun Feb 26 14:37:55 2012
33.95% done, estimate finish Sun Feb 26 14:37:54 2012
33.96% done, estimate finish Sun Feb 26 14:37:54 2012
33.96% done, estimate finish Sun Feb 26 14:37:53 2012
33.97% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
33.98% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
33.99% done, estimate finish Sun Feb 26 14:37:52 2012
33.99% done, estimate finish Sun Feb 26 14:37:51 2012
34.00% done, estimate finish Sun Feb 26 14:37:51 2012
34.00% done, estimate finish Sun Feb 26 14:37:50 2012
34.01% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.02% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.03% done, estimate finish Sun Feb 26 14:37:52 2012
34.03% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
34.04% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.05% done, estimate finish Sun Feb 26 14:37:53 2012
34.05% done, estimate finish Sun Feb 26 14:37:52 2012
34.06% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.07% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
34.08% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.09% done, estimate finish Sun Feb 26 14:37:53 2012
34.09% done, estimate finish Sun Feb 26 14:37:52 2012
34.10% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.11% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.11% done, estimate finish Sun Feb 26 14:37:53 2012
34.12% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.13% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.14% done, estimate finish Sun Feb 26 14:37:52 2012
34.14% done, estimate finish Sun Feb 26 14:37:54 2012
34.15% done, estimate finish Sun Feb 26 14:37:54 2012
34.15% done, estimate finish Sun Feb 26 14:37:53 2012
34.16% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.17% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.18% done, estimate finish Sun Feb 26 14:37:52 2012
34.18% done, estimate finish Sun Feb 26 14:37:51 2012
34.19% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.19% done, estimate finish Sun Feb 26 14:37:50 2012
34.20% done, estimate finish Sun Feb 26 14:37:53 2012
34.20% done, estimate finish Sun Feb 26 14:37:52 2012
34.21% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.22% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.23% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.24% done, estimate finish Sun Feb 26 14:37:53 2012
34.24% done, estimate finish Sun Feb 26 14:37:52 2012
34.25% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.26% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
34.27% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 3 times. ===
34.28% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.29% done, estimate finish Sun Feb 26 14:37:52 2012
34.29% done, estimate finish Sun Feb 26 14:37:51 2012
34.30% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.31% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.32% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.33% done, estimate finish Sun Feb 26 14:37:52 2012
34.33% done, estimate finish Sun Feb 26 14:37:51 2012
34.34% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
34.35% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.35% done, estimate finish Sun Feb 26 14:37:52 2012
34.36% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.37% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.38% done, estimate finish Sun Feb 26 14:37:51 2012
34.38% done, estimate finish Sun Feb 26 14:37:50 2012
34.39% done, estimate finish Sun Feb 26 14:37:50 2012
34.39% done, estimate finish Sun Feb 26 14:37:52 2012
34.40% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.41% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.42% done, estimate finish Sun Feb 26 14:37:51 2012
34.42% done, estimate finish Sun Feb 26 14:37:53 2012
34.43% done, estimate finish Sun Feb 26 14:37:53 2012
34.43% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.44% done, estimate finish Sun Feb 26 14:37:52 2012
34.44% done, estimate finish Sun Feb 26 14:37:51 2012
34.45% done, estimate finish Sun Feb 26 14:37:54 2012
=== last message repeated 2 times. ===
34.46% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.47% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.48% done, estimate finish Sun Feb 26 14:37:52 2012
34.48% done, estimate finish Sun Feb 26 14:37:51 2012
34.49% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.50% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
34.51% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 3 times. ===
34.52% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.53% done, estimate finish Sun Feb 26 14:37:54 2012
34.53% done, estimate finish Sun Feb 26 14:37:53 2012
34.54% done, estimate finish Sun Feb 26 14:37:53 2012
34.54% done, estimate finish Sun Feb 26 14:37:52 2012
34.55% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.56% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.57% done, estimate finish Sun Feb 26 14:37:51 2012
34.57% done, estimate finish Sun Feb 26 14:37:50 2012
34.58% done, estimate finish Sun Feb 26 14:37:53 2012
34.58% done, estimate finish Sun Feb 26 14:37:52 2012
34.59% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.59% done, estimate finish Sun Feb 26 14:37:51 2012
34.60% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.61% done, estimate finish Sun Feb 26 14:37:50 2012
34.61% done, estimate finish Sun Feb 26 14:37:53 2012
34.62% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.63% done, estimate finish Sun Feb 26 14:37:52 2012
34.63% done, estimate finish Sun Feb 26 14:37:51 2012
34.64% done, estimate finish Sun Feb 26 14:37:51 2012
34.64% done, estimate finish Sun Feb 26 14:37:54 2012
34.65% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.66% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.67% done, estimate finish Sun Feb 26 14:37:52 2012
34.67% done, estimate finish Sun Feb 26 14:37:51 2012
34.68% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.68% done, estimate finish Sun Feb 26 14:37:50 2012
34.69% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
34.70% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.71% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.72% done, estimate finish Sun Feb 26 14:37:51 2012
34.72% done, estimate finish Sun Feb 26 14:37:50 2012
34.73% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.74% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.75% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.76% done, estimate finish Sun Feb 26 14:37:51 2012
34.76% done, estimate finish Sun Feb 26 14:37:50 2012
34.76% done, estimate finish Sun Feb 26 14:37:53 2012
34.77% done, estimate finish Sun Feb 26 14:37:53 2012
34.77% done, estimate finish Sun Feb 26 14:37:52 2012
34.78% done, estimate finish Sun Feb 26 14:37:52 2012
34.78% done, estimate finish Sun Feb 26 14:37:51 2012
34.79% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.80% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
34.81% done, estimate finish Sun Feb 26 14:37:53 2012
34.81% done, estimate finish Sun Feb 26 14:37:52 2012
34.82% done, estimate finish Sun Feb 26 14:37:52 2012
34.82% done, estimate finish Sun Feb 26 14:37:51 2012
34.83% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.84% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 3 times. ===
34.85% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
34.86% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.87% done, estimate finish Sun Feb 26 14:37:51 2012
34.87% done, estimate finish Sun Feb 26 14:37:50 2012
34.88% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
34.89% done, estimate finish Sun Feb 26 14:37:49 2012
34.89% done, estimate finish Sun Feb 26 14:37:52 2012
34.90% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.91% done, estimate finish Sun Feb 26 14:37:51 2012
34.91% done, estimate finish Sun Feb 26 14:37:50 2012
34.92% done, estimate finish Sun Feb 26 14:37:50 2012
34.92% done, estimate finish Sun Feb 26 14:37:53 2012
34.92% done, estimate finish Sun Feb 26 14:37:52 2012
34.93% done, estimate finish Sun Feb 26 14:37:52 2012
34.93% done, estimate finish Sun Feb 26 14:37:51 2012
34.94% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.95% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
34.96% done, estimate finish Sun Feb 26 14:37:53 2012
34.96% done, estimate finish Sun Feb 26 14:37:52 2012
34.97% done, estimate finish Sun Feb 26 14:37:52 2012
34.97% done, estimate finish Sun Feb 26 14:37:51 2012
34.98% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
34.99% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.00% done, estimate finish Sun Feb 26 14:37:50 2012
35.00% done, estimate finish Sun Feb 26 14:37:49 2012
35.00% done, estimate finish Sun Feb 26 14:37:52 2012
35.01% done, estimate finish Sun Feb 26 14:37:52 2012
35.01% done, estimate finish Sun Feb 26 14:37:51 2012
35.02% done, estimate finish Sun Feb 26 14:37:51 2012
35.02% done, estimate finish Sun Feb 26 14:37:50 2012
35.03% done, estimate finish Sun Feb 26 14:37:53 2012
=== last message repeated 2 times. ===
35.04% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.05% done, estimate finish Sun Feb 26 14:37:52 2012
35.05% done, estimate finish Sun Feb 26 14:37:51 2012
35.06% done, estimate finish Sun Feb 26 14:37:51 2012
35.06% done, estimate finish Sun Feb 26 14:37:50 2012
35.07% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.08% done, estimate finish Sun Feb 26 14:37:49 2012
35.08% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.09% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.10% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.11% done, estimate finish Sun Feb 26 14:37:50 2012
35.11% done, estimate finish Sun Feb 26 14:37:52 2012
35.12% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.13% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.14% done, estimate finish Sun Feb 26 14:37:50 2012
35.14% done, estimate finish Sun Feb 26 14:37:53 2012
35.15% done, estimate finish Sun Feb 26 14:37:53 2012
35.15% done, estimate finish Sun Feb 26 14:37:52 2012
35.16% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.16% done, estimate finish Sun Feb 26 14:37:51 2012
35.17% done, estimate finish Sun Feb 26 14:37:51 2012
35.17% done, estimate finish Sun Feb 26 14:37:50 2012
35.18% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.19% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.20% done, estimate finish Sun Feb 26 14:37:52 2012
35.20% done, estimate finish Sun Feb 26 14:37:51 2012
35.21% done, estimate finish Sun Feb 26 14:37:51 2012
35.21% done, estimate finish Sun Feb 26 14:37:50 2012
35.22% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.23% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.24% done, estimate finish Sun Feb 26 14:37:52 2012
35.24% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.25% done, estimate finish Sun Feb 26 14:37:51 2012
35.25% done, estimate finish Sun Feb 26 14:37:50 2012
35.26% done, estimate finish Sun Feb 26 14:37:50 2012
35.26% done, estimate finish Sun Feb 26 14:37:52 2012
35.27% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.28% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.29% done, estimate finish Sun Feb 26 14:37:51 2012
35.29% done, estimate finish Sun Feb 26 14:37:50 2012
35.30% done, estimate finish Sun Feb 26 14:37:50 2012
35.30% done, estimate finish Sun Feb 26 14:37:49 2012
35.31% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.32% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 3 times. ===
35.33% done, estimate finish Sun Feb 26 14:37:50 2012
35.33% done, estimate finish Sun Feb 26 14:37:53 2012
35.34% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.35% done, estimate finish Sun Feb 26 14:37:52 2012
35.35% done, estimate finish Sun Feb 26 14:37:51 2012
35.36% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.37% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.38% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.39% done, estimate finish Sun Feb 26 14:37:49 2012
35.39% done, estimate finish Sun Feb 26 14:37:51 2012
35.40% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.40% done, estimate finish Sun Feb 26 14:37:50 2012
35.41% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.42% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.43% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.44% done, estimate finish Sun Feb 26 14:37:51 2012
35.44% done, estimate finish Sun Feb 26 14:37:50 2012
35.45% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.46% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.47% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.48% done, estimate finish Sun Feb 26 14:37:51 2012
35.48% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.49% done, estimate finish Sun Feb 26 14:37:50 2012
35.49% done, estimate finish Sun Feb 26 14:37:49 2012
35.50% done, estimate finish Sun Feb 26 14:37:52 2012
35.50% done, estimate finish Sun Feb 26 14:37:51 2012
35.51% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.52% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.53% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.54% done, estimate finish Sun Feb 26 14:37:52 2012
35.54% done, estimate finish Sun Feb 26 14:37:51 2012
35.55% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.56% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 3 times. ===
35.57% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.58% done, estimate finish Sun Feb 26 14:37:49 2012
35.58% done, estimate finish Sun Feb 26 14:37:51 2012
35.59% done, estimate finish Sun Feb 26 14:37:51 2012
35.59% done, estimate finish Sun Feb 26 14:37:50 2012
35.60% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.61% done, estimate finish Sun Feb 26 14:37:49 2012
35.61% done, estimate finish Sun Feb 26 14:37:52 2012
35.62% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.63% done, estimate finish Sun Feb 26 14:37:51 2012
35.63% done, estimate finish Sun Feb 26 14:37:50 2012
35.64% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.65% done, estimate finish Sun Feb 26 14:37:52 2012
=== last message repeated 2 times. ===
35.65% done, estimate finish Sun Feb 26 14:37:51 2012
35.66% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.67% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.68% done, estimate finish Sun Feb 26 14:37:50 2012
35.68% done, estimate finish Sun Feb 26 14:37:49 2012
35.69% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.70% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.71% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.72% done, estimate finish Sun Feb 26 14:37:50 2012
35.72% done, estimate finish Sun Feb 26 14:37:49 2012
35.73% done, estimate finish Sun Feb 26 14:37:49 2012
35.73% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.74% done, estimate finish Sun Feb 26 14:37:51 2012
35.74% done, estimate finish Sun Feb 26 14:37:50 2012
35.75% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.76% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.77% done, estimate finish Sun Feb 26 14:37:49 2012
35.77% done, estimate finish Sun Feb 26 14:37:48 2012
35.78% done, estimate finish Sun Feb 26 14:37:51 2012
35.78% done, estimate finish Sun Feb 26 14:37:50 2012
35.79% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.80% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.81% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 3 times. ===
35.82% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.83% done, estimate finish Sun Feb 26 14:37:50 2012
35.83% done, estimate finish Sun Feb 26 14:37:49 2012
35.84% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.85% done, estimate finish Sun Feb 26 14:37:48 2012
35.85% done, estimate finish Sun Feb 26 14:37:51 2012
35.86% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.87% done, estimate finish Sun Feb 26 14:37:50 2012
35.87% done, estimate finish Sun Feb 26 14:37:49 2012
35.88% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.89% done, estimate finish Sun Feb 26 14:37:48 2012
35.89% done, estimate finish Sun Feb 26 14:37:51 2012
35.89% done, estimate finish Sun Feb 26 14:37:50 2012
35.90% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.91% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.92% done, estimate finish Sun Feb 26 14:37:51 2012
=== last message repeated 2 times. ===
35.93% done, estimate finish Sun Feb 26 14:37:51 2012
35.93% done, estimate finish Sun Feb 26 14:37:50 2012
35.94% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.95% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
35.96% done, estimate finish Sun Feb 26 14:37:49 2012
35.96% done, estimate finish Sun Feb 26 14:37:51 2012
35.97% done, estimate finish Sun Feb 26 14:37:51 2012
35.97% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
35.98% done, estimate finish Sun Feb 26 14:37:50 2012
35.98% done, estimate finish Sun Feb 26 14:37:49 2012
35.99% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.00% done, estimate finish Sun Feb 26 14:37:48 2012
36.00% done, estimate finish Sun Feb 26 14:37:51 2012
36.01% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.02% done, estimate finish Sun Feb 26 14:37:50 2012
36.02% done, estimate finish Sun Feb 26 14:37:49 2012
36.03% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.04% done, estimate finish Sun Feb 26 14:37:48 2012
36.04% done, estimate finish Sun Feb 26 14:37:51 2012
36.05% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 3 times. ===
36.06% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.07% done, estimate finish Sun Feb 26 14:37:49 2012
36.07% done, estimate finish Sun Feb 26 14:37:48 2012
36.08% done, estimate finish Sun Feb 26 14:37:48 2012
36.08% done, estimate finish Sun Feb 26 14:37:50 2012
36.09% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.10% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.11% done, estimate finish Sun Feb 26 14:37:49 2012
36.11% done, estimate finish Sun Feb 26 14:37:51 2012
36.12% done, estimate finish Sun Feb 26 14:37:51 2012
36.12% done, estimate finish Sun Feb 26 14:37:50 2012
36.13% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.13% done, estimate finish Sun Feb 26 14:37:49 2012
36.14% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.15% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.16% done, estimate finish Sun Feb 26 14:37:48 2012
36.16% done, estimate finish Sun Feb 26 14:37:47 2012
36.17% done, estimate finish Sun Feb 26 14:37:50 2012
36.17% done, estimate finish Sun Feb 26 14:37:49 2012
36.18% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.19% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.20% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.21% done, estimate finish Sun Feb 26 14:37:50 2012
36.21% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.22% done, estimate finish Sun Feb 26 14:37:49 2012
36.22% done, estimate finish Sun Feb 26 14:37:48 2012
36.23% done, estimate finish Sun Feb 26 14:37:51 2012
36.23% done, estimate finish Sun Feb 26 14:37:50 2012
36.24% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.25% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.26% done, estimate finish Sun Feb 26 14:37:49 2012
36.26% done, estimate finish Sun Feb 26 14:37:48 2012
36.27% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.28% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.29% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 3 times. ===
36.30% done, estimate finish Sun Feb 26 14:37:48 2012
36.30% done, estimate finish Sun Feb 26 14:37:51 2012
36.31% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.32% done, estimate finish Sun Feb 26 14:37:50 2012
36.32% done, estimate finish Sun Feb 26 14:37:49 2012
36.33% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.34% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.35% done, estimate finish Sun Feb 26 14:37:48 2012
36.35% done, estimate finish Sun Feb 26 14:37:47 2012
36.36% done, estimate finish Sun Feb 26 14:37:47 2012
36.36% done, estimate finish Sun Feb 26 14:37:49 2012
36.37% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.37% done, estimate finish Sun Feb 26 14:37:48 2012
36.38% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.39% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.40% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.41% done, estimate finish Sun Feb 26 14:37:49 2012
36.41% done, estimate finish Sun Feb 26 14:37:48 2012
36.42% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.43% done, estimate finish Sun Feb 26 14:37:47 2012
36.43% done, estimate finish Sun Feb 26 14:37:50 2012
36.44% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.45% done, estimate finish Sun Feb 26 14:37:49 2012
36.45% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.46% done, estimate finish Sun Feb 26 14:37:48 2012
36.46% done, estimate finish Sun Feb 26 14:37:47 2012
36.47% done, estimate finish Sun Feb 26 14:37:47 2012
36.47% done, estimate finish Sun Feb 26 14:37:49 2012
36.48% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.49% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.50% done, estimate finish Sun Feb 26 14:37:48 2012
36.50% done, estimate finish Sun Feb 26 14:37:50 2012
36.51% done, estimate finish Sun Feb 26 14:37:50 2012
=== last message repeated 2 times. ===
36.52% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.53% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 3 times. ===
36.54% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.55% done, estimate finish Sun Feb 26 14:37:47 2012
36.55% done, estimate finish Sun Feb 26 14:37:49 2012
36.56% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.57% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.58% done, estimate finish Sun Feb 26 14:37:47 2012
36.58% done, estimate finish Sun Feb 26 14:37:50 2012
36.59% done, estimate finish Sun Feb 26 14:37:50 2012
36.59% done, estimate finish Sun Feb 26 14:37:49 2012
36.60% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.61% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.61% done, estimate finish Sun Feb 26 14:37:47 2012
36.62% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.63% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
36.64% done, estimate finish Sun Feb 26 14:37:49 2012
36.64% done, estimate finish Sun Feb 26 14:37:48 2012
36.65% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.66% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.67% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.68% done, estimate finish Sun Feb 26 14:37:49 2012
36.68% done, estimate finish Sun Feb 26 14:37:48 2012
36.69% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.70% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.70% done, estimate finish Sun Feb 26 14:37:49 2012
36.71% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.72% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.73% done, estimate finish Sun Feb 26 14:37:48 2012
36.73% done, estimate finish Sun Feb 26 14:37:47 2012
36.74% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.75% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.76% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.77% done, estimate finish Sun Feb 26 14:37:48 2012
36.77% done, estimate finish Sun Feb 26 14:37:47 2012
36.78% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.78% done, estimate finish Sun Feb 26 14:37:49 2012
36.79% done, estimate finish Sun Feb 26 14:37:49 2012
36.79% done, estimate finish Sun Feb 26 14:37:48 2012
36.80% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.81% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.82% done, estimate finish Sun Feb 26 14:37:47 2012
36.82% done, estimate finish Sun Feb 26 14:37:46 2012
36.83% done, estimate finish Sun Feb 26 14:37:46 2012
36.83% done, estimate finish Sun Feb 26 14:37:48 2012
36.84% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.85% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.86% done, estimate finish Sun Feb 26 14:37:47 2012
36.86% done, estimate finish Sun Feb 26 14:37:49 2012
=== last message repeated 2 times. ===
36.87% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.88% done, estimate finish Sun Feb 26 14:37:48 2012
36.88% done, estimate finish Sun Feb 26 14:37:47 2012
36.89% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.90% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
36.91% done, estimate finish Sun Feb 26 14:37:46 2012
36.91% done, estimate finish Sun Feb 26 14:37:48 2012
36.92% done, estimate finish Sun Feb 26 14:37:48 2012
36.92% done, estimate finish Sun Feb 26 14:37:47 2012
36.93% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.94% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
36.94% done, estimate finish Sun Feb 26 14:37:48 2012
36.95% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
36.96% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
36.97% done, estimate finish Sun Feb 26 14:37:47 2012
36.97% done, estimate finish Sun Feb 26 14:37:49 2012
36.98% done, estimate finish Sun Feb 26 14:37:49 2012
36.98% done, estimate finish Sun Feb 26 14:37:48 2012
36.99% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
37.00% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.01% done, estimate finish Sun Feb 26 14:37:47 2012
37.01% done, estimate finish Sun Feb 26 14:37:46 2012
37.02% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.02% done, estimate finish Sun Feb 26 14:37:48 2012
37.03% done, estimate finish Sun Feb 26 14:37:48 2012
37.03% done, estimate finish Sun Feb 26 14:37:47 2012
37.04% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.05% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.06% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
37.07% done, estimate finish Sun Feb 26 14:37:48 2012
37.07% done, estimate finish Sun Feb 26 14:37:47 2012
37.08% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.09% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.10% done, estimate finish Sun Feb 26 14:37:46 2012
37.10% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.11% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.12% done, estimate finish Sun Feb 26 14:37:47 2012
37.12% done, estimate finish Sun Feb 26 14:37:46 2012
37.13% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.14% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
37.15% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.16% done, estimate finish Sun Feb 26 14:37:47 2012
37.16% done, estimate finish Sun Feb 26 14:37:46 2012
37.17% done, estimate finish Sun Feb 26 14:37:46 2012
37.17% done, estimate finish Sun Feb 26 14:37:48 2012
37.18% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
37.18% done, estimate finish Sun Feb 26 14:37:47 2012
37.19% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.20% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.21% done, estimate finish Sun Feb 26 14:37:46 2012
37.21% done, estimate finish Sun Feb 26 14:37:45 2012
37.22% done, estimate finish Sun Feb 26 14:37:45 2012
37.22% done, estimate finish Sun Feb 26 14:37:47 2012
37.23% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.24% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.25% done, estimate finish Sun Feb 26 14:37:48 2012
=== last message repeated 2 times. ===
37.26% done, estimate finish Sun Feb 26 14:37:48 2012
37.26% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.27% done, estimate finish Sun Feb 26 14:37:47 2012
37.27% done, estimate finish Sun Feb 26 14:37:46 2012
37.28% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.29% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.30% done, estimate finish Sun Feb 26 14:37:45 2012
37.30% done, estimate finish Sun Feb 26 14:37:47 2012
37.31% done, estimate finish Sun Feb 26 14:37:47 2012
37.31% done, estimate finish Sun Feb 26 14:37:46 2012
37.32% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.33% done, estimate finish Sun Feb 26 14:37:45 2012
37.33% done, estimate finish Sun Feb 26 14:37:48 2012
37.34% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 3 times. ===
37.35% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.36% done, estimate finish Sun Feb 26 14:37:46 2012
37.36% done, estimate finish Sun Feb 26 14:37:45 2012
37.37% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.38% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.39% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.40% done, estimate finish Sun Feb 26 14:37:46 2012
37.40% done, estimate finish Sun Feb 26 14:37:45 2012
37.41% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.42% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.42% done, estimate finish Sun Feb 26 14:37:46 2012
37.43% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.44% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.45% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.46% done, estimate finish Sun Feb 26 14:37:47 2012
37.46% done, estimate finish Sun Feb 26 14:37:46 2012
37.47% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.48% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.49% done, estimate finish Sun Feb 26 14:37:45 2012
37.49% done, estimate finish Sun Feb 26 14:37:44 2012
37.50% done, estimate finish Sun Feb 26 14:37:47 2012
37.50% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.51% done, estimate finish Sun Feb 26 14:37:46 2012
37.51% done, estimate finish Sun Feb 26 14:37:45 2012
37.52% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.53% done, estimate finish Sun Feb 26 14:37:44 2012
37.53% done, estimate finish Sun Feb 26 14:37:47 2012
37.54% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.55% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.56% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.57% done, estimate finish Sun Feb 26 14:37:45 2012
37.57% done, estimate finish Sun Feb 26 14:37:44 2012
37.58% done, estimate finish Sun Feb 26 14:37:47 2012
37.58% done, estimate finish Sun Feb 26 14:37:46 2012
37.59% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.59% done, estimate finish Sun Feb 26 14:37:45 2012
37.60% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.61% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.62% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.63% done, estimate finish Sun Feb 26 14:37:46 2012
37.63% done, estimate finish Sun Feb 26 14:37:45 2012
37.64% done, estimate finish Sun Feb 26 14:37:45 2012
37.64% done, estimate finish Sun Feb 26 14:37:47 2012
37.65% done, estimate finish Sun Feb 26 14:37:47 2012
=== last message repeated 2 times. ===
37.66% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.67% done, estimate finish Sun Feb 26 14:37:46 2012
37.67% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.68% done, estimate finish Sun Feb 26 14:37:45 2012
37.68% done, estimate finish Sun Feb 26 14:37:44 2012
37.69% done, estimate finish Sun Feb 26 14:37:44 2012
37.69% done, estimate finish Sun Feb 26 14:37:46 2012
37.70% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.71% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.72% done, estimate finish Sun Feb 26 14:37:45 2012
37.72% done, estimate finish Sun Feb 26 14:37:44 2012
37.73% done, estimate finish Sun Feb 26 14:37:47 2012
37.73% done, estimate finish Sun Feb 26 14:37:46 2012
37.74% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.75% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 3 times. ===
37.76% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
37.77% done, estimate finish Sun Feb 26 14:37:44 2012
37.77% done, estimate finish Sun Feb 26 14:37:46 2012
37.78% done, estimate finish Sun Feb 26 14:37:46 2012
37.78% done, estimate finish Sun Feb 26 14:37:45 2012
37.79% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.80% done, estimate finish Sun Feb 26 14:37:44 2012
37.80% done, estimate finish Sun Feb 26 14:37:47 2012
37.81% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.82% done, estimate finish Sun Feb 26 14:37:46 2012
37.82% done, estimate finish Sun Feb 26 14:37:45 2012
37.83% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.83% done, estimate finish Sun Feb 26 14:37:44 2012
37.84% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
37.85% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.86% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.87% done, estimate finish Sun Feb 26 14:37:45 2012
37.87% done, estimate finish Sun Feb 26 14:37:44 2012
37.88% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
37.89% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.90% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.91% done, estimate finish Sun Feb 26 14:37:45 2012
37.91% done, estimate finish Sun Feb 26 14:37:44 2012
37.91% done, estimate finish Sun Feb 26 14:37:47 2012
37.92% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
37.93% done, estimate finish Sun Feb 26 14:37:46 2012
37.93% done, estimate finish Sun Feb 26 14:37:45 2012
37.94% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.95% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
37.96% done, estimate finish Sun Feb 26 14:37:44 2012
37.96% done, estimate finish Sun Feb 26 14:37:43 2012
37.97% done, estimate finish Sun Feb 26 14:37:43 2012
37.97% done, estimate finish Sun Feb 26 14:37:45 2012
37.98% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
37.99% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
37.99% done, estimate finish Sun Feb 26 14:37:46 2012
38.00% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
38.01% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.02% done, estimate finish Sun Feb 26 14:37:45 2012
38.02% done, estimate finish Sun Feb 26 14:37:44 2012
38.03% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.04% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
38.05% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.06% done, estimate finish Sun Feb 26 14:37:45 2012
38.06% done, estimate finish Sun Feb 26 14:37:44 2012
38.07% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.07% done, estimate finish Sun Feb 26 14:37:43 2012
38.08% done, estimate finish Sun Feb 26 14:37:46 2012
38.08% done, estimate finish Sun Feb 26 14:37:45 2012
38.09% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.10% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.11% done, estimate finish Sun Feb 26 14:37:46 2012
=== last message repeated 2 times. ===
38.12% done, estimate finish Sun Feb 26 14:37:46 2012
38.12% done, estimate finish Sun Feb 26 14:37:45 2012
38.13% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.14% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.15% done, estimate finish Sun Feb 26 14:37:44 2012
38.15% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.16% done, estimate finish Sun Feb 26 14:37:43 2012
38.16% done, estimate finish Sun Feb 26 14:37:45 2012
38.17% done, estimate finish Sun Feb 26 14:37:45 2012
38.17% done, estimate finish Sun Feb 26 14:37:44 2012
38.18% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.19% done, estimate finish Sun Feb 26 14:37:43 2012
38.19% done, estimate finish Sun Feb 26 14:37:46 2012
38.20% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.21% done, estimate finish Sun Feb 26 14:37:45 2012
38.21% done, estimate finish Sun Feb 26 14:37:44 2012
38.22% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.23% done, estimate finish Sun Feb 26 14:37:43 2012
38.23% done, estimate finish Sun Feb 26 14:37:46 2012
38.23% done, estimate finish Sun Feb 26 14:37:45 2012
38.24% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.25% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.26% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.27% done, estimate finish Sun Feb 26 14:37:43 2012
38.27% done, estimate finish Sun Feb 26 14:37:45 2012
38.28% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.29% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.30% done, estimate finish Sun Feb 26 14:37:44 2012
38.30% done, estimate finish Sun Feb 26 14:37:46 2012
38.31% done, estimate finish Sun Feb 26 14:37:46 2012
38.31% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.32% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.33% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.34% done, estimate finish Sun Feb 26 14:37:44 2012
38.34% done, estimate finish Sun Feb 26 14:37:43 2012
38.35% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.36% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.37% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.38% done, estimate finish Sun Feb 26 14:37:44 2012
38.38% done, estimate finish Sun Feb 26 14:37:43 2012
38.39% done, estimate finish Sun Feb 26 14:37:46 2012
38.39% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.40% done, estimate finish Sun Feb 26 14:37:45 2012
38.40% done, estimate finish Sun Feb 26 14:37:44 2012
38.41% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.42% done, estimate finish Sun Feb 26 14:37:43 2012
38.42% done, estimate finish Sun Feb 26 14:37:46 2012
38.43% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.44% done, estimate finish Sun Feb 26 14:37:45 2012
38.44% done, estimate finish Sun Feb 26 14:37:44 2012
38.45% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.46% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.47% done, estimate finish Sun Feb 26 14:37:43 2012
38.47% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.48% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.49% done, estimate finish Sun Feb 26 14:37:44 2012
38.49% done, estimate finish Sun Feb 26 14:37:46 2012
38.50% done, estimate finish Sun Feb 26 14:37:46 2012
38.50% done, estimate finish Sun Feb 26 14:37:45 2012
38.51% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.52% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.53% done, estimate finish Sun Feb 26 14:37:44 2012
38.53% done, estimate finish Sun Feb 26 14:37:43 2012
38.54% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.55% done, estimate finish Sun Feb 26 14:37:42 2012
38.55% done, estimate finish Sun Feb 26 14:37:45 2012
38.55% done, estimate finish Sun Feb 26 14:37:44 2012
38.56% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.57% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.58% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.59% done, estimate finish Sun Feb 26 14:37:45 2012
38.59% done, estimate finish Sun Feb 26 14:37:44 2012
38.60% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.61% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.62% done, estimate finish Sun Feb 26 14:37:43 2012
38.62% done, estimate finish Sun Feb 26 14:37:45 2012
38.63% done, estimate finish Sun Feb 26 14:37:45 2012
38.63% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.64% done, estimate finish Sun Feb 26 14:37:44 2012
38.64% done, estimate finish Sun Feb 26 14:37:43 2012
38.65% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.66% done, estimate finish Sun Feb 26 14:37:42 2012
38.66% done, estimate finish Sun Feb 26 14:37:45 2012
38.67% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.68% done, estimate finish Sun Feb 26 14:37:44 2012
38.68% done, estimate finish Sun Feb 26 14:37:43 2012
38.69% done, estimate finish Sun Feb 26 14:37:43 2012
38.69% done, estimate finish Sun Feb 26 14:37:45 2012
38.70% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.71% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.72% done, estimate finish Sun Feb 26 14:37:44 2012
38.72% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.73% done, estimate finish Sun Feb 26 14:37:43 2012
38.73% done, estimate finish Sun Feb 26 14:37:42 2012
38.74% done, estimate finish Sun Feb 26 14:37:42 2012
38.74% done, estimate finish Sun Feb 26 14:37:44 2012
38.75% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.76% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.77% done, estimate finish Sun Feb 26 14:37:43 2012
38.77% done, estimate finish Sun Feb 26 14:37:45 2012
38.78% done, estimate finish Sun Feb 26 14:37:45 2012
38.78% done, estimate finish Sun Feb 26 14:37:44 2012
38.79% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.80% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 3 times. ===
38.81% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
38.82% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.83% done, estimate finish Sun Feb 26 14:37:44 2012
38.83% done, estimate finish Sun Feb 26 14:37:43 2012
38.84% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.85% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
38.86% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.87% done, estimate finish Sun Feb 26 14:37:44 2012
38.87% done, estimate finish Sun Feb 26 14:37:43 2012
38.88% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.88% done, estimate finish Sun Feb 26 14:37:45 2012
38.89% done, estimate finish Sun Feb 26 14:37:45 2012
38.89% done, estimate finish Sun Feb 26 14:37:44 2012
38.90% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.91% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.92% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.93% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
38.94% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.95% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.96% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
38.96% done, estimate finish Sun Feb 26 14:37:42 2012
38.97% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.98% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
38.99% done, estimate finish Sun Feb 26 14:37:43 2012
38.99% done, estimate finish Sun Feb 26 14:37:45 2012
39.00% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
39.01% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.02% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.03% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.04% done, estimate finish Sun Feb 26 14:37:43 2012
39.04% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.05% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.06% done, estimate finish Sun Feb 26 14:37:44 2012
39.06% done, estimate finish Sun Feb 26 14:37:43 2012
39.07% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.08% done, estimate finish Sun Feb 26 14:37:45 2012
=== last message repeated 2 times. ===
39.09% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.10% done, estimate finish Sun Feb 26 14:37:44 2012
39.10% done, estimate finish Sun Feb 26 14:37:43 2012
39.11% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.12% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 3 times. ===
39.13% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.14% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.15% done, estimate finish Sun Feb 26 14:37:43 2012
39.15% done, estimate finish Sun Feb 26 14:37:42 2012
39.16% done, estimate finish Sun Feb 26 14:37:42 2012
39.16% done, estimate finish Sun Feb 26 14:37:44 2012
39.17% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.18% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.19% done, estimate finish Sun Feb 26 14:37:43 2012
39.19% done, estimate finish Sun Feb 26 14:37:45 2012
39.20% done, estimate finish Sun Feb 26 14:37:45 2012
39.20% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.21% done, estimate finish Sun Feb 26 14:37:44 2012
39.21% done, estimate finish Sun Feb 26 14:37:43 2012
39.22% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.23% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.24% done, estimate finish Sun Feb 26 14:37:42 2012
39.24% done, estimate finish Sun Feb 26 14:37:44 2012
39.25% done, estimate finish Sun Feb 26 14:37:44 2012
39.25% done, estimate finish Sun Feb 26 14:37:43 2012
39.26% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.27% done, estimate finish Sun Feb 26 14:37:42 2012
39.27% done, estimate finish Sun Feb 26 14:37:45 2012
39.28% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 3 times. ===
39.29% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.30% done, estimate finish Sun Feb 26 14:37:43 2012
39.30% done, estimate finish Sun Feb 26 14:37:42 2012
39.31% done, estimate finish Sun Feb 26 14:37:42 2012
39.31% done, estimate finish Sun Feb 26 14:37:44 2012
39.32% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.33% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.34% done, estimate finish Sun Feb 26 14:37:43 2012
39.34% done, estimate finish Sun Feb 26 14:37:42 2012
39.35% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.36% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.36% done, estimate finish Sun Feb 26 14:37:43 2012
39.37% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.38% done, estimate finish Sun Feb 26 14:37:42 2012
39.38% done, estimate finish Sun Feb 26 14:37:45 2012
39.39% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.40% done, estimate finish Sun Feb 26 14:37:44 2012
39.40% done, estimate finish Sun Feb 26 14:37:43 2012
39.41% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.42% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.43% done, estimate finish Sun Feb 26 14:37:42 2012
39.43% done, estimate finish Sun Feb 26 14:37:41 2012
39.44% done, estimate finish Sun Feb 26 14:37:41 2012
39.44% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.45% done, estimate finish Sun Feb 26 14:37:43 2012
39.45% done, estimate finish Sun Feb 26 14:37:42 2012
39.46% done, estimate finish Sun Feb 26 14:37:42 2012
39.46% done, estimate finish Sun Feb 26 14:37:44 2012
39.47% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.48% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.49% done, estimate finish Sun Feb 26 14:37:43 2012
39.49% done, estimate finish Sun Feb 26 14:37:42 2012
39.50% done, estimate finish Sun Feb 26 14:37:45 2012
39.50% done, estimate finish Sun Feb 26 14:37:44 2012
39.51% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.52% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.53% done, estimate finish Sun Feb 26 14:37:43 2012
39.53% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.54% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.55% done, estimate finish Sun Feb 26 14:37:44 2012
39.55% done, estimate finish Sun Feb 26 14:37:43 2012
39.56% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.57% done, estimate finish Sun Feb 26 14:37:43 2012
39.57% done, estimate finish Sun Feb 26 14:37:42 2012
39.58% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.59% done, estimate finish Sun Feb 26 14:37:44 2012
39.59% done, estimate finish Sun Feb 26 14:37:43 2012
39.60% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.61% done, estimate finish Sun Feb 26 14:37:43 2012
39.61% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.62% done, estimate finish Sun Feb 26 14:37:42 2012
39.62% done, estimate finish Sun Feb 26 14:37:41 2012
39.63% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.64% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.65% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.66% done, estimate finish Sun Feb 26 14:37:42 2012
39.66% done, estimate finish Sun Feb 26 14:37:44 2012
39.67% done, estimate finish Sun Feb 26 14:37:44 2012
39.67% done, estimate finish Sun Feb 26 14:37:43 2012
39.68% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.69% done, estimate finish Sun Feb 26 14:37:42 2012
39.69% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.70% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.71% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.72% done, estimate finish Sun Feb 26 14:37:43 2012
39.72% done, estimate finish Sun Feb 26 14:37:42 2012
39.73% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.74% done, estimate finish Sun Feb 26 14:37:41 2012
39.74% done, estimate finish Sun Feb 26 14:37:44 2012
39.75% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.76% done, estimate finish Sun Feb 26 14:37:43 2012
39.76% done, estimate finish Sun Feb 26 14:37:42 2012
39.77% done, estimate finish Sun Feb 26 14:37:42 2012
39.77% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.78% done, estimate finish Sun Feb 26 14:37:44 2012
39.78% done, estimate finish Sun Feb 26 14:37:43 2012
39.79% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.80% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.81% done, estimate finish Sun Feb 26 14:37:42 2012
39.81% done, estimate finish Sun Feb 26 14:37:41 2012
39.82% done, estimate finish Sun Feb 26 14:37:44 2012
39.82% done, estimate finish Sun Feb 26 14:37:43 2012
39.83% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.84% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.85% done, estimate finish Sun Feb 26 14:37:42 2012
39.85% done, estimate finish Sun Feb 26 14:37:41 2012
39.85% done, estimate finish Sun Feb 26 14:37:44 2012
39.86% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.87% done, estimate finish Sun Feb 26 14:37:43 2012
39.87% done, estimate finish Sun Feb 26 14:37:42 2012
39.88% done, estimate finish Sun Feb 26 14:37:42 2012
39.88% done, estimate finish Sun Feb 26 14:37:44 2012
39.89% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
39.90% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.91% done, estimate finish Sun Feb 26 14:37:43 2012
39.91% done, estimate finish Sun Feb 26 14:37:42 2012
39.92% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.93% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 3 times. ===
39.94% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.95% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
39.96% done, estimate finish Sun Feb 26 14:37:42 2012
39.96% done, estimate finish Sun Feb 26 14:37:44 2012
39.97% done, estimate finish Sun Feb 26 14:37:44 2012
39.97% done, estimate finish Sun Feb 26 14:37:43 2012
39.98% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
39.99% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.00% done, estimate finish Sun Feb 26 14:37:42 2012
40.00% done, estimate finish Sun Feb 26 14:37:44 2012
40.01% done, estimate finish Sun Feb 26 14:37:44 2012
40.01% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.02% done, estimate finish Sun Feb 26 14:37:43 2012
40.02% done, estimate finish Sun Feb 26 14:37:42 2012
40.03% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.04% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.05% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.06% done, estimate finish Sun Feb 26 14:37:43 2012
40.06% done, estimate finish Sun Feb 26 14:37:42 2012
40.07% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.08% done, estimate finish Sun Feb 26 14:37:44 2012
=== last message repeated 2 times. ===
40.09% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 3 times. ===
40.10% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.11% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.12% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.13% done, estimate finish Sun Feb 26 14:37:41 2012
40.13% done, estimate finish Sun Feb 26 14:37:43 2012
40.14% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.15% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.16% done, estimate finish Sun Feb 26 14:37:41 2012
40.16% done, estimate finish Sun Feb 26 14:37:43 2012
40.17% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.17% done, estimate finish Sun Feb 26 14:37:42 2012
40.18% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.19% done, estimate finish Sun Feb 26 14:37:42 2012
40.19% done, estimate finish Sun Feb 26 14:37:44 2012
40.20% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.21% done, estimate finish Sun Feb 26 14:37:43 2012
40.21% done, estimate finish Sun Feb 26 14:37:42 2012
40.22% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.23% done, estimate finish Sun Feb 26 14:37:42 2012
40.23% done, estimate finish Sun Feb 26 14:37:41 2012
40.24% done, estimate finish Sun Feb 26 14:37:41 2012
40.24% done, estimate finish Sun Feb 26 14:37:43 2012
40.25% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.25% done, estimate finish Sun Feb 26 14:37:42 2012
40.26% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.27% done, estimate finish Sun Feb 26 14:37:44 2012
40.27% done, estimate finish Sun Feb 26 14:37:43 2012
40.28% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.29% done, estimate finish Sun Feb 26 14:37:43 2012
40.29% done, estimate finish Sun Feb 26 14:37:42 2012
40.30% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.31% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.32% done, estimate finish Sun Feb 26 14:37:41 2012
40.32% done, estimate finish Sun Feb 26 14:37:40 2012
40.33% done, estimate finish Sun Feb 26 14:37:43 2012
40.33% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.34% done, estimate finish Sun Feb 26 14:37:42 2012
40.34% done, estimate finish Sun Feb 26 14:37:41 2012
40.35% done, estimate finish Sun Feb 26 14:37:41 2012
40.35% done, estimate finish Sun Feb 26 14:37:43 2012
40.36% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.37% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.38% done, estimate finish Sun Feb 26 14:37:42 2012
40.38% done, estimate finish Sun Feb 26 14:37:41 2012
40.39% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.40% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.41% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 3 times. ===
40.42% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.43% done, estimate finish Sun Feb 26 14:37:41 2012
40.43% done, estimate finish Sun Feb 26 14:37:40 2012
40.44% done, estimate finish Sun Feb 26 14:37:43 2012
40.44% done, estimate finish Sun Feb 26 14:37:42 2012
40.45% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.46% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.47% done, estimate finish Sun Feb 26 14:37:41 2012
40.47% done, estimate finish Sun Feb 26 14:37:40 2012
40.48% done, estimate finish Sun Feb 26 14:37:43 2012
40.48% done, estimate finish Sun Feb 26 14:37:42 2012
40.49% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.49% done, estimate finish Sun Feb 26 14:37:41 2012
40.50% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.51% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.52% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.53% done, estimate finish Sun Feb 26 14:37:42 2012
40.53% done, estimate finish Sun Feb 26 14:37:41 2012
40.54% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.55% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.56% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.57% done, estimate finish Sun Feb 26 14:37:42 2012
40.57% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.58% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.59% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.60% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.61% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.62% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.63% done, estimate finish Sun Feb 26 14:37:40 2012
40.63% done, estimate finish Sun Feb 26 14:37:42 2012
40.64% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.65% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.66% done, estimate finish Sun Feb 26 14:37:41 2012
40.66% done, estimate finish Sun Feb 26 14:37:43 2012
=== last message repeated 2 times. ===
40.67% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.68% done, estimate finish Sun Feb 26 14:37:42 2012
40.68% done, estimate finish Sun Feb 26 14:37:41 2012
40.69% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.70% done, estimate finish Sun Feb 26 14:37:41 2012
40.70% done, estimate finish Sun Feb 26 14:37:40 2012
40.71% done, estimate finish Sun Feb 26 14:37:40 2012
40.71% done, estimate finish Sun Feb 26 14:37:42 2012
40.72% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.73% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.74% done, estimate finish Sun Feb 26 14:37:41 2012
40.74% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.75% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.76% done, estimate finish Sun Feb 26 14:37:42 2012
40.76% done, estimate finish Sun Feb 26 14:37:41 2012
40.77% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.78% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.79% done, estimate finish Sun Feb 26 14:37:40 2012
40.79% done, estimate finish Sun Feb 26 14:37:42 2012
40.80% done, estimate finish Sun Feb 26 14:37:42 2012
40.80% done, estimate finish Sun Feb 26 14:37:41 2012
40.81% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.82% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.82% done, estimate finish Sun Feb 26 14:37:42 2012
40.83% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.84% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.85% done, estimate finish Sun Feb 26 14:37:41 2012
40.85% done, estimate finish Sun Feb 26 14:37:40 2012
40.86% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.87% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.88% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.89% done, estimate finish Sun Feb 26 14:37:41 2012
40.89% done, estimate finish Sun Feb 26 14:37:40 2012
40.90% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.90% done, estimate finish Sun Feb 26 14:37:39 2012
40.91% done, estimate finish Sun Feb 26 14:37:42 2012
40.91% done, estimate finish Sun Feb 26 14:37:41 2012
40.92% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.93% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.94% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
40.95% done, estimate finish Sun Feb 26 14:37:42 2012
40.95% done, estimate finish Sun Feb 26 14:37:41 2012
40.96% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
40.97% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
40.98% done, estimate finish Sun Feb 26 14:37:40 2012
40.98% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
40.99% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.00% done, estimate finish Sun Feb 26 14:37:41 2012
41.00% done, estimate finish Sun Feb 26 14:37:40 2012
41.01% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.02% done, estimate finish Sun Feb 26 14:37:42 2012
=== last message repeated 2 times. ===
41.03% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.04% done, estimate finish Sun Feb 26 14:37:41 2012
41.04% done, estimate finish Sun Feb 26 14:37:40 2012
41.05% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.06% done, estimate finish Sun Feb 26 14:37:40 2012
41.06% done, estimate finish Sun Feb 26 14:37:39 2012
41.06% done, estimate finish Sun Feb 26 14:37:41 2012
41.07% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.08% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.09% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.10% done, estimate finish Sun Feb 26 14:37:39 2012
41.10% done, estimate finish Sun Feb 26 14:37:41 2012
41.11% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.12% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.13% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.14% done, estimate finish Sun Feb 26 14:37:42 2012
41.14% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.15% done, estimate finish Sun Feb 26 14:37:41 2012
41.15% done, estimate finish Sun Feb 26 14:37:40 2012
41.16% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.17% done, estimate finish Sun Feb 26 14:37:40 2012
41.17% done, estimate finish Sun Feb 26 14:37:39 2012
41.18% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.19% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.20% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.21% done, estimate finish Sun Feb 26 14:37:40 2012
41.21% done, estimate finish Sun Feb 26 14:37:42 2012
41.22% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 3 times. ===
41.23% done, estimate finish Sun Feb 26 14:37:41 2012
41.23% done, estimate finish Sun Feb 26 14:37:40 2012
41.24% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.25% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.26% done, estimate finish Sun Feb 26 14:37:39 2012
41.26% done, estimate finish Sun Feb 26 14:37:38 2012
41.27% done, estimate finish Sun Feb 26 14:37:41 2012
41.27% done, estimate finish Sun Feb 26 14:37:40 2012
41.28% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.29% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.30% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 3 times. ===
41.31% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.32% done, estimate finish Sun Feb 26 14:37:40 2012
41.32% done, estimate finish Sun Feb 26 14:37:39 2012
41.33% done, estimate finish Sun Feb 26 14:37:39 2012
41.33% done, estimate finish Sun Feb 26 14:37:41 2012
41.34% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.35% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.36% done, estimate finish Sun Feb 26 14:37:40 2012
41.36% done, estimate finish Sun Feb 26 14:37:39 2012
41.37% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.38% done, estimate finish Sun Feb 26 14:37:38 2012
41.38% done, estimate finish Sun Feb 26 14:37:41 2012
41.38% done, estimate finish Sun Feb 26 14:37:40 2012
41.39% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.40% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.41% done, estimate finish Sun Feb 26 14:37:41 2012
=== last message repeated 2 times. ===
41.42% done, estimate finish Sun Feb 26 14:37:41 2012
41.42% done, estimate finish Sun Feb 26 14:37:40 2012
41.43% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.44% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.45% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.46% done, estimate finish Sun Feb 26 14:37:38 2012
41.46% done, estimate finish Sun Feb 26 14:37:40 2012
41.47% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.47% done, estimate finish Sun Feb 26 14:37:39 2012
41.48% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.49% done, estimate finish Sun Feb 26 14:37:39 2012
41.49% done, estimate finish Sun Feb 26 14:37:41 2012
41.50% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.51% done, estimate finish Sun Feb 26 14:37:40 2012
41.51% done, estimate finish Sun Feb 26 14:37:39 2012
41.52% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.53% done, estimate finish Sun Feb 26 14:37:39 2012
41.53% done, estimate finish Sun Feb 26 14:37:41 2012
41.54% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.55% done, estimate finish Sun Feb 26 14:37:40 2012
41.55% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.56% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.57% done, estimate finish Sun Feb 26 14:37:38 2012
41.57% done, estimate finish Sun Feb 26 14:37:40 2012
41.58% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.59% done, estimate finish Sun Feb 26 14:37:40 2012
41.59% done, estimate finish Sun Feb 26 14:37:39 2012
41.60% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.61% done, estimate finish Sun Feb 26 14:37:41 2012
41.61% done, estimate finish Sun Feb 26 14:37:40 2012
41.62% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.63% done, estimate finish Sun Feb 26 14:37:40 2012
41.63% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.64% done, estimate finish Sun Feb 26 14:37:39 2012
41.64% done, estimate finish Sun Feb 26 14:37:38 2012
41.65% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.66% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.67% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.68% done, estimate finish Sun Feb 26 14:37:39 2012
41.68% done, estimate finish Sun Feb 26 14:37:38 2012
41.69% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.70% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.71% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 3 times. ===
41.72% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.73% done, estimate finish Sun Feb 26 14:37:38 2012
41.73% done, estimate finish Sun Feb 26 14:37:37 2012
41.74% done, estimate finish Sun Feb 26 14:37:40 2012
41.74% done, estimate finish Sun Feb 26 14:37:39 2012
41.75% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.76% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.77% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.78% done, estimate finish Sun Feb 26 14:37:40 2012
41.78% done, estimate finish Sun Feb 26 14:37:39 2012
41.79% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.79% done, estimate finish Sun Feb 26 14:37:38 2012
41.80% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.81% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.82% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.83% done, estimate finish Sun Feb 26 14:37:39 2012
41.83% done, estimate finish Sun Feb 26 14:37:38 2012
41.84% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.85% done, estimate finish Sun Feb 26 14:37:38 2012
41.85% done, estimate finish Sun Feb 26 14:37:40 2012
41.86% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.87% done, estimate finish Sun Feb 26 14:37:39 2012
41.87% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.88% done, estimate finish Sun Feb 26 14:37:38 2012
41.88% done, estimate finish Sun Feb 26 14:37:40 2012
41.89% done, estimate finish Sun Feb 26 14:37:40 2012
41.89% done, estimate finish Sun Feb 26 14:37:39 2012
41.90% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.91% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.92% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.93% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
41.94% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.95% done, estimate finish Sun Feb 26 14:37:39 2012
41.95% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
41.96% done, estimate finish Sun Feb 26 14:37:40 2012
=== last message repeated 2 times. ===
41.97% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.98% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
41.99% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.00% done, estimate finish Sun Feb 26 14:37:38 2012
42.00% done, estimate finish Sun Feb 26 14:37:37 2012
42.01% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.02% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.03% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 3 times. ===
42.04% done, estimate finish Sun Feb 26 14:37:37 2012
42.04% done, estimate finish Sun Feb 26 14:37:39 2012
42.05% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.06% done, estimate finish Sun Feb 26 14:37:39 2012
42.06% done, estimate finish Sun Feb 26 14:37:38 2012
42.07% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.08% done, estimate finish Sun Feb 26 14:37:40 2012
42.08% done, estimate finish Sun Feb 26 14:37:39 2012
42.09% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.10% done, estimate finish Sun Feb 26 14:37:39 2012
42.10% done, estimate finish Sun Feb 26 14:37:38 2012
42.11% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.11% done, estimate finish Sun Feb 26 14:37:37 2012
42.12% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.13% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.14% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.15% done, estimate finish Sun Feb 26 14:37:38 2012
42.15% done, estimate finish Sun Feb 26 14:37:37 2012
42.16% done, estimate finish Sun Feb 26 14:37:40 2012
42.16% done, estimate finish Sun Feb 26 14:37:39 2012
42.17% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.18% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.19% done, estimate finish Sun Feb 26 14:37:38 2012
42.19% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.20% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.21% done, estimate finish Sun Feb 26 14:37:39 2012
42.21% done, estimate finish Sun Feb 26 14:37:38 2012
42.22% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.23% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.24% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.25% done, estimate finish Sun Feb 26 14:37:39 2012
42.25% done, estimate finish Sun Feb 26 14:37:38 2012
42.26% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.27% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 3 times. ===
42.28% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.29% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.30% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.31% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.32% done, estimate finish Sun Feb 26 14:37:37 2012
42.32% done, estimate finish Sun Feb 26 14:37:39 2012
42.33% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.34% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.35% done, estimate finish Sun Feb 26 14:37:37 2012
42.35% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.36% done, estimate finish Sun Feb 26 14:37:39 2012
42.36% done, estimate finish Sun Feb 26 14:37:38 2012
42.37% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.38% done, estimate finish Sun Feb 26 14:37:38 2012
42.38% done, estimate finish Sun Feb 26 14:37:37 2012
42.39% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.40% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.41% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.42% done, estimate finish Sun Feb 26 14:37:38 2012
42.42% done, estimate finish Sun Feb 26 14:37:37 2012
42.43% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.43% done, estimate finish Sun Feb 26 14:37:39 2012
42.44% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.45% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.46% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.47% done, estimate finish Sun Feb 26 14:37:37 2012
42.47% done, estimate finish Sun Feb 26 14:37:36 2012
42.48% done, estimate finish Sun Feb 26 14:37:36 2012
42.48% done, estimate finish Sun Feb 26 14:37:38 2012
42.49% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.50% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.51% done, estimate finish Sun Feb 26 14:37:37 2012
42.51% done, estimate finish Sun Feb 26 14:37:36 2012
42.51% done, estimate finish Sun Feb 26 14:37:39 2012
42.52% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.53% done, estimate finish Sun Feb 26 14:37:38 2012
42.53% done, estimate finish Sun Feb 26 14:37:37 2012
42.54% done, estimate finish Sun Feb 26 14:37:37 2012
42.54% done, estimate finish Sun Feb 26 14:37:39 2012
42.55% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.56% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.57% done, estimate finish Sun Feb 26 14:37:38 2012
42.57% done, estimate finish Sun Feb 26 14:37:37 2012
42.58% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.59% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.60% done, estimate finish Sun Feb 26 14:37:36 2012
42.60% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.61% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.62% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.63% done, estimate finish Sun Feb 26 14:37:39 2012
42.63% done, estimate finish Sun Feb 26 14:37:38 2012
42.64% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.65% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.66% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.67% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.68% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.68% done, estimate finish Sun Feb 26 14:37:37 2012
42.69% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.70% done, estimate finish Sun Feb 26 14:37:37 2012
42.70% done, estimate finish Sun Feb 26 14:37:36 2012
42.71% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.72% done, estimate finish Sun Feb 26 14:37:38 2012
42.72% done, estimate finish Sun Feb 26 14:37:37 2012
42.73% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.74% done, estimate finish Sun Feb 26 14:37:39 2012
=== last message repeated 2 times. ===
42.75% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.76% done, estimate finish Sun Feb 26 14:37:38 2012
42.76% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.77% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.78% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.79% done, estimate finish Sun Feb 26 14:37:36 2012
42.79% done, estimate finish Sun Feb 26 14:37:38 2012
42.80% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.81% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.82% done, estimate finish Sun Feb 26 14:37:36 2012
42.82% done, estimate finish Sun Feb 26 14:37:38 2012
42.83% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.84% done, estimate finish Sun Feb 26 14:37:38 2012
42.84% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.85% done, estimate finish Sun Feb 26 14:37:37 2012
42.85% done, estimate finish Sun Feb 26 14:37:36 2012
42.86% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.87% done, estimate finish Sun Feb 26 14:37:35 2012
42.87% done, estimate finish Sun Feb 26 14:37:38 2012
42.88% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.89% done, estimate finish Sun Feb 26 14:37:37 2012
42.89% done, estimate finish Sun Feb 26 14:37:36 2012
42.90% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.91% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.92% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 3 times. ===
42.93% done, estimate finish Sun Feb 26 14:37:36 2012
42.93% done, estimate finish Sun Feb 26 14:37:38 2012
42.94% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
42.95% done, estimate finish Sun Feb 26 14:37:38 2012
42.95% done, estimate finish Sun Feb 26 14:37:37 2012
42.96% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
42.97% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.98% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
42.99% done, estimate finish Sun Feb 26 14:37:38 2012
42.99% done, estimate finish Sun Feb 26 14:37:37 2012
43.00% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.00% done, estimate finish Sun Feb 26 14:37:36 2012
43.01% done, estimate finish Sun Feb 26 14:37:36 2012
43.01% done, estimate finish Sun Feb 26 14:37:38 2012
43.02% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
43.03% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.04% done, estimate finish Sun Feb 26 14:37:37 2012
43.04% done, estimate finish Sun Feb 26 14:37:36 2012
43.05% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.06% done, estimate finish Sun Feb 26 14:37:36 2012
43.06% done, estimate finish Sun Feb 26 14:37:35 2012
43.07% done, estimate finish Sun Feb 26 14:37:35 2012
43.07% done, estimate finish Sun Feb 26 14:37:37 2012
43.08% done, estimate finish Sun Feb 26 14:37:37 2012
43.08% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.09% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.10% done, estimate finish Sun Feb 26 14:37:38 2012
43.10% done, estimate finish Sun Feb 26 14:37:37 2012
43.11% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.12% done, estimate finish Sun Feb 26 14:37:37 2012
43.12% done, estimate finish Sun Feb 26 14:37:36 2012
43.13% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.14% done, estimate finish Sun Feb 26 14:37:38 2012
43.14% done, estimate finish Sun Feb 26 14:37:37 2012
43.15% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.16% done, estimate finish Sun Feb 26 14:37:37 2012
43.16% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.17% done, estimate finish Sun Feb 26 14:37:36 2012
43.17% done, estimate finish Sun Feb 26 14:37:35 2012
43.18% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.19% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.20% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.21% done, estimate finish Sun Feb 26 14:37:38 2012
=== last message repeated 2 times. ===
43.22% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.23% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.24% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 3 times. ===
43.25% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.26% done, estimate finish Sun Feb 26 14:37:35 2012
43.26% done, estimate finish Sun Feb 26 14:37:37 2012
43.27% done, estimate finish Sun Feb 26 14:37:37 2012
43.27% done, estimate finish Sun Feb 26 14:37:36 2012
43.28% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.29% done, estimate finish Sun Feb 26 14:37:35 2012
43.29% done, estimate finish Sun Feb 26 14:37:37 2012
43.30% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.31% done, estimate finish Sun Feb 26 14:37:37 2012
43.31% done, estimate finish Sun Feb 26 14:37:36 2012
43.32% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.32% done, estimate finish Sun Feb 26 14:37:35 2012
43.33% done, estimate finish Sun Feb 26 14:37:35 2012
43.33% done, estimate finish Sun Feb 26 14:37:37 2012
43.34% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.35% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.36% done, estimate finish Sun Feb 26 14:37:36 2012
43.36% done, estimate finish Sun Feb 26 14:37:35 2012
43.37% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.38% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.39% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.40% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.41% done, estimate finish Sun Feb 26 14:37:38 2012
43.41% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.42% done, estimate finish Sun Feb 26 14:37:37 2012
43.42% done, estimate finish Sun Feb 26 14:37:36 2012
43.43% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.44% done, estimate finish Sun Feb 26 14:37:36 2012
43.44% done, estimate finish Sun Feb 26 14:37:35 2012
43.45% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.46% done, estimate finish Sun Feb 26 14:37:37 2012
43.46% done, estimate finish Sun Feb 26 14:37:36 2012
43.47% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.48% done, estimate finish Sun Feb 26 14:37:36 2012
43.48% done, estimate finish Sun Feb 26 14:37:35 2012
43.49% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 3 times. ===
43.50% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.51% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.52% done, estimate finish Sun Feb 26 14:37:35 2012
43.52% done, estimate finish Sun Feb 26 14:37:37 2012
43.53% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.54% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.55% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.56% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.57% done, estimate finish Sun Feb 26 14:37:35 2012
43.57% done, estimate finish Sun Feb 26 14:37:37 2012
43.57% done, estimate finish Sun Feb 26 14:37:36 2012
43.58% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.59% done, estimate finish Sun Feb 26 14:37:36 2012
43.59% done, estimate finish Sun Feb 26 14:37:35 2012
43.60% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.61% done, estimate finish Sun Feb 26 14:37:37 2012
43.61% done, estimate finish Sun Feb 26 14:37:36 2012
43.62% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.63% done, estimate finish Sun Feb 26 14:37:36 2012
43.63% done, estimate finish Sun Feb 26 14:37:35 2012
43.64% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.65% done, estimate finish Sun Feb 26 14:37:35 2012
43.65% done, estimate finish Sun Feb 26 14:37:37 2012
43.65% done, estimate finish Sun Feb 26 14:37:36 2012
43.66% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.67% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.68% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.69% done, estimate finish Sun Feb 26 14:37:37 2012
43.69% done, estimate finish Sun Feb 26 14:37:36 2012
43.70% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.71% done, estimate finish Sun Feb 26 14:37:38 2012
43.71% done, estimate finish Sun Feb 26 14:37:37 2012
43.72% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.73% done, estimate finish Sun Feb 26 14:37:37 2012
43.73% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.74% done, estimate finish Sun Feb 26 14:37:36 2012
43.74% done, estimate finish Sun Feb 26 14:37:35 2012
43.75% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.76% done, estimate finish Sun Feb 26 14:37:35 2012
43.76% done, estimate finish Sun Feb 26 14:37:37 2012
43.77% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.78% done, estimate finish Sun Feb 26 14:37:36 2012
43.78% done, estimate finish Sun Feb 26 14:37:35 2012
43.79% done, estimate finish Sun Feb 26 14:37:35 2012
43.79% done, estimate finish Sun Feb 26 14:37:37 2012
43.80% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.81% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 3 times. ===
43.82% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.83% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.84% done, estimate finish Sun Feb 26 14:37:37 2012
43.84% done, estimate finish Sun Feb 26 14:37:36 2012
43.85% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.86% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.87% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.88% done, estimate finish Sun Feb 26 14:37:37 2012
43.88% done, estimate finish Sun Feb 26 14:37:36 2012
43.89% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 3 times. ===
43.90% done, estimate finish Sun Feb 26 14:37:35 2012
43.90% done, estimate finish Sun Feb 26 14:37:37 2012
43.91% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
43.92% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.93% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.94% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
43.95% done, estimate finish Sun Feb 26 14:37:35 2012
43.95% done, estimate finish Sun Feb 26 14:37:34 2012
43.96% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.97% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
43.97% done, estimate finish Sun Feb 26 14:37:35 2012
43.98% done, estimate finish Sun Feb 26 14:37:35 2012
43.98% done, estimate finish Sun Feb 26 14:37:37 2012
43.99% done, estimate finish Sun Feb 26 14:37:37 2012
43.99% done, estimate finish Sun Feb 26 14:37:36 2012
44.00% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.01% done, estimate finish Sun Feb 26 14:37:36 2012
44.01% done, estimate finish Sun Feb 26 14:37:35 2012
44.02% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.03% done, estimate finish Sun Feb 26 14:37:37 2012
44.03% done, estimate finish Sun Feb 26 14:37:36 2012
44.04% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.05% done, estimate finish Sun Feb 26 14:37:36 2012
44.05% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.06% done, estimate finish Sun Feb 26 14:37:35 2012
44.06% done, estimate finish Sun Feb 26 14:37:34 2012
44.07% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.08% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.09% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.10% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
44.11% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.12% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.13% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 3 times. ===
44.14% done, estimate finish Sun Feb 26 14:37:35 2012
44.14% done, estimate finish Sun Feb 26 14:37:34 2012
44.15% done, estimate finish Sun Feb 26 14:37:34 2012
44.15% done, estimate finish Sun Feb 26 14:37:36 2012
44.16% done, estimate finish Sun Feb 26 14:37:36 2012
44.16% done, estimate finish Sun Feb 26 14:37:35 2012
44.17% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.18% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
44.19% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.20% done, estimate finish Sun Feb 26 14:37:36 2012
44.20% done, estimate finish Sun Feb 26 14:37:35 2012
44.21% done, estimate finish Sun Feb 26 14:37:35 2012
44.21% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
44.22% done, estimate finish Sun Feb 26 14:37:37 2012
44.22% done, estimate finish Sun Feb 26 14:37:36 2012
44.23% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.24% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.25% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.26% done, estimate finish Sun Feb 26 14:37:34 2012
44.26% done, estimate finish Sun Feb 26 14:37:36 2012
44.27% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.28% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.29% done, estimate finish Sun Feb 26 14:37:35 2012
44.29% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
44.30% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.31% done, estimate finish Sun Feb 26 14:37:36 2012
44.31% done, estimate finish Sun Feb 26 14:37:35 2012
44.32% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.33% done, estimate finish Sun Feb 26 14:37:35 2012
44.33% done, estimate finish Sun Feb 26 14:37:34 2012
44.34% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.35% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.36% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.37% done, estimate finish Sun Feb 26 14:37:35 2012
44.37% done, estimate finish Sun Feb 26 14:37:34 2012
44.37% done, estimate finish Sun Feb 26 14:37:36 2012
44.38% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.39% done, estimate finish Sun Feb 26 14:37:36 2012
44.39% done, estimate finish Sun Feb 26 14:37:35 2012
44.40% done, estimate finish Sun Feb 26 14:37:35 2012
44.40% done, estimate finish Sun Feb 26 14:37:37 2012
44.41% done, estimate finish Sun Feb 26 14:37:37 2012
44.41% done, estimate finish Sun Feb 26 14:37:36 2012
44.42% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.43% done, estimate finish Sun Feb 26 14:37:36 2012
44.43% done, estimate finish Sun Feb 26 14:37:35 2012
44.44% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.45% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
44.45% done, estimate finish Sun Feb 26 14:37:36 2012
44.46% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.47% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.48% done, estimate finish Sun Feb 26 14:37:35 2012
44.48% done, estimate finish Sun Feb 26 14:37:37 2012
44.49% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.50% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.51% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.52% done, estimate finish Sun Feb 26 14:37:35 2012
44.52% done, estimate finish Sun Feb 26 14:37:34 2012
44.53% done, estimate finish Sun Feb 26 14:37:34 2012
44.53% done, estimate finish Sun Feb 26 14:37:36 2012
44.54% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.54% done, estimate finish Sun Feb 26 14:37:35 2012
44.55% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.56% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
44.57% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.58% done, estimate finish Sun Feb 26 14:37:36 2012
44.58% done, estimate finish Sun Feb 26 14:37:35 2012
44.59% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.60% done, estimate finish Sun Feb 26 14:37:37 2012
44.60% done, estimate finish Sun Feb 26 14:37:36 2012
44.61% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.62% done, estimate finish Sun Feb 26 14:37:36 2012
44.62% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.63% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.64% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
44.65% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.66% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.67% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.68% done, estimate finish Sun Feb 26 14:37:37 2012
44.68% done, estimate finish Sun Feb 26 14:37:36 2012
44.69% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.70% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 3 times. ===
44.71% done, estimate finish Sun Feb 26 14:37:37 2012
=== last message repeated 2 times. ===
44.72% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.73% done, estimate finish Sun Feb 26 14:37:36 2012
44.73% done, estimate finish Sun Feb 26 14:37:35 2012
44.74% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.75% done, estimate finish Sun Feb 26 14:37:35 2012
44.75% done, estimate finish Sun Feb 26 14:37:34 2012
44.76% done, estimate finish Sun Feb 26 14:37:34 2012
44.76% done, estimate finish Sun Feb 26 14:37:36 2012
44.77% done, estimate finish Sun Feb 26 14:37:36 2012
44.77% done, estimate finish Sun Feb 26 14:37:35 2012
44.78% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 3 times. ===
44.79% done, estimate finish Sun Feb 26 14:37:37 2012
44.79% done, estimate finish Sun Feb 26 14:37:36 2012
44.80% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.81% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.82% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.83% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
44.84% done, estimate finish Sun Feb 26 14:37:34 2012
44.84% done, estimate finish Sun Feb 26 14:37:36 2012
44.85% done, estimate finish Sun Feb 26 14:37:36 2012
44.85% done, estimate finish Sun Feb 26 14:37:35 2012
44.86% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.86% done, estimate finish Sun Feb 26 14:37:34 2012
44.87% done, estimate finish Sun Feb 26 14:37:34 2012
44.87% done, estimate finish Sun Feb 26 14:37:36 2012
44.88% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.89% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.90% done, estimate finish Sun Feb 26 14:37:35 2012
44.90% done, estimate finish Sun Feb 26 14:37:37 2012
44.91% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.92% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
44.93% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.94% done, estimate finish Sun Feb 26 14:37:35 2012
44.94% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
44.95% done, estimate finish Sun Feb 26 14:37:34 2012
44.95% done, estimate finish Sun Feb 26 14:37:36 2012
44.96% done, estimate finish Sun Feb 26 14:37:36 2012
44.96% done, estimate finish Sun Feb 26 14:37:35 2012
44.97% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
44.98% done, estimate finish Sun Feb 26 14:37:34 2012
44.98% done, estimate finish Sun Feb 26 14:37:36 2012
44.99% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
45.00% done, estimate finish Sun Feb 26 14:37:36 2012
45.00% done, estimate finish Sun Feb 26 14:37:35 2012
45.01% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.02% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 3 times. ===
45.03% done, estimate finish Sun Feb 26 14:37:34 2012
45.03% done, estimate finish Sun Feb 26 14:37:36 2012
45.04% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.05% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.06% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.07% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
45.08% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.09% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.10% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 3 times. ===
45.11% done, estimate finish Sun Feb 26 14:37:36 2012
45.11% done, estimate finish Sun Feb 26 14:37:35 2012
45.12% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.13% done, estimate finish Sun Feb 26 14:37:35 2012
45.13% done, estimate finish Sun Feb 26 14:37:34 2012
45.14% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.15% done, estimate finish Sun Feb 26 14:37:33 2012
45.15% done, estimate finish Sun Feb 26 14:37:35 2012
45.16% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.17% done, estimate finish Sun Feb 26 14:37:35 2012
45.17% done, estimate finish Sun Feb 26 14:37:34 2012
45.18% done, estimate finish Sun Feb 26 14:37:34 2012
45.18% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
45.19% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.20% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.21% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.22% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.23% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.24% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.25% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.26% done, estimate finish Sun Feb 26 14:37:34 2012
45.26% done, estimate finish Sun Feb 26 14:37:36 2012
45.26% done, estimate finish Sun Feb 26 14:37:35 2012
45.27% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.28% done, estimate finish Sun Feb 26 14:37:35 2012
45.28% done, estimate finish Sun Feb 26 14:37:34 2012
45.29% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
45.30% done, estimate finish Sun Feb 26 14:37:36 2012
45.30% done, estimate finish Sun Feb 26 14:37:35 2012
45.31% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.32% done, estimate finish Sun Feb 26 14:37:35 2012
45.32% done, estimate finish Sun Feb 26 14:37:34 2012
45.33% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.34% done, estimate finish Sun Feb 26 14:37:34 2012
45.34% done, estimate finish Sun Feb 26 14:37:33 2012
45.35% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 3 times. ===
45.36% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.37% done, estimate finish Sun Feb 26 14:37:34 2012
45.37% done, estimate finish Sun Feb 26 14:37:36 2012
45.38% done, estimate finish Sun Feb 26 14:37:36 2012
45.38% done, estimate finish Sun Feb 26 14:37:35 2012
45.39% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.40% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.41% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.42% done, estimate finish Sun Feb 26 14:37:33 2012
45.42% done, estimate finish Sun Feb 26 14:37:35 2012
45.43% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.43% done, estimate finish Sun Feb 26 14:37:34 2012
45.44% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.45% done, estimate finish Sun Feb 26 14:37:34 2012
45.45% done, estimate finish Sun Feb 26 14:37:36 2012
45.46% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.47% done, estimate finish Sun Feb 26 14:37:35 2012
45.47% done, estimate finish Sun Feb 26 14:37:34 2012
45.48% done, estimate finish Sun Feb 26 14:37:34 2012
45.48% done, estimate finish Sun Feb 26 14:37:36 2012
45.49% done, estimate finish Sun Feb 26 14:37:36 2012
=== last message repeated 2 times. ===
45.50% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.51% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.51% done, estimate finish Sun Feb 26 14:37:34 2012
45.52% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.53% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
45.54% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.55% done, estimate finish Sun Feb 26 14:37:35 2012
45.55% done, estimate finish Sun Feb 26 14:37:34 2012
45.56% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.57% done, estimate finish Sun Feb 26 14:37:36 2012
45.57% done, estimate finish Sun Feb 26 14:37:35 2012
45.58% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.59% done, estimate finish Sun Feb 26 14:37:35 2012
45.59% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.60% done, estimate finish Sun Feb 26 14:37:34 2012
45.60% done, estimate finish Sun Feb 26 14:37:33 2012
45.61% done, estimate finish Sun Feb 26 14:37:33 2012
45.61% done, estimate finish Sun Feb 26 14:37:35 2012
45.62% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.63% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.64% done, estimate finish Sun Feb 26 14:37:34 2012
45.64% done, estimate finish Sun Feb 26 14:37:33 2012
45.65% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.66% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.67% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 3 times. ===
45.68% done, estimate finish Sun Feb 26 14:37:36 2012
45.68% done, estimate finish Sun Feb 26 14:37:35 2012
45.69% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.70% done, estimate finish Sun Feb 26 14:37:35 2012
45.70% done, estimate finish Sun Feb 26 14:37:34 2012
45.71% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.72% done, estimate finish Sun Feb 26 14:37:34 2012
45.72% done, estimate finish Sun Feb 26 14:37:33 2012
45.73% done, estimate finish Sun Feb 26 14:37:33 2012
45.73% done, estimate finish Sun Feb 26 14:37:35 2012
45.74% done, estimate finish Sun Feb 26 14:37:35 2012
45.74% done, estimate finish Sun Feb 26 14:37:34 2012
45.75% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 3 times. ===
45.76% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
45.77% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.78% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.79% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.80% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
45.81% done, estimate finish Sun Feb 26 14:37:33 2012
45.81% done, estimate finish Sun Feb 26 14:37:35 2012
45.82% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.83% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.83% done, estimate finish Sun Feb 26 14:37:33 2012
45.84% done, estimate finish Sun Feb 26 14:37:33 2012
45.84% done, estimate finish Sun Feb 26 14:37:35 2012
45.85% done, estimate finish Sun Feb 26 14:37:35 2012
45.85% done, estimate finish Sun Feb 26 14:37:34 2012
45.86% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.87% done, estimate finish Sun Feb 26 14:37:34 2012
45.87% done, estimate finish Sun Feb 26 14:37:33 2012
45.88% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
45.89% done, estimate finish Sun Feb 26 14:37:33 2012
45.89% done, estimate finish Sun Feb 26 14:37:34 2012
45.90% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.91% done, estimate finish Sun Feb 26 14:37:34 2012
45.91% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
45.92% done, estimate finish Sun Feb 26 14:37:33 2012
45.92% done, estimate finish Sun Feb 26 14:37:35 2012
45.93% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.94% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.95% done, estimate finish Sun Feb 26 14:37:33 2012
45.95% done, estimate finish Sun Feb 26 14:37:35 2012
45.96% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
45.97% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.98% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
45.99% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 3 times. ===
46.00% done, estimate finish Sun Feb 26 14:37:33 2012
46.00% done, estimate finish Sun Feb 26 14:37:32 2012
46.01% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.02% done, estimate finish Sun Feb 26 14:37:34 2012
46.02% done, estimate finish Sun Feb 26 14:37:33 2012
46.03% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.04% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
46.05% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.06% done, estimate finish Sun Feb 26 14:37:34 2012
46.06% done, estimate finish Sun Feb 26 14:37:33 2012
46.07% done, estimate finish Sun Feb 26 14:37:33 2012
46.07% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
46.08% done, estimate finish Sun Feb 26 14:37:35 2012
46.08% done, estimate finish Sun Feb 26 14:37:34 2012
46.09% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.10% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.11% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.12% done, estimate finish Sun Feb 26 14:37:32 2012
46.12% done, estimate finish Sun Feb 26 14:37:34 2012
46.13% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.14% done, estimate finish Sun Feb 26 14:37:34 2012
46.14% done, estimate finish Sun Feb 26 14:37:33 2012
46.15% done, estimate finish Sun Feb 26 14:37:33 2012
46.15% done, estimate finish Sun Feb 26 14:37:35 2012
=== last message repeated 2 times. ===
46.16% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.17% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.18% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.19% done, estimate finish Sun Feb 26 14:37:33 2012
46.19% done, estimate finish Sun Feb 26 14:37:32 2012
46.20% done, estimate finish Sun Feb 26 14:37:32 2012
46.20% done, estimate finish Sun Feb 26 14:37:34 2012
46.21% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.22% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.23% done, estimate finish Sun Feb 26 14:37:33 2012
46.23% done, estimate finish Sun Feb 26 14:37:35 2012
46.23% done, estimate finish Sun Feb 26 14:37:34 2012
46.24% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.25% done, estimate finish Sun Feb 26 14:37:34 2012
46.25% done, estimate finish Sun Feb 26 14:37:33 2012
46.26% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.27% done, estimate finish Sun Feb 26 14:37:33 2012
46.27% done, estimate finish Sun Feb 26 14:37:34 2012
46.28% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.29% done, estimate finish Sun Feb 26 14:37:34 2012
46.29% done, estimate finish Sun Feb 26 14:37:33 2012
46.30% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.31% done, estimate finish Sun Feb 26 14:37:33 2012
46.31% done, estimate finish Sun Feb 26 14:37:32 2012
46.31% done, estimate finish Sun Feb 26 14:37:34 2012
46.32% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.33% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.34% done, estimate finish Sun Feb 26 14:37:33 2012
46.34% done, estimate finish Sun Feb 26 14:37:35 2012
46.35% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.36% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.37% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.38% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.39% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.39% done, estimate finish Sun Feb 26 14:37:34 2012
46.40% done, estimate finish Sun Feb 26 14:37:34 2012
46.40% done, estimate finish Sun Feb 26 14:37:33 2012
46.41% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.42% done, estimate finish Sun Feb 26 14:37:33 2012
46.42% done, estimate finish Sun Feb 26 14:37:32 2012
46.43% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.44% done, estimate finish Sun Feb 26 14:37:34 2012
46.44% done, estimate finish Sun Feb 26 14:37:33 2012
46.45% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.46% done, estimate finish Sun Feb 26 14:37:33 2012
46.46% done, estimate finish Sun Feb 26 14:37:32 2012
46.47% done, estimate finish Sun Feb 26 14:37:32 2012
46.47% done, estimate finish Sun Feb 26 14:37:34 2012
46.48% done, estimate finish Sun Feb 26 14:37:34 2012
46.48% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.49% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.50% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.51% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.52% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.53% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.54% done, estimate finish Sun Feb 26 14:37:35 2012
46.54% done, estimate finish Sun Feb 26 14:37:34 2012
46.55% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.56% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 3 times. ===
46.57% done, estimate finish Sun Feb 26 14:37:33 2012
46.57% done, estimate finish Sun Feb 26 14:37:32 2012
46.58% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.59% done, estimate finish Sun Feb 26 14:37:32 2012
46.59% done, estimate finish Sun Feb 26 14:37:34 2012
46.60% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.61% done, estimate finish Sun Feb 26 14:37:33 2012
46.61% done, estimate finish Sun Feb 26 14:37:32 2012
46.62% done, estimate finish Sun Feb 26 14:37:32 2012
46.62% done, estimate finish Sun Feb 26 14:37:34 2012
46.63% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.64% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 3 times. ===
46.65% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.66% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.67% done, estimate finish Sun Feb 26 14:37:31 2012
46.67% done, estimate finish Sun Feb 26 14:37:33 2012
46.68% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.69% done, estimate finish Sun Feb 26 14:37:33 2012
46.69% done, estimate finish Sun Feb 26 14:37:32 2012
46.70% done, estimate finish Sun Feb 26 14:37:32 2012
46.70% done, estimate finish Sun Feb 26 14:37:34 2012
46.71% done, estimate finish Sun Feb 26 14:37:34 2012
46.71% done, estimate finish Sun Feb 26 14:37:33 2012
46.72% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 3 times. ===
46.73% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.74% done, estimate finish Sun Feb 26 14:37:34 2012
=== last message repeated 2 times. ===
46.75% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.76% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.77% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.78% done, estimate finish Sun Feb 26 14:37:32 2012
46.78% done, estimate finish Sun Feb 26 14:37:31 2012
46.79% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.80% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.80% done, estimate finish Sun Feb 26 14:37:32 2012
46.81% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.82% done, estimate finish Sun Feb 26 14:37:34 2012
46.82% done, estimate finish Sun Feb 26 14:37:33 2012
46.83% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.84% done, estimate finish Sun Feb 26 14:37:33 2012
46.84% done, estimate finish Sun Feb 26 14:37:32 2012
46.85% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.86% done, estimate finish Sun Feb 26 14:37:32 2012
46.86% done, estimate finish Sun Feb 26 14:37:31 2012
46.87% done, estimate finish Sun Feb 26 14:37:31 2012
46.87% done, estimate finish Sun Feb 26 14:37:33 2012
46.88% done, estimate finish Sun Feb 26 14:37:33 2012
46.88% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.89% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.90% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.91% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.92% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.93% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
46.94% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
46.95% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.96% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 3 times. ===
46.97% done, estimate finish Sun Feb 26 14:37:32 2012
46.97% done, estimate finish Sun Feb 26 14:37:31 2012
46.98% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
46.99% done, estimate finish Sun Feb 26 14:37:33 2012
46.99% done, estimate finish Sun Feb 26 14:37:32 2012
47.00% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.01% done, estimate finish Sun Feb 26 14:37:32 2012
47.01% done, estimate finish Sun Feb 26 14:37:33 2012
47.02% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
47.03% done, estimate finish Sun Feb 26 14:37:33 2012
47.03% done, estimate finish Sun Feb 26 14:37:32 2012
47.04% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 3 times. ===
47.05% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.06% done, estimate finish Sun Feb 26 14:37:31 2012
47.06% done, estimate finish Sun Feb 26 14:37:33 2012
47.07% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.08% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.09% done, estimate finish Sun Feb 26 14:37:31 2012
47.09% done, estimate finish Sun Feb 26 14:37:33 2012
47.10% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
47.11% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.12% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.12% done, estimate finish Sun Feb 26 14:37:31 2012
47.13% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.14% done, estimate finish Sun Feb 26 14:37:31 2012
47.14% done, estimate finish Sun Feb 26 14:37:33 2012
47.15% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.16% done, estimate finish Sun Feb 26 14:37:32 2012
47.16% done, estimate finish Sun Feb 26 14:37:31 2012
47.17% done, estimate finish Sun Feb 26 14:37:31 2012
47.17% done, estimate finish Sun Feb 26 14:37:33 2012
47.18% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
47.19% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.20% done, estimate finish Sun Feb 26 14:37:32 2012
47.20% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.21% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 2 times. ===
47.22% done, estimate finish Sun Feb 26 14:37:33 2012
47.22% done, estimate finish Sun Feb 26 14:37:32 2012
47.23% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.24% done, estimate finish Sun Feb 26 14:37:32 2012
47.24% done, estimate finish Sun Feb 26 14:37:31 2012
47.25% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.26% done, estimate finish Sun Feb 26 14:37:33 2012
47.26% done, estimate finish Sun Feb 26 14:37:32 2012
47.27% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.28% done, estimate finish Sun Feb 26 14:37:32 2012
47.28% done, estimate finish Sun Feb 26 14:37:31 2012
47.29% done, estimate finish Sun Feb 26 14:37:33 2012
=== last message repeated 3 times. ===
47.30% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.31% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.32% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.33% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.34% done, estimate finish Sun Feb 26 14:37:30 2012
47.34% done, estimate finish Sun Feb 26 14:37:32 2012
47.35% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.36% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.37% done, estimate finish Sun Feb 26 14:37:31 2012
47.37% done, estimate finish Sun Feb 26 14:37:33 2012
47.37% done, estimate finish Sun Feb 26 14:37:32 2012
47.38% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.39% done, estimate finish Sun Feb 26 14:37:32 2012
47.39% done, estimate finish Sun Feb 26 14:37:31 2012
47.40% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.41% done, estimate finish Sun Feb 26 14:37:31 2012
47.41% done, estimate finish Sun Feb 26 14:37:30 2012
47.42% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.43% done, estimate finish Sun Feb 26 14:37:32 2012
47.43% done, estimate finish Sun Feb 26 14:37:31 2012
47.44% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.45% done, estimate finish Sun Feb 26 14:37:31 2012
47.45% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.46% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.47% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.48% done, estimate finish Sun Feb 26 14:37:31 2012
47.48% done, estimate finish Sun Feb 26 14:37:33 2012
47.49% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.50% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.51% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.52% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.53% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.53% done, estimate finish Sun Feb 26 14:37:32 2012
47.54% done, estimate finish Sun Feb 26 14:37:32 2012
47.54% done, estimate finish Sun Feb 26 14:37:31 2012
47.55% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.56% done, estimate finish Sun Feb 26 14:37:31 2012
47.56% done, estimate finish Sun Feb 26 14:37:30 2012
47.57% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.58% done, estimate finish Sun Feb 26 14:37:32 2012
47.58% done, estimate finish Sun Feb 26 14:37:31 2012
47.59% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.60% done, estimate finish Sun Feb 26 14:37:31 2012
47.60% done, estimate finish Sun Feb 26 14:37:30 2012
47.61% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
47.62% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.63% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.64% done, estimate finish Sun Feb 26 14:37:30 2012
47.64% done, estimate finish Sun Feb 26 14:37:32 2012
47.65% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.66% done, estimate finish Sun Feb 26 14:37:32 2012
47.66% done, estimate finish Sun Feb 26 14:37:31 2012
47.67% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.68% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.69% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.69% done, estimate finish Sun Feb 26 14:37:32 2012
47.70% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.71% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.72% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.73% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.74% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.75% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.76% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.77% done, estimate finish Sun Feb 26 14:37:32 2012
=== last message repeated 2 times. ===
47.77% done, estimate finish Sun Feb 26 14:37:31 2012
47.78% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.79% done, estimate finish Sun Feb 26 14:37:31 2012
47.79% done, estimate finish Sun Feb 26 14:37:30 2012
47.80% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.81% done, estimate finish Sun Feb 26 14:37:30 2012
47.81% done, estimate finish Sun Feb 26 14:37:31 2012
47.82% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.83% done, estimate finish Sun Feb 26 14:37:31 2012
47.83% done, estimate finish Sun Feb 26 14:37:30 2012
47.84% done, estimate finish Sun Feb 26 14:37:30 2012
47.84% done, estimate finish Sun Feb 26 14:37:32 2012
47.85% done, estimate finish Sun Feb 26 14:37:32 2012
47.85% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.86% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.87% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.88% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.89% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.90% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.91% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
47.92% done, estimate finish Sun Feb 26 14:37:30 2012
47.92% done, estimate finish Sun Feb 26 14:37:32 2012
47.93% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 3 times. ===
47.94% done, estimate finish Sun Feb 26 14:37:31 2012
47.94% done, estimate finish Sun Feb 26 14:37:30 2012
47.95% done, estimate finish Sun Feb 26 14:37:30 2012
47.95% done, estimate finish Sun Feb 26 14:37:32 2012
47.96% done, estimate finish Sun Feb 26 14:37:32 2012
47.96% done, estimate finish Sun Feb 26 14:37:31 2012
47.97% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
47.98% done, estimate finish Sun Feb 26 14:37:31 2012
47.98% done, estimate finish Sun Feb 26 14:37:30 2012
47.99% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.00% done, estimate finish Sun Feb 26 14:37:30 2012
48.00% done, estimate finish Sun Feb 26 14:37:29 2012
48.01% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 3 times. ===
48.02% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.03% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.04% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.05% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.06% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.07% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.08% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.09% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.09% done, estimate finish Sun Feb 26 14:37:30 2012
48.10% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.11% done, estimate finish Sun Feb 26 14:37:30 2012
48.11% done, estimate finish Sun Feb 26 14:37:29 2012
48.12% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.13% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.14% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.15% done, estimate finish Sun Feb 26 14:37:30 2012
48.15% done, estimate finish Sun Feb 26 14:37:32 2012
48.16% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.17% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.17% done, estimate finish Sun Feb 26 14:37:30 2012
48.18% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.19% done, estimate finish Sun Feb 26 14:37:30 2012
48.19% done, estimate finish Sun Feb 26 14:37:29 2012
48.20% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.21% done, estimate finish Sun Feb 26 14:37:31 2012
48.21% done, estimate finish Sun Feb 26 14:37:30 2012
48.22% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.23% done, estimate finish Sun Feb 26 14:37:32 2012
48.23% done, estimate finish Sun Feb 26 14:37:31 2012
48.24% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.25% done, estimate finish Sun Feb 26 14:37:31 2012
48.25% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.26% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.27% done, estimate finish Sun Feb 26 14:37:29 2012
48.27% done, estimate finish Sun Feb 26 14:37:31 2012
48.28% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.29% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.30% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.31% done, estimate finish Sun Feb 26 14:37:29 2012
48.31% done, estimate finish Sun Feb 26 14:37:31 2012
48.32% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.33% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
48.34% done, estimate finish Sun Feb 26 14:37:30 2012
48.34% done, estimate finish Sun Feb 26 14:37:29 2012
48.35% done, estimate finish Sun Feb 26 14:37:29 2012
48.35% done, estimate finish Sun Feb 26 14:37:31 2012
48.36% done, estimate finish Sun Feb 26 14:37:31 2012
48.36% done, estimate finish Sun Feb 26 14:37:30 2012
48.37% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.38% done, estimate finish Sun Feb 26 14:37:30 2012
48.38% done, estimate finish Sun Feb 26 14:37:29 2012
48.39% done, estimate finish Sun Feb 26 14:37:29 2012
48.39% done, estimate finish Sun Feb 26 14:37:31 2012
48.40% done, estimate finish Sun Feb 26 14:37:31 2012
48.40% done, estimate finish Sun Feb 26 14:37:30 2012
48.41% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.42% done, estimate finish Sun Feb 26 14:37:30 2012
48.42% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.43% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.44% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.45% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.46% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.47% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.48% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.49% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.50% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.50% done, estimate finish Sun Feb 26 14:37:31 2012
48.51% done, estimate finish Sun Feb 26 14:37:31 2012
48.51% done, estimate finish Sun Feb 26 14:37:30 2012
48.52% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.53% done, estimate finish Sun Feb 26 14:37:30 2012
48.53% done, estimate finish Sun Feb 26 14:37:29 2012
48.54% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.55% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.56% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.57% done, estimate finish Sun Feb 26 14:37:30 2012
48.57% done, estimate finish Sun Feb 26 14:37:29 2012
48.58% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 3 times. ===
48.59% done, estimate finish Sun Feb 26 14:37:31 2012
48.59% done, estimate finish Sun Feb 26 14:37:30 2012
48.60% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.61% done, estimate finish Sun Feb 26 14:37:30 2012
48.61% done, estimate finish Sun Feb 26 14:37:29 2012
48.62% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.63% done, estimate finish Sun Feb 26 14:37:31 2012
48.63% done, estimate finish Sun Feb 26 14:37:30 2012
48.64% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.65% done, estimate finish Sun Feb 26 14:37:30 2012
48.65% done, estimate finish Sun Feb 26 14:37:29 2012
48.66% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 3 times. ===
48.67% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.68% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.69% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.70% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.71% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.72% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.73% done, estimate finish Sun Feb 26 14:37:29 2012
48.73% done, estimate finish Sun Feb 26 14:37:31 2012
48.74% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.74% done, estimate finish Sun Feb 26 14:37:30 2012
48.75% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.76% done, estimate finish Sun Feb 26 14:37:30 2012
48.76% done, estimate finish Sun Feb 26 14:37:29 2012
48.77% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.78% done, estimate finish Sun Feb 26 14:37:29 2012
48.78% done, estimate finish Sun Feb 26 14:37:30 2012
48.79% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.80% done, estimate finish Sun Feb 26 14:37:30 2012
48.80% done, estimate finish Sun Feb 26 14:37:29 2012
48.81% done, estimate finish Sun Feb 26 14:37:29 2012
48.81% done, estimate finish Sun Feb 26 14:37:31 2012
48.82% done, estimate finish Sun Feb 26 14:37:31 2012
48.82% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.83% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.84% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.85% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.86% done, estimate finish Sun Feb 26 14:37:28 2012
48.86% done, estimate finish Sun Feb 26 14:37:30 2012
48.87% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.88% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.89% done, estimate finish Sun Feb 26 14:37:29 2012
48.89% done, estimate finish Sun Feb 26 14:37:31 2012
48.90% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
48.91% done, estimate finish Sun Feb 26 14:37:30 2012
48.91% done, estimate finish Sun Feb 26 14:37:29 2012
48.92% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
48.93% done, estimate finish Sun Feb 26 14:37:31 2012
48.93% done, estimate finish Sun Feb 26 14:37:30 2012
48.94% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
48.95% done, estimate finish Sun Feb 26 14:37:30 2012
48.95% done, estimate finish Sun Feb 26 14:37:29 2012
48.96% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
48.97% done, estimate finish Sun Feb 26 14:37:29 2012
48.97% done, estimate finish Sun Feb 26 14:37:28 2012
48.98% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
48.99% done, estimate finish Sun Feb 26 14:37:30 2012
48.99% done, estimate finish Sun Feb 26 14:37:29 2012
49.00% done, estimate finish Sun Feb 26 14:37:29 2012
49.00% done, estimate finish Sun Feb 26 14:37:31 2012
49.01% done, estimate finish Sun Feb 26 14:37:31 2012
49.01% done, estimate finish Sun Feb 26 14:37:30 2012
49.02% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.03% done, estimate finish Sun Feb 26 14:37:30 2012
49.03% done, estimate finish Sun Feb 26 14:37:29 2012
49.04% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.05% done, estimate finish Sun Feb 26 14:37:29 2012
49.05% done, estimate finish Sun Feb 26 14:37:30 2012
49.06% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
49.07% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.08% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.09% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.10% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.11% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.12% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
49.13% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.14% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.14% done, estimate finish Sun Feb 26 14:37:29 2012
49.15% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.16% done, estimate finish Sun Feb 26 14:37:29 2012
49.16% done, estimate finish Sun Feb 26 14:37:28 2012
49.17% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.18% done, estimate finish Sun Feb 26 14:37:30 2012
49.18% done, estimate finish Sun Feb 26 14:37:29 2012
49.19% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.20% done, estimate finish Sun Feb 26 14:37:31 2012
49.20% done, estimate finish Sun Feb 26 14:37:30 2012
49.21% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.22% done, estimate finish Sun Feb 26 14:37:30 2012
49.22% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.23% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
49.24% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.25% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.26% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.27% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.28% done, estimate finish Sun Feb 26 14:37:28 2012
49.28% done, estimate finish Sun Feb 26 14:37:30 2012
49.29% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.30% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.31% done, estimate finish Sun Feb 26 14:37:29 2012
49.31% done, estimate finish Sun Feb 26 14:37:31 2012
49.31% done, estimate finish Sun Feb 26 14:37:30 2012
49.32% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.33% done, estimate finish Sun Feb 26 14:37:30 2012
49.33% done, estimate finish Sun Feb 26 14:37:29 2012
49.34% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.35% done, estimate finish Sun Feb 26 14:37:29 2012
49.35% done, estimate finish Sun Feb 26 14:37:28 2012
49.36% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.37% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.38% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.39% done, estimate finish Sun Feb 26 14:37:29 2012
49.39% done, estimate finish Sun Feb 26 14:37:31 2012
49.39% done, estimate finish Sun Feb 26 14:37:30 2012
49.40% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.41% done, estimate finish Sun Feb 26 14:37:30 2012
49.41% done, estimate finish Sun Feb 26 14:37:29 2012
49.42% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
49.43% done, estimate finish Sun Feb 26 14:37:31 2012
49.43% done, estimate finish Sun Feb 26 14:37:30 2012
49.44% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.45% done, estimate finish Sun Feb 26 14:37:30 2012
49.45% done, estimate finish Sun Feb 26 14:37:29 2012
49.46% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.47% done, estimate finish Sun Feb 26 14:37:29 2012
49.47% done, estimate finish Sun Feb 26 14:37:28 2012
49.47% done, estimate finish Sun Feb 26 14:37:30 2012
49.48% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.49% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.50% done, estimate finish Sun Feb 26 14:37:29 2012
49.50% done, estimate finish Sun Feb 26 14:37:31 2012
49.51% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.52% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.53% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.54% done, estimate finish Sun Feb 26 14:37:29 2012
49.54% done, estimate finish Sun Feb 26 14:37:31 2012
49.55% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
49.56% done, estimate finish Sun Feb 26 14:37:30 2012
49.56% done, estimate finish Sun Feb 26 14:37:29 2012
49.57% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.58% done, estimate finish Sun Feb 26 14:37:29 2012
49.58% done, estimate finish Sun Feb 26 14:37:30 2012
49.59% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.60% done, estimate finish Sun Feb 26 14:37:30 2012
49.60% done, estimate finish Sun Feb 26 14:37:29 2012
49.61% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.62% done, estimate finish Sun Feb 26 14:37:31 2012
49.62% done, estimate finish Sun Feb 26 14:37:30 2012
49.63% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 3 times. ===
49.64% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.65% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.66% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
49.67% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.68% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.69% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.70% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.71% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.71% done, estimate finish Sun Feb 26 14:37:29 2012
49.72% done, estimate finish Sun Feb 26 14:37:29 2012
49.72% done, estimate finish Sun Feb 26 14:37:31 2012
49.73% done, estimate finish Sun Feb 26 14:37:31 2012
49.73% done, estimate finish Sun Feb 26 14:37:30 2012
49.74% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.75% done, estimate finish Sun Feb 26 14:37:30 2012
49.75% done, estimate finish Sun Feb 26 14:37:29 2012
49.76% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.77% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.78% done, estimate finish Sun Feb 26 14:37:28 2012
49.78% done, estimate finish Sun Feb 26 14:37:30 2012
49.79% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.79% done, estimate finish Sun Feb 26 14:37:29 2012
49.80% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.81% done, estimate finish Sun Feb 26 14:37:31 2012
49.81% done, estimate finish Sun Feb 26 14:37:30 2012
49.82% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.83% done, estimate finish Sun Feb 26 14:37:30 2012
49.83% done, estimate finish Sun Feb 26 14:37:29 2012
49.84% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.85% done, estimate finish Sun Feb 26 14:37:31 2012
49.85% done, estimate finish Sun Feb 26 14:37:30 2012
49.86% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.87% done, estimate finish Sun Feb 26 14:37:30 2012
49.87% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.88% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.89% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.90% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.91% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
49.92% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
49.93% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.94% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
49.95% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 3 times. ===
49.96% done, estimate finish Sun Feb 26 14:37:29 2012
49.96% done, estimate finish Sun Feb 26 14:37:28 2012
49.97% done, estimate finish Sun Feb 26 14:37:28 2012
49.97% done, estimate finish Sun Feb 26 14:37:30 2012
49.98% done, estimate finish Sun Feb 26 14:37:30 2012
49.98% done, estimate finish Sun Feb 26 14:37:29 2012
49.99% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.00% done, estimate finish Sun Feb 26 14:37:29 2012
50.00% done, estimate finish Sun Feb 26 14:37:30 2012
50.01% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.02% done, estimate finish Sun Feb 26 14:37:30 2012
50.02% done, estimate finish Sun Feb 26 14:37:29 2012
50.03% done, estimate finish Sun Feb 26 14:37:29 2012
50.03% done, estimate finish Sun Feb 26 14:37:31 2012
=== last message repeated 2 times. ===
50.04% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.05% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.06% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.07% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.08% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.09% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.10% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.11% done, estimate finish Sun Feb 26 14:37:29 2012
50.11% done, estimate finish Sun Feb 26 14:37:31 2012
50.11% done, estimate finish Sun Feb 26 14:37:30 2012
50.12% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.13% done, estimate finish Sun Feb 26 14:37:30 2012
50.13% done, estimate finish Sun Feb 26 14:37:29 2012
50.14% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.15% done, estimate finish Sun Feb 26 14:37:29 2012
50.15% done, estimate finish Sun Feb 26 14:37:28 2012
50.16% done, estimate finish Sun Feb 26 14:37:28 2012
50.16% done, estimate finish Sun Feb 26 14:37:30 2012
50.17% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.18% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.19% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.19% done, estimate finish Sun Feb 26 14:37:30 2012
50.20% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.21% done, estimate finish Sun Feb 26 14:37:30 2012
50.21% done, estimate finish Sun Feb 26 14:37:29 2012
50.22% done, estimate finish Sun Feb 26 14:37:29 2012
50.22% done, estimate finish Sun Feb 26 14:37:31 2012
50.23% done, estimate finish Sun Feb 26 14:37:31 2012
50.23% done, estimate finish Sun Feb 26 14:37:30 2012
50.24% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.25% done, estimate finish Sun Feb 26 14:37:30 2012
50.25% done, estimate finish Sun Feb 26 14:37:29 2012
50.26% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.27% done, estimate finish Sun Feb 26 14:37:29 2012
50.27% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.28% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.29% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.30% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.31% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.32% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.33% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.34% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.35% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.36% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.36% done, estimate finish Sun Feb 26 14:37:29 2012
50.37% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.38% done, estimate finish Sun Feb 26 14:37:29 2012
50.38% done, estimate finish Sun Feb 26 14:37:28 2012
50.39% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.40% done, estimate finish Sun Feb 26 14:37:30 2012
50.40% done, estimate finish Sun Feb 26 14:37:29 2012
50.41% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.42% done, estimate finish Sun Feb 26 14:37:31 2012
50.42% done, estimate finish Sun Feb 26 14:37:30 2012
50.43% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.44% done, estimate finish Sun Feb 26 14:37:30 2012
50.44% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.45% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.46% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.47% done, estimate finish Sun Feb 26 14:37:28 2012
50.47% done, estimate finish Sun Feb 26 14:37:30 2012
50.48% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.49% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.50% done, estimate finish Sun Feb 26 14:37:28 2012
50.50% done, estimate finish Sun Feb 26 14:37:30 2012
50.51% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.52% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 3 times. ===
50.53% done, estimate finish Sun Feb 26 14:37:29 2012
50.53% done, estimate finish Sun Feb 26 14:37:28 2012
50.54% done, estimate finish Sun Feb 26 14:37:28 2012
50.54% done, estimate finish Sun Feb 26 14:37:30 2012
50.55% done, estimate finish Sun Feb 26 14:37:30 2012
50.55% done, estimate finish Sun Feb 26 14:37:29 2012
50.56% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.57% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.58% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.59% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.60% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 3 times. ===
50.61% done, estimate finish Sun Feb 26 14:37:29 2012
50.61% done, estimate finish Sun Feb 26 14:37:30 2012
50.62% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.63% done, estimate finish Sun Feb 26 14:37:30 2012
50.63% done, estimate finish Sun Feb 26 14:37:29 2012
50.64% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.65% done, estimate finish Sun Feb 26 14:37:29 2012
50.65% done, estimate finish Sun Feb 26 14:37:28 2012
50.66% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.67% done, estimate finish Sun Feb 26 14:37:30 2012
50.67% done, estimate finish Sun Feb 26 14:37:29 2012
50.68% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 3 times. ===
50.69% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.70% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.71% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.72% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.73% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.74% done, estimate finish Sun Feb 26 14:37:28 2012
50.74% done, estimate finish Sun Feb 26 14:37:30 2012
50.75% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.76% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.76% done, estimate finish Sun Feb 26 14:37:28 2012
50.77% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.78% done, estimate finish Sun Feb 26 14:37:30 2012
50.78% done, estimate finish Sun Feb 26 14:37:29 2012
50.79% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.80% done, estimate finish Sun Feb 26 14:37:29 2012
50.80% done, estimate finish Sun Feb 26 14:37:28 2012
50.81% done, estimate finish Sun Feb 26 14:37:28 2012
50.81% done, estimate finish Sun Feb 26 14:37:30 2012
50.82% done, estimate finish Sun Feb 26 14:37:30 2012
50.82% done, estimate finish Sun Feb 26 14:37:29 2012
50.83% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.84% done, estimate finish Sun Feb 26 14:37:29 2012
50.84% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.85% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.86% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.87% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.88% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.89% done, estimate finish Sun Feb 26 14:37:30 2012
=== last message repeated 2 times. ===
50.90% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.91% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.92% done, estimate finish Sun Feb 26 14:37:29 2012
50.92% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.93% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.94% done, estimate finish Sun Feb 26 14:37:27 2012
50.94% done, estimate finish Sun Feb 26 14:37:29 2012
50.95% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.96% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
50.97% done, estimate finish Sun Feb 26 14:37:28 2012
50.97% done, estimate finish Sun Feb 26 14:37:30 2012
50.98% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
50.99% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.00% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.00% done, estimate finish Sun Feb 26 14:37:30 2012
51.01% done, estimate finish Sun Feb 26 14:37:30 2012
51.01% done, estimate finish Sun Feb 26 14:37:29 2012
51.02% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.03% done, estimate finish Sun Feb 26 14:37:29 2012
51.03% done, estimate finish Sun Feb 26 14:37:28 2012
51.04% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.05% done, estimate finish Sun Feb 26 14:37:28 2012
51.05% done, estimate finish Sun Feb 26 14:37:27 2012
51.06% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.07% done, estimate finish Sun Feb 26 14:37:29 2012
51.07% done, estimate finish Sun Feb 26 14:37:28 2012
51.08% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 3 times. ===
51.09% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.10% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.11% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.12% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.13% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.14% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.15% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.16% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.16% done, estimate finish Sun Feb 26 14:37:29 2012
51.17% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.18% done, estimate finish Sun Feb 26 14:37:29 2012
51.18% done, estimate finish Sun Feb 26 14:37:28 2012
51.19% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.20% done, estimate finish Sun Feb 26 14:37:28 2012
51.20% done, estimate finish Sun Feb 26 14:37:27 2012
51.21% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.22% done, estimate finish Sun Feb 26 14:37:27 2012
51.22% done, estimate finish Sun Feb 26 14:37:28 2012
51.23% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.24% done, estimate finish Sun Feb 26 14:37:28 2012
51.24% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.25% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.26% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.27% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.28% done, estimate finish Sun Feb 26 14:37:28 2012
51.28% done, estimate finish Sun Feb 26 14:37:29 2012
51.29% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.30% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.31% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.32% done, estimate finish Sun Feb 26 14:37:28 2012
51.32% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.33% done, estimate finish Sun Feb 26 14:37:27 2012
51.33% done, estimate finish Sun Feb 26 14:37:29 2012
51.34% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.35% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.36% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.37% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.38% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.39% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.40% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
51.41% done, estimate finish Sun Feb 26 14:37:27 2012
51.41% done, estimate finish Sun Feb 26 14:37:28 2012
51.42% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.43% done, estimate finish Sun Feb 26 14:37:28 2012
51.43% done, estimate finish Sun Feb 26 14:37:27 2012
51.44% done, estimate finish Sun Feb 26 14:37:27 2012
51.44% done, estimate finish Sun Feb 26 14:37:29 2012
51.45% done, estimate finish Sun Feb 26 14:37:29 2012
51.45% done, estimate finish Sun Feb 26 14:37:28 2012
51.46% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.47% done, estimate finish Sun Feb 26 14:37:28 2012
51.47% done, estimate finish Sun Feb 26 14:37:27 2012
51.48% done, estimate finish Sun Feb 26 14:37:27 2012
51.48% done, estimate finish Sun Feb 26 14:37:29 2012
51.49% done, estimate finish Sun Feb 26 14:37:29 2012
51.49% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.50% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.51% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.52% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.53% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.54% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.55% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.56% done, estimate finish Sun Feb 26 14:37:27 2012
51.56% done, estimate finish Sun Feb 26 14:37:29 2012
51.57% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 3 times. ===
51.58% done, estimate finish Sun Feb 26 14:37:28 2012
51.58% done, estimate finish Sun Feb 26 14:37:27 2012
51.59% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.60% done, estimate finish Sun Feb 26 14:37:27 2012
51.60% done, estimate finish Sun Feb 26 14:37:28 2012
51.61% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.62% done, estimate finish Sun Feb 26 14:37:28 2012
51.62% done, estimate finish Sun Feb 26 14:37:27 2012
51.63% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.64% done, estimate finish Sun Feb 26 14:37:29 2012
51.64% done, estimate finish Sun Feb 26 14:37:28 2012
51.65% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 3 times. ===
51.66% done, estimate finish Sun Feb 26 14:37:28 2012
51.66% done, estimate finish Sun Feb 26 14:37:27 2012
51.67% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.68% done, estimate finish Sun Feb 26 14:37:27 2012
51.68% done, estimate finish Sun Feb 26 14:37:26 2012
51.69% done, estimate finish Sun Feb 26 14:37:26 2012
51.69% done, estimate finish Sun Feb 26 14:37:28 2012
51.70% done, estimate finish Sun Feb 26 14:37:28 2012
51.70% done, estimate finish Sun Feb 26 14:37:27 2012
51.71% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.72% done, estimate finish Sun Feb 26 14:37:27 2012
51.72% done, estimate finish Sun Feb 26 14:37:28 2012
51.73% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 3 times. ===
51.74% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.75% done, estimate finish Sun Feb 26 14:37:29 2012
=== last message repeated 2 times. ===
51.76% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.77% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.78% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.79% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.80% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
51.81% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.81% done, estimate finish Sun Feb 26 14:37:27 2012
51.82% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.83% done, estimate finish Sun Feb 26 14:37:27 2012
51.83% done, estimate finish Sun Feb 26 14:37:28 2012
51.84% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.85% done, estimate finish Sun Feb 26 14:37:28 2012
51.85% done, estimate finish Sun Feb 26 14:37:27 2012
51.86% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.87% done, estimate finish Sun Feb 26 14:37:27 2012
51.87% done, estimate finish Sun Feb 26 14:37:26 2012
51.88% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
51.89% done, estimate finish Sun Feb 26 14:37:28 2012
51.89% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.90% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.91% done, estimate finish Sun Feb 26 14:37:26 2012
51.91% done, estimate finish Sun Feb 26 14:37:28 2012
51.92% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.93% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.94% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.95% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.96% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
51.97% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
51.98% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
51.99% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.00% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
52.01% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.02% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.03% done, estimate finish Sun Feb 26 14:37:26 2012
52.03% done, estimate finish Sun Feb 26 14:37:28 2012
52.04% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
52.05% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
52.06% done, estimate finish Sun Feb 26 14:37:27 2012
52.06% done, estimate finish Sun Feb 26 14:37:26 2012
52.07% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.08% done, estimate finish Sun Feb 26 14:37:26 2012
52.08% done, estimate finish Sun Feb 26 14:37:27 2012
52.09% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.10% done, estimate finish Sun Feb 26 14:37:27 2012
52.10% done, estimate finish Sun Feb 26 14:37:26 2012
52.11% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
52.12% done, estimate finish Sun Feb 26 14:37:28 2012
52.12% done, estimate finish Sun Feb 26 14:37:27 2012
52.13% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
52.14% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.15% done, estimate finish Sun Feb 26 14:37:26 2012
52.15% done, estimate finish Sun Feb 26 14:37:28 2012
52.16% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.17% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.18% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.19% done, estimate finish Sun Feb 26 14:37:26 2012
52.19% done, estimate finish Sun Feb 26 14:37:28 2012
52.20% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.21% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.21% done, estimate finish Sun Feb 26 14:37:26 2012
52.22% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
52.23% done, estimate finish Sun Feb 26 14:37:28 2012
52.23% done, estimate finish Sun Feb 26 14:37:27 2012
52.24% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.25% done, estimate finish Sun Feb 26 14:37:27 2012
52.25% done, estimate finish Sun Feb 26 14:37:26 2012
52.26% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.27% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.28% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.29% done, estimate finish Sun Feb 26 14:37:27 2012
52.29% done, estimate finish Sun Feb 26 14:37:26 2012
52.30% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.30% done, estimate finish Sun Feb 26 14:37:28 2012
52.31% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.32% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.33% done, estimate finish Sun Feb 26 14:37:27 2012
52.33% done, estimate finish Sun Feb 26 14:37:26 2012
52.34% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.35% done, estimate finish Sun Feb 26 14:37:26 2012
52.35% done, estimate finish Sun Feb 26 14:37:25 2012
52.36% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.37% done, estimate finish Sun Feb 26 14:37:27 2012
52.37% done, estimate finish Sun Feb 26 14:37:26 2012
52.38% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.38% done, estimate finish Sun Feb 26 14:37:28 2012
52.39% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.40% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.41% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.42% done, estimate finish Sun Feb 26 14:37:28 2012
=== last message repeated 2 times. ===
52.43% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.44% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.45% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.46% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.46% done, estimate finish Sun Feb 26 14:37:25 2012
52.47% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.48% done, estimate finish Sun Feb 26 14:37:27 2012
52.48% done, estimate finish Sun Feb 26 14:37:26 2012
52.49% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.50% done, estimate finish Sun Feb 26 14:37:28 2012
52.50% done, estimate finish Sun Feb 26 14:37:27 2012
52.51% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.52% done, estimate finish Sun Feb 26 14:37:27 2012
52.52% done, estimate finish Sun Feb 26 14:37:26 2012
52.53% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.54% done, estimate finish Sun Feb 26 14:37:26 2012
52.54% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
52.55% done, estimate finish Sun Feb 26 14:37:25 2012
52.55% done, estimate finish Sun Feb 26 14:37:27 2012
52.56% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.57% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.58% done, estimate finish Sun Feb 26 14:37:25 2012
52.58% done, estimate finish Sun Feb 26 14:37:27 2012
52.59% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.60% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.61% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.62% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
52.63% done, estimate finish Sun Feb 26 14:37:27 2012
52.63% done, estimate finish Sun Feb 26 14:37:26 2012
52.64% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.65% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.66% done, estimate finish Sun Feb 26 14:37:25 2012
52.66% done, estimate finish Sun Feb 26 14:37:27 2012
52.67% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.68% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.69% done, estimate finish Sun Feb 26 14:37:26 2012
52.69% done, estimate finish Sun Feb 26 14:37:27 2012
52.70% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
52.71% done, estimate finish Sun Feb 26 14:37:27 2012
52.71% done, estimate finish Sun Feb 26 14:37:26 2012
52.72% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.73% done, estimate finish Sun Feb 26 14:37:26 2012
52.73% done, estimate finish Sun Feb 26 14:37:25 2012
52.74% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
52.75% done, estimate finish Sun Feb 26 14:37:27 2012
52.75% done, estimate finish Sun Feb 26 14:37:26 2012
52.76% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.77% done, estimate finish Sun Feb 26 14:37:26 2012
52.77% done, estimate finish Sun Feb 26 14:37:25 2012
52.78% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 3 times. ===
52.79% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.80% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.81% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
52.82% done, estimate finish Sun Feb 26 14:37:25 2012
52.82% done, estimate finish Sun Feb 26 14:37:27 2012
52.83% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.84% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.85% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
52.86% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.86% done, estimate finish Sun Feb 26 14:37:26 2012
52.87% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.88% done, estimate finish Sun Feb 26 14:37:26 2012
52.88% done, estimate finish Sun Feb 26 14:37:25 2012
52.89% done, estimate finish Sun Feb 26 14:37:25 2012
52.89% done, estimate finish Sun Feb 26 14:37:27 2012
52.90% done, estimate finish Sun Feb 26 14:37:27 2012
52.90% done, estimate finish Sun Feb 26 14:37:26 2012
52.91% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.92% done, estimate finish Sun Feb 26 14:37:26 2012
52.92% done, estimate finish Sun Feb 26 14:37:25 2012
52.93% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
52.94% done, estimate finish Sun Feb 26 14:37:25 2012
52.94% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.95% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.96% done, estimate finish Sun Feb 26 14:37:26 2012
52.96% done, estimate finish Sun Feb 26 14:37:25 2012
52.97% done, estimate finish Sun Feb 26 14:37:27 2012
=== last message repeated 2 times. ===
52.98% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
52.99% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.00% done, estimate finish Sun Feb 26 14:37:26 2012
53.00% done, estimate finish Sun Feb 26 14:37:25 2012
53.01% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.02% done, estimate finish Sun Feb 26 14:37:25 2012
53.02% done, estimate finish Sun Feb 26 14:37:24 2012
53.02% done, estimate finish Sun Feb 26 14:37:26 2012
53.03% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.04% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.05% done, estimate finish Sun Feb 26 14:37:25 2012
53.05% done, estimate finish Sun Feb 26 14:37:27 2012
53.06% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.07% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.08% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.09% done, estimate finish Sun Feb 26 14:37:25 2012
53.09% done, estimate finish Sun Feb 26 14:37:27 2012
53.10% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 3 times. ===
53.11% done, estimate finish Sun Feb 26 14:37:26 2012
53.11% done, estimate finish Sun Feb 26 14:37:25 2012
53.12% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.13% done, estimate finish Sun Feb 26 14:37:25 2012
53.13% done, estimate finish Sun Feb 26 14:37:26 2012
53.14% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.15% done, estimate finish Sun Feb 26 14:37:26 2012
53.15% done, estimate finish Sun Feb 26 14:37:25 2012
53.16% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.17% done, estimate finish Sun Feb 26 14:37:27 2012
53.17% done, estimate finish Sun Feb 26 14:37:26 2012
53.18% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 3 times. ===
53.19% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.20% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.21% done, estimate finish Sun Feb 26 14:37:25 2012
53.21% done, estimate finish Sun Feb 26 14:37:24 2012
53.22% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.23% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.24% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.25% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.26% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.26% done, estimate finish Sun Feb 26 14:37:25 2012
53.27% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.28% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.29% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.30% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.31% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.32% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.33% done, estimate finish Sun Feb 26 14:37:24 2012
53.33% done, estimate finish Sun Feb 26 14:37:26 2012
53.34% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.34% done, estimate finish Sun Feb 26 14:37:25 2012
53.35% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.36% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.37% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.38% done, estimate finish Sun Feb 26 14:37:26 2012
53.38% done, estimate finish Sun Feb 26 14:37:25 2012
53.39% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.40% done, estimate finish Sun Feb 26 14:37:25 2012
53.40% done, estimate finish Sun Feb 26 14:37:24 2012
53.41% done, estimate finish Sun Feb 26 14:37:24 2012
53.41% done, estimate finish Sun Feb 26 14:37:26 2012
53.42% done, estimate finish Sun Feb 26 14:37:26 2012
53.42% done, estimate finish Sun Feb 26 14:37:25 2012
53.43% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 3 times. ===
53.44% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.45% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.46% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.47% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.48% done, estimate finish Sun Feb 26 14:37:24 2012
53.48% done, estimate finish Sun Feb 26 14:37:26 2012
53.49% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.50% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.51% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.51% done, estimate finish Sun Feb 26 14:37:24 2012
53.52% done, estimate finish Sun Feb 26 14:37:24 2012
53.52% done, estimate finish Sun Feb 26 14:37:26 2012
53.53% done, estimate finish Sun Feb 26 14:37:26 2012
53.53% done, estimate finish Sun Feb 26 14:37:25 2012
53.54% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.55% done, estimate finish Sun Feb 26 14:37:25 2012
53.55% done, estimate finish Sun Feb 26 14:37:26 2012
53.56% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.57% done, estimate finish Sun Feb 26 14:37:26 2012
53.57% done, estimate finish Sun Feb 26 14:37:25 2012
53.58% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.59% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.59% done, estimate finish Sun Feb 26 14:37:24 2012
53.60% done, estimate finish Sun Feb 26 14:37:24 2012
53.60% done, estimate finish Sun Feb 26 14:37:26 2012
53.61% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.62% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.63% done, estimate finish Sun Feb 26 14:37:25 2012
53.63% done, estimate finish Sun Feb 26 14:37:26 2012
53.64% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.65% done, estimate finish Sun Feb 26 14:37:26 2012
53.65% done, estimate finish Sun Feb 26 14:37:25 2012
53.66% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.67% done, estimate finish Sun Feb 26 14:37:25 2012
53.67% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
53.68% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.69% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.70% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.71% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
53.72% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.73% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.74% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.75% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 3 times. ===
53.76% done, estimate finish Sun Feb 26 14:37:26 2012
53.76% done, estimate finish Sun Feb 26 14:37:25 2012
53.77% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.78% done, estimate finish Sun Feb 26 14:37:25 2012
53.78% done, estimate finish Sun Feb 26 14:37:24 2012
53.79% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
53.80% done, estimate finish Sun Feb 26 14:37:24 2012
53.80% done, estimate finish Sun Feb 26 14:37:25 2012
53.81% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.82% done, estimate finish Sun Feb 26 14:37:25 2012
53.82% done, estimate finish Sun Feb 26 14:37:24 2012
53.83% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 3 times. ===
53.84% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.85% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.86% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
53.87% done, estimate finish Sun Feb 26 14:37:24 2012
53.87% done, estimate finish Sun Feb 26 14:37:26 2012
53.88% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.89% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.90% done, estimate finish Sun Feb 26 14:37:25 2012
53.90% done, estimate finish Sun Feb 26 14:37:24 2012
53.91% done, estimate finish Sun Feb 26 14:37:24 2012
53.91% done, estimate finish Sun Feb 26 14:37:26 2012
53.91% done, estimate finish Sun Feb 26 14:37:25 2012
53.92% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.93% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.94% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
53.95% done, estimate finish Sun Feb 26 14:37:26 2012
53.95% done, estimate finish Sun Feb 26 14:37:25 2012
53.96% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.97% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
53.98% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
53.99% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
53.99% done, estimate finish Sun Feb 26 14:37:25 2012
54.00% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.01% done, estimate finish Sun Feb 26 14:37:25 2012
54.01% done, estimate finish Sun Feb 26 14:37:24 2012
54.02% done, estimate finish Sun Feb 26 14:37:24 2012
54.02% done, estimate finish Sun Feb 26 14:37:26 2012
54.03% done, estimate finish Sun Feb 26 14:37:26 2012
54.03% done, estimate finish Sun Feb 26 14:37:25 2012
54.04% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.05% done, estimate finish Sun Feb 26 14:37:25 2012
54.05% done, estimate finish Sun Feb 26 14:37:24 2012
54.06% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.07% done, estimate finish Sun Feb 26 14:37:26 2012
54.07% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.08% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.09% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.10% done, estimate finish Sun Feb 26 14:37:24 2012
54.10% done, estimate finish Sun Feb 26 14:37:26 2012
54.11% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.12% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.13% done, estimate finish Sun Feb 26 14:37:24 2012
54.13% done, estimate finish Sun Feb 26 14:37:26 2012
54.14% done, estimate finish Sun Feb 26 14:37:26 2012
=== last message repeated 2 times. ===
54.15% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 3 times. ===
54.16% done, estimate finish Sun Feb 26 14:37:25 2012
54.16% done, estimate finish Sun Feb 26 14:37:24 2012
54.17% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.18% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.19% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.20% done, estimate finish Sun Feb 26 14:37:25 2012
54.20% done, estimate finish Sun Feb 26 14:37:24 2012
54.21% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.22% done, estimate finish Sun Feb 26 14:37:26 2012
54.22% done, estimate finish Sun Feb 26 14:37:25 2012
54.23% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.24% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.24% done, estimate finish Sun Feb 26 14:37:24 2012
54.25% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.26% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.27% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.28% done, estimate finish Sun Feb 26 14:37:25 2012
54.28% done, estimate finish Sun Feb 26 14:37:24 2012
54.29% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.30% done, estimate finish Sun Feb 26 14:37:24 2012
54.30% done, estimate finish Sun Feb 26 14:37:25 2012
54.31% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.32% done, estimate finish Sun Feb 26 14:37:25 2012
54.32% done, estimate finish Sun Feb 26 14:37:24 2012
54.32% done, estimate finish Sun Feb 26 14:37:26 2012
54.33% done, estimate finish Sun Feb 26 14:37:26 2012
54.33% done, estimate finish Sun Feb 26 14:37:25 2012
54.34% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.35% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.36% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.37% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.38% done, estimate finish Sun Feb 26 14:37:23 2012
54.38% done, estimate finish Sun Feb 26 14:37:25 2012
54.39% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.40% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
54.41% done, estimate finish Sun Feb 26 14:37:26 2012
54.41% done, estimate finish Sun Feb 26 14:37:25 2012
54.42% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.43% done, estimate finish Sun Feb 26 14:37:25 2012
54.43% done, estimate finish Sun Feb 26 14:37:24 2012
54.44% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.45% done, estimate finish Sun Feb 26 14:37:24 2012
54.45% done, estimate finish Sun Feb 26 14:37:25 2012
54.46% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.47% done, estimate finish Sun Feb 26 14:37:25 2012
54.47% done, estimate finish Sun Feb 26 14:37:24 2012
54.48% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
54.49% done, estimate finish Sun Feb 26 14:37:24 2012
54.49% done, estimate finish Sun Feb 26 14:37:25 2012
54.50% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.51% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.52% done, estimate finish Sun Feb 26 14:37:24 2012
54.52% done, estimate finish Sun Feb 26 14:37:26 2012
54.53% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.54% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.55% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.56% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
54.57% done, estimate finish Sun Feb 26 14:37:23 2012
54.57% done, estimate finish Sun Feb 26 14:37:25 2012
54.58% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.59% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.60% done, estimate finish Sun Feb 26 14:37:24 2012
54.60% done, estimate finish Sun Feb 26 14:37:25 2012
54.61% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.62% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.63% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.64% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.64% done, estimate finish Sun Feb 26 14:37:25 2012
54.65% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.66% done, estimate finish Sun Feb 26 14:37:25 2012
54.66% done, estimate finish Sun Feb 26 14:37:24 2012
54.67% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.68% done, estimate finish Sun Feb 26 14:37:24 2012
54.68% done, estimate finish Sun Feb 26 14:37:23 2012
54.69% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.70% done, estimate finish Sun Feb 26 14:37:25 2012
54.70% done, estimate finish Sun Feb 26 14:37:24 2012
54.71% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.72% done, estimate finish Sun Feb 26 14:37:26 2012
54.72% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.73% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.74% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.75% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.76% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
54.77% done, estimate finish Sun Feb 26 14:37:23 2012
54.77% done, estimate finish Sun Feb 26 14:37:25 2012
54.78% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.79% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.80% done, estimate finish Sun Feb 26 14:37:24 2012
54.80% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.81% done, estimate finish Sun Feb 26 14:37:25 2012
54.81% done, estimate finish Sun Feb 26 14:37:24 2012
54.82% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.83% done, estimate finish Sun Feb 26 14:37:26 2012
54.83% done, estimate finish Sun Feb 26 14:37:25 2012
54.84% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.85% done, estimate finish Sun Feb 26 14:37:25 2012
54.85% done, estimate finish Sun Feb 26 14:37:24 2012
54.86% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.87% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.88% done, estimate finish Sun Feb 26 14:37:23 2012
54.88% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.89% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.90% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.91% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.92% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
54.93% done, estimate finish Sun Feb 26 14:37:25 2012
54.93% done, estimate finish Sun Feb 26 14:37:24 2012
54.94% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.95% done, estimate finish Sun Feb 26 14:37:24 2012
54.95% done, estimate finish Sun Feb 26 14:37:23 2012
54.96% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 3 times. ===
54.97% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.98% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
54.99% done, estimate finish Sun Feb 26 14:37:23 2012
54.99% done, estimate finish Sun Feb 26 14:37:25 2012
55.00% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.01% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.02% done, estimate finish Sun Feb 26 14:37:24 2012
55.02% done, estimate finish Sun Feb 26 14:37:25 2012
55.03% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.04% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.04% done, estimate finish Sun Feb 26 14:37:24 2012
55.05% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.06% done, estimate finish Sun Feb 26 14:37:24 2012
55.06% done, estimate finish Sun Feb 26 14:37:23 2012
55.07% done, estimate finish Sun Feb 26 14:37:23 2012
55.07% done, estimate finish Sun Feb 26 14:37:25 2012
55.08% done, estimate finish Sun Feb 26 14:37:25 2012
55.08% done, estimate finish Sun Feb 26 14:37:24 2012
55.09% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.10% done, estimate finish Sun Feb 26 14:37:24 2012
55.10% done, estimate finish Sun Feb 26 14:37:25 2012
55.11% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.12% done, estimate finish Sun Feb 26 14:37:25 2012
55.12% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.13% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.14% done, estimate finish Sun Feb 26 14:37:24 2012
55.14% done, estimate finish Sun Feb 26 14:37:25 2012
55.15% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.16% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.17% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.18% done, estimate finish Sun Feb 26 14:37:24 2012
55.18% done, estimate finish Sun Feb 26 14:37:23 2012
55.19% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.20% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
55.21% done, estimate finish Sun Feb 26 14:37:24 2012
55.21% done, estimate finish Sun Feb 26 14:37:25 2012
55.22% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.23% done, estimate finish Sun Feb 26 14:37:25 2012
55.23% done, estimate finish Sun Feb 26 14:37:24 2012
55.24% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.25% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.26% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
55.27% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.28% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
55.29% done, estimate finish Sun Feb 26 14:37:24 2012
55.29% done, estimate finish Sun Feb 26 14:37:23 2012
55.30% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.31% done, estimate finish Sun Feb 26 14:37:25 2012
55.31% done, estimate finish Sun Feb 26 14:37:24 2012
55.32% done, estimate finish Sun Feb 26 14:37:24 2012
55.32% done, estimate finish Sun Feb 26 14:37:26 2012
55.33% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.34% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.35% done, estimate finish Sun Feb 26 14:37:25 2012
55.35% done, estimate finish Sun Feb 26 14:37:24 2012
55.36% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.37% done, estimate finish Sun Feb 26 14:37:24 2012
55.37% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
55.38% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.39% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.40% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.41% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.42% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.43% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.44% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.45% done, estimate finish Sun Feb 26 14:37:24 2012
55.45% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.46% done, estimate finish Sun Feb 26 14:37:25 2012
55.46% done, estimate finish Sun Feb 26 14:37:24 2012
55.47% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.48% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.49% done, estimate finish Sun Feb 26 14:37:23 2012
55.49% done, estimate finish Sun Feb 26 14:37:25 2012
55.50% done, estimate finish Sun Feb 26 14:37:25 2012
55.50% done, estimate finish Sun Feb 26 14:37:24 2012
55.51% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.52% done, estimate finish Sun Feb 26 14:37:24 2012
55.52% done, estimate finish Sun Feb 26 14:37:25 2012
55.53% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 3 times. ===
55.54% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.55% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.56% done, estimate finish Sun Feb 26 14:37:24 2012
55.56% done, estimate finish Sun Feb 26 14:37:23 2012
55.57% done, estimate finish Sun Feb 26 14:37:23 2012
55.57% done, estimate finish Sun Feb 26 14:37:25 2012
55.58% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.59% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.60% done, estimate finish Sun Feb 26 14:37:24 2012
55.60% done, estimate finish Sun Feb 26 14:37:25 2012
55.61% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 3 times. ===
55.62% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.63% done, estimate finish Sun Feb 26 14:37:26 2012
55.63% done, estimate finish Sun Feb 26 14:37:25 2012
55.64% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.65% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.66% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.67% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.68% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
55.69% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.69% done, estimate finish Sun Feb 26 14:37:24 2012
55.70% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.71% done, estimate finish Sun Feb 26 14:37:24 2012
55.71% done, estimate finish Sun Feb 26 14:37:25 2012
55.72% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.73% done, estimate finish Sun Feb 26 14:37:25 2012
55.73% done, estimate finish Sun Feb 26 14:37:24 2012
55.74% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.75% done, estimate finish Sun Feb 26 14:37:24 2012
55.75% done, estimate finish Sun Feb 26 14:37:23 2012
55.76% done, estimate finish Sun Feb 26 14:37:23 2012
55.76% done, estimate finish Sun Feb 26 14:37:25 2012
55.77% done, estimate finish Sun Feb 26 14:37:25 2012
55.77% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.78% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.79% done, estimate finish Sun Feb 26 14:37:24 2012
55.79% done, estimate finish Sun Feb 26 14:37:23 2012
55.80% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.81% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.82% done, estimate finish Sun Feb 26 14:37:24 2012
55.82% done, estimate finish Sun Feb 26 14:37:26 2012
55.83% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.84% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.85% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
55.86% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.87% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
55.88% done, estimate finish Sun Feb 26 14:37:25 2012
55.88% done, estimate finish Sun Feb 26 14:37:24 2012
55.89% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.90% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.91% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.92% done, estimate finish Sun Feb 26 14:37:25 2012
55.92% done, estimate finish Sun Feb 26 14:37:24 2012
55.93% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
55.94% done, estimate finish Sun Feb 26 14:37:24 2012
55.94% done, estimate finish Sun Feb 26 14:37:25 2012
55.95% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
55.96% done, estimate finish Sun Feb 26 14:37:25 2012
55.96% done, estimate finish Sun Feb 26 14:37:24 2012
55.97% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
55.98% done, estimate finish Sun Feb 26 14:37:24 2012
55.98% done, estimate finish Sun Feb 26 14:37:23 2012
55.99% done, estimate finish Sun Feb 26 14:37:23 2012
55.99% done, estimate finish Sun Feb 26 14:37:25 2012
56.00% done, estimate finish Sun Feb 26 14:37:25 2012
56.00% done, estimate finish Sun Feb 26 14:37:24 2012
56.01% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
56.02% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.03% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.04% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.05% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.06% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.07% done, estimate finish Sun Feb 26 14:37:23 2012
56.07% done, estimate finish Sun Feb 26 14:37:25 2012
56.08% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.09% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.09% done, estimate finish Sun Feb 26 14:37:23 2012
56.10% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.11% done, estimate finish Sun Feb 26 14:37:25 2012
56.11% done, estimate finish Sun Feb 26 14:37:24 2012
56.12% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.13% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.14% done, estimate finish Sun Feb 26 14:37:23 2012
56.14% done, estimate finish Sun Feb 26 14:37:25 2012
56.15% done, estimate finish Sun Feb 26 14:37:25 2012
56.15% done, estimate finish Sun Feb 26 14:37:24 2012
56.16% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.17% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.18% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.18% done, estimate finish Sun Feb 26 14:37:25 2012
56.19% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.20% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.21% done, estimate finish Sun Feb 26 14:37:24 2012
56.21% done, estimate finish Sun Feb 26 14:37:25 2012
56.22% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.23% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.24% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.25% done, estimate finish Sun Feb 26 14:37:24 2012
56.25% done, estimate finish Sun Feb 26 14:37:23 2012
56.26% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 3 times. ===
56.27% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.28% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.29% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.30% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.31% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.32% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.33% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.34% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.34% done, estimate finish Sun Feb 26 14:37:24 2012
56.35% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.36% done, estimate finish Sun Feb 26 14:37:24 2012
56.36% done, estimate finish Sun Feb 26 14:37:23 2012
56.37% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.38% done, estimate finish Sun Feb 26 14:37:25 2012
56.38% done, estimate finish Sun Feb 26 14:37:24 2012
56.39% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.40% done, estimate finish Sun Feb 26 14:37:24 2012
56.40% done, estimate finish Sun Feb 26 14:37:23 2012
56.41% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.42% done, estimate finish Sun Feb 26 14:37:25 2012
56.42% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.43% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.44% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.45% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.46% done, estimate finish Sun Feb 26 14:37:23 2012
56.46% done, estimate finish Sun Feb 26 14:37:24 2012
56.47% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.48% done, estimate finish Sun Feb 26 14:37:24 2012
56.48% done, estimate finish Sun Feb 26 14:37:23 2012
56.49% done, estimate finish Sun Feb 26 14:37:23 2012
56.49% done, estimate finish Sun Feb 26 14:37:25 2012
56.50% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
56.51% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.52% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.53% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.54% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.55% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.56% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.57% done, estimate finish Sun Feb 26 14:37:23 2012
56.57% done, estimate finish Sun Feb 26 14:37:24 2012
56.58% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
56.59% done, estimate finish Sun Feb 26 14:37:24 2012
56.59% done, estimate finish Sun Feb 26 14:37:23 2012
56.60% done, estimate finish Sun Feb 26 14:37:25 2012
=== last message repeated 2 times. ===
56.61% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.62% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.63% done, estimate finish Sun Feb 26 14:37:24 2012
56.63% done, estimate finish Sun Feb 26 14:37:23 2012
56.64% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.65% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.66% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 3 times. ===
56.67% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.68% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.69% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.70% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.71% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.72% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.73% done, estimate finish Sun Feb 26 14:37:23 2012
56.73% done, estimate finish Sun Feb 26 14:37:24 2012
56.74% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.74% done, estimate finish Sun Feb 26 14:37:23 2012
56.75% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.76% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.77% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.78% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.79% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.80% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.81% done, estimate finish Sun Feb 26 14:37:22 2012
56.81% done, estimate finish Sun Feb 26 14:37:24 2012
56.82% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.82% done, estimate finish Sun Feb 26 14:37:23 2012
56.83% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.84% done, estimate finish Sun Feb 26 14:37:23 2012
56.84% done, estimate finish Sun Feb 26 14:37:22 2012
56.85% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.86% done, estimate finish Sun Feb 26 14:37:24 2012
56.86% done, estimate finish Sun Feb 26 14:37:23 2012
56.87% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.88% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.89% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.90% done, estimate finish Sun Feb 26 14:37:24 2012
56.90% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.91% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.92% done, estimate finish Sun Feb 26 14:37:23 2012
56.92% done, estimate finish Sun Feb 26 14:37:22 2012
56.93% done, estimate finish Sun Feb 26 14:37:22 2012
56.93% done, estimate finish Sun Feb 26 14:37:24 2012
56.94% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.95% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
56.96% done, estimate finish Sun Feb 26 14:37:23 2012
56.96% done, estimate finish Sun Feb 26 14:37:24 2012
56.97% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
56.98% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 3 times. ===
56.99% done, estimate finish Sun Feb 26 14:37:23 2012
56.99% done, estimate finish Sun Feb 26 14:37:24 2012
57.00% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
57.01% done, estimate finish Sun Feb 26 14:37:24 2012
57.01% done, estimate finish Sun Feb 26 14:37:23 2012
57.02% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.03% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.04% done, estimate finish Sun Feb 26 14:37:22 2012
57.04% done, estimate finish Sun Feb 26 14:37:24 2012
57.05% done, estimate finish Sun Feb 26 14:37:24 2012
57.05% done, estimate finish Sun Feb 26 14:37:23 2012
57.06% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 3 times. ===
57.07% done, estimate finish Sun Feb 26 14:37:23 2012
57.07% done, estimate finish Sun Feb 26 14:37:24 2012
57.08% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
57.09% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.10% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.11% done, estimate finish Sun Feb 26 14:37:23 2012
57.11% done, estimate finish Sun Feb 26 14:37:22 2012
57.12% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.13% done, estimate finish Sun Feb 26 14:37:24 2012
57.13% done, estimate finish Sun Feb 26 14:37:23 2012
57.14% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 3 times. ===
57.15% done, estimate finish Sun Feb 26 14:37:22 2012
57.15% done, estimate finish Sun Feb 26 14:37:24 2012
57.16% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
57.17% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.18% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.19% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.20% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.21% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.22% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.22% done, estimate finish Sun Feb 26 14:37:22 2012
57.23% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.24% done, estimate finish Sun Feb 26 14:37:24 2012
57.24% done, estimate finish Sun Feb 26 14:37:23 2012
57.25% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.26% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.27% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
57.28% done, estimate finish Sun Feb 26 14:37:24 2012
57.28% done, estimate finish Sun Feb 26 14:37:23 2012
57.29% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.30% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.31% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 3 times. ===
57.32% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.33% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.34% done, estimate finish Sun Feb 26 14:37:23 2012
57.34% done, estimate finish Sun Feb 26 14:37:22 2012
57.35% done, estimate finish Sun Feb 26 14:37:22 2012
57.35% done, estimate finish Sun Feb 26 14:37:24 2012
57.36% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.37% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.38% done, estimate finish Sun Feb 26 14:37:23 2012
57.38% done, estimate finish Sun Feb 26 14:37:22 2012
57.39% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 3 times. ===
57.40% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.41% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.42% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.43% done, estimate finish Sun Feb 26 14:37:22 2012
57.43% done, estimate finish Sun Feb 26 14:37:24 2012
57.44% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.45% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.46% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.47% done, estimate finish Sun Feb 26 14:37:24 2012
=== last message repeated 2 times. ===
57.47% done, estimate finish Sun Feb 26 14:37:23 2012
57.48% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.49% done, estimate finish Sun Feb 26 14:37:23 2012
57.49% done, estimate finish Sun Feb 26 14:37:22 2012
57.50% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.51% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.52% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.53% done, estimate finish Sun Feb 26 14:37:23 2012
57.53% done, estimate finish Sun Feb 26 14:37:22 2012
57.54% done, estimate finish Sun Feb 26 14:37:22 2012
57.54% done, estimate finish Sun Feb 26 14:37:24 2012
57.55% done, estimate finish Sun Feb 26 14:37:24 2012
57.55% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.56% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.57% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.58% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.59% done, estimate finish Sun Feb 26 14:37:22 2012
57.59% done, estimate finish Sun Feb 26 14:37:21 2012
57.60% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.61% done, estimate finish Sun Feb 26 14:37:23 2012
57.61% done, estimate finish Sun Feb 26 14:37:22 2012
57.62% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.63% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 3 times. ===
57.64% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.65% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.66% done, estimate finish Sun Feb 26 14:37:22 2012
57.66% done, estimate finish Sun Feb 26 14:37:23 2012
57.67% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.68% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.69% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.70% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.71% done, estimate finish Sun Feb 26 14:37:22 2012
57.71% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.72% done, estimate finish Sun Feb 26 14:37:23 2012
57.72% done, estimate finish Sun Feb 26 14:37:22 2012
57.73% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.74% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.75% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.76% done, estimate finish Sun Feb 26 14:37:23 2012
57.76% done, estimate finish Sun Feb 26 14:37:22 2012
57.77% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.78% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.79% done, estimate finish Sun Feb 26 14:37:21 2012
57.79% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.80% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.81% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.82% done, estimate finish Sun Feb 26 14:37:22 2012
57.82% done, estimate finish Sun Feb 26 14:37:23 2012
57.83% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.84% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.85% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.86% done, estimate finish Sun Feb 26 14:37:22 2012
57.86% done, estimate finish Sun Feb 26 14:37:21 2012
57.87% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.87% done, estimate finish Sun Feb 26 14:37:22 2012
57.88% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.89% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.90% done, estimate finish Sun Feb 26 14:37:21 2012
57.90% done, estimate finish Sun Feb 26 14:37:23 2012
57.91% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.92% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.93% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.94% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.95% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
57.95% done, estimate finish Sun Feb 26 14:37:22 2012
57.96% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
57.97% done, estimate finish Sun Feb 26 14:37:22 2012
57.97% done, estimate finish Sun Feb 26 14:37:21 2012
57.98% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
57.99% done, estimate finish Sun Feb 26 14:37:23 2012
57.99% done, estimate finish Sun Feb 26 14:37:22 2012
58.00% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.01% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.02% done, estimate finish Sun Feb 26 14:37:21 2012
58.02% done, estimate finish Sun Feb 26 14:37:23 2012
58.03% done, estimate finish Sun Feb 26 14:37:23 2012
58.03% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.04% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.05% done, estimate finish Sun Feb 26 14:37:22 2012
58.05% done, estimate finish Sun Feb 26 14:37:21 2012
58.06% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
58.07% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.08% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.09% done, estimate finish Sun Feb 26 14:37:22 2012
58.09% done, estimate finish Sun Feb 26 14:37:21 2012
58.10% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
58.11% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.12% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 3 times. ===
58.13% done, estimate finish Sun Feb 26 14:37:21 2012
58.13% done, estimate finish Sun Feb 26 14:37:23 2012
58.14% done, estimate finish Sun Feb 26 14:37:23 2012
58.14% done, estimate finish Sun Feb 26 14:37:22 2012
58.15% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.16% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.17% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.18% done, estimate finish Sun Feb 26 14:37:21 2012
58.18% done, estimate finish Sun Feb 26 14:37:22 2012
58.19% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.20% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.20% done, estimate finish Sun Feb 26 14:37:21 2012
58.21% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
58.22% done, estimate finish Sun Feb 26 14:37:23 2012
58.22% done, estimate finish Sun Feb 26 14:37:22 2012
58.23% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.24% done, estimate finish Sun Feb 26 14:37:22 2012
58.24% done, estimate finish Sun Feb 26 14:37:21 2012
58.25% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.26% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.27% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.28% done, estimate finish Sun Feb 26 14:37:22 2012
58.28% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.29% done, estimate finish Sun Feb 26 14:37:23 2012
=== last message repeated 2 times. ===
58.30% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.31% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.32% done, estimate finish Sun Feb 26 14:37:22 2012
58.32% done, estimate finish Sun Feb 26 14:37:21 2012
58.33% done, estimate finish Sun Feb 26 14:37:21 2012
58.33% done, estimate finish Sun Feb 26 14:37:23 2012
58.34% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.35% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.36% done, estimate finish Sun Feb 26 14:37:22 2012
58.36% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.37% done, estimate finish Sun Feb 26 14:37:21 2012
58.37% done, estimate finish Sun Feb 26 14:37:22 2012
58.38% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.39% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.40% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.41% done, estimate finish Sun Feb 26 14:37:21 2012
58.41% done, estimate finish Sun Feb 26 14:37:22 2012
58.42% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.43% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.44% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 3 times. ===
58.45% done, estimate finish Sun Feb 26 14:37:21 2012
58.45% done, estimate finish Sun Feb 26 14:37:22 2012
58.46% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.47% done, estimate finish Sun Feb 26 14:37:22 2012
58.47% done, estimate finish Sun Feb 26 14:37:21 2012
58.48% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.49% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.50% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.51% done, estimate finish Sun Feb 26 14:37:22 2012
58.51% done, estimate finish Sun Feb 26 14:37:21 2012
58.52% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 3 times. ===
58.53% done, estimate finish Sun Feb 26 14:37:21 2012
58.53% done, estimate finish Sun Feb 26 14:37:20 2012
58.54% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.55% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.56% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.57% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.58% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.59% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.60% done, estimate finish Sun Feb 26 14:37:21 2012
58.60% done, estimate finish Sun Feb 26 14:37:23 2012
58.60% done, estimate finish Sun Feb 26 14:37:22 2012
58.61% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.62% done, estimate finish Sun Feb 26 14:37:22 2012
58.62% done, estimate finish Sun Feb 26 14:37:21 2012
58.63% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.64% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.65% done, estimate finish Sun Feb 26 14:37:20 2012
58.65% done, estimate finish Sun Feb 26 14:37:22 2012
58.66% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.67% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.68% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.68% done, estimate finish Sun Feb 26 14:37:22 2012
58.69% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.70% done, estimate finish Sun Feb 26 14:37:22 2012
58.70% done, estimate finish Sun Feb 26 14:37:21 2012
58.71% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.72% done, estimate finish Sun Feb 26 14:37:21 2012
58.72% done, estimate finish Sun Feb 26 14:37:20 2012
58.73% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
58.74% done, estimate finish Sun Feb 26 14:37:22 2012
58.74% done, estimate finish Sun Feb 26 14:37:21 2012
58.75% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.76% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.76% done, estimate finish Sun Feb 26 14:37:22 2012
58.77% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.78% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.79% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.80% done, estimate finish Sun Feb 26 14:37:21 2012
58.80% done, estimate finish Sun Feb 26 14:37:22 2012
58.81% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.82% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.83% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.84% done, estimate finish Sun Feb 26 14:37:21 2012
58.84% done, estimate finish Sun Feb 26 14:37:20 2012
58.84% done, estimate finish Sun Feb 26 14:37:22 2012
58.85% done, estimate finish Sun Feb 26 14:37:22 2012
58.85% done, estimate finish Sun Feb 26 14:37:21 2012
58.86% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.87% done, estimate finish Sun Feb 26 14:37:21 2012
58.87% done, estimate finish Sun Feb 26 14:37:22 2012
58.88% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.89% done, estimate finish Sun Feb 26 14:37:22 2012
58.89% done, estimate finish Sun Feb 26 14:37:21 2012
58.90% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.91% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.92% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
58.93% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.94% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.95% done, estimate finish Sun Feb 26 14:37:21 2012
58.95% done, estimate finish Sun Feb 26 14:37:20 2012
58.96% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
58.97% done, estimate finish Sun Feb 26 14:37:22 2012
58.97% done, estimate finish Sun Feb 26 14:37:21 2012
58.98% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
58.99% done, estimate finish Sun Feb 26 14:37:21 2012
58.99% done, estimate finish Sun Feb 26 14:37:20 2012
59.00% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
59.01% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.02% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.03% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.04% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
59.05% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.06% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.07% done, estimate finish Sun Feb 26 14:37:21 2012
59.07% done, estimate finish Sun Feb 26 14:37:22 2012
59.08% done, estimate finish Sun Feb 26 14:37:22 2012
=== last message repeated 2 times. ===
59.08% done, estimate finish Sun Feb 26 14:37:21 2012
59.09% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.10% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.11% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.12% done, estimate finish Sun Feb 26 14:37:20 2012
59.12% done, estimate finish Sun Feb 26 14:37:21 2012
59.13% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.14% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.15% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.16% done, estimate finish Sun Feb 26 14:37:22 2012
59.16% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.17% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.18% done, estimate finish Sun Feb 26 14:37:21 2012
59.18% done, estimate finish Sun Feb 26 14:37:20 2012
59.19% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.20% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.21% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.22% done, estimate finish Sun Feb 26 14:37:21 2012
59.22% done, estimate finish Sun Feb 26 14:37:20 2012
59.23% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.24% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.25% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 3 times. ===
59.26% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.27% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.28% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.29% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.30% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.31% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.32% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.33% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.33% done, estimate finish Sun Feb 26 14:37:20 2012
59.34% done, estimate finish Sun Feb 26 14:37:20 2012
59.34% done, estimate finish Sun Feb 26 14:37:22 2012
59.35% done, estimate finish Sun Feb 26 14:37:22 2012
59.35% done, estimate finish Sun Feb 26 14:37:21 2012
59.36% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.37% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.38% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.39% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.40% done, estimate finish Sun Feb 26 14:37:19 2012
59.40% done, estimate finish Sun Feb 26 14:37:21 2012
59.41% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.41% done, estimate finish Sun Feb 26 14:37:20 2012
59.42% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.43% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.44% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.45% done, estimate finish Sun Feb 26 14:37:21 2012
59.45% done, estimate finish Sun Feb 26 14:37:20 2012
59.46% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.47% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.48% done, estimate finish Sun Feb 26 14:37:19 2012
59.48% done, estimate finish Sun Feb 26 14:37:21 2012
59.49% done, estimate finish Sun Feb 26 14:37:21 2012
59.49% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.50% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.51% done, estimate finish Sun Feb 26 14:37:20 2012
59.51% done, estimate finish Sun Feb 26 14:37:21 2012
59.52% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.53% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.54% done, estimate finish Sun Feb 26 14:37:20 2012
59.54% done, estimate finish Sun Feb 26 14:37:21 2012
59.55% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.56% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.57% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
59.58% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.59% done, estimate finish Sun Feb 26 14:37:19 2012
59.59% done, estimate finish Sun Feb 26 14:37:21 2012
59.60% done, estimate finish Sun Feb 26 14:37:21 2012
59.60% done, estimate finish Sun Feb 26 14:37:20 2012
59.61% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.62% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.63% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.64% done, estimate finish Sun Feb 26 14:37:21 2012
59.64% done, estimate finish Sun Feb 26 14:37:20 2012
59.65% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
59.66% done, estimate finish Sun Feb 26 14:37:20 2012
59.66% done, estimate finish Sun Feb 26 14:37:19 2012
59.67% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
59.68% done, estimate finish Sun Feb 26 14:37:21 2012
59.68% done, estimate finish Sun Feb 26 14:37:20 2012
59.69% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.70% done, estimate finish Sun Feb 26 14:37:20 2012
59.70% done, estimate finish Sun Feb 26 14:37:19 2012
59.71% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.72% done, estimate finish Sun Feb 26 14:37:21 2012
59.72% done, estimate finish Sun Feb 26 14:37:20 2012
59.73% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
59.74% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.75% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.76% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.77% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.78% done, estimate finish Sun Feb 26 14:37:20 2012
59.78% done, estimate finish Sun Feb 26 14:37:19 2012
59.79% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.80% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.81% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.81% done, estimate finish Sun Feb 26 14:37:21 2012
59.82% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.83% done, estimate finish Sun Feb 26 14:37:21 2012
59.83% done, estimate finish Sun Feb 26 14:37:20 2012
59.84% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.85% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.86% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
59.87% done, estimate finish Sun Feb 26 14:37:19 2012
59.87% done, estimate finish Sun Feb 26 14:37:20 2012
59.88% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.89% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.89% done, estimate finish Sun Feb 26 14:37:19 2012
59.90% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
59.91% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.92% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.93% done, estimate finish Sun Feb 26 14:37:20 2012
59.93% done, estimate finish Sun Feb 26 14:37:19 2012
59.94% done, estimate finish Sun Feb 26 14:37:19 2012
59.94% done, estimate finish Sun Feb 26 14:37:21 2012
59.95% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.96% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
59.97% done, estimate finish Sun Feb 26 14:37:20 2012
59.97% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
59.98% done, estimate finish Sun Feb 26 14:37:19 2012
59.98% done, estimate finish Sun Feb 26 14:37:21 2012
59.99% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.00% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.01% done, estimate finish Sun Feb 26 14:37:19 2012
60.01% done, estimate finish Sun Feb 26 14:37:21 2012
60.02% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
60.03% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.04% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.05% done, estimate finish Sun Feb 26 14:37:20 2012
60.05% done, estimate finish Sun Feb 26 14:37:19 2012
60.06% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.06% done, estimate finish Sun Feb 26 14:37:20 2012
60.07% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.08% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.09% done, estimate finish Sun Feb 26 14:37:19 2012
60.09% done, estimate finish Sun Feb 26 14:37:21 2012
60.10% done, estimate finish Sun Feb 26 14:37:21 2012
60.10% done, estimate finish Sun Feb 26 14:37:20 2012
60.11% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.12% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.13% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.14% done, estimate finish Sun Feb 26 14:37:21 2012
60.14% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.15% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.16% done, estimate finish Sun Feb 26 14:37:20 2012
60.16% done, estimate finish Sun Feb 26 14:37:19 2012
60.17% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.18% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.19% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.20% done, estimate finish Sun Feb 26 14:37:20 2012
60.20% done, estimate finish Sun Feb 26 14:37:19 2012
60.21% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
60.22% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
60.23% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.24% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.25% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.26% done, estimate finish Sun Feb 26 14:37:19 2012
60.26% done, estimate finish Sun Feb 26 14:37:20 2012
60.27% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.28% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.29% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
60.30% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
60.31% done, estimate finish Sun Feb 26 14:37:20 2012
60.31% done, estimate finish Sun Feb 26 14:37:19 2012
60.32% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.33% done, estimate finish Sun Feb 26 14:37:19 2012
60.33% done, estimate finish Sun Feb 26 14:37:20 2012
60.34% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.35% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.36% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.37% done, estimate finish Sun Feb 26 14:37:19 2012
60.37% done, estimate finish Sun Feb 26 14:37:20 2012
60.38% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
60.39% done, estimate finish Sun Feb 26 14:37:20 2012
60.39% done, estimate finish Sun Feb 26 14:37:19 2012
60.40% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
60.41% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.42% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.43% done, estimate finish Sun Feb 26 14:37:20 2012
60.43% done, estimate finish Sun Feb 26 14:37:19 2012
60.44% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.45% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.46% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
60.47% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.48% done, estimate finish Sun Feb 26 14:37:19 2012
60.48% done, estimate finish Sun Feb 26 14:37:20 2012
60.49% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.50% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.51% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.52% done, estimate finish Sun Feb 26 14:37:19 2012
60.52% done, estimate finish Sun Feb 26 14:37:20 2012
60.53% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.54% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.54% done, estimate finish Sun Feb 26 14:37:19 2012
60.55% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.56% done, estimate finish Sun Feb 26 14:37:19 2012
60.56% done, estimate finish Sun Feb 26 14:37:20 2012
60.57% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.58% done, estimate finish Sun Feb 26 14:37:20 2012
60.58% done, estimate finish Sun Feb 26 14:37:19 2012
60.59% done, estimate finish Sun Feb 26 14:37:19 2012
60.59% done, estimate finish Sun Feb 26 14:37:21 2012
60.60% done, estimate finish Sun Feb 26 14:37:21 2012
60.60% done, estimate finish Sun Feb 26 14:37:20 2012
60.61% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.62% done, estimate finish Sun Feb 26 14:37:20 2012
60.62% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.63% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.64% done, estimate finish Sun Feb 26 14:37:19 2012
60.64% done, estimate finish Sun Feb 26 14:37:18 2012
60.65% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.66% done, estimate finish Sun Feb 26 14:37:20 2012
60.66% done, estimate finish Sun Feb 26 14:37:19 2012
60.67% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.68% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.69% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.70% done, estimate finish Sun Feb 26 14:37:20 2012
60.70% done, estimate finish Sun Feb 26 14:37:19 2012
60.70% done, estimate finish Sun Feb 26 14:37:21 2012
60.71% done, estimate finish Sun Feb 26 14:37:21 2012
60.71% done, estimate finish Sun Feb 26 14:37:20 2012
60.72% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.73% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.74% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.75% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.76% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.77% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.78% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.78% done, estimate finish Sun Feb 26 14:37:21 2012
60.79% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.80% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.81% done, estimate finish Sun Feb 26 14:37:20 2012
60.81% done, estimate finish Sun Feb 26 14:37:19 2012
60.82% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.83% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.84% done, estimate finish Sun Feb 26 14:37:18 2012
60.84% done, estimate finish Sun Feb 26 14:37:20 2012
60.85% done, estimate finish Sun Feb 26 14:37:20 2012
60.85% done, estimate finish Sun Feb 26 14:37:19 2012
60.86% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
60.87% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.88% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.89% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.90% done, estimate finish Sun Feb 26 14:37:21 2012
=== last message repeated 2 times. ===
60.91% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.92% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.93% done, estimate finish Sun Feb 26 14:37:20 2012
60.93% done, estimate finish Sun Feb 26 14:37:19 2012
60.94% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
60.95% done, estimate finish Sun Feb 26 14:37:18 2012
60.95% done, estimate finish Sun Feb 26 14:37:20 2012
60.96% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
60.97% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
60.98% done, estimate finish Sun Feb 26 14:37:19 2012
60.98% done, estimate finish Sun Feb 26 14:37:20 2012
60.99% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.00% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.01% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.02% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
61.03% done, estimate finish Sun Feb 26 14:37:18 2012
61.03% done, estimate finish Sun Feb 26 14:37:20 2012
61.04% done, estimate finish Sun Feb 26 14:37:20 2012
61.04% done, estimate finish Sun Feb 26 14:37:19 2012
61.05% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.06% done, estimate finish Sun Feb 26 14:37:19 2012
61.06% done, estimate finish Sun Feb 26 14:37:20 2012
61.07% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.08% done, estimate finish Sun Feb 26 14:37:20 2012
61.08% done, estimate finish Sun Feb 26 14:37:19 2012
61.09% done, estimate finish Sun Feb 26 14:37:19 2012
61.09% done, estimate finish Sun Feb 26 14:37:21 2012
61.10% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
61.11% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.12% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.13% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.14% done, estimate finish Sun Feb 26 14:37:19 2012
61.14% done, estimate finish Sun Feb 26 14:37:18 2012
61.15% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.16% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.17% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.18% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.19% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.19% done, estimate finish Sun Feb 26 14:37:19 2012
61.20% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.21% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.22% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
61.23% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.24% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.25% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.26% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.27% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.27% done, estimate finish Sun Feb 26 14:37:19 2012
61.28% done, estimate finish Sun Feb 26 14:37:19 2012
61.28% done, estimate finish Sun Feb 26 14:37:21 2012
61.29% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.30% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.31% done, estimate finish Sun Feb 26 14:37:20 2012
61.31% done, estimate finish Sun Feb 26 14:37:19 2012
61.32% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.33% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.34% done, estimate finish Sun Feb 26 14:37:18 2012
61.34% done, estimate finish Sun Feb 26 14:37:20 2012
61.35% done, estimate finish Sun Feb 26 14:37:20 2012
61.35% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.36% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.37% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.38% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.39% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.40% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.41% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.42% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.43% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
61.44% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.45% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.46% done, estimate finish Sun Feb 26 14:37:20 2012
61.46% done, estimate finish Sun Feb 26 14:37:19 2012
61.47% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.48% done, estimate finish Sun Feb 26 14:37:19 2012
61.48% done, estimate finish Sun Feb 26 14:37:20 2012
61.49% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.50% done, estimate finish Sun Feb 26 14:37:20 2012
61.50% done, estimate finish Sun Feb 26 14:37:19 2012
61.51% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
61.52% done, estimate finish Sun Feb 26 14:37:19 2012
61.52% done, estimate finish Sun Feb 26 14:37:18 2012
61.53% done, estimate finish Sun Feb 26 14:37:18 2012
61.53% done, estimate finish Sun Feb 26 14:37:20 2012
61.54% done, estimate finish Sun Feb 26 14:37:20 2012
61.54% done, estimate finish Sun Feb 26 14:37:19 2012
61.55% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.56% done, estimate finish Sun Feb 26 14:37:19 2012
61.56% done, estimate finish Sun Feb 26 14:37:20 2012
61.57% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.58% done, estimate finish Sun Feb 26 14:37:20 2012
61.58% done, estimate finish Sun Feb 26 14:37:19 2012
61.59% done, estimate finish Sun Feb 26 14:37:19 2012
61.59% done, estimate finish Sun Feb 26 14:37:21 2012
61.59% done, estimate finish Sun Feb 26 14:37:20 2012
61.60% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.61% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.62% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.63% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.64% done, estimate finish Sun Feb 26 14:37:19 2012
61.64% done, estimate finish Sun Feb 26 14:37:18 2012
61.65% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.66% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.67% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.67% done, estimate finish Sun Feb 26 14:37:20 2012
61.68% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.69% done, estimate finish Sun Feb 26 14:37:20 2012
61.69% done, estimate finish Sun Feb 26 14:37:19 2012
61.70% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.71% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.72% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.73% done, estimate finish Sun Feb 26 14:37:20 2012
61.73% done, estimate finish Sun Feb 26 14:37:19 2012
61.74% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.75% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.75% done, estimate finish Sun Feb 26 14:37:20 2012
61.76% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.77% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.78% done, estimate finish Sun Feb 26 14:37:19 2012
61.78% done, estimate finish Sun Feb 26 14:37:20 2012
61.79% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.80% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.81% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.82% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.83% done, estimate finish Sun Feb 26 14:37:19 2012
61.83% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
61.84% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.85% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.86% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.87% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.88% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
61.89% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.90% done, estimate finish Sun Feb 26 14:37:21 2012
61.90% done, estimate finish Sun Feb 26 14:37:20 2012
61.91% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
61.92% done, estimate finish Sun Feb 26 14:37:20 2012
61.92% done, estimate finish Sun Feb 26 14:37:19 2012
61.93% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.94% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.95% done, estimate finish Sun Feb 26 14:37:18 2012
61.95% done, estimate finish Sun Feb 26 14:37:20 2012
61.96% done, estimate finish Sun Feb 26 14:37:20 2012
61.96% done, estimate finish Sun Feb 26 14:37:19 2012
61.97% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
61.98% done, estimate finish Sun Feb 26 14:37:19 2012
61.98% done, estimate finish Sun Feb 26 14:37:20 2012
61.99% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
62.00% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.01% done, estimate finish Sun Feb 26 14:37:21 2012
62.01% done, estimate finish Sun Feb 26 14:37:20 2012
62.02% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.03% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.04% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.05% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.06% done, estimate finish Sun Feb 26 14:37:19 2012
62.06% done, estimate finish Sun Feb 26 14:37:20 2012
62.07% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.08% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
62.09% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.10% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.11% done, estimate finish Sun Feb 26 14:37:20 2012
62.11% done, estimate finish Sun Feb 26 14:37:19 2012
62.12% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.13% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.14% done, estimate finish Sun Feb 26 14:37:19 2012
62.14% done, estimate finish Sun Feb 26 14:37:18 2012
62.15% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.16% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
62.17% done, estimate finish Sun Feb 26 14:37:19 2012
62.17% done, estimate finish Sun Feb 26 14:37:20 2012
62.18% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.19% done, estimate finish Sun Feb 26 14:37:20 2012
62.19% done, estimate finish Sun Feb 26 14:37:19 2012
62.20% done, estimate finish Sun Feb 26 14:37:19 2012
62.20% done, estimate finish Sun Feb 26 14:37:21 2012
62.21% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.22% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.23% done, estimate finish Sun Feb 26 14:37:20 2012
62.23% done, estimate finish Sun Feb 26 14:37:19 2012
62.24% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
62.25% done, estimate finish Sun Feb 26 14:37:19 2012
62.25% done, estimate finish Sun Feb 26 14:37:20 2012
62.26% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.27% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.28% done, estimate finish Sun Feb 26 14:37:19 2012
62.28% done, estimate finish Sun Feb 26 14:37:20 2012
62.29% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.30% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.31% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.32% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
62.33% done, estimate finish Sun Feb 26 14:37:18 2012
62.33% done, estimate finish Sun Feb 26 14:37:20 2012
62.34% done, estimate finish Sun Feb 26 14:37:20 2012
62.34% done, estimate finish Sun Feb 26 14:37:19 2012
62.35% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.36% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.37% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.38% done, estimate finish Sun Feb 26 14:37:20 2012
62.38% done, estimate finish Sun Feb 26 14:37:19 2012
62.39% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.40% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
62.41% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.42% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.43% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.44% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.45% done, estimate finish Sun Feb 26 14:37:18 2012
62.45% done, estimate finish Sun Feb 26 14:37:20 2012
62.46% done, estimate finish Sun Feb 26 14:37:20 2012
62.46% done, estimate finish Sun Feb 26 14:37:19 2012
62.47% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.48% done, estimate finish Sun Feb 26 14:37:19 2012
62.48% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.49% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.50% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.51% done, estimate finish Sun Feb 26 14:37:19 2012
62.51% done, estimate finish Sun Feb 26 14:37:20 2012
62.52% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.53% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.54% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.55% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.56% done, estimate finish Sun Feb 26 14:37:19 2012
62.56% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.57% done, estimate finish Sun Feb 26 14:37:20 2012
62.57% done, estimate finish Sun Feb 26 14:37:19 2012
62.58% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.59% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.60% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.61% done, estimate finish Sun Feb 26 14:37:20 2012
62.61% done, estimate finish Sun Feb 26 14:37:19 2012
62.62% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.63% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.64% done, estimate finish Sun Feb 26 14:37:18 2012
62.64% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.65% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.66% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.67% done, estimate finish Sun Feb 26 14:37:19 2012
62.67% done, estimate finish Sun Feb 26 14:37:20 2012
62.68% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.69% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.70% done, estimate finish Sun Feb 26 14:37:19 2012
62.70% done, estimate finish Sun Feb 26 14:37:20 2012
62.71% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.72% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
62.73% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.74% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.75% done, estimate finish Sun Feb 26 14:37:19 2012
62.75% done, estimate finish Sun Feb 26 14:37:20 2012
62.76% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.77% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.78% done, estimate finish Sun Feb 26 14:37:19 2012
62.78% done, estimate finish Sun Feb 26 14:37:20 2012
62.79% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.80% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.80% done, estimate finish Sun Feb 26 14:37:19 2012
62.81% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.82% done, estimate finish Sun Feb 26 14:37:19 2012
62.82% done, estimate finish Sun Feb 26 14:37:20 2012
62.83% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.84% done, estimate finish Sun Feb 26 14:37:20 2012
62.84% done, estimate finish Sun Feb 26 14:37:19 2012
62.85% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.86% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.87% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.88% done, estimate finish Sun Feb 26 14:37:20 2012
62.88% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.89% done, estimate finish Sun Feb 26 14:37:19 2012
62.89% done, estimate finish Sun Feb 26 14:37:20 2012
62.90% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.91% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.92% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.93% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.94% done, estimate finish Sun Feb 26 14:37:19 2012
62.94% done, estimate finish Sun Feb 26 14:37:18 2012
62.95% done, estimate finish Sun Feb 26 14:37:18 2012
62.95% done, estimate finish Sun Feb 26 14:37:20 2012
62.96% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
62.97% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
62.98% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
62.99% done, estimate finish Sun Feb 26 14:37:20 2012
62.99% done, estimate finish Sun Feb 26 14:37:19 2012
63.00% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.01% done, estimate finish Sun Feb 26 14:37:19 2012
63.01% done, estimate finish Sun Feb 26 14:37:20 2012
63.02% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.03% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.04% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
63.05% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.06% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.07% done, estimate finish Sun Feb 26 14:37:20 2012
63.07% done, estimate finish Sun Feb 26 14:37:19 2012
63.08% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.09% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.10% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.11% done, estimate finish Sun Feb 26 14:37:20 2012
63.11% done, estimate finish Sun Feb 26 14:37:19 2012
63.12% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.13% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.13% done, estimate finish Sun Feb 26 14:37:18 2012
63.14% done, estimate finish Sun Feb 26 14:37:18 2012
63.14% done, estimate finish Sun Feb 26 14:37:20 2012
63.15% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.16% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.17% done, estimate finish Sun Feb 26 14:37:19 2012
63.17% done, estimate finish Sun Feb 26 14:37:20 2012
63.18% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.19% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.20% done, estimate finish Sun Feb 26 14:37:19 2012
63.20% done, estimate finish Sun Feb 26 14:37:20 2012
63.21% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
63.22% done, estimate finish Sun Feb 26 14:37:20 2012
63.22% done, estimate finish Sun Feb 26 14:37:19 2012
63.23% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.24% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.25% done, estimate finish Sun Feb 26 14:37:18 2012
63.25% done, estimate finish Sun Feb 26 14:37:20 2012
63.26% done, estimate finish Sun Feb 26 14:37:20 2012
63.26% done, estimate finish Sun Feb 26 14:37:19 2012
63.27% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.28% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.29% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
63.30% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.31% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.32% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.33% done, estimate finish Sun Feb 26 14:37:18 2012
63.33% done, estimate finish Sun Feb 26 14:37:20 2012
63.34% done, estimate finish Sun Feb 26 14:37:20 2012
63.34% done, estimate finish Sun Feb 26 14:37:19 2012
63.35% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.36% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.37% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 3 times. ===
63.38% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.39% done, estimate finish Sun Feb 26 14:37:19 2012
63.39% done, estimate finish Sun Feb 26 14:37:20 2012
63.40% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.41% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.42% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.43% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.44% done, estimate finish Sun Feb 26 14:37:19 2012
63.44% done, estimate finish Sun Feb 26 14:37:18 2012
63.45% done, estimate finish Sun Feb 26 14:37:18 2012
63.45% done, estimate finish Sun Feb 26 14:37:20 2012
63.45% done, estimate finish Sun Feb 26 14:37:19 2012
63.46% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.47% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.48% done, estimate finish Sun Feb 26 14:37:18 2012
63.48% done, estimate finish Sun Feb 26 14:37:20 2012
63.49% done, estimate finish Sun Feb 26 14:37:20 2012
63.49% done, estimate finish Sun Feb 26 14:37:19 2012
63.50% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.51% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.52% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.53% done, estimate finish Sun Feb 26 14:37:18 2012
63.53% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.54% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.55% done, estimate finish Sun Feb 26 14:37:19 2012
63.55% done, estimate finish Sun Feb 26 14:37:18 2012
63.56% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.57% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.58% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.59% done, estimate finish Sun Feb 26 14:37:19 2012
63.59% done, estimate finish Sun Feb 26 14:37:18 2012
63.60% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.61% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
63.62% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.63% done, estimate finish Sun Feb 26 14:37:19 2012
63.63% done, estimate finish Sun Feb 26 14:37:18 2012
63.64% done, estimate finish Sun Feb 26 14:37:18 2012
63.64% done, estimate finish Sun Feb 26 14:37:20 2012
63.65% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.66% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.67% done, estimate finish Sun Feb 26 14:37:19 2012
63.67% done, estimate finish Sun Feb 26 14:37:20 2012
63.68% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.69% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
63.70% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.71% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.72% done, estimate finish Sun Feb 26 14:37:18 2012
63.72% done, estimate finish Sun Feb 26 14:37:19 2012
63.73% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.74% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.75% done, estimate finish Sun Feb 26 14:37:18 2012
63.75% done, estimate finish Sun Feb 26 14:37:20 2012
63.76% done, estimate finish Sun Feb 26 14:37:20 2012
63.76% done, estimate finish Sun Feb 26 14:37:19 2012
63.77% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
63.78% done, estimate finish Sun Feb 26 14:37:19 2012
63.78% done, estimate finish Sun Feb 26 14:37:20 2012
63.79% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
63.80% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.81% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.82% done, estimate finish Sun Feb 26 14:37:19 2012
63.82% done, estimate finish Sun Feb 26 14:37:18 2012
63.83% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.84% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.85% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
63.86% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.87% done, estimate finish Sun Feb 26 14:37:20 2012
63.87% done, estimate finish Sun Feb 26 14:37:19 2012
63.88% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.89% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.90% done, estimate finish Sun Feb 26 14:37:19 2012
63.90% done, estimate finish Sun Feb 26 14:37:18 2012
63.91% done, estimate finish Sun Feb 26 14:37:18 2012
63.91% done, estimate finish Sun Feb 26 14:37:19 2012
63.92% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.93% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 3 times. ===
63.94% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.95% done, estimate finish Sun Feb 26 14:37:20 2012
63.95% done, estimate finish Sun Feb 26 14:37:19 2012
63.96% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.97% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
63.98% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
63.99% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.00% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.01% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.01% done, estimate finish Sun Feb 26 14:37:18 2012
64.02% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.03% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.04% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.05% done, estimate finish Sun Feb 26 14:37:19 2012
64.05% done, estimate finish Sun Feb 26 14:37:18 2012
64.06% done, estimate finish Sun Feb 26 14:37:20 2012
=== last message repeated 2 times. ===
64.07% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.08% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.09% done, estimate finish Sun Feb 26 14:37:19 2012
64.09% done, estimate finish Sun Feb 26 14:37:18 2012
64.10% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 3 times. ===
64.11% done, estimate finish Sun Feb 26 14:37:18 2012
64.11% done, estimate finish Sun Feb 26 14:37:19 2012
64.12% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.13% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.14% done, estimate finish Sun Feb 26 14:37:18 2012
64.14% done, estimate finish Sun Feb 26 14:37:19 2012
64.15% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.16% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.17% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.18% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 3 times. ===
64.19% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.20% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.21% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.22% done, estimate finish Sun Feb 26 14:37:18 2012
64.22% done, estimate finish Sun Feb 26 14:37:19 2012
64.23% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.24% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.25% done, estimate finish Sun Feb 26 14:37:18 2012
64.25% done, estimate finish Sun Feb 26 14:37:20 2012
64.26% done, estimate finish Sun Feb 26 14:37:20 2012
64.26% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.27% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.28% done, estimate finish Sun Feb 26 14:37:19 2012
64.28% done, estimate finish Sun Feb 26 14:37:18 2012
64.29% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.30% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.31% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.32% done, estimate finish Sun Feb 26 14:37:19 2012
64.32% done, estimate finish Sun Feb 26 14:37:18 2012
64.33% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.34% done, estimate finish Sun Feb 26 14:37:18 2012
64.34% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.35% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.36% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.37% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.38% done, estimate finish Sun Feb 26 14:37:18 2012
64.38% done, estimate finish Sun Feb 26 14:37:17 2012
64.39% done, estimate finish Sun Feb 26 14:37:17 2012
64.39% done, estimate finish Sun Feb 26 14:37:19 2012
64.40% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.41% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.42% done, estimate finish Sun Feb 26 14:37:18 2012
64.42% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.43% done, estimate finish Sun Feb 26 14:37:19 2012
64.43% done, estimate finish Sun Feb 26 14:37:18 2012
64.44% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.45% done, estimate finish Sun Feb 26 14:37:18 2012
64.45% done, estimate finish Sun Feb 26 14:37:19 2012
64.46% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.47% done, estimate finish Sun Feb 26 14:37:19 2012
64.47% done, estimate finish Sun Feb 26 14:37:18 2012
64.48% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.49% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.50% done, estimate finish Sun Feb 26 14:37:18 2012
64.50% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.51% done, estimate finish Sun Feb 26 14:37:19 2012
64.51% done, estimate finish Sun Feb 26 14:37:18 2012
64.52% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.53% done, estimate finish Sun Feb 26 14:37:18 2012
64.53% done, estimate finish Sun Feb 26 14:37:19 2012
64.54% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.55% done, estimate finish Sun Feb 26 14:37:19 2012
64.55% done, estimate finish Sun Feb 26 14:37:18 2012
64.56% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.57% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.58% done, estimate finish Sun Feb 26 14:37:17 2012
64.58% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.59% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.60% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.61% done, estimate finish Sun Feb 26 14:37:18 2012
64.61% done, estimate finish Sun Feb 26 14:37:19 2012
64.62% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.63% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.64% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.65% done, estimate finish Sun Feb 26 14:37:18 2012
64.65% done, estimate finish Sun Feb 26 14:37:19 2012
64.66% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.66% done, estimate finish Sun Feb 26 14:37:18 2012
64.67% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.68% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.69% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
64.70% done, estimate finish Sun Feb 26 14:37:19 2012
64.70% done, estimate finish Sun Feb 26 14:37:18 2012
64.71% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.72% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.73% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.74% done, estimate finish Sun Feb 26 14:37:19 2012
64.74% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.75% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.76% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.77% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
64.78% done, estimate finish Sun Feb 26 14:37:19 2012
64.78% done, estimate finish Sun Feb 26 14:37:18 2012
64.79% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.80% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.81% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.82% done, estimate finish Sun Feb 26 14:37:19 2012
64.82% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.83% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.84% done, estimate finish Sun Feb 26 14:37:18 2012
64.84% done, estimate finish Sun Feb 26 14:37:17 2012
64.85% done, estimate finish Sun Feb 26 14:37:17 2012
64.85% done, estimate finish Sun Feb 26 14:37:19 2012
64.86% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.87% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.88% done, estimate finish Sun Feb 26 14:37:18 2012
64.88% done, estimate finish Sun Feb 26 14:37:17 2012
64.89% done, estimate finish Sun Feb 26 14:37:17 2012
64.89% done, estimate finish Sun Feb 26 14:37:19 2012
64.90% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 3 times. ===
64.91% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.92% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
64.93% done, estimate finish Sun Feb 26 14:37:19 2012
64.93% done, estimate finish Sun Feb 26 14:37:18 2012
64.94% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.95% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
64.96% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
64.97% done, estimate finish Sun Feb 26 14:37:17 2012
64.97% done, estimate finish Sun Feb 26 14:37:18 2012
64.98% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 3 times. ===
64.99% done, estimate finish Sun Feb 26 14:37:18 2012
64.99% done, estimate finish Sun Feb 26 14:37:17 2012
65.00% done, estimate finish Sun Feb 26 14:37:17 2012
65.00% done, estimate finish Sun Feb 26 14:37:19 2012
65.01% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.02% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.03% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.04% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.05% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.06% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.07% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.07% done, estimate finish Sun Feb 26 14:37:17 2012
65.08% done, estimate finish Sun Feb 26 14:37:17 2012
65.08% done, estimate finish Sun Feb 26 14:37:19 2012
65.09% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.10% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.11% done, estimate finish Sun Feb 26 14:37:18 2012
65.11% done, estimate finish Sun Feb 26 14:37:17 2012
65.12% done, estimate finish Sun Feb 26 14:37:19 2012
=== last message repeated 2 times. ===
65.13% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.14% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.15% done, estimate finish Sun Feb 26 14:37:18 2012
65.15% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.16% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.17% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.18% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.19% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.20% done, estimate finish Sun Feb 26 14:37:19 2012
65.20% done, estimate finish Sun Feb 26 14:37:18 2012
65.21% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.22% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.23% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 3 times. ===
65.24% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.25% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.26% done, estimate finish Sun Feb 26 14:37:18 2012
65.26% done, estimate finish Sun Feb 26 14:37:17 2012
65.27% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.28% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.29% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.30% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.31% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.31% done, estimate finish Sun Feb 26 14:37:18 2012
65.32% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.33% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.34% done, estimate finish Sun Feb 26 14:37:18 2012
65.34% done, estimate finish Sun Feb 26 14:37:17 2012
65.35% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.36% done, estimate finish Sun Feb 26 14:37:17 2012
65.36% done, estimate finish Sun Feb 26 14:37:18 2012
65.37% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.38% done, estimate finish Sun Feb 26 14:37:18 2012
65.38% done, estimate finish Sun Feb 26 14:37:17 2012
65.39% done, estimate finish Sun Feb 26 14:37:17 2012
65.39% done, estimate finish Sun Feb 26 14:37:19 2012
65.39% done, estimate finish Sun Feb 26 14:37:18 2012
65.40% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.41% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.42% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.43% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.44% done, estimate finish Sun Feb 26 14:37:17 2012
65.44% done, estimate finish Sun Feb 26 14:37:16 2012
65.45% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.46% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.47% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.47% done, estimate finish Sun Feb 26 14:37:18 2012
65.48% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.49% done, estimate finish Sun Feb 26 14:37:18 2012
65.49% done, estimate finish Sun Feb 26 14:37:17 2012
65.50% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.51% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.52% done, estimate finish Sun Feb 26 14:37:17 2012
65.52% done, estimate finish Sun Feb 26 14:37:16 2012
65.53% done, estimate finish Sun Feb 26 14:37:18 2012
65.53% done, estimate finish Sun Feb 26 14:37:17 2012
65.54% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.55% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.55% done, estimate finish Sun Feb 26 14:37:18 2012
65.56% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.57% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.58% done, estimate finish Sun Feb 26 14:37:17 2012
65.58% done, estimate finish Sun Feb 26 14:37:18 2012
65.59% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.60% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.61% done, estimate finish Sun Feb 26 14:37:18 2012
65.61% done, estimate finish Sun Feb 26 14:37:17 2012
65.62% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.63% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.63% done, estimate finish Sun Feb 26 14:37:16 2012
65.64% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.65% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.66% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.67% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.68% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.69% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.70% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.71% done, estimate finish Sun Feb 26 14:37:17 2012
65.71% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
65.72% done, estimate finish Sun Feb 26 14:37:18 2012
65.72% done, estimate finish Sun Feb 26 14:37:17 2012
65.73% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.74% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.75% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.76% done, estimate finish Sun Feb 26 14:37:18 2012
65.76% done, estimate finish Sun Feb 26 14:37:17 2012
65.77% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.78% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.79% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 3 times. ===
65.80% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.81% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.82% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.83% done, estimate finish Sun Feb 26 14:37:16 2012
65.83% done, estimate finish Sun Feb 26 14:37:18 2012
65.84% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.85% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.86% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.87% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 3 times. ===
65.88% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.89% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.90% done, estimate finish Sun Feb 26 14:37:17 2012
65.90% done, estimate finish Sun Feb 26 14:37:16 2012
65.91% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
65.92% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.93% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.94% done, estimate finish Sun Feb 26 14:37:17 2012
65.94% done, estimate finish Sun Feb 26 14:37:16 2012
65.95% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
65.95% done, estimate finish Sun Feb 26 14:37:17 2012
65.96% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.97% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
65.98% done, estimate finish Sun Feb 26 14:37:16 2012
65.98% done, estimate finish Sun Feb 26 14:37:18 2012
65.99% done, estimate finish Sun Feb 26 14:37:18 2012
65.99% done, estimate finish Sun Feb 26 14:37:17 2012
66.00% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.01% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.02% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.03% done, estimate finish Sun Feb 26 14:37:18 2012
66.03% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.04% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.05% done, estimate finish Sun Feb 26 14:37:17 2012
66.05% done, estimate finish Sun Feb 26 14:37:18 2012
66.06% done, estimate finish Sun Feb 26 14:37:18 2012
=== last message repeated 2 times. ===
66.07% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.08% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.09% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.10% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.11% done, estimate finish Sun Feb 26 14:37:16 2012
66.11% done, estimate finish Sun Feb 26 14:37:17 2012
66.12% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 3 times. ===
66.13% done, estimate finish Sun Feb 26 14:37:17 2012
66.13% done, estimate finish Sun Feb 26 14:37:16 2012
66.14% done, estimate finish Sun Feb 26 14:37:18 2012
66.14% done, estimate finish Sun Feb 26 14:37:17 2012
66.15% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.16% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.17% done, estimate finish Sun Feb 26 14:37:17 2012
66.17% done, estimate finish Sun Feb 26 14:37:16 2012
66.18% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.19% done, estimate finish Sun Feb 26 14:37:16 2012
66.19% done, estimate finish Sun Feb 26 14:37:17 2012
66.20% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 3 times. ===
66.21% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.22% done, estimate finish Sun Feb 26 14:37:18 2012
66.22% done, estimate finish Sun Feb 26 14:37:17 2012
66.23% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.24% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.25% done, estimate finish Sun Feb 26 14:37:16 2012
66.25% done, estimate finish Sun Feb 26 14:37:18 2012
66.26% done, estimate finish Sun Feb 26 14:37:18 2012
66.26% done, estimate finish Sun Feb 26 14:37:17 2012
66.27% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.28% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.28% done, estimate finish Sun Feb 26 14:37:16 2012
66.29% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.30% done, estimate finish Sun Feb 26 14:37:16 2012
66.30% done, estimate finish Sun Feb 26 14:37:17 2012
66.31% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.32% done, estimate finish Sun Feb 26 14:37:17 2012
66.32% done, estimate finish Sun Feb 26 14:37:16 2012
66.33% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.34% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.35% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.36% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.36% done, estimate finish Sun Feb 26 14:37:16 2012
66.37% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.38% done, estimate finish Sun Feb 26 14:37:16 2012
66.38% done, estimate finish Sun Feb 26 14:37:17 2012
66.39% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.40% done, estimate finish Sun Feb 26 14:37:17 2012
66.40% done, estimate finish Sun Feb 26 14:37:16 2012
66.41% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.42% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.43% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.44% done, estimate finish Sun Feb 26 14:37:17 2012
66.44% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.45% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.46% done, estimate finish Sun Feb 26 14:37:16 2012
66.46% done, estimate finish Sun Feb 26 14:37:17 2012
66.47% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.48% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.49% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.50% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.51% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.52% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.52% done, estimate finish Sun Feb 26 14:37:18 2012
66.53% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.54% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.55% done, estimate finish Sun Feb 26 14:37:17 2012
66.55% done, estimate finish Sun Feb 26 14:37:16 2012
66.56% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.57% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.58% done, estimate finish Sun Feb 26 14:37:16 2012
66.58% done, estimate finish Sun Feb 26 14:37:17 2012
66.59% done, estimate finish Sun Feb 26 14:37:17 2012
66.59% done, estimate finish Sun Feb 26 14:37:16 2012
66.60% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
66.61% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.62% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.63% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.64% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.65% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.66% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.67% done, estimate finish Sun Feb 26 14:37:17 2012
66.67% done, estimate finish Sun Feb 26 14:37:16 2012
66.68% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
66.69% done, estimate finish Sun Feb 26 14:37:16 2012
66.69% done, estimate finish Sun Feb 26 14:37:17 2012
66.70% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.71% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.72% done, estimate finish Sun Feb 26 14:37:16 2012
66.72% done, estimate finish Sun Feb 26 14:37:17 2012
66.73% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.74% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.75% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.76% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
66.77% done, estimate finish Sun Feb 26 14:37:15 2012
66.77% done, estimate finish Sun Feb 26 14:37:17 2012
66.78% done, estimate finish Sun Feb 26 14:37:17 2012
66.78% done, estimate finish Sun Feb 26 14:37:16 2012
66.79% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.80% done, estimate finish Sun Feb 26 14:37:16 2012
66.80% done, estimate finish Sun Feb 26 14:37:17 2012
66.81% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.82% done, estimate finish Sun Feb 26 14:37:17 2012
66.82% done, estimate finish Sun Feb 26 14:37:16 2012
66.83% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.84% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
66.85% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
66.86% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.87% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.88% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.89% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.90% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.91% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.92% done, estimate finish Sun Feb 26 14:37:16 2012
66.92% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.93% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.94% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.95% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.96% done, estimate finish Sun Feb 26 14:37:16 2012
66.96% done, estimate finish Sun Feb 26 14:37:15 2012
66.97% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
66.98% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
66.99% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.00% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
67.01% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
67.01% done, estimate finish Sun Feb 26 14:37:16 2012
67.02% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.03% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.04% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.05% done, estimate finish Sun Feb 26 14:37:15 2012
67.05% done, estimate finish Sun Feb 26 14:37:16 2012
67.06% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.07% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.08% done, estimate finish Sun Feb 26 14:37:15 2012
67.08% done, estimate finish Sun Feb 26 14:37:17 2012
67.09% done, estimate finish Sun Feb 26 14:37:17 2012
67.09% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.10% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.11% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.12% done, estimate finish Sun Feb 26 14:37:15 2012
67.12% done, estimate finish Sun Feb 26 14:37:17 2012
67.13% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.14% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.15% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.16% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.17% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
67.18% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.19% done, estimate finish Sun Feb 26 14:37:16 2012
67.19% done, estimate finish Sun Feb 26 14:37:17 2012
67.20% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
67.21% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.22% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.23% done, estimate finish Sun Feb 26 14:37:16 2012
67.23% done, estimate finish Sun Feb 26 14:37:15 2012
67.24% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.25% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
67.26% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.27% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.28% done, estimate finish Sun Feb 26 14:37:17 2012
67.28% done, estimate finish Sun Feb 26 14:37:16 2012
67.29% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.30% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.31% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.32% done, estimate finish Sun Feb 26 14:37:15 2012
67.32% done, estimate finish Sun Feb 26 14:37:16 2012
67.33% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
67.34% done, estimate finish Sun Feb 26 14:37:16 2012
67.34% done, estimate finish Sun Feb 26 14:37:15 2012
67.35% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.36% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.37% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.38% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.39% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
67.40% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.41% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
67.42% done, estimate finish Sun Feb 26 14:37:16 2012
67.42% done, estimate finish Sun Feb 26 14:37:15 2012
67.43% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.44% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.45% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.46% done, estimate finish Sun Feb 26 14:37:16 2012
67.46% done, estimate finish Sun Feb 26 14:37:15 2012
67.47% done, estimate finish Sun Feb 26 14:37:15 2012
67.47% done, estimate finish Sun Feb 26 14:37:17 2012
67.48% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.49% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
67.50% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.51% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.52% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.53% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.54% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.55% done, estimate finish Sun Feb 26 14:37:15 2012
67.55% done, estimate finish Sun Feb 26 14:37:16 2012
67.56% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.57% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.57% done, estimate finish Sun Feb 26 14:37:15 2012
67.58% done, estimate finish Sun Feb 26 14:37:17 2012
=== last message repeated 2 times. ===
67.59% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.60% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.61% done, estimate finish Sun Feb 26 14:37:16 2012
67.61% done, estimate finish Sun Feb 26 14:37:15 2012
67.62% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.63% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.64% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.65% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.65% done, estimate finish Sun Feb 26 14:37:15 2012
67.66% done, estimate finish Sun Feb 26 14:37:15 2012
67.66% done, estimate finish Sun Feb 26 14:37:16 2012
67.67% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.68% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.69% done, estimate finish Sun Feb 26 14:37:16 2012
67.69% done, estimate finish Sun Feb 26 14:37:15 2012
67.70% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.71% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.72% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.73% done, estimate finish Sun Feb 26 14:37:16 2012
67.73% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.74% done, estimate finish Sun Feb 26 14:37:15 2012
67.74% done, estimate finish Sun Feb 26 14:37:16 2012
67.75% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.76% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.77% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.78% done, estimate finish Sun Feb 26 14:37:15 2012
67.78% done, estimate finish Sun Feb 26 14:37:16 2012
67.79% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.80% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.81% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
67.82% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.83% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.84% done, estimate finish Sun Feb 26 14:37:16 2012
67.84% done, estimate finish Sun Feb 26 14:37:15 2012
67.85% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.86% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.87% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.88% done, estimate finish Sun Feb 26 14:37:16 2012
67.88% done, estimate finish Sun Feb 26 14:37:15 2012
67.89% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
67.90% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.91% done, estimate finish Sun Feb 26 14:37:14 2012
67.91% done, estimate finish Sun Feb 26 14:37:16 2012
67.92% done, estimate finish Sun Feb 26 14:37:16 2012
67.92% done, estimate finish Sun Feb 26 14:37:15 2012
67.93% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
67.94% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.95% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.96% done, estimate finish Sun Feb 26 14:37:16 2012
67.96% done, estimate finish Sun Feb 26 14:37:15 2012
67.97% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
67.98% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
67.99% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.00% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.01% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.02% done, estimate finish Sun Feb 26 14:37:15 2012
68.02% done, estimate finish Sun Feb 26 14:37:16 2012
68.03% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.04% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.05% done, estimate finish Sun Feb 26 14:37:15 2012
68.05% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.06% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.07% done, estimate finish Sun Feb 26 14:37:16 2012
68.07% done, estimate finish Sun Feb 26 14:37:15 2012
68.08% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.09% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.10% done, estimate finish Sun Feb 26 14:37:15 2012
68.10% done, estimate finish Sun Feb 26 14:37:14 2012
68.11% done, estimate finish Sun Feb 26 14:37:16 2012
68.11% done, estimate finish Sun Feb 26 14:37:15 2012
68.12% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.13% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.14% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
68.15% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.16% done, estimate finish Sun Feb 26 14:37:15 2012
68.16% done, estimate finish Sun Feb 26 14:37:16 2012
68.17% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.18% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.19% done, estimate finish Sun Feb 26 14:37:16 2012
68.19% done, estimate finish Sun Feb 26 14:37:15 2012
68.20% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.21% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.22% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
68.23% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.24% done, estimate finish Sun Feb 26 14:37:15 2012
68.24% done, estimate finish Sun Feb 26 14:37:16 2012
68.25% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.26% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.27% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.28% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.29% done, estimate finish Sun Feb 26 14:37:15 2012
68.29% done, estimate finish Sun Feb 26 14:37:16 2012
68.30% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.30% done, estimate finish Sun Feb 26 14:37:15 2012
68.31% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.32% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.33% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.34% done, estimate finish Sun Feb 26 14:37:16 2012
68.34% done, estimate finish Sun Feb 26 14:37:15 2012
68.35% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.36% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.37% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.38% done, estimate finish Sun Feb 26 14:37:16 2012
68.38% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.39% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.40% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.41% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.42% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.43% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.44% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.45% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.46% done, estimate finish Sun Feb 26 14:37:16 2012
68.46% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.47% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.48% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.49% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.50% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.51% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.52% done, estimate finish Sun Feb 26 14:37:15 2012
68.52% done, estimate finish Sun Feb 26 14:37:16 2012
68.53% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.54% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
68.55% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.56% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.57% done, estimate finish Sun Feb 26 14:37:16 2012
68.57% done, estimate finish Sun Feb 26 14:37:15 2012
68.58% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.59% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.60% done, estimate finish Sun Feb 26 14:37:15 2012
68.60% done, estimate finish Sun Feb 26 14:37:16 2012
68.61% done, estimate finish Sun Feb 26 14:37:16 2012
68.61% done, estimate finish Sun Feb 26 14:37:15 2012
68.62% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
68.63% done, estimate finish Sun Feb 26 14:37:15 2012
68.63% done, estimate finish Sun Feb 26 14:37:16 2012
68.64% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.65% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.66% done, estimate finish Sun Feb 26 14:37:15 2012
68.66% done, estimate finish Sun Feb 26 14:37:16 2012
68.67% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.68% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.69% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.70% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
68.71% done, estimate finish Sun Feb 26 14:37:15 2012
68.71% done, estimate finish Sun Feb 26 14:37:16 2012
68.72% done, estimate finish Sun Feb 26 14:37:16 2012
68.72% done, estimate finish Sun Feb 26 14:37:15 2012
68.73% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.74% done, estimate finish Sun Feb 26 14:37:15 2012
68.74% done, estimate finish Sun Feb 26 14:37:16 2012
68.75% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.76% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.77% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.78% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
68.79% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.80% done, estimate finish Sun Feb 26 14:37:16 2012
68.80% done, estimate finish Sun Feb 26 14:37:15 2012
68.81% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.82% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.83% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.84% done, estimate finish Sun Feb 26 14:37:16 2012
68.84% done, estimate finish Sun Feb 26 14:37:15 2012
68.85% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.86% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
68.87% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.88% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.89% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.90% done, estimate finish Sun Feb 26 14:37:15 2012
68.90% done, estimate finish Sun Feb 26 14:37:16 2012
68.91% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.92% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.93% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
68.94% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.95% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.95% done, estimate finish Sun Feb 26 14:37:15 2012
68.96% done, estimate finish Sun Feb 26 14:37:15 2012
68.96% done, estimate finish Sun Feb 26 14:37:17 2012
68.97% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.98% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
68.99% done, estimate finish Sun Feb 26 14:37:16 2012
68.99% done, estimate finish Sun Feb 26 14:37:15 2012
69.00% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.01% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.02% done, estimate finish Sun Feb 26 14:37:15 2012
69.02% done, estimate finish Sun Feb 26 14:37:16 2012
69.03% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.03% done, estimate finish Sun Feb 26 14:37:15 2012
69.04% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.05% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.06% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.07% done, estimate finish Sun Feb 26 14:37:16 2012
69.07% done, estimate finish Sun Feb 26 14:37:15 2012
69.08% done, estimate finish Sun Feb 26 14:37:15 2012
69.08% done, estimate finish Sun Feb 26 14:37:16 2012
69.09% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.10% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.11% done, estimate finish Sun Feb 26 14:37:16 2012
69.11% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.12% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.13% done, estimate finish Sun Feb 26 14:37:15 2012
69.13% done, estimate finish Sun Feb 26 14:37:16 2012
69.14% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.15% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.16% done, estimate finish Sun Feb 26 14:37:15 2012
69.16% done, estimate finish Sun Feb 26 14:37:16 2012
69.17% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.18% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.19% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
69.20% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.21% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.22% done, estimate finish Sun Feb 26 14:37:16 2012
69.22% done, estimate finish Sun Feb 26 14:37:15 2012
69.23% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.24% done, estimate finish Sun Feb 26 14:37:15 2012
69.24% done, estimate finish Sun Feb 26 14:37:16 2012
69.25% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.26% done, estimate finish Sun Feb 26 14:37:16 2012
69.26% done, estimate finish Sun Feb 26 14:37:15 2012
69.27% done, estimate finish Sun Feb 26 14:37:15 2012
69.27% done, estimate finish Sun Feb 26 14:37:17 2012
69.27% done, estimate finish Sun Feb 26 14:37:16 2012
69.28% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.29% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.30% done, estimate finish Sun Feb 26 14:37:16 2012
69.30% done, estimate finish Sun Feb 26 14:37:15 2012
69.31% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.32% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.33% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.34% done, estimate finish Sun Feb 26 14:37:16 2012
69.34% done, estimate finish Sun Feb 26 14:37:15 2012
69.35% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.35% done, estimate finish Sun Feb 26 14:37:16 2012
69.36% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.37% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.38% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.39% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.40% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.41% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.42% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.43% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.43% done, estimate finish Sun Feb 26 14:37:16 2012
69.44% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.45% done, estimate finish Sun Feb 26 14:37:16 2012
69.45% done, estimate finish Sun Feb 26 14:37:15 2012
69.46% done, estimate finish Sun Feb 26 14:37:15 2012
69.46% done, estimate finish Sun Feb 26 14:37:17 2012
69.47% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.48% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.49% done, estimate finish Sun Feb 26 14:37:16 2012
69.49% done, estimate finish Sun Feb 26 14:37:15 2012
69.50% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.51% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.51% done, estimate finish Sun Feb 26 14:37:16 2012
69.52% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.53% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.54% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.55% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.56% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.57% done, estimate finish Sun Feb 26 14:37:16 2012
69.57% done, estimate finish Sun Feb 26 14:37:15 2012
69.58% done, estimate finish Sun Feb 26 14:37:17 2012
69.58% done, estimate finish Sun Feb 26 14:37:16 2012
69.59% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
69.60% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.61% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.62% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.63% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.64% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.65% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.66% done, estimate finish Sun Feb 26 14:37:15 2012
69.66% done, estimate finish Sun Feb 26 14:37:16 2012
69.67% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
69.68% done, estimate finish Sun Feb 26 14:37:16 2012
69.68% done, estimate finish Sun Feb 26 14:37:15 2012
69.69% done, estimate finish Sun Feb 26 14:37:15 2012
69.69% done, estimate finish Sun Feb 26 14:37:16 2012
69.70% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.71% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.72% done, estimate finish Sun Feb 26 14:37:16 2012
69.72% done, estimate finish Sun Feb 26 14:37:15 2012
69.73% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.74% done, estimate finish Sun Feb 26 14:37:15 2012
69.74% done, estimate finish Sun Feb 26 14:37:16 2012
69.75% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
69.76% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.77% done, estimate finish Sun Feb 26 14:37:17 2012
69.77% done, estimate finish Sun Feb 26 14:37:16 2012
69.78% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.79% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.80% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.81% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.82% done, estimate finish Sun Feb 26 14:37:15 2012
69.82% done, estimate finish Sun Feb 26 14:37:16 2012
69.83% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
69.84% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.85% done, estimate finish Sun Feb 26 14:37:15 2012
69.85% done, estimate finish Sun Feb 26 14:37:16 2012
69.86% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.87% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.88% done, estimate finish Sun Feb 26 14:37:15 2012
69.88% done, estimate finish Sun Feb 26 14:37:17 2012
69.89% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.90% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.91% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.91% done, estimate finish Sun Feb 26 14:37:15 2012
69.92% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
69.93% done, estimate finish Sun Feb 26 14:37:15 2012
69.93% done, estimate finish Sun Feb 26 14:37:16 2012
69.94% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.95% done, estimate finish Sun Feb 26 14:37:16 2012
69.95% done, estimate finish Sun Feb 26 14:37:15 2012
69.96% done, estimate finish Sun Feb 26 14:37:15 2012
69.96% done, estimate finish Sun Feb 26 14:37:16 2012
69.97% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.98% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
69.99% done, estimate finish Sun Feb 26 14:37:16 2012
69.99% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.00% done, estimate finish Sun Feb 26 14:37:15 2012
70.00% done, estimate finish Sun Feb 26 14:37:16 2012
70.01% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.02% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.03% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.04% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.05% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.06% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.07% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.08% done, estimate finish Sun Feb 26 14:37:17 2012
70.08% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.09% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.10% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.11% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.12% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.13% done, estimate finish Sun Feb 26 14:37:15 2012
70.13% done, estimate finish Sun Feb 26 14:37:16 2012
70.14% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.15% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.16% done, estimate finish Sun Feb 26 14:37:15 2012
70.16% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.17% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.18% done, estimate finish Sun Feb 26 14:37:16 2012
70.18% done, estimate finish Sun Feb 26 14:37:15 2012
70.19% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.20% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.21% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.22% done, estimate finish Sun Feb 26 14:37:16 2012
70.22% done, estimate finish Sun Feb 26 14:37:15 2012
70.23% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.24% done, estimate finish Sun Feb 26 14:37:15 2012
70.24% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.25% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.26% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.27% done, estimate finish Sun Feb 26 14:37:17 2012
70.27% done, estimate finish Sun Feb 26 14:37:16 2012
70.28% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.29% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.30% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.31% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.32% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.32% done, estimate finish Sun Feb 26 14:37:16 2012
70.33% done, estimate finish Sun Feb 26 14:37:16 2012
70.33% done, estimate finish Sun Feb 26 14:37:15 2012
70.34% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.35% done, estimate finish Sun Feb 26 14:37:15 2012
70.35% done, estimate finish Sun Feb 26 14:37:16 2012
70.36% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.37% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.38% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.39% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.40% done, estimate finish Sun Feb 26 14:37:15 2012
70.40% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.41% done, estimate finish Sun Feb 26 14:37:16 2012
70.41% done, estimate finish Sun Feb 26 14:37:15 2012
70.42% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.43% done, estimate finish Sun Feb 26 14:37:15 2012
70.43% done, estimate finish Sun Feb 26 14:37:16 2012
70.44% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.45% done, estimate finish Sun Feb 26 14:37:16 2012
70.45% done, estimate finish Sun Feb 26 14:37:15 2012
70.46% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.47% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.48% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 3 times. ===
70.49% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.50% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.51% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.52% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.53% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.54% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.55% done, estimate finish Sun Feb 26 14:37:15 2012
70.55% done, estimate finish Sun Feb 26 14:37:16 2012
70.56% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.56% done, estimate finish Sun Feb 26 14:37:15 2012
70.57% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.58% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.59% done, estimate finish Sun Feb 26 14:37:15 2012
70.59% done, estimate finish Sun Feb 26 14:37:14 2012
70.60% done, estimate finish Sun Feb 26 14:37:16 2012
70.60% done, estimate finish Sun Feb 26 14:37:15 2012
70.61% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.62% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.63% done, estimate finish Sun Feb 26 14:37:15 2012
70.63% done, estimate finish Sun Feb 26 14:37:16 2012
70.64% done, estimate finish Sun Feb 26 14:37:16 2012
70.64% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.65% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.66% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.67% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
70.68% done, estimate finish Sun Feb 26 14:37:16 2012
70.68% done, estimate finish Sun Feb 26 14:37:15 2012
70.69% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.70% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.71% done, estimate finish Sun Feb 26 14:37:14 2012
70.71% done, estimate finish Sun Feb 26 14:37:16 2012
70.72% done, estimate finish Sun Feb 26 14:37:16 2012
70.72% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.73% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.74% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.75% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
70.76% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.77% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.78% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.79% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
70.80% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
70.81% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.82% done, estimate finish Sun Feb 26 14:37:15 2012
70.82% done, estimate finish Sun Feb 26 14:37:16 2012
70.83% done, estimate finish Sun Feb 26 14:37:16 2012
70.83% done, estimate finish Sun Feb 26 14:37:15 2012
70.84% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.85% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.86% done, estimate finish Sun Feb 26 14:37:15 2012
70.86% done, estimate finish Sun Feb 26 14:37:14 2012
70.87% done, estimate finish Sun Feb 26 14:37:14 2012
70.87% done, estimate finish Sun Feb 26 14:37:15 2012
70.88% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.89% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
70.90% done, estimate finish Sun Feb 26 14:37:14 2012
70.90% done, estimate finish Sun Feb 26 14:37:16 2012
70.91% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.92% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.93% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.94% done, estimate finish Sun Feb 26 14:37:14 2012
70.94% done, estimate finish Sun Feb 26 14:37:16 2012
70.95% done, estimate finish Sun Feb 26 14:37:16 2012
70.95% done, estimate finish Sun Feb 26 14:37:15 2012
70.96% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.97% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
70.97% done, estimate finish Sun Feb 26 14:37:14 2012
70.98% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
70.99% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.00% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.01% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.02% done, estimate finish Sun Feb 26 14:37:14 2012
71.02% done, estimate finish Sun Feb 26 14:37:16 2012
71.03% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.04% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.05% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.05% done, estimate finish Sun Feb 26 14:37:14 2012
71.06% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.07% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.08% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.09% done, estimate finish Sun Feb 26 14:37:15 2012
71.09% done, estimate finish Sun Feb 26 14:37:14 2012
71.10% done, estimate finish Sun Feb 26 14:37:14 2012
71.10% done, estimate finish Sun Feb 26 14:37:15 2012
71.11% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.12% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.13% done, estimate finish Sun Feb 26 14:37:15 2012
71.13% done, estimate finish Sun Feb 26 14:37:16 2012
=== last message repeated 2 times. ===
71.14% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.15% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.16% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.17% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.18% done, estimate finish Sun Feb 26 14:37:14 2012
71.18% done, estimate finish Sun Feb 26 14:37:15 2012
71.19% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.20% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.21% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
71.22% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.23% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.24% done, estimate finish Sun Feb 26 14:37:15 2012
71.24% done, estimate finish Sun Feb 26 14:37:14 2012
71.25% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.26% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.27% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.28% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.29% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.29% done, estimate finish Sun Feb 26 14:37:15 2012
71.30% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.31% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.32% done, estimate finish Sun Feb 26 14:37:15 2012
71.32% done, estimate finish Sun Feb 26 14:37:14 2012
71.33% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.34% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.35% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.36% done, estimate finish Sun Feb 26 14:37:15 2012
71.36% done, estimate finish Sun Feb 26 14:37:14 2012
71.37% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
71.38% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.39% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.40% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.41% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.42% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.43% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.44% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.45% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
71.46% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.47% done, estimate finish Sun Feb 26 14:37:15 2012
71.47% done, estimate finish Sun Feb 26 14:37:14 2012
71.48% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.49% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.50% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.51% done, estimate finish Sun Feb 26 14:37:15 2012
71.51% done, estimate finish Sun Feb 26 14:37:14 2012
71.52% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.53% done, estimate finish Sun Feb 26 14:37:14 2012
71.53% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.54% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.55% done, estimate finish Sun Feb 26 14:37:15 2012
71.55% done, estimate finish Sun Feb 26 14:37:14 2012
71.56% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.57% done, estimate finish Sun Feb 26 14:37:14 2012
71.57% done, estimate finish Sun Feb 26 14:37:15 2012
71.58% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.59% done, estimate finish Sun Feb 26 14:37:15 2012
71.59% done, estimate finish Sun Feb 26 14:37:14 2012
71.60% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.61% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
71.62% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.63% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.64% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.65% done, estimate finish Sun Feb 26 14:37:14 2012
71.65% done, estimate finish Sun Feb 26 14:37:15 2012
71.66% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.67% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.68% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.69% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
71.70% done, estimate finish Sun Feb 26 14:37:15 2012
71.70% done, estimate finish Sun Feb 26 14:37:14 2012
71.71% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.72% done, estimate finish Sun Feb 26 14:37:14 2012
71.72% done, estimate finish Sun Feb 26 14:37:15 2012
71.73% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.74% done, estimate finish Sun Feb 26 14:37:15 2012
71.74% done, estimate finish Sun Feb 26 14:37:14 2012
71.75% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.76% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.77% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 3 times. ===
71.78% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.79% done, estimate finish Sun Feb 26 14:37:14 2012
71.79% done, estimate finish Sun Feb 26 14:37:15 2012
71.80% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.81% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.82% done, estimate finish Sun Feb 26 14:37:15 2012
71.82% done, estimate finish Sun Feb 26 14:37:14 2012
71.83% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.84% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.85% done, estimate finish Sun Feb 26 14:37:13 2012
71.85% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.86% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.87% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.88% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.89% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.90% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.91% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.92% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.93% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.93% done, estimate finish Sun Feb 26 14:37:14 2012
71.94% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.95% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.96% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
71.97% done, estimate finish Sun Feb 26 14:37:15 2012
71.97% done, estimate finish Sun Feb 26 14:37:14 2012
71.98% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
71.99% done, estimate finish Sun Feb 26 14:37:14 2012
71.99% done, estimate finish Sun Feb 26 14:37:15 2012
72.00% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.01% done, estimate finish Sun Feb 26 14:37:15 2012
72.01% done, estimate finish Sun Feb 26 14:37:14 2012
72.02% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
72.03% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.04% done, estimate finish Sun Feb 26 14:37:13 2012
72.04% done, estimate finish Sun Feb 26 14:37:15 2012
72.05% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.06% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.07% done, estimate finish Sun Feb 26 14:37:14 2012
72.07% done, estimate finish Sun Feb 26 14:37:15 2012
72.08% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.09% done, estimate finish Sun Feb 26 14:37:15 2012
72.09% done, estimate finish Sun Feb 26 14:37:14 2012
72.10% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
72.11% done, estimate finish Sun Feb 26 14:37:14 2012
72.11% done, estimate finish Sun Feb 26 14:37:13 2012
72.12% done, estimate finish Sun Feb 26 14:37:13 2012
72.12% done, estimate finish Sun Feb 26 14:37:15 2012
72.13% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.14% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.15% done, estimate finish Sun Feb 26 14:37:14 2012
72.15% done, estimate finish Sun Feb 26 14:37:15 2012
72.16% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.17% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.18% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.18% done, estimate finish Sun Feb 26 14:37:15 2012
72.19% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.20% done, estimate finish Sun Feb 26 14:37:15 2012
72.20% done, estimate finish Sun Feb 26 14:37:14 2012
72.21% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.22% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.23% done, estimate finish Sun Feb 26 14:37:14 2012
72.23% done, estimate finish Sun Feb 26 14:37:13 2012
72.24% done, estimate finish Sun Feb 26 14:37:15 2012
72.24% done, estimate finish Sun Feb 26 14:37:14 2012
72.25% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.26% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
72.27% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.28% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.29% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.30% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.31% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.32% done, estimate finish Sun Feb 26 14:37:13 2012
72.32% done, estimate finish Sun Feb 26 14:37:14 2012
72.33% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.34% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.34% done, estimate finish Sun Feb 26 14:37:13 2012
72.35% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.36% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.37% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.38% done, estimate finish Sun Feb 26 14:37:14 2012
72.38% done, estimate finish Sun Feb 26 14:37:15 2012
72.39% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.40% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.41% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.42% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.42% done, estimate finish Sun Feb 26 14:37:13 2012
72.43% done, estimate finish Sun Feb 26 14:37:15 2012
72.43% done, estimate finish Sun Feb 26 14:37:14 2012
72.44% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.45% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.46% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.47% done, estimate finish Sun Feb 26 14:37:15 2012
72.47% done, estimate finish Sun Feb 26 14:37:14 2012
72.48% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.49% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.50% done, estimate finish Sun Feb 26 14:37:14 2012
72.50% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.51% done, estimate finish Sun Feb 26 14:37:13 2012
72.51% done, estimate finish Sun Feb 26 14:37:14 2012
72.52% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.53% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.54% done, estimate finish Sun Feb 26 14:37:13 2012
72.54% done, estimate finish Sun Feb 26 14:37:15 2012
72.55% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.56% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.57% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.58% done, estimate finish Sun Feb 26 14:37:13 2012
72.58% done, estimate finish Sun Feb 26 14:37:15 2012
72.58% done, estimate finish Sun Feb 26 14:37:14 2012
72.59% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.60% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.61% done, estimate finish Sun Feb 26 14:37:14 2012
72.61% done, estimate finish Sun Feb 26 14:37:13 2012
72.62% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.63% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.64% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.65% done, estimate finish Sun Feb 26 14:37:14 2012
72.65% done, estimate finish Sun Feb 26 14:37:13 2012
72.66% done, estimate finish Sun Feb 26 14:37:15 2012
=== last message repeated 2 times. ===
72.66% done, estimate finish Sun Feb 26 14:37:14 2012
72.67% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.68% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.69% done, estimate finish Sun Feb 26 14:37:14 2012
72.69% done, estimate finish Sun Feb 26 14:37:13 2012
72.70% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.71% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.72% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.73% done, estimate finish Sun Feb 26 14:37:14 2012
72.73% done, estimate finish Sun Feb 26 14:37:13 2012
72.74% done, estimate finish Sun Feb 26 14:37:15 2012
72.74% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.75% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.76% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.77% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.78% done, estimate finish Sun Feb 26 14:37:13 2012
72.78% done, estimate finish Sun Feb 26 14:37:14 2012
72.79% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.80% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.81% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.82% done, estimate finish Sun Feb 26 14:37:13 2012
72.82% done, estimate finish Sun Feb 26 14:37:14 2012
72.83% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
72.84% done, estimate finish Sun Feb 26 14:37:14 2012
72.84% done, estimate finish Sun Feb 26 14:37:13 2012
72.85% done, estimate finish Sun Feb 26 14:37:15 2012
72.85% done, estimate finish Sun Feb 26 14:37:14 2012
72.86% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.87% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.88% done, estimate finish Sun Feb 26 14:37:14 2012
72.88% done, estimate finish Sun Feb 26 14:37:13 2012
72.89% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.90% done, estimate finish Sun Feb 26 14:37:13 2012
72.90% done, estimate finish Sun Feb 26 14:37:14 2012
72.91% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
72.92% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.93% done, estimate finish Sun Feb 26 14:37:13 2012
72.93% done, estimate finish Sun Feb 26 14:37:14 2012
72.94% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.95% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
72.96% done, estimate finish Sun Feb 26 14:37:14 2012
72.96% done, estimate finish Sun Feb 26 14:37:13 2012
72.97% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
72.98% done, estimate finish Sun Feb 26 14:37:13 2012
72.98% done, estimate finish Sun Feb 26 14:37:14 2012
72.99% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 3 times. ===
73.00% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.01% done, estimate finish Sun Feb 26 14:37:13 2012
73.01% done, estimate finish Sun Feb 26 14:37:14 2012
73.02% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.03% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.04% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.05% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.06% done, estimate finish Sun Feb 26 14:37:13 2012
73.06% done, estimate finish Sun Feb 26 14:37:14 2012
73.07% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.07% done, estimate finish Sun Feb 26 14:37:13 2012
73.08% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.09% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.10% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.11% done, estimate finish Sun Feb 26 14:37:14 2012
73.11% done, estimate finish Sun Feb 26 14:37:13 2012
73.12% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.13% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.14% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.15% done, estimate finish Sun Feb 26 14:37:14 2012
73.15% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.16% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.17% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.18% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.19% done, estimate finish Sun Feb 26 14:37:14 2012
73.19% done, estimate finish Sun Feb 26 14:37:13 2012
73.20% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.21% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.22% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.23% done, estimate finish Sun Feb 26 14:37:14 2012
73.23% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.24% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.25% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.26% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.27% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.28% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.29% done, estimate finish Sun Feb 26 14:37:13 2012
73.29% done, estimate finish Sun Feb 26 14:37:14 2012
73.30% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.31% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
73.32% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.33% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.34% done, estimate finish Sun Feb 26 14:37:14 2012
73.34% done, estimate finish Sun Feb 26 14:37:13 2012
73.35% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.36% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.37% done, estimate finish Sun Feb 26 14:37:13 2012
73.37% done, estimate finish Sun Feb 26 14:37:12 2012
73.38% done, estimate finish Sun Feb 26 14:37:14 2012
73.38% done, estimate finish Sun Feb 26 14:37:13 2012
73.39% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
73.40% done, estimate finish Sun Feb 26 14:37:13 2012
73.40% done, estimate finish Sun Feb 26 14:37:14 2012
73.41% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.42% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.43% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.44% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.45% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.46% done, estimate finish Sun Feb 26 14:37:14 2012
73.46% done, estimate finish Sun Feb 26 14:37:13 2012
73.47% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
73.48% done, estimate finish Sun Feb 26 14:37:13 2012
73.48% done, estimate finish Sun Feb 26 14:37:14 2012
73.49% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.50% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.51% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.52% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.53% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.54% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.55% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
73.56% done, estimate finish Sun Feb 26 14:37:13 2012
73.56% done, estimate finish Sun Feb 26 14:37:12 2012
73.57% done, estimate finish Sun Feb 26 14:37:14 2012
73.57% done, estimate finish Sun Feb 26 14:37:13 2012
73.58% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.59% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.60% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.61% done, estimate finish Sun Feb 26 14:37:14 2012
73.61% done, estimate finish Sun Feb 26 14:37:13 2012
73.62% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.63% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
73.64% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
73.65% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.66% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.67% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.68% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.69% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.70% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.71% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.71% done, estimate finish Sun Feb 26 14:37:12 2012
73.72% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.73% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.74% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.75% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.76% done, estimate finish Sun Feb 26 14:37:12 2012
73.76% done, estimate finish Sun Feb 26 14:37:14 2012
73.77% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.78% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.79% done, estimate finish Sun Feb 26 14:37:13 2012
73.79% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
73.80% done, estimate finish Sun Feb 26 14:37:14 2012
73.80% done, estimate finish Sun Feb 26 14:37:13 2012
73.81% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.82% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.83% done, estimate finish Sun Feb 26 14:37:13 2012
73.83% done, estimate finish Sun Feb 26 14:37:12 2012
73.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
73.85% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.86% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.87% done, estimate finish Sun Feb 26 14:37:13 2012
73.87% done, estimate finish Sun Feb 26 14:37:12 2012
73.87% done, estimate finish Sun Feb 26 14:37:14 2012
73.88% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.89% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.90% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
73.92% done, estimate finish Sun Feb 26 14:37:12 2012
73.92% done, estimate finish Sun Feb 26 14:37:13 2012
73.93% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.94% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.95% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
73.96% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
73.97% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
73.98% done, estimate finish Sun Feb 26 14:37:13 2012
73.98% done, estimate finish Sun Feb 26 14:37:14 2012
73.99% done, estimate finish Sun Feb 26 14:37:14 2012
=== last message repeated 2 times. ===
74.00% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.01% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.02% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.04% done, estimate finish Sun Feb 26 14:37:12 2012
74.04% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.05% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.06% done, estimate finish Sun Feb 26 14:37:13 2012
74.06% done, estimate finish Sun Feb 26 14:37:12 2012
74.07% done, estimate finish Sun Feb 26 14:37:14 2012
74.07% done, estimate finish Sun Feb 26 14:37:13 2012
74.08% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.09% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.10% done, estimate finish Sun Feb 26 14:37:13 2012
74.10% done, estimate finish Sun Feb 26 14:37:12 2012
74.11% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.12% done, estimate finish Sun Feb 26 14:37:12 2012
74.12% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.13% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.14% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.15% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.16% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.17% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.18% done, estimate finish Sun Feb 26 14:37:12 2012
74.18% done, estimate finish Sun Feb 26 14:37:14 2012
74.19% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.20% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
74.21% done, estimate finish Sun Feb 26 14:37:13 2012
74.21% done, estimate finish Sun Feb 26 14:37:12 2012
74.22% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.23% done, estimate finish Sun Feb 26 14:37:12 2012
74.23% done, estimate finish Sun Feb 26 14:37:13 2012
74.24% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.25% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.27% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.28% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
74.29% done, estimate finish Sun Feb 26 14:37:13 2012
74.29% done, estimate finish Sun Feb 26 14:37:12 2012
74.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.31% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.32% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.33% done, estimate finish Sun Feb 26 14:37:13 2012
74.33% done, estimate finish Sun Feb 26 14:37:12 2012
74.34% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.35% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.36% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
74.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.38% done, estimate finish Sun Feb 26 14:37:12 2012
74.38% done, estimate finish Sun Feb 26 14:37:13 2012
74.39% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.40% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.41% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.42% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.43% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.44% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.44% done, estimate finish Sun Feb 26 14:37:12 2012
74.45% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.46% done, estimate finish Sun Feb 26 14:37:12 2012
74.46% done, estimate finish Sun Feb 26 14:37:13 2012
74.47% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.48% done, estimate finish Sun Feb 26 14:37:13 2012
74.48% done, estimate finish Sun Feb 26 14:37:12 2012
74.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.50% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.51% done, estimate finish Sun Feb 26 14:37:12 2012
74.51% done, estimate finish Sun Feb 26 14:37:13 2012
74.52% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.52% done, estimate finish Sun Feb 26 14:37:12 2012
74.53% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.54% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.55% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.56% done, estimate finish Sun Feb 26 14:37:13 2012
74.56% done, estimate finish Sun Feb 26 14:37:12 2012
74.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.58% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.59% done, estimate finish Sun Feb 26 14:37:12 2012
74.59% done, estimate finish Sun Feb 26 14:37:13 2012
74.60% done, estimate finish Sun Feb 26 14:37:13 2012
74.60% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.61% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.62% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.63% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.64% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.65% done, estimate finish Sun Feb 26 14:37:12 2012
74.65% done, estimate finish Sun Feb 26 14:37:13 2012
74.66% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.67% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
74.69% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.70% done, estimate finish Sun Feb 26 14:37:12 2012
74.70% done, estimate finish Sun Feb 26 14:37:13 2012
74.71% done, estimate finish Sun Feb 26 14:37:13 2012
74.71% done, estimate finish Sun Feb 26 14:37:12 2012
74.72% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.73% done, estimate finish Sun Feb 26 14:37:12 2012
74.73% done, estimate finish Sun Feb 26 14:37:13 2012
74.74% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.75% done, estimate finish Sun Feb 26 14:37:13 2012
74.75% done, estimate finish Sun Feb 26 14:37:12 2012
74.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.77% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
74.78% done, estimate finish Sun Feb 26 14:37:12 2012
74.78% done, estimate finish Sun Feb 26 14:37:11 2012
74.79% done, estimate finish Sun Feb 26 14:37:13 2012
74.79% done, estimate finish Sun Feb 26 14:37:12 2012
74.80% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.81% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.82% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.83% done, estimate finish Sun Feb 26 14:37:13 2012
74.83% done, estimate finish Sun Feb 26 14:37:12 2012
74.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.85% done, estimate finish Sun Feb 26 14:37:12 2012
74.85% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.86% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.87% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.88% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.89% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.90% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.92% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.93% done, estimate finish Sun Feb 26 14:37:12 2012
74.93% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
74.94% done, estimate finish Sun Feb 26 14:37:13 2012
74.94% done, estimate finish Sun Feb 26 14:37:12 2012
74.95% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.96% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
74.97% done, estimate finish Sun Feb 26 14:37:12 2012
74.97% done, estimate finish Sun Feb 26 14:37:11 2012
74.98% done, estimate finish Sun Feb 26 14:37:11 2012
74.98% done, estimate finish Sun Feb 26 14:37:12 2012
74.99% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.00% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.01% done, estimate finish Sun Feb 26 14:37:12 2012
75.01% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.02% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.04% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.05% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.06% done, estimate finish Sun Feb 26 14:37:13 2012
75.06% done, estimate finish Sun Feb 26 14:37:12 2012
75.07% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.08% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.09% done, estimate finish Sun Feb 26 14:37:12 2012
75.09% done, estimate finish Sun Feb 26 14:37:11 2012
75.09% done, estimate finish Sun Feb 26 14:37:13 2012
75.10% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.11% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.12% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.13% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.14% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.15% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.16% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.17% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.17% done, estimate finish Sun Feb 26 14:37:12 2012
75.18% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.19% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.20% done, estimate finish Sun Feb 26 14:37:12 2012
75.20% done, estimate finish Sun Feb 26 14:37:13 2012
75.21% done, estimate finish Sun Feb 26 14:37:13 2012
75.21% done, estimate finish Sun Feb 26 14:37:12 2012
75.22% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.23% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.24% done, estimate finish Sun Feb 26 14:37:12 2012
75.24% done, estimate finish Sun Feb 26 14:37:11 2012
75.25% done, estimate finish Sun Feb 26 14:37:13 2012
75.25% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.27% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.28% done, estimate finish Sun Feb 26 14:37:12 2012
75.28% done, estimate finish Sun Feb 26 14:37:11 2012
75.29% done, estimate finish Sun Feb 26 14:37:13 2012
75.29% done, estimate finish Sun Feb 26 14:37:12 2012
75.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.31% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.32% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.33% done, estimate finish Sun Feb 26 14:37:13 2012
75.33% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.34% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.35% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.36% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.38% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.39% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.40% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.41% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
75.42% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.43% done, estimate finish Sun Feb 26 14:37:12 2012
75.43% done, estimate finish Sun Feb 26 14:37:11 2012
75.44% done, estimate finish Sun Feb 26 14:37:13 2012
75.44% done, estimate finish Sun Feb 26 14:37:12 2012
75.45% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.46% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.47% done, estimate finish Sun Feb 26 14:37:12 2012
75.47% done, estimate finish Sun Feb 26 14:37:11 2012
75.48% done, estimate finish Sun Feb 26 14:37:11 2012
75.48% done, estimate finish Sun Feb 26 14:37:12 2012
75.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
75.50% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.51% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.52% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.53% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.54% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.55% done, estimate finish Sun Feb 26 14:37:12 2012
75.55% done, estimate finish Sun Feb 26 14:37:11 2012
75.56% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
75.58% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.59% done, estimate finish Sun Feb 26 14:37:11 2012
75.59% done, estimate finish Sun Feb 26 14:37:13 2012
75.60% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.61% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.62% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.63% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.64% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.65% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
75.66% done, estimate finish Sun Feb 26 14:37:12 2012
75.66% done, estimate finish Sun Feb 26 14:37:11 2012
75.67% done, estimate finish Sun Feb 26 14:37:11 2012
75.67% done, estimate finish Sun Feb 26 14:37:12 2012
75.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.69% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.70% done, estimate finish Sun Feb 26 14:37:12 2012
75.70% done, estimate finish Sun Feb 26 14:37:13 2012
75.71% done, estimate finish Sun Feb 26 14:37:13 2012
75.71% done, estimate finish Sun Feb 26 14:37:12 2012
75.72% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.73% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
75.74% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.75% done, estimate finish Sun Feb 26 14:37:11 2012
75.75% done, estimate finish Sun Feb 26 14:37:12 2012
75.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.77% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.78% done, estimate finish Sun Feb 26 14:37:12 2012
75.78% done, estimate finish Sun Feb 26 14:37:11 2012
75.79% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.80% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.81% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
75.82% done, estimate finish Sun Feb 26 14:37:11 2012
75.82% done, estimate finish Sun Feb 26 14:37:13 2012
75.83% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.85% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.86% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.87% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.88% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.89% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.90% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
75.90% done, estimate finish Sun Feb 26 14:37:12 2012
75.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.92% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.93% done, estimate finish Sun Feb 26 14:37:12 2012
75.93% done, estimate finish Sun Feb 26 14:37:11 2012
75.94% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
75.95% done, estimate finish Sun Feb 26 14:37:11 2012
75.95% done, estimate finish Sun Feb 26 14:37:12 2012
75.96% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.97% done, estimate finish Sun Feb 26 14:37:12 2012
75.97% done, estimate finish Sun Feb 26 14:37:11 2012
75.98% done, estimate finish Sun Feb 26 14:37:11 2012
75.98% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
75.99% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.00% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.01% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.02% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.04% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.05% done, estimate finish Sun Feb 26 14:37:12 2012
76.05% done, estimate finish Sun Feb 26 14:37:11 2012
76.06% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.06% done, estimate finish Sun Feb 26 14:37:12 2012
76.07% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.08% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.09% done, estimate finish Sun Feb 26 14:37:11 2012
76.09% done, estimate finish Sun Feb 26 14:37:13 2012
76.10% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.11% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.12% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.13% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.14% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.14% done, estimate finish Sun Feb 26 14:37:12 2012
76.15% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.16% done, estimate finish Sun Feb 26 14:37:12 2012
76.16% done, estimate finish Sun Feb 26 14:37:11 2012
76.17% done, estimate finish Sun Feb 26 14:37:11 2012
76.17% done, estimate finish Sun Feb 26 14:37:12 2012
76.18% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.19% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.20% done, estimate finish Sun Feb 26 14:37:12 2012
76.20% done, estimate finish Sun Feb 26 14:37:11 2012
76.21% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.22% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.23% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.24% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.25% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.27% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.28% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.29% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.31% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.32% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.33% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.34% done, estimate finish Sun Feb 26 14:37:11 2012
76.34% done, estimate finish Sun Feb 26 14:37:12 2012
76.35% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.36% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.38% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.39% done, estimate finish Sun Feb 26 14:37:12 2012
76.39% done, estimate finish Sun Feb 26 14:37:11 2012
76.40% done, estimate finish Sun Feb 26 14:37:13 2012
76.40% done, estimate finish Sun Feb 26 14:37:12 2012
76.41% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.42% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.43% done, estimate finish Sun Feb 26 14:37:12 2012
76.43% done, estimate finish Sun Feb 26 14:37:11 2012
76.44% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.45% done, estimate finish Sun Feb 26 14:37:11 2012
76.45% done, estimate finish Sun Feb 26 14:37:12 2012
76.46% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.47% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.48% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.50% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.51% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.52% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.53% done, estimate finish Sun Feb 26 14:37:11 2012
76.53% done, estimate finish Sun Feb 26 14:37:12 2012
76.54% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.55% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.56% done, estimate finish Sun Feb 26 14:37:11 2012
76.56% done, estimate finish Sun Feb 26 14:37:12 2012
76.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.58% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.59% done, estimate finish Sun Feb 26 14:37:11 2012
76.59% done, estimate finish Sun Feb 26 14:37:13 2012
76.60% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.61% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.62% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.62% done, estimate finish Sun Feb 26 14:37:11 2012
76.63% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.64% done, estimate finish Sun Feb 26 14:37:11 2012
76.64% done, estimate finish Sun Feb 26 14:37:12 2012
76.65% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.66% done, estimate finish Sun Feb 26 14:37:12 2012
76.66% done, estimate finish Sun Feb 26 14:37:11 2012
76.67% done, estimate finish Sun Feb 26 14:37:11 2012
76.67% done, estimate finish Sun Feb 26 14:37:12 2012
76.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.69% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.70% done, estimate finish Sun Feb 26 14:37:12 2012
76.70% done, estimate finish Sun Feb 26 14:37:11 2012
76.71% done, estimate finish Sun Feb 26 14:37:11 2012
76.71% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.72% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.73% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.74% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.75% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.77% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.78% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.79% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.80% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.81% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.82% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.83% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.85% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.86% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.87% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
76.88% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.89% done, estimate finish Sun Feb 26 14:37:12 2012
76.89% done, estimate finish Sun Feb 26 14:37:13 2012
76.90% done, estimate finish Sun Feb 26 14:37:13 2012
76.90% done, estimate finish Sun Feb 26 14:37:12 2012
76.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.92% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.93% done, estimate finish Sun Feb 26 14:37:12 2012
76.93% done, estimate finish Sun Feb 26 14:37:11 2012
76.94% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.95% done, estimate finish Sun Feb 26 14:37:11 2012
76.95% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.96% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.97% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
76.98% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
76.99% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.00% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.01% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.02% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
77.04% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.05% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.06% done, estimate finish Sun Feb 26 14:37:11 2012
77.06% done, estimate finish Sun Feb 26 14:37:12 2012
77.07% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.08% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.09% done, estimate finish Sun Feb 26 14:37:11 2012
77.09% done, estimate finish Sun Feb 26 14:37:13 2012
77.10% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.11% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
77.12% done, estimate finish Sun Feb 26 14:37:12 2012
77.12% done, estimate finish Sun Feb 26 14:37:11 2012
77.13% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.14% done, estimate finish Sun Feb 26 14:37:11 2012
77.14% done, estimate finish Sun Feb 26 14:37:12 2012
77.15% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.16% done, estimate finish Sun Feb 26 14:37:12 2012
77.16% done, estimate finish Sun Feb 26 14:37:11 2012
77.17% done, estimate finish Sun Feb 26 14:37:11 2012
77.17% done, estimate finish Sun Feb 26 14:37:12 2012
77.18% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.19% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
77.20% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
77.21% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.22% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.23% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.24% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.25% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.27% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.27% done, estimate finish Sun Feb 26 14:37:11 2012
77.28% done, estimate finish Sun Feb 26 14:37:11 2012
77.28% done, estimate finish Sun Feb 26 14:37:12 2012
77.29% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.31% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.32% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.33% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.34% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.35% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.35% done, estimate finish Sun Feb 26 14:37:11 2012
77.36% done, estimate finish Sun Feb 26 14:37:11 2012
77.36% done, estimate finish Sun Feb 26 14:37:12 2012
77.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.38% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.39% done, estimate finish Sun Feb 26 14:37:12 2012
77.39% done, estimate finish Sun Feb 26 14:37:13 2012
77.40% done, estimate finish Sun Feb 26 14:37:13 2012
77.40% done, estimate finish Sun Feb 26 14:37:12 2012
77.41% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.42% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.43% done, estimate finish Sun Feb 26 14:37:12 2012
77.43% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.44% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.45% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.46% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.47% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.48% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.50% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.51% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
77.51% done, estimate finish Sun Feb 26 14:37:12 2012
77.52% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.53% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.54% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.55% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.56% done, estimate finish Sun Feb 26 14:37:11 2012
77.56% done, estimate finish Sun Feb 26 14:37:12 2012
77.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.58% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.59% done, estimate finish Sun Feb 26 14:37:11 2012
77.59% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.60% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.61% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.62% done, estimate finish Sun Feb 26 14:37:12 2012
77.62% done, estimate finish Sun Feb 26 14:37:13 2012
77.63% done, estimate finish Sun Feb 26 14:37:13 2012
77.63% done, estimate finish Sun Feb 26 14:37:12 2012
77.64% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.65% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.66% done, estimate finish Sun Feb 26 14:37:12 2012
77.66% done, estimate finish Sun Feb 26 14:37:11 2012
77.67% done, estimate finish Sun Feb 26 14:37:11 2012
77.67% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.69% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.70% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
77.71% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.72% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.73% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.74% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.75% done, estimate finish Sun Feb 26 14:37:11 2012
77.75% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.77% done, estimate finish Sun Feb 26 14:37:12 2012
77.77% done, estimate finish Sun Feb 26 14:37:11 2012
77.78% done, estimate finish Sun Feb 26 14:37:11 2012
77.78% done, estimate finish Sun Feb 26 14:37:12 2012
77.79% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.80% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.81% done, estimate finish Sun Feb 26 14:37:12 2012
77.81% done, estimate finish Sun Feb 26 14:37:13 2012
77.82% done, estimate finish Sun Feb 26 14:37:13 2012
77.82% done, estimate finish Sun Feb 26 14:37:12 2012
77.83% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
77.85% done, estimate finish Sun Feb 26 14:37:12 2012
77.85% done, estimate finish Sun Feb 26 14:37:11 2012
77.86% done, estimate finish Sun Feb 26 14:37:11 2012
77.86% done, estimate finish Sun Feb 26 14:37:12 2012
77.87% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.88% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.89% done, estimate finish Sun Feb 26 14:37:12 2012
77.89% done, estimate finish Sun Feb 26 14:37:13 2012
77.90% done, estimate finish Sun Feb 26 14:37:13 2012
77.90% done, estimate finish Sun Feb 26 14:37:12 2012
77.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.92% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.92% done, estimate finish Sun Feb 26 14:37:13 2012
77.93% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
77.94% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.95% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.96% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.97% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
77.98% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
77.99% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.00% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.00% done, estimate finish Sun Feb 26 14:37:13 2012
78.01% done, estimate finish Sun Feb 26 14:37:13 2012
78.01% done, estimate finish Sun Feb 26 14:37:12 2012
78.02% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.04% done, estimate finish Sun Feb 26 14:37:12 2012
78.04% done, estimate finish Sun Feb 26 14:37:11 2012
78.05% done, estimate finish Sun Feb 26 14:37:11 2012
78.05% done, estimate finish Sun Feb 26 14:37:12 2012
78.06% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.07% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.08% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.08% done, estimate finish Sun Feb 26 14:37:13 2012
78.09% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.10% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.11% done, estimate finish Sun Feb 26 14:37:12 2012
78.11% done, estimate finish Sun Feb 26 14:37:13 2012
78.12% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.13% done, estimate finish Sun Feb 26 14:37:13 2012
78.13% done, estimate finish Sun Feb 26 14:37:12 2012
78.14% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.15% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.16% done, estimate finish Sun Feb 26 14:37:12 2012
78.16% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
78.17% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.18% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.19% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.20% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.21% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.22% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.23% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.24% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.24% done, estimate finish Sun Feb 26 14:37:12 2012
78.25% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.27% done, estimate finish Sun Feb 26 14:37:12 2012
78.27% done, estimate finish Sun Feb 26 14:37:11 2012
78.28% done, estimate finish Sun Feb 26 14:37:11 2012
78.28% done, estimate finish Sun Feb 26 14:37:12 2012
78.29% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.31% done, estimate finish Sun Feb 26 14:37:12 2012
78.31% done, estimate finish Sun Feb 26 14:37:13 2012
78.32% done, estimate finish Sun Feb 26 14:37:13 2012
78.32% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.33% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.34% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.35% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.36% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.38% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.39% done, estimate finish Sun Feb 26 14:37:12 2012
78.39% done, estimate finish Sun Feb 26 14:37:13 2012
78.40% done, estimate finish Sun Feb 26 14:37:13 2012
78.40% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.41% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.42% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.43% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.44% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.45% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.46% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.47% done, estimate finish Sun Feb 26 14:37:11 2012
78.47% done, estimate finish Sun Feb 26 14:37:13 2012
78.48% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
78.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.50% done, estimate finish Sun Feb 26 14:37:12 2012
78.50% done, estimate finish Sun Feb 26 14:37:13 2012
78.51% done, estimate finish Sun Feb 26 14:37:13 2012
78.51% done, estimate finish Sun Feb 26 14:37:12 2012
78.52% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.53% done, estimate finish Sun Feb 26 14:37:12 2012
78.53% done, estimate finish Sun Feb 26 14:37:13 2012
78.54% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.55% done, estimate finish Sun Feb 26 14:37:13 2012
78.55% done, estimate finish Sun Feb 26 14:37:12 2012
78.56% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
78.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.58% done, estimate finish Sun Feb 26 14:37:12 2012
78.58% done, estimate finish Sun Feb 26 14:37:13 2012
78.59% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.60% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.61% done, estimate finish Sun Feb 26 14:37:12 2012
78.61% done, estimate finish Sun Feb 26 14:37:13 2012
78.62% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.63% done, estimate finish Sun Feb 26 14:37:13 2012
78.63% done, estimate finish Sun Feb 26 14:37:12 2012
78.64% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
78.65% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.66% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.67% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.69% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.70% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.71% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.72% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.73% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 3 times. ===
78.74% done, estimate finish Sun Feb 26 14:37:13 2012
78.74% done, estimate finish Sun Feb 26 14:37:12 2012
78.75% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.77% done, estimate finish Sun Feb 26 14:37:12 2012
78.77% done, estimate finish Sun Feb 26 14:37:11 2012
78.78% done, estimate finish Sun Feb 26 14:37:11 2012
78.78% done, estimate finish Sun Feb 26 14:37:12 2012
78.79% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.80% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.81% done, estimate finish Sun Feb 26 14:37:12 2012
78.81% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.82% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.83% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.84% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.85% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.86% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.87% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.88% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.89% done, estimate finish Sun Feb 26 14:37:12 2012
78.89% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.90% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.92% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.93% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
78.94% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.95% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.96% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.97% done, estimate finish Sun Feb 26 14:37:11 2012
78.97% done, estimate finish Sun Feb 26 14:37:13 2012
78.97% done, estimate finish Sun Feb 26 14:37:12 2012
78.98% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
78.99% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.00% done, estimate finish Sun Feb 26 14:37:12 2012
79.00% done, estimate finish Sun Feb 26 14:37:13 2012
79.01% done, estimate finish Sun Feb 26 14:37:13 2012
79.01% done, estimate finish Sun Feb 26 14:37:12 2012
79.02% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.03% done, estimate finish Sun Feb 26 14:37:12 2012
79.03% done, estimate finish Sun Feb 26 14:37:13 2012
79.04% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.05% done, estimate finish Sun Feb 26 14:37:13 2012
79.05% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.06% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.07% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.08% done, estimate finish Sun Feb 26 14:37:12 2012
79.08% done, estimate finish Sun Feb 26 14:37:13 2012
79.09% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.10% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.11% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.12% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.13% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.14% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.15% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.16% done, estimate finish Sun Feb 26 14:37:11 2012
79.16% done, estimate finish Sun Feb 26 14:37:13 2012
79.17% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.18% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.19% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.20% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.21% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.22% done, estimate finish Sun Feb 26 14:37:12 2012
79.22% done, estimate finish Sun Feb 26 14:37:13 2012
79.23% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.24% done, estimate finish Sun Feb 26 14:37:13 2012
79.24% done, estimate finish Sun Feb 26 14:37:12 2012
79.25% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.27% done, estimate finish Sun Feb 26 14:37:12 2012
79.27% done, estimate finish Sun Feb 26 14:37:11 2012
79.28% done, estimate finish Sun Feb 26 14:37:11 2012
79.28% done, estimate finish Sun Feb 26 14:37:12 2012
79.29% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.31% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.32% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.33% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.34% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.35% done, estimate finish Sun Feb 26 14:37:12 2012
79.35% done, estimate finish Sun Feb 26 14:37:11 2012
79.36% done, estimate finish Sun Feb 26 14:37:11 2012
79.36% done, estimate finish Sun Feb 26 14:37:12 2012
79.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.38% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.39% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.40% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.41% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.42% done, estimate finish Sun Feb 26 14:37:12 2012
79.42% done, estimate finish Sun Feb 26 14:37:13 2012
79.43% done, estimate finish Sun Feb 26 14:37:13 2012
=== last message repeated 2 times. ===
79.44% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.45% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.46% done, estimate finish Sun Feb 26 14:37:12 2012
79.46% done, estimate finish Sun Feb 26 14:37:11 2012
79.47% done, estimate finish Sun Feb 26 14:37:11 2012
79.47% done, estimate finish Sun Feb 26 14:37:12 2012
79.48% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.50% done, estimate finish Sun Feb 26 14:37:12 2012
79.50% done, estimate finish Sun Feb 26 14:37:13 2012
79.51% done, estimate finish Sun Feb 26 14:37:13 2012
79.51% done, estimate finish Sun Feb 26 14:37:12 2012
79.52% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.53% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.54% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.55% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.56% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.58% done, estimate finish Sun Feb 26 14:37:12 2012
79.58% done, estimate finish Sun Feb 26 14:37:13 2012
79.59% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.60% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.61% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
79.62% done, estimate finish Sun Feb 26 14:37:13 2012
79.62% done, estimate finish Sun Feb 26 14:37:12 2012
79.63% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.64% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.65% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.66% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.67% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.69% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.69% done, estimate finish Sun Feb 26 14:37:11 2012
79.70% done, estimate finish Sun Feb 26 14:37:11 2012
79.70% done, estimate finish Sun Feb 26 14:37:12 2012
79.71% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.72% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.73% done, estimate finish Sun Feb 26 14:37:12 2012
79.73% done, estimate finish Sun Feb 26 14:37:11 2012
79.74% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.75% done, estimate finish Sun Feb 26 14:37:11 2012
79.75% done, estimate finish Sun Feb 26 14:37:12 2012
79.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.77% done, estimate finish Sun Feb 26 14:37:12 2012
79.77% done, estimate finish Sun Feb 26 14:37:11 2012
79.78% done, estimate finish Sun Feb 26 14:37:11 2012
79.78% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.79% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.80% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.81% done, estimate finish Sun Feb 26 14:37:12 2012
79.81% done, estimate finish Sun Feb 26 14:37:11 2012
79.82% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.83% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.85% done, estimate finish Sun Feb 26 14:37:12 2012
79.85% done, estimate finish Sun Feb 26 14:37:11 2012
79.86% done, estimate finish Sun Feb 26 14:37:11 2012
79.86% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.87% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.88% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.89% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.90% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.91% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.92% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.93% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.94% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
79.94% done, estimate finish Sun Feb 26 14:37:12 2012
79.95% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.96% done, estimate finish Sun Feb 26 14:37:12 2012
79.96% done, estimate finish Sun Feb 26 14:37:11 2012
79.97% done, estimate finish Sun Feb 26 14:37:11 2012
79.97% done, estimate finish Sun Feb 26 14:37:12 2012
79.98% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
79.99% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.00% done, estimate finish Sun Feb 26 14:37:12 2012
80.00% done, estimate finish Sun Feb 26 14:37:11 2012
80.01% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.02% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.02% done, estimate finish Sun Feb 26 14:37:12 2012
80.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.04% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.05% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.06% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.07% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.08% done, estimate finish Sun Feb 26 14:37:12 2012
80.08% done, estimate finish Sun Feb 26 14:37:11 2012
80.09% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.10% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
80.11% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.12% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.13% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.14% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.15% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.16% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.17% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.18% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
80.19% done, estimate finish Sun Feb 26 14:37:12 2012
80.19% done, estimate finish Sun Feb 26 14:37:11 2012
80.20% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.21% done, estimate finish Sun Feb 26 14:37:11 2012
80.21% done, estimate finish Sun Feb 26 14:37:12 2012
80.22% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.23% done, estimate finish Sun Feb 26 14:37:12 2012
80.23% done, estimate finish Sun Feb 26 14:37:11 2012
80.24% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.25% done, estimate finish Sun Feb 26 14:37:11 2012
80.25% done, estimate finish Sun Feb 26 14:37:12 2012
80.26% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
80.27% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.28% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.29% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.30% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.31% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.32% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.33% done, estimate finish Sun Feb 26 14:37:11 2012
80.33% done, estimate finish Sun Feb 26 14:37:12 2012
80.34% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 3 times. ===
80.35% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.36% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.37% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.38% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.39% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.40% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.41% done, estimate finish Sun Feb 26 14:37:11 2012
80.41% done, estimate finish Sun Feb 26 14:37:12 2012
80.42% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.42% done, estimate finish Sun Feb 26 14:37:11 2012
80.43% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.44% done, estimate finish Sun Feb 26 14:37:11 2012
80.44% done, estimate finish Sun Feb 26 14:37:12 2012
80.45% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.46% done, estimate finish Sun Feb 26 14:37:12 2012
80.46% done, estimate finish Sun Feb 26 14:37:11 2012
80.47% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.48% done, estimate finish Sun Feb 26 14:37:11 2012
80.48% done, estimate finish Sun Feb 26 14:37:12 2012
80.49% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.50% done, estimate finish Sun Feb 26 14:37:12 2012
80.50% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.51% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.52% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.53% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.54% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.55% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.56% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.57% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.58% done, estimate finish Sun Feb 26 14:37:12 2012
80.58% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.59% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.60% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.61% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.62% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.63% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.64% done, estimate finish Sun Feb 26 14:37:11 2012
80.64% done, estimate finish Sun Feb 26 14:37:12 2012
80.65% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.66% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 3 times. ===
80.67% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.68% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.69% done, estimate finish Sun Feb 26 14:37:12 2012
80.69% done, estimate finish Sun Feb 26 14:37:11 2012
80.70% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.71% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.72% done, estimate finish Sun Feb 26 14:37:11 2012
80.72% done, estimate finish Sun Feb 26 14:37:12 2012
80.73% done, estimate finish Sun Feb 26 14:37:12 2012
80.73% done, estimate finish Sun Feb 26 14:37:11 2012
80.74% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.75% done, estimate finish Sun Feb 26 14:37:11 2012
80.75% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.76% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.77% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.78% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.79% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.80% done, estimate finish Sun Feb 26 14:37:11 2012
80.80% done, estimate finish Sun Feb 26 14:37:10 2012
80.81% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.82% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.83% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.83% done, estimate finish Sun Feb 26 14:37:12 2012
80.84% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
80.85% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.86% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.87% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.88% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
80.89% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.90% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.91% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.91% done, estimate finish Sun Feb 26 14:37:12 2012
80.92% done, estimate finish Sun Feb 26 14:37:12 2012
80.92% done, estimate finish Sun Feb 26 14:37:11 2012
80.93% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.94% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.95% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.96% done, estimate finish Sun Feb 26 14:37:10 2012
80.96% done, estimate finish Sun Feb 26 14:37:11 2012
80.97% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.98% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.99% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
80.99% done, estimate finish Sun Feb 26 14:37:10 2012
81.00% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.01% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.02% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.03% done, estimate finish Sun Feb 26 14:37:12 2012
=== last message repeated 2 times. ===
81.04% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.05% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.06% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.07% done, estimate finish Sun Feb 26 14:37:11 2012
81.07% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.08% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.09% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.10% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.11% done, estimate finish Sun Feb 26 14:37:10 2012
81.11% done, estimate finish Sun Feb 26 14:37:12 2012
81.12% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.13% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.14% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.15% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.15% done, estimate finish Sun Feb 26 14:37:11 2012
81.16% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.17% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.18% done, estimate finish Sun Feb 26 14:37:11 2012
81.18% done, estimate finish Sun Feb 26 14:37:10 2012
81.19% done, estimate finish Sun Feb 26 14:37:10 2012
81.19% done, estimate finish Sun Feb 26 14:37:11 2012
81.20% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.21% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.22% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.23% done, estimate finish Sun Feb 26 14:37:12 2012
81.23% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.24% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.25% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.26% done, estimate finish Sun Feb 26 14:37:11 2012
81.26% done, estimate finish Sun Feb 26 14:37:10 2012
81.27% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.28% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.29% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.30% done, estimate finish Sun Feb 26 14:37:11 2012
81.30% done, estimate finish Sun Feb 26 14:37:12 2012
81.31% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 3 times. ===
81.32% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.33% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.34% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.35% done, estimate finish Sun Feb 26 14:37:10 2012
81.35% done, estimate finish Sun Feb 26 14:37:11 2012
81.36% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.37% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.38% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.39% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 3 times. ===
81.40% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.41% done, estimate finish Sun Feb 26 14:37:11 2012
81.41% done, estimate finish Sun Feb 26 14:37:12 2012
81.42% done, estimate finish Sun Feb 26 14:37:12 2012
81.42% done, estimate finish Sun Feb 26 14:37:11 2012
81.43% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.44% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.45% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.46% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.47% done, estimate finish Sun Feb 26 14:37:10 2012
81.47% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.48% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.49% done, estimate finish Sun Feb 26 14:37:11 2012
81.49% done, estimate finish Sun Feb 26 14:37:10 2012
81.50% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.51% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.52% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.53% done, estimate finish Sun Feb 26 14:37:11 2012
81.53% done, estimate finish Sun Feb 26 14:37:10 2012
81.54% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.55% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 3 times. ===
81.56% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.57% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.58% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.59% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.60% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.61% done, estimate finish Sun Feb 26 14:37:10 2012
81.61% done, estimate finish Sun Feb 26 14:37:12 2012
81.62% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.63% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 3 times. ===
81.64% done, estimate finish Sun Feb 26 14:37:11 2012
81.64% done, estimate finish Sun Feb 26 14:37:10 2012
81.65% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.66% done, estimate finish Sun Feb 26 14:37:10 2012
81.66% done, estimate finish Sun Feb 26 14:37:11 2012
81.67% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.68% done, estimate finish Sun Feb 26 14:37:11 2012
81.68% done, estimate finish Sun Feb 26 14:37:10 2012
81.69% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.70% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.71% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.72% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.72% done, estimate finish Sun Feb 26 14:37:10 2012
81.73% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.74% done, estimate finish Sun Feb 26 14:37:10 2012
81.74% done, estimate finish Sun Feb 26 14:37:11 2012
81.75% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.76% done, estimate finish Sun Feb 26 14:37:11 2012
81.76% done, estimate finish Sun Feb 26 14:37:10 2012
81.77% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.78% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.79% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.80% done, estimate finish Sun Feb 26 14:37:11 2012
81.80% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.81% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.82% done, estimate finish Sun Feb 26 14:37:10 2012
81.82% done, estimate finish Sun Feb 26 14:37:11 2012
81.83% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.84% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.85% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.86% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.87% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.88% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.88% done, estimate finish Sun Feb 26 14:37:11 2012
81.89% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.90% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.91% done, estimate finish Sun Feb 26 14:37:11 2012
81.91% done, estimate finish Sun Feb 26 14:37:10 2012
81.92% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.93% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
81.94% done, estimate finish Sun Feb 26 14:37:10 2012
81.94% done, estimate finish Sun Feb 26 14:37:11 2012
81.95% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.96% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
81.97% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.98% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
81.99% done, estimate finish Sun Feb 26 14:37:11 2012
81.99% done, estimate finish Sun Feb 26 14:37:10 2012
82.00% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.01% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.02% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.03% done, estimate finish Sun Feb 26 14:37:11 2012
82.03% done, estimate finish Sun Feb 26 14:37:10 2012
82.04% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
82.05% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.06% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.07% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.08% done, estimate finish Sun Feb 26 14:37:10 2012
82.08% done, estimate finish Sun Feb 26 14:37:11 2012
82.09% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.10% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.11% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.12% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
82.13% done, estimate finish Sun Feb 26 14:37:10 2012
82.13% done, estimate finish Sun Feb 26 14:37:11 2012
82.14% done, estimate finish Sun Feb 26 14:37:11 2012
82.14% done, estimate finish Sun Feb 26 14:37:10 2012
82.15% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.16% done, estimate finish Sun Feb 26 14:37:10 2012
82.16% done, estimate finish Sun Feb 26 14:37:11 2012
82.17% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.18% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.19% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.20% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.20% done, estimate finish Sun Feb 26 14:37:11 2012
82.21% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.22% done, estimate finish Sun Feb 26 14:37:11 2012
82.22% done, estimate finish Sun Feb 26 14:37:10 2012
82.23% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.24% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.25% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.26% done, estimate finish Sun Feb 26 14:37:11 2012
82.26% done, estimate finish Sun Feb 26 14:37:10 2012
82.27% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.28% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.28% done, estimate finish Sun Feb 26 14:37:11 2012
82.29% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.30% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.31% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.32% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.33% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.34% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.35% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.36% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 3 times. ===
82.37% done, estimate finish Sun Feb 26 14:37:11 2012
82.37% done, estimate finish Sun Feb 26 14:37:10 2012
82.38% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.39% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.40% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.41% done, estimate finish Sun Feb 26 14:37:11 2012
82.41% done, estimate finish Sun Feb 26 14:37:10 2012
82.42% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.43% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.44% done, estimate finish Sun Feb 26 14:37:10 2012
82.44% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.45% done, estimate finish Sun Feb 26 14:37:11 2012
82.45% done, estimate finish Sun Feb 26 14:37:10 2012
82.46% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.47% done, estimate finish Sun Feb 26 14:37:10 2012
82.47% done, estimate finish Sun Feb 26 14:37:11 2012
82.48% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.49% done, estimate finish Sun Feb 26 14:37:11 2012
82.49% done, estimate finish Sun Feb 26 14:37:10 2012
82.50% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.51% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.52% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.52% done, estimate finish Sun Feb 26 14:37:11 2012
82.53% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.54% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.55% done, estimate finish Sun Feb 26 14:37:10 2012
82.55% done, estimate finish Sun Feb 26 14:37:11 2012
82.56% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.57% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.58% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.59% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.60% done, estimate finish Sun Feb 26 14:37:10 2012
82.60% done, estimate finish Sun Feb 26 14:37:09 2012
82.60% done, estimate finish Sun Feb 26 14:37:10 2012
82.61% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.62% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.63% done, estimate finish Sun Feb 26 14:37:10 2012
82.63% done, estimate finish Sun Feb 26 14:37:11 2012
82.64% done, estimate finish Sun Feb 26 14:37:11 2012
82.64% done, estimate finish Sun Feb 26 14:37:10 2012
82.65% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.66% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.67% done, estimate finish Sun Feb 26 14:37:10 2012
82.67% done, estimate finish Sun Feb 26 14:37:11 2012
82.68% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.68% done, estimate finish Sun Feb 26 14:37:10 2012
82.69% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.70% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.71% done, estimate finish Sun Feb 26 14:37:10 2012
82.71% done, estimate finish Sun Feb 26 14:37:09 2012
82.72% done, estimate finish Sun Feb 26 14:37:11 2012
82.72% done, estimate finish Sun Feb 26 14:37:10 2012
82.73% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.74% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.75% done, estimate finish Sun Feb 26 14:37:11 2012
=== last message repeated 2 times. ===
82.76% done, estimate finish Sun Feb 26 14:37:11 2012
82.76% done, estimate finish Sun Feb 26 14:37:10 2012
82.77% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
82.78% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.79% done, estimate finish Sun Feb 26 14:37:10 2012
82.79% done, estimate finish Sun Feb 26 14:37:09 2012
82.80% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.81% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.82% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.83% done, estimate finish Sun Feb 26 14:37:10 2012
82.83% done, estimate finish Sun Feb 26 14:37:11 2012
82.84% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.85% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
82.86% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.87% done, estimate finish Sun Feb 26 14:37:11 2012
82.87% done, estimate finish Sun Feb 26 14:37:10 2012
82.88% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.89% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.90% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.91% done, estimate finish Sun Feb 26 14:37:09 2012
82.91% done, estimate finish Sun Feb 26 14:37:10 2012
82.92% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.93% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
82.94% done, estimate finish Sun Feb 26 14:37:10 2012
82.94% done, estimate finish Sun Feb 26 14:37:11 2012
82.95% done, estimate finish Sun Feb 26 14:37:11 2012
82.95% done, estimate finish Sun Feb 26 14:37:10 2012
82.96% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.97% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
82.98% done, estimate finish Sun Feb 26 14:37:10 2012
82.98% done, estimate finish Sun Feb 26 14:37:09 2012
82.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.00% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.01% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
83.02% done, estimate finish Sun Feb 26 14:37:10 2012
83.02% done, estimate finish Sun Feb 26 14:37:11 2012
83.03% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.04% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.05% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.06% done, estimate finish Sun Feb 26 14:37:10 2012
83.06% done, estimate finish Sun Feb 26 14:37:09 2012
83.07% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.08% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.09% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
83.10% done, estimate finish Sun Feb 26 14:37:09 2012
83.10% done, estimate finish Sun Feb 26 14:37:10 2012
83.11% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.12% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.13% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.14% done, estimate finish Sun Feb 26 14:37:09 2012
83.14% done, estimate finish Sun Feb 26 14:37:10 2012
83.15% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.16% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.17% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.17% done, estimate finish Sun Feb 26 14:37:09 2012
83.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.19% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.20% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.21% done, estimate finish Sun Feb 26 14:37:10 2012
83.21% done, estimate finish Sun Feb 26 14:37:09 2012
83.22% done, estimate finish Sun Feb 26 14:37:11 2012
83.22% done, estimate finish Sun Feb 26 14:37:10 2012
83.23% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.24% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.25% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.25% done, estimate finish Sun Feb 26 14:37:09 2012
83.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.27% done, estimate finish Sun Feb 26 14:37:09 2012
83.27% done, estimate finish Sun Feb 26 14:37:10 2012
83.28% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.29% done, estimate finish Sun Feb 26 14:37:10 2012
83.29% done, estimate finish Sun Feb 26 14:37:09 2012
83.30% done, estimate finish Sun Feb 26 14:37:09 2012
83.30% done, estimate finish Sun Feb 26 14:37:10 2012
83.31% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.32% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.33% done, estimate finish Sun Feb 26 14:37:10 2012
83.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.34% done, estimate finish Sun Feb 26 14:37:09 2012
83.34% done, estimate finish Sun Feb 26 14:37:10 2012
83.35% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.36% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.37% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.38% done, estimate finish Sun Feb 26 14:37:09 2012
83.38% done, estimate finish Sun Feb 26 14:37:10 2012
83.39% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.40% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.41% done, estimate finish Sun Feb 26 14:37:10 2012
83.42% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.43% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.44% done, estimate finish Sun Feb 26 14:37:10 2012
83.44% done, estimate finish Sun Feb 26 14:37:09 2012
83.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.46% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.47% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.48% done, estimate finish Sun Feb 26 14:37:10 2012
83.48% done, estimate finish Sun Feb 26 14:37:09 2012
83.49% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
83.50% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.51% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.52% done, estimate finish Sun Feb 26 14:37:10 2012
83.52% done, estimate finish Sun Feb 26 14:37:09 2012
83.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.54% done, estimate finish Sun Feb 26 14:37:09 2012
83.54% done, estimate finish Sun Feb 26 14:37:10 2012
83.55% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.56% done, estimate finish Sun Feb 26 14:37:10 2012
83.56% done, estimate finish Sun Feb 26 14:37:09 2012
83.57% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.57% done, estimate finish Sun Feb 26 14:37:10 2012
83.58% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.59% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.61% done, estimate finish Sun Feb 26 14:37:09 2012
83.61% done, estimate finish Sun Feb 26 14:37:10 2012
83.62% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.63% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.65% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.66% done, estimate finish Sun Feb 26 14:37:09 2012
83.66% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.67% done, estimate finish Sun Feb 26 14:37:10 2012
83.67% done, estimate finish Sun Feb 26 14:37:09 2012
83.68% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.70% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.71% done, estimate finish Sun Feb 26 14:37:10 2012
83.71% done, estimate finish Sun Feb 26 14:37:09 2012
83.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.74% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
83.75% done, estimate finish Sun Feb 26 14:37:10 2012
83.75% done, estimate finish Sun Feb 26 14:37:09 2012
83.76% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.77% done, estimate finish Sun Feb 26 14:37:09 2012
83.77% done, estimate finish Sun Feb 26 14:37:10 2012
83.78% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.79% done, estimate finish Sun Feb 26 14:37:10 2012
83.79% done, estimate finish Sun Feb 26 14:37:09 2012
83.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.81% done, estimate finish Sun Feb 26 14:37:09 2012
83.81% done, estimate finish Sun Feb 26 14:37:10 2012
83.82% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
83.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.85% done, estimate finish Sun Feb 26 14:37:09 2012
83.85% done, estimate finish Sun Feb 26 14:37:10 2012
83.86% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.88% done, estimate finish Sun Feb 26 14:37:09 2012
83.88% done, estimate finish Sun Feb 26 14:37:10 2012
83.89% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.90% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.90% done, estimate finish Sun Feb 26 14:37:09 2012
83.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.93% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.94% done, estimate finish Sun Feb 26 14:37:10 2012
83.94% done, estimate finish Sun Feb 26 14:37:09 2012
83.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.96% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
83.97% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.98% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
83.98% done, estimate finish Sun Feb 26 14:37:09 2012
83.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.01% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.02% done, estimate finish Sun Feb 26 14:37:10 2012
84.02% done, estimate finish Sun Feb 26 14:37:09 2012
84.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.04% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.05% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.06% done, estimate finish Sun Feb 26 14:37:10 2012
84.06% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.07% done, estimate finish Sun Feb 26 14:37:09 2012
84.07% done, estimate finish Sun Feb 26 14:37:10 2012
84.08% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.09% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.12% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.13% done, estimate finish Sun Feb 26 14:37:09 2012
84.13% done, estimate finish Sun Feb 26 14:37:10 2012
84.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.15% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.16% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.17% done, estimate finish Sun Feb 26 14:37:10 2012
84.17% done, estimate finish Sun Feb 26 14:37:09 2012
84.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.20% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.21% done, estimate finish Sun Feb 26 14:37:08 2012
84.21% done, estimate finish Sun Feb 26 14:37:09 2012
84.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.23% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.24% done, estimate finish Sun Feb 26 14:37:09 2012
84.24% done, estimate finish Sun Feb 26 14:37:10 2012
84.25% done, estimate finish Sun Feb 26 14:37:10 2012
84.25% done, estimate finish Sun Feb 26 14:37:09 2012
84.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.27% done, estimate finish Sun Feb 26 14:37:09 2012
84.27% done, estimate finish Sun Feb 26 14:37:10 2012
84.28% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.29% done, estimate finish Sun Feb 26 14:37:10 2012
84.29% done, estimate finish Sun Feb 26 14:37:09 2012
84.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.31% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.32% done, estimate finish Sun Feb 26 14:37:09 2012
84.32% done, estimate finish Sun Feb 26 14:37:10 2012
84.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.35% done, estimate finish Sun Feb 26 14:37:09 2012
84.35% done, estimate finish Sun Feb 26 14:37:10 2012
84.36% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.37% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.39% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.40% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
84.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.43% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.44% done, estimate finish Sun Feb 26 14:37:10 2012
84.44% done, estimate finish Sun Feb 26 14:37:09 2012
84.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.46% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.47% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.48% done, estimate finish Sun Feb 26 14:37:10 2012
84.48% done, estimate finish Sun Feb 26 14:37:09 2012
84.49% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.50% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.51% done, estimate finish Sun Feb 26 14:37:09 2012
84.51% done, estimate finish Sun Feb 26 14:37:08 2012
84.52% done, estimate finish Sun Feb 26 14:37:08 2012
84.52% done, estimate finish Sun Feb 26 14:37:09 2012
84.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.54% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.54% done, estimate finish Sun Feb 26 14:37:10 2012
84.55% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
84.56% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.57% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.59% done, estimate finish Sun Feb 26 14:37:09 2012
84.59% done, estimate finish Sun Feb 26 14:37:08 2012
84.60% done, estimate finish Sun Feb 26 14:37:08 2012
84.60% done, estimate finish Sun Feb 26 14:37:09 2012
84.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.62% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.63% done, estimate finish Sun Feb 26 14:37:10 2012
84.63% done, estimate finish Sun Feb 26 14:37:09 2012
84.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.65% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.66% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.67% done, estimate finish Sun Feb 26 14:37:10 2012
84.67% done, estimate finish Sun Feb 26 14:37:09 2012
84.68% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.70% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.70% done, estimate finish Sun Feb 26 14:37:08 2012
84.71% done, estimate finish Sun Feb 26 14:37:08 2012
84.71% done, estimate finish Sun Feb 26 14:37:09 2012
84.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.74% done, estimate finish Sun Feb 26 14:37:09 2012
84.74% done, estimate finish Sun Feb 26 14:37:10 2012
84.75% done, estimate finish Sun Feb 26 14:37:10 2012
84.75% done, estimate finish Sun Feb 26 14:37:09 2012
84.76% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.77% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.78% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.79% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
84.79% done, estimate finish Sun Feb 26 14:37:09 2012
84.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.81% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.82% done, estimate finish Sun Feb 26 14:37:09 2012
84.82% done, estimate finish Sun Feb 26 14:37:10 2012
84.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.85% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.86% done, estimate finish Sun Feb 26 14:37:09 2012
84.86% done, estimate finish Sun Feb 26 14:37:08 2012
84.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.89% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.90% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
84.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.93% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.94% done, estimate finish Sun Feb 26 14:37:10 2012
84.94% done, estimate finish Sun Feb 26 14:37:09 2012
84.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
84.96% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
84.97% done, estimate finish Sun Feb 26 14:37:09 2012
84.97% done, estimate finish Sun Feb 26 14:37:08 2012
84.98% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
84.99% done, estimate finish Sun Feb 26 14:37:08 2012
84.99% done, estimate finish Sun Feb 26 14:37:09 2012
85.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.01% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.02% done, estimate finish Sun Feb 26 14:37:10 2012
85.02% done, estimate finish Sun Feb 26 14:37:09 2012
85.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.04% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.05% done, estimate finish Sun Feb 26 14:37:09 2012
85.05% done, estimate finish Sun Feb 26 14:37:08 2012
85.06% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.07% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.08% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.09% done, estimate finish Sun Feb 26 14:37:09 2012
85.09% done, estimate finish Sun Feb 26 14:37:08 2012
85.10% done, estimate finish Sun Feb 26 14:37:08 2012
85.10% done, estimate finish Sun Feb 26 14:37:09 2012
85.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.12% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.13% done, estimate finish Sun Feb 26 14:37:10 2012
85.13% done, estimate finish Sun Feb 26 14:37:09 2012
85.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.15% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.16% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.17% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.18% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.20% done, estimate finish Sun Feb 26 14:37:09 2012
85.20% done, estimate finish Sun Feb 26 14:37:08 2012
85.21% done, estimate finish Sun Feb 26 14:37:08 2012
85.21% done, estimate finish Sun Feb 26 14:37:09 2012
85.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.23% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.24% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.25% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.26% done, estimate finish Sun Feb 26 14:37:08 2012
85.26% done, estimate finish Sun Feb 26 14:37:09 2012
85.27% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.28% done, estimate finish Sun Feb 26 14:37:09 2012
85.28% done, estimate finish Sun Feb 26 14:37:08 2012
85.29% done, estimate finish Sun Feb 26 14:37:08 2012
85.29% done, estimate finish Sun Feb 26 14:37:09 2012
85.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.31% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.32% done, estimate finish Sun Feb 26 14:37:09 2012
85.32% done, estimate finish Sun Feb 26 14:37:08 2012
85.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.35% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.36% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.37% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.39% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.40% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.43% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.43% done, estimate finish Sun Feb 26 14:37:08 2012
85.44% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.45% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.46% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.47% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.48% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.49% done, estimate finish Sun Feb 26 14:37:08 2012
85.49% done, estimate finish Sun Feb 26 14:37:09 2012
85.50% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.51% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.51% done, estimate finish Sun Feb 26 14:37:10 2012
85.52% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.54% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.55% done, estimate finish Sun Feb 26 14:37:09 2012
85.55% done, estimate finish Sun Feb 26 14:37:08 2012
85.56% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.57% done, estimate finish Sun Feb 26 14:37:08 2012
85.57% done, estimate finish Sun Feb 26 14:37:09 2012
85.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.59% done, estimate finish Sun Feb 26 14:37:09 2012
85.59% done, estimate finish Sun Feb 26 14:37:08 2012
85.60% done, estimate finish Sun Feb 26 14:37:08 2012
85.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.62% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.63% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.64% done, estimate finish Sun Feb 26 14:37:08 2012
85.64% done, estimate finish Sun Feb 26 14:37:09 2012
85.65% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.66% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.67% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.68% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.68% done, estimate finish Sun Feb 26 14:37:09 2012
85.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.70% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.71% done, estimate finish Sun Feb 26 14:37:08 2012
85.71% done, estimate finish Sun Feb 26 14:37:09 2012
85.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.74% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.75% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.76% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.76% done, estimate finish Sun Feb 26 14:37:09 2012
85.77% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.78% done, estimate finish Sun Feb 26 14:37:09 2012
85.78% done, estimate finish Sun Feb 26 14:37:08 2012
85.79% done, estimate finish Sun Feb 26 14:37:08 2012
85.79% done, estimate finish Sun Feb 26 14:37:09 2012
85.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.81% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.82% done, estimate finish Sun Feb 26 14:37:09 2012
85.82% done, estimate finish Sun Feb 26 14:37:10 2012
85.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.85% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.86% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.87% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.89% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.90% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
85.93% done, estimate finish Sun Feb 26 14:37:09 2012
85.93% done, estimate finish Sun Feb 26 14:37:08 2012
85.94% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.96% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.97% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
85.98% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
85.99% done, estimate finish Sun Feb 26 14:37:08 2012
85.99% done, estimate finish Sun Feb 26 14:37:09 2012
86.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.01% done, estimate finish Sun Feb 26 14:37:09 2012
86.01% done, estimate finish Sun Feb 26 14:37:10 2012
86.02% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.04% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.05% done, estimate finish Sun Feb 26 14:37:09 2012
86.05% done, estimate finish Sun Feb 26 14:37:08 2012
86.06% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.07% done, estimate finish Sun Feb 26 14:37:08 2012
86.07% done, estimate finish Sun Feb 26 14:37:09 2012
86.08% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.09% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.12% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.13% done, estimate finish Sun Feb 26 14:37:10 2012
86.13% done, estimate finish Sun Feb 26 14:37:09 2012
86.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.15% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.16% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.16% done, estimate finish Sun Feb 26 14:37:08 2012
86.17% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.18% done, estimate finish Sun Feb 26 14:37:08 2012
86.18% done, estimate finish Sun Feb 26 14:37:09 2012
86.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.20% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.21% done, estimate finish Sun Feb 26 14:37:08 2012
86.21% done, estimate finish Sun Feb 26 14:37:09 2012
86.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.23% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.24% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.24% done, estimate finish Sun Feb 26 14:37:08 2012
86.25% done, estimate finish Sun Feb 26 14:37:08 2012
86.25% done, estimate finish Sun Feb 26 14:37:09 2012
86.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.27% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.28% done, estimate finish Sun Feb 26 14:37:09 2012
86.28% done, estimate finish Sun Feb 26 14:37:08 2012
86.29% done, estimate finish Sun Feb 26 14:37:08 2012
86.29% done, estimate finish Sun Feb 26 14:37:09 2012
86.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.31% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.32% done, estimate finish Sun Feb 26 14:37:09 2012
86.32% done, estimate finish Sun Feb 26 14:37:10 2012
86.32% done, estimate finish Sun Feb 26 14:37:09 2012
86.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.35% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.36% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.37% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.39% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.40% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.40% done, estimate finish Sun Feb 26 14:37:09 2012
86.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.43% done, estimate finish Sun Feb 26 14:37:09 2012
86.43% done, estimate finish Sun Feb 26 14:37:10 2012
86.44% done, estimate finish Sun Feb 26 14:37:10 2012
86.44% done, estimate finish Sun Feb 26 14:37:09 2012
86.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.46% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.47% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.48% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.48% done, estimate finish Sun Feb 26 14:37:09 2012
86.49% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.50% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.51% done, estimate finish Sun Feb 26 14:37:09 2012
86.51% done, estimate finish Sun Feb 26 14:37:10 2012
86.52% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.54% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.55% done, estimate finish Sun Feb 26 14:37:09 2012
86.55% done, estimate finish Sun Feb 26 14:37:08 2012
86.56% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.57% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.59% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.62% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.63% done, estimate finish Sun Feb 26 14:37:10 2012
86.63% done, estimate finish Sun Feb 26 14:37:09 2012
86.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.65% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.66% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.67% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
86.68% done, estimate finish Sun Feb 26 14:37:08 2012
86.68% done, estimate finish Sun Feb 26 14:37:09 2012
86.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.70% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.71% done, estimate finish Sun Feb 26 14:37:08 2012
86.71% done, estimate finish Sun Feb 26 14:37:09 2012
86.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.74% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
86.75% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.76% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.77% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.78% done, estimate finish Sun Feb 26 14:37:09 2012
86.78% done, estimate finish Sun Feb 26 14:37:08 2012
86.79% done, estimate finish Sun Feb 26 14:37:08 2012
86.79% done, estimate finish Sun Feb 26 14:37:09 2012
86.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.81% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.82% done, estimate finish Sun Feb 26 14:37:10 2012
86.82% done, estimate finish Sun Feb 26 14:37:09 2012
86.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.85% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.86% done, estimate finish Sun Feb 26 14:37:08 2012
86.86% done, estimate finish Sun Feb 26 14:37:09 2012
86.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.89% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
86.90% done, estimate finish Sun Feb 26 14:37:08 2012
86.90% done, estimate finish Sun Feb 26 14:37:09 2012
86.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.93% done, estimate finish Sun Feb 26 14:37:09 2012
86.93% done, estimate finish Sun Feb 26 14:37:10 2012
86.94% done, estimate finish Sun Feb 26 14:37:10 2012
86.94% done, estimate finish Sun Feb 26 14:37:09 2012
86.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.96% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.97% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
86.97% done, estimate finish Sun Feb 26 14:37:08 2012
86.98% done, estimate finish Sun Feb 26 14:37:08 2012
86.98% done, estimate finish Sun Feb 26 14:37:09 2012
86.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.01% done, estimate finish Sun Feb 26 14:37:09 2012
87.01% done, estimate finish Sun Feb 26 14:37:10 2012
87.02% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.04% done, estimate finish Sun Feb 26 14:37:09 2012
87.04% done, estimate finish Sun Feb 26 14:37:10 2012
87.05% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.05% done, estimate finish Sun Feb 26 14:37:09 2012
87.06% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.07% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.08% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.09% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
87.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.12% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.13% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.13% done, estimate finish Sun Feb 26 14:37:09 2012
87.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.15% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.16% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.17% done, estimate finish Sun Feb 26 14:37:10 2012
87.17% done, estimate finish Sun Feb 26 14:37:09 2012
87.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.20% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.21% done, estimate finish Sun Feb 26 14:37:10 2012
87.21% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.23% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.24% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.25% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.27% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.28% done, estimate finish Sun Feb 26 14:37:09 2012
87.28% done, estimate finish Sun Feb 26 14:37:08 2012
87.29% done, estimate finish Sun Feb 26 14:37:08 2012
87.29% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.31% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.32% done, estimate finish Sun Feb 26 14:37:10 2012
87.32% done, estimate finish Sun Feb 26 14:37:09 2012
87.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.35% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.36% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.37% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
87.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.39% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.40% done, estimate finish Sun Feb 26 14:37:08 2012
87.40% done, estimate finish Sun Feb 26 14:37:09 2012
87.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.43% done, estimate finish Sun Feb 26 14:37:09 2012
87.43% done, estimate finish Sun Feb 26 14:37:10 2012
87.44% done, estimate finish Sun Feb 26 14:37:10 2012
87.44% done, estimate finish Sun Feb 26 14:37:09 2012
87.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
87.46% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.47% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.48% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.49% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.50% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.51% done, estimate finish Sun Feb 26 14:37:09 2012
87.51% done, estimate finish Sun Feb 26 14:37:10 2012
87.52% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.54% done, estimate finish Sun Feb 26 14:37:09 2012
87.54% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.55% done, estimate finish Sun Feb 26 14:37:10 2012
87.55% done, estimate finish Sun Feb 26 14:37:09 2012
87.56% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.57% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.59% done, estimate finish Sun Feb 26 14:37:10 2012
87.59% done, estimate finish Sun Feb 26 14:37:09 2012
87.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.62% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.62% done, estimate finish Sun Feb 26 14:37:10 2012
87.63% done, estimate finish Sun Feb 26 14:37:10 2012
87.63% done, estimate finish Sun Feb 26 14:37:09 2012
87.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.65% done, estimate finish Sun Feb 26 14:37:09 2012
87.65% done, estimate finish Sun Feb 26 14:37:10 2012
87.66% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.67% done, estimate finish Sun Feb 26 14:37:10 2012
87.67% done, estimate finish Sun Feb 26 14:37:09 2012
87.68% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.70% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.70% done, estimate finish Sun Feb 26 14:37:08 2012
87.71% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.74% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.75% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.76% done, estimate finish Sun Feb 26 14:37:09 2012
87.76% done, estimate finish Sun Feb 26 14:37:10 2012
87.77% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.78% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.78% done, estimate finish Sun Feb 26 14:37:09 2012
87.79% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.81% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.82% done, estimate finish Sun Feb 26 14:37:10 2012
87.82% done, estimate finish Sun Feb 26 14:37:09 2012
87.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.85% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.86% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.86% done, estimate finish Sun Feb 26 14:37:09 2012
87.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.89% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.90% done, estimate finish Sun Feb 26 14:37:10 2012
87.90% done, estimate finish Sun Feb 26 14:37:09 2012
87.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.93% done, estimate finish Sun Feb 26 14:37:09 2012
87.93% done, estimate finish Sun Feb 26 14:37:10 2012
87.94% done, estimate finish Sun Feb 26 14:37:10 2012
87.94% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.96% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.97% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
87.98% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
87.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.01% done, estimate finish Sun Feb 26 14:37:09 2012
88.01% done, estimate finish Sun Feb 26 14:37:10 2012
88.02% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.04% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.05% done, estimate finish Sun Feb 26 14:37:10 2012
88.05% done, estimate finish Sun Feb 26 14:37:09 2012
88.06% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.07% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.08% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.09% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.12% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.13% done, estimate finish Sun Feb 26 14:37:10 2012
88.13% done, estimate finish Sun Feb 26 14:37:09 2012
88.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.15% done, estimate finish Sun Feb 26 14:37:09 2012
88.15% done, estimate finish Sun Feb 26 14:37:10 2012
88.16% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.17% done, estimate finish Sun Feb 26 14:37:10 2012
88.17% done, estimate finish Sun Feb 26 14:37:09 2012
88.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.19% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.20% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.21% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.23% done, estimate finish Sun Feb 26 14:37:09 2012
88.23% done, estimate finish Sun Feb 26 14:37:10 2012
88.24% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.25% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.26% done, estimate finish Sun Feb 26 14:37:09 2012
88.26% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.27% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.28% done, estimate finish Sun Feb 26 14:37:10 2012
88.28% done, estimate finish Sun Feb 26 14:37:09 2012
88.29% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.31% done, estimate finish Sun Feb 26 14:37:09 2012
88.31% done, estimate finish Sun Feb 26 14:37:10 2012
88.32% done, estimate finish Sun Feb 26 14:37:10 2012
88.32% done, estimate finish Sun Feb 26 14:37:09 2012
88.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.34% done, estimate finish Sun Feb 26 14:37:10 2012
88.35% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.36% done, estimate finish Sun Feb 26 14:37:10 2012
88.36% done, estimate finish Sun Feb 26 14:37:09 2012
88.37% done, estimate finish Sun Feb 26 14:37:09 2012
88.37% done, estimate finish Sun Feb 26 14:37:10 2012
88.38% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.39% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.40% done, estimate finish Sun Feb 26 14:37:10 2012
88.40% done, estimate finish Sun Feb 26 14:37:09 2012
88.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.43% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.44% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.46% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.47% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.48% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.49% done, estimate finish Sun Feb 26 14:37:09 2012
88.49% done, estimate finish Sun Feb 26 14:37:10 2012
88.50% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
88.51% done, estimate finish Sun Feb 26 14:37:10 2012
88.51% done, estimate finish Sun Feb 26 14:37:09 2012
88.52% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.54% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.55% done, estimate finish Sun Feb 26 14:37:10 2012
88.55% done, estimate finish Sun Feb 26 14:37:09 2012
88.56% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.57% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.58% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 3 times. ===
88.59% done, estimate finish Sun Feb 26 14:37:10 2012
88.59% done, estimate finish Sun Feb 26 14:37:09 2012
88.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.62% done, estimate finish Sun Feb 26 14:37:09 2012
88.62% done, estimate finish Sun Feb 26 14:37:10 2012
88.63% done, estimate finish Sun Feb 26 14:37:10 2012
88.63% done, estimate finish Sun Feb 26 14:37:09 2012
88.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.65% done, estimate finish Sun Feb 26 14:37:09 2012
88.65% done, estimate finish Sun Feb 26 14:37:10 2012
88.66% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.67% done, estimate finish Sun Feb 26 14:37:10 2012
88.67% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.68% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.69% done, estimate finish Sun Feb 26 14:37:09 2012
88.69% done, estimate finish Sun Feb 26 14:37:10 2012
88.70% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.71% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.73% done, estimate finish Sun Feb 26 14:37:09 2012
88.73% done, estimate finish Sun Feb 26 14:37:10 2012
88.74% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.75% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.76% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.77% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.78% done, estimate finish Sun Feb 26 14:37:10 2012
88.78% done, estimate finish Sun Feb 26 14:37:09 2012
88.79% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.81% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.82% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.84% done, estimate finish Sun Feb 26 14:37:09 2012
88.84% done, estimate finish Sun Feb 26 14:37:10 2012
88.85% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.86% done, estimate finish Sun Feb 26 14:37:10 2012
88.86% done, estimate finish Sun Feb 26 14:37:09 2012
88.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.89% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.90% done, estimate finish Sun Feb 26 14:37:10 2012
88.90% done, estimate finish Sun Feb 26 14:37:09 2012
88.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
88.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.93% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.94% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.96% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.97% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
88.98% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
88.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.01% done, estimate finish Sun Feb 26 14:37:10 2012
89.01% done, estimate finish Sun Feb 26 14:37:09 2012
89.02% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.04% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.05% done, estimate finish Sun Feb 26 14:37:10 2012
89.05% done, estimate finish Sun Feb 26 14:37:09 2012
89.06% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.07% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.07% done, estimate finish Sun Feb 26 14:37:10 2012
89.08% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.09% done, estimate finish Sun Feb 26 14:37:10 2012
89.09% done, estimate finish Sun Feb 26 14:37:09 2012
89.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.12% done, estimate finish Sun Feb 26 14:37:09 2012
89.12% done, estimate finish Sun Feb 26 14:37:10 2012
89.13% done, estimate finish Sun Feb 26 14:37:10 2012
89.13% done, estimate finish Sun Feb 26 14:37:09 2012
89.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.15% done, estimate finish Sun Feb 26 14:37:09 2012
89.15% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.16% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.17% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.20% done, estimate finish Sun Feb 26 14:37:09 2012
89.20% done, estimate finish Sun Feb 26 14:37:08 2012
89.21% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.23% done, estimate finish Sun Feb 26 14:37:09 2012
89.23% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.24% done, estimate finish Sun Feb 26 14:37:10 2012
89.24% done, estimate finish Sun Feb 26 14:37:09 2012
89.25% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.27% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.28% done, estimate finish Sun Feb 26 14:37:10 2012
89.28% done, estimate finish Sun Feb 26 14:37:09 2012
89.29% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.31% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.31% done, estimate finish Sun Feb 26 14:37:10 2012
89.32% done, estimate finish Sun Feb 26 14:37:10 2012
89.32% done, estimate finish Sun Feb 26 14:37:09 2012
89.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.34% done, estimate finish Sun Feb 26 14:37:09 2012
89.34% done, estimate finish Sun Feb 26 14:37:10 2012
89.35% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.36% done, estimate finish Sun Feb 26 14:37:10 2012
89.36% done, estimate finish Sun Feb 26 14:37:09 2012
89.37% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.39% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.39% done, estimate finish Sun Feb 26 14:37:08 2012
89.40% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.43% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.44% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.46% done, estimate finish Sun Feb 26 14:37:09 2012
89.46% done, estimate finish Sun Feb 26 14:37:10 2012
89.47% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.48% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.49% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.50% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.51% done, estimate finish Sun Feb 26 14:37:10 2012
89.51% done, estimate finish Sun Feb 26 14:37:09 2012
89.52% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.54% done, estimate finish Sun Feb 26 14:37:09 2012
89.54% done, estimate finish Sun Feb 26 14:37:10 2012
89.55% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.56% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.57% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.59% done, estimate finish Sun Feb 26 14:37:08 2012
89.59% done, estimate finish Sun Feb 26 14:37:09 2012
89.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.62% done, estimate finish Sun Feb 26 14:37:09 2012
89.62% done, estimate finish Sun Feb 26 14:37:10 2012
89.63% done, estimate finish Sun Feb 26 14:37:10 2012
89.63% done, estimate finish Sun Feb 26 14:37:09 2012
89.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.65% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.66% done, estimate finish Sun Feb 26 14:37:09 2012
89.66% done, estimate finish Sun Feb 26 14:37:10 2012
89.67% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.68% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.70% done, estimate finish Sun Feb 26 14:37:09 2012
89.70% done, estimate finish Sun Feb 26 14:37:08 2012
89.71% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.73% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.74% done, estimate finish Sun Feb 26 14:37:10 2012
89.74% done, estimate finish Sun Feb 26 14:37:09 2012
89.75% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.76% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.77% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.78% done, estimate finish Sun Feb 26 14:37:09 2012
89.78% done, estimate finish Sun Feb 26 14:37:08 2012
89.79% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.81% done, estimate finish Sun Feb 26 14:37:09 2012
89.81% done, estimate finish Sun Feb 26 14:37:10 2012
89.82% done, estimate finish Sun Feb 26 14:37:10 2012
89.82% done, estimate finish Sun Feb 26 14:37:09 2012
89.83% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.85% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.86% done, estimate finish Sun Feb 26 14:37:10 2012
89.86% done, estimate finish Sun Feb 26 14:37:09 2012
89.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.89% done, estimate finish Sun Feb 26 14:37:09 2012
89.89% done, estimate finish Sun Feb 26 14:37:08 2012
89.90% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.93% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
89.94% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.95% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.96% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
89.97% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
89.98% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
89.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.01% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.02% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.03% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.04% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
90.05% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.06% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.07% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.08% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.09% done, estimate finish Sun Feb 26 14:37:08 2012
90.09% done, estimate finish Sun Feb 26 14:37:09 2012
90.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.12% done, estimate finish Sun Feb 26 14:37:09 2012
90.12% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
90.13% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.14% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.15% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.16% done, estimate finish Sun Feb 26 14:37:09 2012
90.16% done, estimate finish Sun Feb 26 14:37:08 2012
90.17% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.20% done, estimate finish Sun Feb 26 14:37:09 2012
90.20% done, estimate finish Sun Feb 26 14:37:08 2012
90.20% done, estimate finish Sun Feb 26 14:37:09 2012
90.21% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.22% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.23% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.24% done, estimate finish Sun Feb 26 14:37:09 2012
90.24% done, estimate finish Sun Feb 26 14:37:08 2012
90.25% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.27% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.28% done, estimate finish Sun Feb 26 14:37:09 2012
90.28% done, estimate finish Sun Feb 26 14:37:08 2012
90.28% done, estimate finish Sun Feb 26 14:37:09 2012
90.29% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.30% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.31% done, estimate finish Sun Feb 26 14:37:09 2012
90.31% done, estimate finish Sun Feb 26 14:37:10 2012
90.32% done, estimate finish Sun Feb 26 14:37:10 2012
90.32% done, estimate finish Sun Feb 26 14:37:09 2012
90.33% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.35% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.36% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.36% done, estimate finish Sun Feb 26 14:37:09 2012
90.37% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.39% done, estimate finish Sun Feb 26 14:37:09 2012
90.39% done, estimate finish Sun Feb 26 14:37:08 2012
90.40% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.41% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.42% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.43% done, estimate finish Sun Feb 26 14:37:09 2012
90.43% done, estimate finish Sun Feb 26 14:37:08 2012
90.44% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.44% done, estimate finish Sun Feb 26 14:37:09 2012
90.45% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.46% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.47% done, estimate finish Sun Feb 26 14:37:09 2012
90.47% done, estimate finish Sun Feb 26 14:37:08 2012
90.48% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.49% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.50% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.51% done, estimate finish Sun Feb 26 14:37:10 2012
=== last message repeated 2 times. ===
90.52% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
90.53% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.54% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.55% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.56% done, estimate finish Sun Feb 26 14:37:08 2012
90.56% done, estimate finish Sun Feb 26 14:37:09 2012
90.57% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.59% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.60% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.61% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
90.62% done, estimate finish Sun Feb 26 14:37:09 2012
90.62% done, estimate finish Sun Feb 26 14:37:08 2012
90.63% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.64% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.65% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.66% done, estimate finish Sun Feb 26 14:37:09 2012
90.66% done, estimate finish Sun Feb 26 14:37:08 2012
90.67% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.68% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.69% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
90.70% done, estimate finish Sun Feb 26 14:37:09 2012
90.70% done, estimate finish Sun Feb 26 14:37:08 2012
90.71% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.72% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.74% done, estimate finish Sun Feb 26 14:37:09 2012
90.74% done, estimate finish Sun Feb 26 14:37:08 2012
90.75% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.76% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.77% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 3 times. ===
90.78% done, estimate finish Sun Feb 26 14:37:08 2012
90.78% done, estimate finish Sun Feb 26 14:37:09 2012
90.79% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.80% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.81% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.82% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.83% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.84% done, estimate finish Sun Feb 26 14:37:08 2012
90.84% done, estimate finish Sun Feb 26 14:37:09 2012
90.85% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.85% done, estimate finish Sun Feb 26 14:37:08 2012
90.86% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.87% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.88% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.89% done, estimate finish Sun Feb 26 14:37:09 2012
90.89% done, estimate finish Sun Feb 26 14:37:08 2012
90.90% done, estimate finish Sun Feb 26 14:37:08 2012
90.90% done, estimate finish Sun Feb 26 14:37:09 2012
90.91% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.92% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.93% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.93% done, estimate finish Sun Feb 26 14:37:08 2012
90.94% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
90.95% done, estimate finish Sun Feb 26 14:37:08 2012
90.95% done, estimate finish Sun Feb 26 14:37:09 2012
90.96% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
90.97% done, estimate finish Sun Feb 26 14:37:09 2012
90.97% done, estimate finish Sun Feb 26 14:37:08 2012
90.98% done, estimate finish Sun Feb 26 14:37:08 2012
90.98% done, estimate finish Sun Feb 26 14:37:09 2012
90.99% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.00% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.01% done, estimate finish Sun Feb 26 14:37:09 2012
91.01% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.02% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.03% done, estimate finish Sun Feb 26 14:37:08 2012
91.03% done, estimate finish Sun Feb 26 14:37:09 2012
91.04% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.05% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.06% done, estimate finish Sun Feb 26 14:37:08 2012
91.06% done, estimate finish Sun Feb 26 14:37:09 2012
91.07% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.08% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.09% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
91.10% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.11% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.12% done, estimate finish Sun Feb 26 14:37:09 2012
91.12% done, estimate finish Sun Feb 26 14:37:08 2012
91.13% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.14% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.15% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.16% done, estimate finish Sun Feb 26 14:37:09 2012
91.16% done, estimate finish Sun Feb 26 14:37:08 2012
91.17% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.17% done, estimate finish Sun Feb 26 14:37:09 2012
91.18% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.19% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.20% done, estimate finish Sun Feb 26 14:37:09 2012
91.20% done, estimate finish Sun Feb 26 14:37:08 2012
91.21% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.22% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.23% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.24% done, estimate finish Sun Feb 26 14:37:09 2012
91.24% done, estimate finish Sun Feb 26 14:37:08 2012
91.25% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
91.26% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.27% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.28% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.29% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.30% done, estimate finish Sun Feb 26 14:37:08 2012
91.30% done, estimate finish Sun Feb 26 14:37:09 2012
91.31% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.32% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.33% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
91.34% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.35% done, estimate finish Sun Feb 26 14:37:09 2012
91.35% done, estimate finish Sun Feb 26 14:37:08 2012
91.36% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.37% done, estimate finish Sun Feb 26 14:37:08 2012
91.37% done, estimate finish Sun Feb 26 14:37:09 2012
91.38% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.39% done, estimate finish Sun Feb 26 14:37:09 2012
91.39% done, estimate finish Sun Feb 26 14:37:08 2012
91.40% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.41% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.42% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.42% done, estimate finish Sun Feb 26 14:37:09 2012
91.43% done, estimate finish Sun Feb 26 14:37:09 2012
91.43% done, estimate finish Sun Feb 26 14:37:08 2012
91.44% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.45% done, estimate finish Sun Feb 26 14:37:08 2012
91.45% done, estimate finish Sun Feb 26 14:37:09 2012
91.46% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.47% done, estimate finish Sun Feb 26 14:37:09 2012
91.47% done, estimate finish Sun Feb 26 14:37:08 2012
91.48% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.49% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.50% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.50% done, estimate finish Sun Feb 26 14:37:09 2012
91.51% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.52% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.53% done, estimate finish Sun Feb 26 14:37:08 2012
91.53% done, estimate finish Sun Feb 26 14:37:09 2012
91.54% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.55% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.56% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.57% done, estimate finish Sun Feb 26 14:37:08 2012
91.57% done, estimate finish Sun Feb 26 14:37:09 2012
91.58% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.58% done, estimate finish Sun Feb 26 14:37:08 2012
91.59% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.60% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.61% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.62% done, estimate finish Sun Feb 26 14:37:09 2012
91.62% done, estimate finish Sun Feb 26 14:37:08 2012
91.63% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.64% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.65% done, estimate finish Sun Feb 26 14:37:08 2012
91.65% done, estimate finish Sun Feb 26 14:37:09 2012
91.66% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.66% done, estimate finish Sun Feb 26 14:37:08 2012
91.67% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.68% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.69% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.70% done, estimate finish Sun Feb 26 14:37:09 2012
91.70% done, estimate finish Sun Feb 26 14:37:08 2012
91.71% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.72% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.73% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.74% done, estimate finish Sun Feb 26 14:37:09 2012
91.74% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.75% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.76% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.77% done, estimate finish Sun Feb 26 14:37:08 2012
91.77% done, estimate finish Sun Feb 26 14:37:07 2012
91.78% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.79% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.80% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.81% done, estimate finish Sun Feb 26 14:37:08 2012
91.81% done, estimate finish Sun Feb 26 14:37:09 2012
91.82% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
91.83% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.84% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
91.85% done, estimate finish Sun Feb 26 14:37:09 2012
91.85% done, estimate finish Sun Feb 26 14:37:08 2012
91.86% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.87% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.88% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.89% done, estimate finish Sun Feb 26 14:37:08 2012
91.89% done, estimate finish Sun Feb 26 14:37:07 2012
91.90% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
91.91% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.92% done, estimate finish Sun Feb 26 14:37:08 2012
91.92% done, estimate finish Sun Feb 26 14:37:09 2012
91.93% done, estimate finish Sun Feb 26 14:37:09 2012
91.93% done, estimate finish Sun Feb 26 14:37:08 2012
91.94% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.95% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.96% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
91.97% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
91.98% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
91.99% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.00% done, estimate finish Sun Feb 26 14:37:08 2012
92.00% done, estimate finish Sun Feb 26 14:37:09 2012
92.01% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.02% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.03% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.04% done, estimate finish Sun Feb 26 14:37:09 2012
=== last message repeated 2 times. ===
92.05% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.06% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.07% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.08% done, estimate finish Sun Feb 26 14:37:08 2012
92.08% done, estimate finish Sun Feb 26 14:37:07 2012
92.09% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.10% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.11% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.12% done, estimate finish Sun Feb 26 14:37:08 2012
92.12% done, estimate finish Sun Feb 26 14:37:09 2012
92.13% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.14% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.15% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.16% done, estimate finish Sun Feb 26 14:37:07 2012
92.16% done, estimate finish Sun Feb 26 14:37:08 2012
92.17% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.18% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.19% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.20% done, estimate finish Sun Feb 26 14:37:09 2012
92.20% done, estimate finish Sun Feb 26 14:37:08 2012
92.21% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.22% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.23% done, estimate finish Sun Feb 26 14:37:08 2012
92.23% done, estimate finish Sun Feb 26 14:37:07 2012
92.24% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.25% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.26% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.27% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.28% done, estimate finish Sun Feb 26 14:37:07 2012
92.28% done, estimate finish Sun Feb 26 14:37:08 2012
92.29% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.30% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.31% done, estimate finish Sun Feb 26 14:37:09 2012
92.31% done, estimate finish Sun Feb 26 14:37:08 2012
92.32% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.33% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.34% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.35% done, estimate finish Sun Feb 26 14:37:08 2012
92.35% done, estimate finish Sun Feb 26 14:37:07 2012
92.36% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.37% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.38% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.39% done, estimate finish Sun Feb 26 14:37:07 2012
92.39% done, estimate finish Sun Feb 26 14:37:08 2012
92.40% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.41% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.42% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.43% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.44% done, estimate finish Sun Feb 26 14:37:07 2012
92.44% done, estimate finish Sun Feb 26 14:37:08 2012
92.45% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.46% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.46% done, estimate finish Sun Feb 26 14:37:07 2012
92.47% done, estimate finish Sun Feb 26 14:37:07 2012
92.47% done, estimate finish Sun Feb 26 14:37:08 2012
92.48% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.49% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.50% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.51% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.52% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.53% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.54% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.55% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
92.56% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.57% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.58% done, estimate finish Sun Feb 26 14:37:08 2012
92.58% done, estimate finish Sun Feb 26 14:37:07 2012
92.59% done, estimate finish Sun Feb 26 14:37:07 2012
92.59% done, estimate finish Sun Feb 26 14:37:08 2012
92.60% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.61% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.62% done, estimate finish Sun Feb 26 14:37:08 2012
92.62% done, estimate finish Sun Feb 26 14:37:07 2012
92.63% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
92.64% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.65% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.66% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.67% done, estimate finish Sun Feb 26 14:37:07 2012
92.67% done, estimate finish Sun Feb 26 14:37:08 2012
92.68% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.69% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.70% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.71% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.71% done, estimate finish Sun Feb 26 14:37:08 2012
92.72% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.73% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.74% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.75% done, estimate finish Sun Feb 26 14:37:07 2012
92.75% done, estimate finish Sun Feb 26 14:37:08 2012
92.76% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.77% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.78% done, estimate finish Sun Feb 26 14:37:07 2012
92.78% done, estimate finish Sun Feb 26 14:37:08 2012
92.79% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.80% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.81% done, estimate finish Sun Feb 26 14:37:08 2012
92.81% done, estimate finish Sun Feb 26 14:37:07 2012
92.82% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.83% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.84% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.85% done, estimate finish Sun Feb 26 14:37:08 2012
92.85% done, estimate finish Sun Feb 26 14:37:07 2012
92.86% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.87% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.88% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.89% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.90% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.91% done, estimate finish Sun Feb 26 14:37:07 2012
92.91% done, estimate finish Sun Feb 26 14:37:08 2012
92.92% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.93% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.94% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
92.95% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
92.96% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.97% done, estimate finish Sun Feb 26 14:37:07 2012
92.97% done, estimate finish Sun Feb 26 14:37:08 2012
92.98% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
92.99% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.00% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.01% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.02% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.03% done, estimate finish Sun Feb 26 14:37:07 2012
93.03% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.04% done, estimate finish Sun Feb 26 14:37:08 2012
93.04% done, estimate finish Sun Feb 26 14:37:07 2012
93.05% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.06% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.07% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.08% done, estimate finish Sun Feb 26 14:37:08 2012
93.08% done, estimate finish Sun Feb 26 14:37:07 2012
93.09% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.10% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.11% done, estimate finish Sun Feb 26 14:37:08 2012
93.12% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.13% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.14% done, estimate finish Sun Feb 26 14:37:07 2012
93.14% done, estimate finish Sun Feb 26 14:37:08 2012
93.15% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.16% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.17% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.18% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.19% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 3 times. ===
93.20% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.21% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.22% done, estimate finish Sun Feb 26 14:37:07 2012
93.22% done, estimate finish Sun Feb 26 14:37:08 2012
93.23% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.24% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.25% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.26% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.27% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.27% done, estimate finish Sun Feb 26 14:37:07 2012
93.28% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.29% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.30% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.31% done, estimate finish Sun Feb 26 14:37:08 2012
93.31% done, estimate finish Sun Feb 26 14:37:07 2012
93.32% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.33% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.34% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.35% done, estimate finish Sun Feb 26 14:37:08 2012
93.35% done, estimate finish Sun Feb 26 14:37:07 2012
93.36% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
93.37% done, estimate finish Sun Feb 26 14:37:07 2012
93.37% done, estimate finish Sun Feb 26 14:37:08 2012
93.38% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.39% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.40% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.41% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.42% done, estimate finish Sun Feb 26 14:37:07 2012
93.42% done, estimate finish Sun Feb 26 14:37:08 2012
93.43% done, estimate finish Sun Feb 26 14:37:08 2012
93.43% done, estimate finish Sun Feb 26 14:37:07 2012
93.44% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.44% done, estimate finish Sun Feb 26 14:37:08 2012
93.45% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.46% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.47% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.48% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.49% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.50% done, estimate finish Sun Feb 26 14:37:07 2012
93.50% done, estimate finish Sun Feb 26 14:37:08 2012
93.51% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.52% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
93.53% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.54% done, estimate finish Sun Feb 26 14:37:08 2012
93.54% done, estimate finish Sun Feb 26 14:37:07 2012
93.55% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.56% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.57% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.58% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.59% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.60% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
93.61% done, estimate finish Sun Feb 26 14:37:07 2012
93.61% done, estimate finish Sun Feb 26 14:37:08 2012
93.62% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.63% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.64% done, estimate finish Sun Feb 26 14:37:07 2012
93.64% done, estimate finish Sun Feb 26 14:37:08 2012
93.65% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.66% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.67% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.68% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
93.69% done, estimate finish Sun Feb 26 14:37:07 2012
93.69% done, estimate finish Sun Feb 26 14:37:08 2012
93.70% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.71% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.72% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.73% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.74% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.75% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.76% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
93.77% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
93.78% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.79% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.80% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.81% done, estimate finish Sun Feb 26 14:37:08 2012
93.81% done, estimate finish Sun Feb 26 14:37:07 2012
93.82% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.83% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.84% done, estimate finish Sun Feb 26 14:37:07 2012
93.84% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.85% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.86% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.87% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.88% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.89% done, estimate finish Sun Feb 26 14:37:06 2012
93.89% done, estimate finish Sun Feb 26 14:37:07 2012
93.90% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.91% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.92% done, estimate finish Sun Feb 26 14:37:07 2012
93.92% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
93.93% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.94% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.95% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.96% done, estimate finish Sun Feb 26 14:37:07 2012
93.96% done, estimate finish Sun Feb 26 14:37:06 2012
93.97% done, estimate finish Sun Feb 26 14:37:06 2012
93.97% done, estimate finish Sun Feb 26 14:37:07 2012
93.98% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
93.99% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.00% done, estimate finish Sun Feb 26 14:37:07 2012
94.00% done, estimate finish Sun Feb 26 14:37:08 2012
94.00% done, estimate finish Sun Feb 26 14:37:07 2012
94.01% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.02% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.03% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.04% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.05% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.06% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.07% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.08% done, estimate finish Sun Feb 26 14:37:07 2012
94.08% done, estimate finish Sun Feb 26 14:37:06 2012
94.08% done, estimate finish Sun Feb 26 14:37:07 2012
94.09% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.10% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.12% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.13% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.14% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.15% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.16% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
94.17% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.18% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.19% done, estimate finish Sun Feb 26 14:37:07 2012
94.19% done, estimate finish Sun Feb 26 14:37:06 2012
94.20% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.21% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.22% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.23% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.24% done, estimate finish Sun Feb 26 14:37:06 2012
94.24% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.25% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.26% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.27% done, estimate finish Sun Feb 26 14:37:07 2012
94.27% done, estimate finish Sun Feb 26 14:37:06 2012
94.28% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.29% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.30% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.31% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.32% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
94.33% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.34% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.35% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.36% done, estimate finish Sun Feb 26 14:37:06 2012
94.36% done, estimate finish Sun Feb 26 14:37:07 2012
94.37% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.38% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.39% done, estimate finish Sun Feb 26 14:37:06 2012
94.39% done, estimate finish Sun Feb 26 14:37:07 2012
94.40% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
94.41% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.42% done, estimate finish Sun Feb 26 14:37:07 2012
94.42% done, estimate finish Sun Feb 26 14:37:06 2012
94.43% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.44% done, estimate finish Sun Feb 26 14:37:06 2012
94.44% done, estimate finish Sun Feb 26 14:37:07 2012
94.45% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.46% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.47% done, estimate finish Sun Feb 26 14:37:06 2012
94.47% done, estimate finish Sun Feb 26 14:37:07 2012
94.48% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.49% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
94.50% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.51% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.52% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.53% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.54% done, estimate finish Sun Feb 26 14:37:07 2012
94.54% done, estimate finish Sun Feb 26 14:37:06 2012
94.55% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.56% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.57% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
94.58% done, estimate finish Sun Feb 26 14:37:06 2012
94.58% done, estimate finish Sun Feb 26 14:37:07 2012
94.59% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.60% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.61% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.62% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.63% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.64% done, estimate finish Sun Feb 26 14:37:06 2012
94.64% done, estimate finish Sun Feb 26 14:37:07 2012
94.65% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.65% done, estimate finish Sun Feb 26 14:37:06 2012
94.66% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.67% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.68% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.69% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.70% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.71% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.72% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.73% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.73% done, estimate finish Sun Feb 26 14:37:06 2012
94.74% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.75% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.76% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.77% done, estimate finish Sun Feb 26 14:37:07 2012
94.77% done, estimate finish Sun Feb 26 14:37:06 2012
94.78% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.79% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.80% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.81% done, estimate finish Sun Feb 26 14:37:07 2012
94.81% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.82% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.83% done, estimate finish Sun Feb 26 14:37:06 2012
94.83% done, estimate finish Sun Feb 26 14:37:07 2012
94.84% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.85% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.86% done, estimate finish Sun Feb 26 14:37:06 2012
94.86% done, estimate finish Sun Feb 26 14:37:07 2012
94.87% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.88% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.89% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
94.90% done, estimate finish Sun Feb 26 14:37:06 2012
94.90% done, estimate finish Sun Feb 26 14:37:07 2012
94.91% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.92% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.93% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
94.94% done, estimate finish Sun Feb 26 14:37:06 2012
94.94% done, estimate finish Sun Feb 26 14:37:07 2012
94.95% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.96% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.97% done, estimate finish Sun Feb 26 14:37:06 2012
94.97% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.98% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
94.99% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.00% done, estimate finish Sun Feb 26 14:37:07 2012
95.00% done, estimate finish Sun Feb 26 14:37:06 2012
95.01% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.02% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.03% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.04% done, estimate finish Sun Feb 26 14:37:07 2012
95.04% done, estimate finish Sun Feb 26 14:37:06 2012
95.05% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.05% done, estimate finish Sun Feb 26 14:37:07 2012
95.06% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.07% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.08% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.09% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.10% done, estimate finish Sun Feb 26 14:37:06 2012
95.10% done, estimate finish Sun Feb 26 14:37:07 2012
95.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.12% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.13% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.14% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.15% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.16% done, estimate finish Sun Feb 26 14:37:06 2012
95.16% done, estimate finish Sun Feb 26 14:37:07 2012
95.17% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.18% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.19% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.20% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.21% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.22% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.23% done, estimate finish Sun Feb 26 14:37:07 2012
95.23% done, estimate finish Sun Feb 26 14:37:06 2012
95.24% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.25% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.26% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.27% done, estimate finish Sun Feb 26 14:37:07 2012
95.27% done, estimate finish Sun Feb 26 14:37:06 2012
95.28% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.29% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.30% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.31% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.32% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.33% done, estimate finish Sun Feb 26 14:37:06 2012
95.33% done, estimate finish Sun Feb 26 14:37:07 2012
95.34% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.35% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.36% done, estimate finish Sun Feb 26 14:37:06 2012
95.36% done, estimate finish Sun Feb 26 14:37:07 2012
95.37% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.38% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
95.39% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.40% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.41% done, estimate finish Sun Feb 26 14:37:06 2012
95.41% done, estimate finish Sun Feb 26 14:37:07 2012
95.42% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.43% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.44% done, estimate finish Sun Feb 26 14:37:06 2012
95.44% done, estimate finish Sun Feb 26 14:37:07 2012
95.45% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.46% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.46% done, estimate finish Sun Feb 26 14:37:06 2012
95.47% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.48% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.49% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.50% done, estimate finish Sun Feb 26 14:37:07 2012
95.50% done, estimate finish Sun Feb 26 14:37:06 2012
95.51% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.52% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.53% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.54% done, estimate finish Sun Feb 26 14:37:07 2012
95.54% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.55% done, estimate finish Sun Feb 26 14:37:06 2012
95.55% done, estimate finish Sun Feb 26 14:37:07 2012
95.56% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.57% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.58% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.59% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.60% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.61% done, estimate finish Sun Feb 26 14:37:06 2012
95.61% done, estimate finish Sun Feb 26 14:37:07 2012
95.62% done, estimate finish Sun Feb 26 14:37:07 2012
95.62% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.63% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.64% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.65% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.66% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.67% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.68% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.69% done, estimate finish Sun Feb 26 14:37:06 2012
95.69% done, estimate finish Sun Feb 26 14:37:07 2012
95.70% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.71% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.72% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.73% done, estimate finish Sun Feb 26 14:37:07 2012
95.73% done, estimate finish Sun Feb 26 14:37:06 2012
95.74% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.75% done, estimate finish Sun Feb 26 14:37:06 2012
95.75% done, estimate finish Sun Feb 26 14:37:07 2012
95.76% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.77% done, estimate finish Sun Feb 26 14:37:07 2012
95.77% done, estimate finish Sun Feb 26 14:37:06 2012
95.78% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.79% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.80% done, estimate finish Sun Feb 26 14:37:06 2012
95.80% done, estimate finish Sun Feb 26 14:37:07 2012
95.81% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.82% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.83% done, estimate finish Sun Feb 26 14:37:06 2012
95.83% done, estimate finish Sun Feb 26 14:37:07 2012
95.84% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.85% done, estimate finish Sun Feb 26 14:37:07 2012
95.85% done, estimate finish Sun Feb 26 14:37:06 2012
95.86% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.87% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.88% done, estimate finish Sun Feb 26 14:37:06 2012
95.88% done, estimate finish Sun Feb 26 14:37:05 2012
95.89% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.90% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.91% done, estimate finish Sun Feb 26 14:37:06 2012
95.91% done, estimate finish Sun Feb 26 14:37:07 2012
95.92% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
95.93% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.94% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
95.95% done, estimate finish Sun Feb 26 14:37:06 2012
95.95% done, estimate finish Sun Feb 26 14:37:07 2012
95.96% done, estimate finish Sun Feb 26 14:37:07 2012
95.96% done, estimate finish Sun Feb 26 14:37:06 2012
95.97% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.98% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
95.99% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.00% done, estimate finish Sun Feb 26 14:37:07 2012
96.00% done, estimate finish Sun Feb 26 14:37:06 2012
96.01% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.02% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.02% done, estimate finish Sun Feb 26 14:37:07 2012
96.03% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.04% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.05% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.06% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.07% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.08% done, estimate finish Sun Feb 26 14:37:05 2012
96.08% done, estimate finish Sun Feb 26 14:37:06 2012
96.09% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.10% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.12% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.13% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.14% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.15% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.16% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.17% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.18% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.19% done, estimate finish Sun Feb 26 14:37:07 2012
96.19% done, estimate finish Sun Feb 26 14:37:06 2012
96.20% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.21% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.22% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.23% done, estimate finish Sun Feb 26 14:37:07 2012
96.23% done, estimate finish Sun Feb 26 14:37:06 2012
96.24% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.25% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.26% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.27% done, estimate finish Sun Feb 26 14:37:05 2012
96.27% done, estimate finish Sun Feb 26 14:37:06 2012
96.28% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.29% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.30% done, estimate finish Sun Feb 26 14:37:06 2012
96.30% done, estimate finish Sun Feb 26 14:37:07 2012
96.31% done, estimate finish Sun Feb 26 14:37:07 2012
96.31% done, estimate finish Sun Feb 26 14:37:06 2012
96.32% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.33% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.34% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.34% done, estimate finish Sun Feb 26 14:37:07 2012
96.35% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.36% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.37% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.38% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.39% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.40% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.41% done, estimate finish Sun Feb 26 14:37:06 2012
96.41% done, estimate finish Sun Feb 26 14:37:07 2012
96.42% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.43% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.44% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.45% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.46% done, estimate finish Sun Feb 26 14:37:06 2012
96.46% done, estimate finish Sun Feb 26 14:37:05 2012
96.47% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.48% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.49% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.50% done, estimate finish Sun Feb 26 14:37:07 2012
96.50% done, estimate finish Sun Feb 26 14:37:06 2012
96.51% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.52% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.53% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.54% done, estimate finish Sun Feb 26 14:37:07 2012
96.54% done, estimate finish Sun Feb 26 14:37:06 2012
96.55% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.56% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.57% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.58% done, estimate finish Sun Feb 26 14:37:05 2012
96.58% done, estimate finish Sun Feb 26 14:37:06 2012
96.59% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.60% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.61% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.62% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.63% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.64% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.65% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.66% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.67% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.68% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.69% done, estimate finish Sun Feb 26 14:37:07 2012
96.69% done, estimate finish Sun Feb 26 14:37:06 2012
96.70% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.71% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.72% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.73% done, estimate finish Sun Feb 26 14:37:07 2012
96.73% done, estimate finish Sun Feb 26 14:37:06 2012
96.74% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.75% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
96.76% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.77% done, estimate finish Sun Feb 26 14:37:05 2012
96.77% done, estimate finish Sun Feb 26 14:37:06 2012
96.78% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.79% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.80% done, estimate finish Sun Feb 26 14:37:06 2012
96.80% done, estimate finish Sun Feb 26 14:37:07 2012
96.81% done, estimate finish Sun Feb 26 14:37:07 2012
96.81% done, estimate finish Sun Feb 26 14:37:06 2012
96.82% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.83% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.83% done, estimate finish Sun Feb 26 14:37:07 2012
96.84% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.85% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.86% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.87% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.88% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.89% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.90% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.91% done, estimate finish Sun Feb 26 14:37:06 2012
96.91% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
96.92% done, estimate finish Sun Feb 26 14:37:07 2012
96.92% done, estimate finish Sun Feb 26 14:37:06 2012
96.93% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.94% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.95% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.96% done, estimate finish Sun Feb 26 14:37:07 2012
96.96% done, estimate finish Sun Feb 26 14:37:06 2012
96.97% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.98% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.99% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
96.99% done, estimate finish Sun Feb 26 14:37:07 2012
97.00% done, estimate finish Sun Feb 26 14:37:07 2012
97.00% done, estimate finish Sun Feb 26 14:37:06 2012
97.01% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.02% done, estimate finish Sun Feb 26 14:37:06 2012
97.02% done, estimate finish Sun Feb 26 14:37:07 2012
97.03% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.04% done, estimate finish Sun Feb 26 14:37:07 2012
97.04% done, estimate finish Sun Feb 26 14:37:06 2012
97.05% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.06% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.07% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
97.08% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.09% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.10% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.12% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.13% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.14% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.15% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.15% done, estimate finish Sun Feb 26 14:37:06 2012
97.16% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.17% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.18% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.19% done, estimate finish Sun Feb 26 14:37:07 2012
97.19% done, estimate finish Sun Feb 26 14:37:06 2012
97.20% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.21% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.22% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.23% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.23% done, estimate finish Sun Feb 26 14:37:06 2012
97.24% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.25% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.26% done, estimate finish Sun Feb 26 14:37:06 2012
97.26% done, estimate finish Sun Feb 26 14:37:07 2012
97.27% done, estimate finish Sun Feb 26 14:37:07 2012
97.27% done, estimate finish Sun Feb 26 14:37:06 2012
97.28% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.29% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.30% done, estimate finish Sun Feb 26 14:37:06 2012
97.30% done, estimate finish Sun Feb 26 14:37:07 2012
97.31% done, estimate finish Sun Feb 26 14:37:07 2012
97.31% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.32% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.33% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.34% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.35% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.36% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.37% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.38% done, estimate finish Sun Feb 26 14:37:06 2012
97.38% done, estimate finish Sun Feb 26 14:37:07 2012
97.39% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.40% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
97.41% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.42% done, estimate finish Sun Feb 26 14:37:07 2012
97.42% done, estimate finish Sun Feb 26 14:37:06 2012
97.43% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.44% done, estimate finish Sun Feb 26 14:37:06 2012
97.44% done, estimate finish Sun Feb 26 14:37:07 2012
97.45% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.46% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.47% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.48% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
97.49% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.50% done, estimate finish Sun Feb 26 14:37:07 2012
97.50% done, estimate finish Sun Feb 26 14:37:06 2012
97.51% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.52% done, estimate finish Sun Feb 26 14:37:06 2012
97.52% done, estimate finish Sun Feb 26 14:37:07 2012
97.53% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.54% done, estimate finish Sun Feb 26 14:37:07 2012
97.54% done, estimate finish Sun Feb 26 14:37:06 2012
97.55% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.56% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.56% done, estimate finish Sun Feb 26 14:37:07 2012
97.57% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.58% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.59% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.60% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.61% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.62% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.63% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.64% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
97.65% done, estimate finish Sun Feb 26 14:37:07 2012
97.65% done, estimate finish Sun Feb 26 14:37:06 2012
97.66% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.67% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.68% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.69% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.70% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.71% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.72% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
97.73% done, estimate finish Sun Feb 26 14:37:07 2012
97.73% done, estimate finish Sun Feb 26 14:37:06 2012
97.74% done, estimate finish Sun Feb 26 14:37:06 2012
97.74% done, estimate finish Sun Feb 26 14:37:07 2012
97.75% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.76% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.77% done, estimate finish Sun Feb 26 14:37:07 2012
97.77% done, estimate finish Sun Feb 26 14:37:06 2012
97.78% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.79% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.80% done, estimate finish Sun Feb 26 14:37:06 2012
97.80% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.81% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.82% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.83% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.84% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.85% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.86% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.87% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.88% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.88% done, estimate finish Sun Feb 26 14:37:06 2012
97.89% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.90% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.91% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.92% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.93% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.94% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.95% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.96% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
97.96% done, estimate finish Sun Feb 26 14:37:06 2012
97.97% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.98% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
97.99% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.00% done, estimate finish Sun Feb 26 14:37:07 2012
98.00% done, estimate finish Sun Feb 26 14:37:06 2012
98.01% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.02% done, estimate finish Sun Feb 26 14:37:06 2012
98.02% done, estimate finish Sun Feb 26 14:37:07 2012
98.03% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.04% done, estimate finish Sun Feb 26 14:37:07 2012
98.04% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.05% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.06% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.07% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.08% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.09% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.10% done, estimate finish Sun Feb 26 14:37:06 2012
98.10% done, estimate finish Sun Feb 26 14:37:07 2012
98.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.12% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
98.13% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.14% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.15% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.16% done, estimate finish Sun Feb 26 14:37:06 2012
98.16% done, estimate finish Sun Feb 26 14:37:07 2012
98.17% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.18% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.19% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.20% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 3 times. ===
98.21% done, estimate finish Sun Feb 26 14:37:06 2012
98.21% done, estimate finish Sun Feb 26 14:37:07 2012
98.22% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.23% done, estimate finish Sun Feb 26 14:37:07 2012
98.23% done, estimate finish Sun Feb 26 14:37:06 2012
98.24% done, estimate finish Sun Feb 26 14:37:06 2012
98.24% done, estimate finish Sun Feb 26 14:37:07 2012
98.25% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.26% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.27% done, estimate finish Sun Feb 26 14:37:07 2012
98.27% done, estimate finish Sun Feb 26 14:37:06 2012
98.28% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.28% done, estimate finish Sun Feb 26 14:37:07 2012
98.29% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.30% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.31% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.32% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.33% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.34% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.35% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.36% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.37% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
98.38% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.39% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.40% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.41% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.42% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.43% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.44% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.45% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
98.46% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.47% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.48% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.49% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.50% done, estimate finish Sun Feb 26 14:37:07 2012
98.50% done, estimate finish Sun Feb 26 14:37:06 2012
98.51% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.52% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.53% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
98.54% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.55% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.56% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.57% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.58% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.59% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.60% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.61% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
98.62% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.63% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.64% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.65% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.66% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.67% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.68% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.69% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.69% done, estimate finish Sun Feb 26 14:37:06 2012
98.70% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.71% done, estimate finish Sun Feb 26 14:37:06 2012
98.71% done, estimate finish Sun Feb 26 14:37:07 2012
98.72% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.73% done, estimate finish Sun Feb 26 14:37:07 2012
98.73% done, estimate finish Sun Feb 26 14:37:06 2012
98.74% done, estimate finish Sun Feb 26 14:37:06 2012
98.74% done, estimate finish Sun Feb 26 14:37:07 2012
98.75% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.76% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.77% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
98.78% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.79% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.80% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.81% done, estimate finish Sun Feb 26 14:37:07 2012
98.81% done, estimate finish Sun Feb 26 14:37:06 2012
98.82% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.83% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.84% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.85% done, estimate finish Sun Feb 26 14:37:07 2012
98.85% done, estimate finish Sun Feb 26 14:37:06 2012
98.85% done, estimate finish Sun Feb 26 14:37:07 2012
98.86% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.87% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.88% done, estimate finish Sun Feb 26 14:37:07 2012
98.88% done, estimate finish Sun Feb 26 14:37:08 2012
98.89% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.90% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.91% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.92% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.93% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
98.93% done, estimate finish Sun Feb 26 14:37:07 2012
98.94% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.95% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.96% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.97% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.98% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
98.99% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.00% done, estimate finish Sun Feb 26 14:37:07 2012
99.00% done, estimate finish Sun Feb 26 14:37:06 2012
99.01% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.02% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.03% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.04% done, estimate finish Sun Feb 26 14:37:07 2012
99.04% done, estimate finish Sun Feb 26 14:37:06 2012
99.05% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.06% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.07% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.08% done, estimate finish Sun Feb 26 14:37:08 2012
99.08% done, estimate finish Sun Feb 26 14:37:07 2012
99.09% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.10% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.11% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.12% done, estimate finish Sun Feb 26 14:37:06 2012
=== last message repeated 2 times. ===
99.13% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.14% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.15% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.16% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.17% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.18% done, estimate finish Sun Feb 26 14:37:07 2012
99.18% done, estimate finish Sun Feb 26 14:37:08 2012
99.19% done, estimate finish Sun Feb 26 14:37:08 2012
99.19% done, estimate finish Sun Feb 26 14:37:07 2012
99.20% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.21% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.22% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.23% done, estimate finish Sun Feb 26 14:37:07 2012
99.23% done, estimate finish Sun Feb 26 14:37:06 2012
99.24% done, estimate finish Sun Feb 26 14:37:06 2012
99.24% done, estimate finish Sun Feb 26 14:37:07 2012
99.25% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.26% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.27% done, estimate finish Sun Feb 26 14:37:08 2012
99.27% done, estimate finish Sun Feb 26 14:37:07 2012
99.28% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.29% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.30% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.31% done, estimate finish Sun Feb 26 14:37:08 2012
99.31% done, estimate finish Sun Feb 26 14:37:07 2012
99.32% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.33% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.34% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.35% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.36% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.37% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.38% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.39% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.40% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.41% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.42% done, estimate finish Sun Feb 26 14:37:08 2012
99.42% done, estimate finish Sun Feb 26 14:37:07 2012
99.43% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.44% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.45% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.46% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.47% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.48% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.49% done, estimate finish Sun Feb 26 14:37:07 2012
99.49% done, estimate finish Sun Feb 26 14:37:08 2012
99.50% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.50% done, estimate finish Sun Feb 26 14:37:07 2012
99.51% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.52% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.53% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.54% done, estimate finish Sun Feb 26 14:37:07 2012
99.54% done, estimate finish Sun Feb 26 14:37:06 2012
99.55% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.56% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.57% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.58% done, estimate finish Sun Feb 26 14:37:08 2012
99.58% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.59% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.60% done, estimate finish Sun Feb 26 14:37:07 2012
99.60% done, estimate finish Sun Feb 26 14:37:08 2012
99.61% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.62% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.63% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.64% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.65% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.66% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.67% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.68% done, estimate finish Sun Feb 26 14:37:07 2012
99.68% done, estimate finish Sun Feb 26 14:37:08 2012
99.69% done, estimate finish Sun Feb 26 14:37:08 2012
99.69% done, estimate finish Sun Feb 26 14:37:07 2012
99.70% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.71% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.72% done, estimate finish Sun Feb 26 14:37:07 2012
99.72% done, estimate finish Sun Feb 26 14:37:08 2012
99.73% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.74% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.75% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.76% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.77% done, estimate finish Sun Feb 26 14:37:08 2012
99.77% done, estimate finish Sun Feb 26 14:37:07 2012
99.78% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.79% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.80% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.81% done, estimate finish Sun Feb 26 14:37:08 2012
99.81% done, estimate finish Sun Feb 26 14:37:07 2012
99.82% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.83% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.84% done, estimate finish Sun Feb 26 14:37:07 2012
99.84% done, estimate finish Sun Feb 26 14:37:08 2012
99.85% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.86% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.87% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.88% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.89% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.90% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.90% done, estimate finish Sun Feb 26 14:37:08 2012
99.91% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
99.92% done, estimate finish Sun Feb 26 14:37:08 2012
99.92% done, estimate finish Sun Feb 26 14:37:07 2012
99.93% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.94% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.95% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.96% done, estimate finish Sun Feb 26 14:37:07 2012
99.96% done, estimate finish Sun Feb 26 14:37:08 2012
99.97% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 2 times. ===
99.98% done, estimate finish Sun Feb 26 14:37:07 2012
=== last message repeated 3 times. ===
99.99% done, estimate finish Sun Feb 26 14:37:08 2012
=== last message repeated 2 times. ===
Total translation table size: 0
Total rockridge attributes bytes: 2655
Total directory bytes: 4274
Path table size(bytes): 10
Max brk space used 0
10618620 extents written (20739 MB)
mkisofs calculate size command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid K3b data project -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-sergeyk7ctzu/k3bim7688.tmp -rational-rock -hide-list /tmp/kde-sergeyk7ctzu/k3bsH7688.tmp -joliet -joliet-long -hide-joliet-list /tmp/kde-sergeyk7ctzu/k3bAL7688.tmp -no-cache-inodes -allow-limited-size -udf -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-sergeyk7ctzu/k3bbk7688.tmp
mkisofs command:
-----------------------
/usr/bin/genisoimage -gui -graft-points -volid K3b data project -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-sergeyk7ctzu/k3bmR7688.tmp -rational-rock -hide-list /tmp/kde-sergeyk7ctzu/k3bGk7688.tmp -joliet -joliet-long -hide-joliet-list /tmp/kde-sergeyk7ctzu/k3bsC7688.tmp -no-cache-inodes -allow-limited-size -udf -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-sergeyk7ctzu/k3bqN7688.tmp
-------------- next part --------------
$ k3b
k3b(7688)/kdeui (kdelibs): Attempt to use QAction "view_projects" with KXMLGUIFactory!
k3b(7688)/kdeui (kdelibs): Attempt to use QAction "view_dir_tree" with KXMLGUIFactory!
k3b(7688)/kdeui (kdelibs): Attempt to use QAction "view_contents" with KXMLGUIFactory!
k3b(7688)/kdeui (kdelibs): Attempt to use QAction "location_bar" with KXMLGUIFactory!
sergey at fc3:/media/sb2_data/??_??????$ k3b(7688)/kdecore (services) KMimeTypeFactory::parseMagic: Now parsing "/usr/local/share/mime/magic"
k3b(7688)/kdecore (services) KMimeTypeFactory::parseMagic: Now parsing "/usr/share/mime/magic"
k3b(7688)/kdecore (services) KMimeTypeFactory::parseMagic: Now parsing "/home/sergey/.local/share/mime/magic"
QLayout: Attempting to add QLayout "" to QFrame "", which already has a layout
K3bQProcess::QProcess(0xa8a9870)
K3bQProcess::QProcess(0x0)
K3bQProcess::QProcess(0xa8a9870)
More information about the pkg-kde-extras
mailing list