* Is there a way to configure NUT so that it recognizes the huge 
additional battery pack that has been attached to the 2200XL? The 
51minutes runtime is a number consistent with the load we have placed on 
a stock standalone 2200XL.  With the extra large battery pack we've 
added, the runtime should be more than 2.5 hours.


* I see the "Bizzare configuration" graphic on the 
http://www.networkupstools.org/features/ and that sort of describes my 
configuration.   I haven't yet been able to compile a version of NUT on 
an old Slackware 9.0 server so I am hoping to have my master server 
monitor the little APC ups and then take action to shutdown the remote 
server via a script.  On which portions of the documentation do I need 
to focus to accomplish this?